    1/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 1 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSLNO

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8.0

    9.0

    LIST OF CONTENTS

    PLANT DETAILS

    OBJECTIVE

    PROPOSAL

    SERVICES REQUIRED

    SAFETY PERECAUTIONS

    EMERGENCY PROCEDURE

    STATE OF THE PLANT

    METHOD

    COMPLETION CRITERIA

  • 7/28/2019 Aux Steam System

    2/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 2 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    1.0

    1.1

    1.2

    1.3

    PLANT DETAILS

    Auxiliary steam system is designed to provide steam for theturbine auxiliaries, boiler auxiliaries and fuel oil heating systemduring start-up, low loads and normal running of units.

    The system comprises of two auxiliary steam pressure reducingand desuperheating stations (PRDS). One High capacity PRDSwith tapping off steam from main steam line to meet auxiliary

    steam requirements during unit start-up, low loads, fuel oil systemand F.O. wagon unloading and the other Low Capacity PRDSwith tapping off steam from CRH line to meet auxiliary steamrequirements during normal running. Spray water required fordesuperheating will be tapped off from boiler feed pumpdischarge.

    These two stations will reduce the pressure and temperature ofthe steam tapped off from CRH line and main steam line to16Kg/ cm2 (abs) & 3200C at the high temperature auxiliary steamheader and subsequently to 16 Kg/ cm2 (abs) & 2100C at the low

    temperature auxiliary steam header through a suitabledesuperheater between the high temperature and lowtemperature auxiliary steam headers.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    3/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 3 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSL.NO

    1.4

    1.5

    The systems which are supplied with Auxiliary Steam from HTUnit auxiliary steam header are

    a) BFP Turbine & Gland Sealing

    b) Seal Steam to main turbine

    c) Mill inerting

    d) AH Soot blowers

    The systems which are supplied with auxiliary steam from LT UnitAuxiliary Steam Header are

    a) SCAPH

    b) F.O Atomisation

    c) Deaerator Pegging

    d) Fuel Oil Pump House

    e) Fuel Oil Storage / Unloading yard.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    4/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 4 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    1.6

    1.7

    2.0

    .

    Auxiliary steam system is normally operating on unit basis,however auxiliary steam system of both the units areinterconnected through HT and LT auxiliary steam headers, sothat unit start-up requirement of one unit can be met from otherunit or vice-versa.

    An auxiliary boiler has been envisaged for initial start-up of theunit and fuel oil heating. For starting the units, boiler has to run on

    light oil and steam thus generated will be used for unit start-up.

    OBJECTIVE

    The objective of this procedure is to commission the AuxiliarySteam system and make it available for Unit operation.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    5/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 5 of 13

    Plant area: BOILERPROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    3.0

    3.1

    3.2

    3.3

    4.0

    4.1

    4.2

    4.3

    4.4

    PROPOSAL

    Auxiliary Steam system will be commissioned through thefollowing proposals.

    Commissioning of L.T. Station and Unit Auxiliary Steam Headerthrough Auxiliary Boiler.

    Commissioning of H.T. Unit and station Auxiliary Steam Headerthrough

    a) High Capacity (HC) Steam line from MS.line

    b) Low Capacity (LC) Steam line from CRH

    Safety valve floating of H.T Auxiliary Steam Header

    ( For Remote / Auto operation of all control System with

    envisaged interlocks , refer to Commissioning Schedule BHELref. No. PS-DC-186-500-0039 )

    SERVICES REQUIRED

    Availability of Auxiliary Boiler for operation.

    Availability of Main Boiler for operation.

    Availability of lighting, Communication at PRDS area.

    Availability of Man Power for conducting the activity.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    6/14

  • 7/28/2019 Aux Steam System

    7/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 7 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSL.NO

    7.0

    7.1

    7.2

    7.3

    7.4

    7.5

    STATE OF THE PLANT

    Installation of H.T and LT Auxiliary Steam Station & Unit headerscompleted in all respect Namely,

    a) Erection of the headers completed.

    b) Hydraulic Test of headers completed

    c) Supports completed

    d) Insulation completed

    Drain lines of the H.T. & L.T. Headers (Station & Unit) are safelyrouted to an outlet, supported and insulated.

    Erection of pipe line to different system (Sec 1.5 & 1.6) completedand their respective isolating valves kept closed.

    Safety valves 3 Nos (As-32, AS-33 and AS-34) are erected andtheir exhaust, drip pan and drain lines are erected andcompleted.

    Suitable exhaust pipe lines are laid for the following Headers /Steam lines for steam blowing.

    a) High Capacity (HC) Steam inlet line from M.S line.

    b) Low Capacity (LC) Steam inlet line from CRH line

    c) H.T Steam headers of both Station and Unit auxiliarysystem.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    8/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 8 of 13

    Plant area: BOILERPROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    7.6

    7.7

    7.8

    8.0

    8.1

    8.1

    8.2

    8.3

    Steam blowing of Steam line from Auxiliary boiler to LT Aux.Steam header completed (Refer to procedure for SB and oilflushing of F.O System)

    All manual valves in the system are erected and their freeoperation ensured.

    Required local/Remote instrumentation inputs are madeavailable. (List to be prepared at site)

    METHOD

    (Refer Drg.No. PE-DG-186-100-0107)

    Commissioning of L.T Auxiliary Steam Header ThroughAuxiliary Boiler

    Prepare and put the auxiliary boiler under Steaming condition at

    around 25% of its MCR rating

    Charge slowly the Steam line from auxiliary boiler up to L.T.auxiliary steam header in main boiler. All the required drains andvents are lined up before charging and all the outgoing valvesfrom the Auxiliary headers are Kept closed.

    (Charging done through AS-56, As-48 and AS-47)

    While charging, increase the fuel loading of the auxiliary boilersufficiently to warm up the line as well as to gradually pressurizethe system.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    9/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 9 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    8.4

    8.5

    8.6

    8.7

    8.8

    8.9

    The L.T. auxiliary header is charged to around 14-16 KSC at 200-2100C.

    After attaining more or less a steady condition, Steam blowing of

    a) Steam line to SCAPH and

    b) Steam line to F.O. Atomisation carried out.

    Suitable steam exhaust provisions are made for the above twocircuits and steam blown for about 10 minutes for two times witha time gap of 15 minutes between the blows.

    Valves AS-45 and the individual system inlet valves are used forthis blowing. After completion of steam blowing of the above twosystem, (Sec.8.5) the steam lines are normalized with thesystem.

    Steam line to Deaerator pegging will be steam blown on similar

    lines as enplaned above. Alternatively, this line can be steamblown by charging L.T. auxiliary steam header through HC/LCsteam lines from M.S line / CRH lines respectively.

    Since AH Soot blowing is required during initial oil firing onwards,AH sootblower steam line connected to H.T. Unit Aux. Steam Hdris steam blown by charging steam from Auxiliary Boiler via H.T.

    Auxiliary Station Header.

    Local / Remote indications are verified for proper display ofparameters.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    10/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 10 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSL.NO

    8.10

    8.11

    8.12

    8.13

    8.14

    Commissioning of H.T. Auxiliary Steam Header through HCSteam line from MSL.

    After ensuring that main boiler is steaming with LDO burners,charge the HC steam line from MSL slowly through valves AS-21& AS-22 and steam blow the line for two times with 10 minutesblwing duration and 15 minutes gap between the blows. (The inletpressure to be around 10 KSC).

    All the required drains and vents are lined up before charging.

    After the H.T. Unit Auxiliary Steam Header is then charged toaround 14-16-KSC at 300-3200C

    The following steam lines are steam blown from H.T Unit Aux.Steam Header

    a) Steam line to Mill inerting

    b) Steam line to AH sootblower (same as 8.9)

    c) Steam line to Main Turbine Gland Seal

    d) Steam line to BFP Turbine & Gland Seal.

    (These are steam blown as per erection readiness)

    Suitable steam exhaust provisions are made for the above andSteam blown for about 10minutes for two times with a time gap of15 minutes between the blows.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    11/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 11 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEM

    SL.NO

    8.16

    8.17

    8.18

    8.19

    8.20

    8.21

    8.22

    8.23

    Valves AS-38, AS-39, AS-40 and AS-41 along with individualsystem inlet valves are used for this blowing. After completion ofsteam blowing, the lines are normalized with individual system.

    Local / Remote indications are verified for proper display ofparameters.

    Commissioning of H.T. Auxiliary Steam Header through LCSteam line from CRH.

    After ensuring that the Unit is put under HP/LP bypass operation,charge the Low Capacity (LC) steam line from CRH slowlythrough valves AS-28 and AS-29 and steam blow the line for twotimes with 10 minutes blowing duration and 15 minutes betweenthe blows.

    The inlet pressure to be around 5 KSC.

    Required drain and vents kept open prior to steam blowing.

    After completion of steam blowing, the LC line normalized withHC line vis--vis H.T Aux Steam Header.

    SAFETY VALVE FLOATING

    Safety valve with higher set pressure will be floated first followedby other two safety valves. Required safety valve gags are putsuitably while carrying out safety valve floating.

    Steam pressure raising and lowering to be done suitably at local.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    12/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 12 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSL.NO

    8.24

    8.25

    Procedure for commissioning of Auxiliary boiler to referred forsafety valve floating and adjustments.

    (BHEL Reg: PS-DC-186-500-0030/NTPC ref. No SIM/1/TS/3/30).

    Remote / Auto operation and Control System Interlocks.

    Refer to commissioning schedule BHEL ref . no.PS-DC-186-500-0039 //// NTPC ref.no. SIM/1/TS/1/39 for the above.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    13/14

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0039 A

    NTPC Ref no SIM/1/TS/1/39 ASheet 13 of 13

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING OF AUXILIARY STEAM SYSTEMSL.NO

    9.0

    9.1

    9.2

    COMPLETION CRITERIA

    Commissioning of Auxiliary Steam system is completed bycarrying out all the proposals given in Section 3.0

    The system released for regular operation.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Aux Steam System

    14/14

    PROCEDURE FOR COMMISSIONING OFAUXILIARY STEAM SYSTEM