Chris Mihok Director Procurement Yale University Elevating Procurement’s Role at Your Institution.
AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for...
Transcript of AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for...
![Page 1: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/1.jpg)
1
CITY OF PHOENIX REQUEST FOR BIDS
STREET TRANSPORTATION DEPARTMENT
PHOENIX SKY HARBOR INTERNATIONAL AIRPORTTURF REMOVAL AND LANDSCAPE DESIGN PHASE II
DESIGN BID BUILD
PROJECT NO. AV14000026-1
May 22, 2018
Pre-Bid Meeting
![Page 2: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/2.jpg)
2
Mr. Emeka Ekpe, Contracts SpecialistPoint of Contact for Submittals and Bid QuestionsOffice of the City [email protected] (602) 273-3488
John Ojeda, Equal Opportunity Compliance Specialist Point of Contact for SBE QuestionsEqual Opportunity Department [email protected] (602) 262-6690
Sam Hanna, Project ManagerAviation Department Design and Construction Services Division
Welcome and Introductions
![Page 3: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/3.jpg)
3
Sign-in please
Sign-in sheet and PowerPoint will be posted on Procurement’s website:http://phoenix.gov/streets/procurement/current-opportunities
Click on respective project, then click on:■ Planholder List ■ Addendum / Notifications (if applicable)
It is your responsibility as an RFB holder to determine, prior to submittal, if any Addendums have been issued
Please hold questions until Q&A period
This is the ONLY opportunity to discuss this project with City staff
Meeting Overview
![Page 4: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/4.jpg)
All Firms SHOULD Be Registered in the Vendor Management System PRIOR TO SUBMITTING A PROPOSAL
New Firms – After Registering, the City will send an e-mail with a vendor number approx. 2 days
NEW: The VENDOR NUMBER is to be included on the cover of the Statement Of Qualifications OR Proposal package envelope. Information on how to register with the City is available at: https://www.phoenix.gov/finance/vendorsreg
Vendor Registration
![Page 5: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/5.jpg)
5
Project Description and Scope of Work
SBE Program Requirements
Submittal Requirements
Bids Due
Questions?
Agenda
![Page 6: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/6.jpg)
6
Project Description The overall project involves the re-imagining and re-design of
approximately 30 acres of landscape at Phoenix Sky Harbor International Airport.
Previously constructed Phase I involved removing turf grass, grading new land forms and installing gabion basket retaining walls west of Terminal 2.
Phase II will complete the grading and gabion work as well as install new landscape, new decomposed granite and renovate the existing drip irrigation system for the entire 30 acres.
![Page 7: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/7.jpg)
7
Scope of Work Removal of: Turf Grass, Concrete Header, CMU
Walls, Retaining Walls, Trees, Decomposed Granite, Rip-Rap and other removals.
Provide Earthwork Grading, Earthwork Import, Concrete Cut Off Walls, Gabion Basket Retaining Walls, Gabion Basket Accent Walls, Storm Water Pollution and Prevention, Transporting and Planting Salvaged Landscape Materials from an existing on-site salvage nursery.
![Page 8: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/8.jpg)
8
Scope of Work Provide and Plant New Landscaping Materials,
Decomposed Granite Landscape Ground Cover, New Landscape Boulders, New and Renovated Landscape Irrigation Systems, Traffic Control, Concrete Barrier Removal and Replacement, and various Miscellaneous Items of Work as shown on the plans.
Base Bid & Two (2) Bid Alternates
![Page 9: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/9.jpg)
9
Base Bid Turf Grass Removal, Land Form Grading and Gabion
Construction Mostly Completed in Phase I. FAA Slope Only- Remove Turf Grass. FAA Slope & West End of Flood Field- Construct New Land
Form Grading & Gabions. Install New Plants & Irrigation Add New Madison Gold DG over Phase I Areas (1-1/2” Depth)
& Phase II Only Areas (2-1/2” Depth) 24th Street & Buckeye- Renovate all Four Corners with New
Grading, Gabions Walls, Plants, Irrigation & DG.
![Page 10: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/10.jpg)
10
Base Bid (East of T4) Remove and Haul Away Existing ‘Pink’ Decomposed
Granite and Replace with New Madison Gold Granite; 2-1/2” Depth.
Protect in Place Existing Rip-Rap, Land Form Graphics & Landscape.
Add a New Maintenance Access at Coyote Basin. Fix any Erosion Rilling.
![Page 11: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/11.jpg)
11
Alternate 1 (East of T4) Remove and Haul Away Existing ‘Pink’ Decomposed
Granite and Replace with New Madison Gold Granite; 2-1/2” Depth.
Protect in Place Existing Rip-Rap, Land Form Graphics & Landscape.
Fix any Erosion Rilling. ADOT Traffic Control Approval Required.
![Page 12: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/12.jpg)
12
Alternate 2 (24th St) Renovate the Western Corners of 24th
Street & Harrison/ N. Sky Harbor Circle/ S. Sky Harbor Circle with New Land Form Grading, Plants, Irrigation & Madison Gold DG; 2-1/2” Depth.
Protect in Place and Connect to Existing 24th Street Irrigation System.
![Page 13: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/13.jpg)
13
Special Instructions Contractor Responsible for Locating Existing Utilities
and Repairing any Damage in a Prompt Manor. No Planting of Nursery Stock between June 1st &
September 15th. No Bucket Planting will be Allowed and Plants must be
Installed Prior to DG Placement. Saguaros recently Salvaged by Sky Train that are
located in the Flood Field will be Installed by this Project. A Crane Permit from the FAA Prior to Date Palm
Relocation. Contractor to Coordinate with Phoenix Aviation.
![Page 14: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/14.jpg)
14
Special Instructions Purple Pipe is being Installed for Future Identification
Purposes, Purple Valve Boxes will not be Required. Protect in Place any Irrigation Lines that Supply Water
to Existing Plant Material that is To Remain or Outside the Limits of Work.
Traffic Control Plans must be Submitted and Approved by Phoenix Aviation Prior to any Roadway Restrictions being Implemented.
ADOT Approval will be Required for Traffic Control on the Kokopelli Slope (Far East End of Alternative 2).
Night Work is Encouraged for Areas with Difficult Traffic Management Access.
![Page 15: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/15.jpg)
15
Questions
![Page 16: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/16.jpg)
16
The City of Phoenix strives to advance the economic growth of local businesses through its Small Business Enterprise (SBE) Program.
The City requires the participation of SBE firms throughout ALL phases of contracts.
Subject to City of Phoenix Code, Chapter 18, Article Vl, pertaining to the participation of Small Business Enterprise (SBE) firms.
SBE Program
![Page 17: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/17.jpg)
17
The City of Phoenix SBE Goals Committee has established an SBE participation goal of 10% for this contract.
The successful submitter is required to meet or exceed the Required SBE Goal for ALL work performed on the construction contract.
The Prime Contractor is required to demonstrate good faith efforts to utilize certified SBE firms to achieve this goal during the life of this contract.
SBE Program Requirements
![Page 18: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/18.jpg)
MUST PROVIDE AT SUBMITTAL Contractor’s Statement of Proposed SBE Utilization
Letter’s of Intent to Perform as an SBE Subcontractor / Supplier
Failure to submit complete & accurate forms = NON-RESPONSIVE
SBE Bid Submittal Requirements
![Page 19: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/19.jpg)
19
To participate in this opportunity as an SBE, only firms certified by the City of Phoenix in the specified scopes of work shall be considered in calculating SBE participation.
Prime Contractors may NOT self perform work proposed for SBE participation.
Eligible SBEs can be found at:https://phoenix.diversitycompliance.com
Certified SBE Firms
![Page 20: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/20.jpg)
SBE Waiver RequestIf the Bidder is Unable to Meet the Goal
“Good Faith Efforts”
To show proof of having exercised good faith efforts in trying to obtain bids from SBE firms to meet the utilization goals:
Partial Waiver Request Full Waiver Request Supporting Documentation
Details pertaining to the above requirements are listed in the SBE Clause for this contract under the SBE Clause – Section III
![Page 21: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/21.jpg)
21
Equal Opportunity Department
For more information please contact:
John Ojeda, Equal Opportunity Compliance Specialist
Point of Contact for SBE QuestionsEqual Opportunity Department
[email protected] (602) 262-6690
![Page 22: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/22.jpg)
22
EOD Questions
![Page 23: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/23.jpg)
23
Bidders Should Review:
Information for Bidders (IFB) Section:
Bid Submittal ChecklistItems due at time of bid submittal
Post-Bid Submittal ChecklistItems due 3 days after bid opening by 5:00 p.m.
E-mail to: [email protected]
![Page 24: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/24.jpg)
24
Receipt of Bid after the specified cut-off date and time
Deposit of Bid in the wrong location
Violating the “Contact with City Employees” policy
Grounds for Disqualification
![Page 25: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/25.jpg)
25
2:00 P.M. Phoenix time
Tuesday, June 19, 2018
City Hall, 200 W. Washington Street
6th Floor, Submittal Box
Bids Due
![Page 26: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/26.jpg)
26
https://www.phoenix.gov/streets/procurement/current-opportunities
Request for Bids
Plans & Specifications
Pre-Bid Attendance List & Powerpoint Presentation
Addenda (if any)
Plan Holders List
Preliminary & Final Bid Results
Can also sign up for Procurement’s Weekly e-Newsletter
Street Transportation DepartmentProcurement Section WEBPAGE
![Page 27: AV14000026 Pre-Bid Presentation - SH...Preliminary & Final Bid Results Can also sign up for Procurement’s Weekly e-Newsletter Street Transportation Department ... Microsoft PowerPoint](https://reader036.fdocuments.us/reader036/viewer/2022062606/5fe0bf770fd15752b25ba1a6/html5/thumbnails/27.jpg)
27
E-mail your questions to:[email protected]
Mr. Emeka Ekpe- Contracts Specialist(602) 273-3488
PROJECT TITLE:PHOENIX SKY HARBOR INTERNATIONAL AIRPORT
TURF REMOVAL AND LANDSCAPE DESIGN PHASE IIDESIGN-BID-BUILD
PROJECT NO. AV14000026-1
OPEN FOR QUESTIONS&
Thank You for Attending!!!
Questions After Today