Automation Opportunities in
LDAR(and the P&ID Data Conundrum)
![Page 2: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/2.jpg)
2
Presenter
• Shane Kling is CEO and Co-Founder of Environmental intellect (Ei) and has approximately 9 years of LDAR compliance experience. During his career, he has supported more than 100 facilities spanning petroleum refining, chemicals, upstream oil and gas, and other manufacturing industries. He recently transitioned from Sage Environmental Consulting to support Ei’s mission on a full-time basis, which is to improve industry standards by introducing industry best available technology and integrating existing data systems to achieve the highest level of compliance.
![Page 3: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/3.jpg)
3
Audience Poll
What type of phone do you use?
or
![Page 4: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/4.jpg)
Topics to be Covered
– LDAR Compliance Processes and Management Systems
– Description of Various LDAR Compliance Processes
– P&IDs: The Compliance Foundation
– Automating Manual Compliance Processes
– Reducing Costs Associated With Manual Processes
– Question and Answer
4
![Page 5: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/5.jpg)
Topics *Not* Covered
– Automating LDAR Monitoring Data Collection–Bluetooth transmitters in combination with LDAR
databases is already industry best practice
– Automating LDAR Calibration Process–LDAR Tools as already addressed this area with its
Cal3.0™ software and SpanBox3™
– LDAR Monitoring Robots, Puppies or Rainbows
5
![Page 6: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/6.jpg)
LDAR Automation Opportunities
6
![Page 7: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/7.jpg)
Why Automate Manual Processes?
1. Reduce opportunities for error
2. Eliminate inefficiencies and maximize labor force
3. Save costs by automating repetitive processes
4. Improve QA/QC between data systems
5. Create sustainable compliance processes
7
![Page 8: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/8.jpg)
Various LDAR Compliance Processes
8
•LDAR Applicability Determinations: (review and highlighting of P&IDs to indicate LDAR / non-LDAR)
•LDAR Inventory/Retag (transcribing P&IDs markups through flagging, then tagging and documentation)
•Management of Change (managing impacts to LDAR program from engineering changes)
•Fugitive Emissions Estimating (heavy liquid equipment counts)
•LDAR QA/QC (cross-referencing P&IDs vs. LDAR database to verify accuracy)
![Page 9: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/9.jpg)
Common Link Within Compliance Processes
9
•What do all of these things have in common?• LDAR Applicability Determinations • LDAR Inventory/Retag• Management of Change• Fugitive Emissions Estimating• LDAR QA/QC
1.They are all manually-intensive processes2.They all involve Piping and Instrumentation Diagrams (P&IDs)
![Page 10: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/10.jpg)
The Compliance Foundation
What in the world do P&IDs and foundations for houses have in common?
10
![Page 11: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/11.jpg)
Data Within P&IDs
11
•The following data can be present in P&IDs:• Equipment counts/inventory• Equipment types• Stream speciation• Equipment design specifications• Directional flow• From/to information• PI tag references• Line lists, including piping IDs• MOCs, redlines, and revision numbers• Process unit, drawing number, and facility name
![Page 12: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/12.jpg)
Anatomy Of P&ID:Data, Data, Data
12
![Page 13: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/13.jpg)
The P&ID Data Conundrum
13
• Industry standard CAD programs were not designed to meet the needs of compliance programs– Purpose was to provide an "electronic drawing board" to
draftspersons
• In fact, the first commercial version of AutoCAD was released in 1982:– Shortly after the promulgation of NSPS VV (1981) but before
NSPS GGG (1983)– 10 YEARS prior to the promulgation of the Process Safety
Management standards in 1992, which requires P&ID updates every 5 years as part of PHA revalidation
– 32 YEARS prior to promulgation of NSPS GGGa and VVa (2008)
![Page 14: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/14.jpg)
Best Opportunity to Automate?
14
Sure, “automation” sounds like a nice concept,
but…
…how do we justify the costs?
•The answer for most plants: capital projects, turnarounds, or LDAR inventory/retag projects
![Page 15: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/15.jpg)
LDAR Inventory/Retag Projects
15
• Let’s now examine the various steps in a retag project and explore opportunities for automation:– Applicability determinations and P&ID markup– Flagging– Tagging– Documentation
![Page 16: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/16.jpg)
Manual: LDAR Applicability Determinations
16
![Page 17: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/17.jpg)
Automated: LDAR Applicability Determinations
17
• Use “smart” P&IDs to automate process
![Page 18: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/18.jpg)
MANUAL: LDAR FLAGGING
18
![Page 19: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/19.jpg)
AUTOMATED: LDAR FLAGGING
• Engineering data is incorporated into smart P&ID™• Single-click functionality to “push” inventory data into
GuideWare™ (directly) or LeakDAS™ database (indirectly)• Saves on inventory/retag technician labor-hours• More efficient data management/reduces potential for errors
19
![Page 20: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/20.jpg)
MANUAL: LDAR TAGGING
20
![Page 21: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/21.jpg)
(SEMI)AUTOMATED: LDAR TAGGING
• Physical hanging of tags is unchanged; however you can:• Track that all tags hung for valves, pumps, and other tagged
equipment match LDAR applicability in smart P&ID• Audit LDAR database and smart P&ID to identify tagging gaps• Incorporate LDAR tag numbers into P&IDs for future MOC tracking
21
![Page 22: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/22.jpg)
MANUAL: LDAR DOCUMENTATION
22
![Page 23: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/23.jpg)
AUTOMATED: LDAR DOCUMENTATION
• Equipment, Stream, Service, Drawing No. etc. is stored in sP&ID™
• Data is exported from sP&IDs™ into GuideWare™ or LeakDAS™
• Data is pre-populated into handhelds for technicians to field-verify
Increased Efficiency!
23
![Page 24: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/24.jpg)
DocumentationWorkflow
24
![Page 25: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/25.jpg)
Example LDAR MOC Workflow
![Page 26: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/26.jpg)
Automated LDAR MOC Workflow
26
MOC Data Shared Amongst Plant
Disciplines
HA-135Technician with “smart P&ID” loaded on tablet
Smart P&ID indicating MOC changes (pink cloud)
Component identified and updated in tablet
![Page 27: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/27.jpg)
Automated LDAR MOC Tools
27
HA-135
NAPHTHA FEED PUMP 1A4FWA-1A
LUBE OIL PUMP DISCHARGE 269-1
![Page 28: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/28.jpg)
Novel Approach to IdentifyWhen MOCs are Put into Service
28
PI tag near newly-added component may indicate if equipment is in
hydrocarbon service
![Page 29: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/29.jpg)
Manual: Leak Repair Scheduling
• Question: When a leak is identified, how is the repair scheduled, tracked, and ultimately logged into database for compliance records?– Answer: The LDAR Coordinator or Database Admin
generates Leak Repair Work Order, and this is distributed to Maintenance
• Maintenance then logs the repair into its maintenance management system (e.g., SAP)
• Closure of leak relies on a lot of communication, manual processes, and data “silos”
29
![Page 30: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/30.jpg)
Automated: Repair Scheduling and Data Exchange
30 30
Maintenance work orders within smart
P&ID
![Page 31: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/31.jpg)
Automated: Repair Scheduling and Data Exchange (cont.)
31
• Integrating LDAR databases, such as GuideWare™ or LeakDAS™ with SAP or Maximo offers: compliance improvements, reduced labor, and seamless communication
• Some companies have integrated their LDAR database with SAP, but there are others with limited I.T. resources that have this need
![Page 32: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/32.jpg)
Costs Associated with P&IDs
• Many operating facilities spend millions of dollars each year in activities that directly/indirectly involve P&IDs:– Engineering/CAD
– MOC Updates and Redlines, Troubleshooting
– CAD Updates
– Safety– PHA Revalidation– Process Safety Information (PSI) Updates
32
![Page 33: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/33.jpg)
Costs Associated with P&IDs (cont.)
– Operations and Maintenance– Identification of equipment
– Environmental– Applicability determinations
– P&ID-based compliance reviews (e.g., LDAR, BWON, NSPS Ja)
– MOC updates
33
![Page 34: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/34.jpg)
LDAR Compliance Costs
34
•There are several LDAR-related costs that can be reduced with automation, including but not limited to: •LDAR Applicability Determinations•LDAR Inventory/Retag •Management of Change •LDAR QA/QC•Fugitive Emissions Estimating
![Page 35: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/35.jpg)
Return on Investment: LDAR Applicability Determinations / P&ID Markups
35
No. of P&IDs 1000
Frequency Every 5 Years
Labor Category Bill Rate Time w/o (hrs) Cost w/o
Engineer $100/hr 1 $100
- 1 P&ID per hour to markup by Efficiency Gain Time w/ Cost w/
hand, speciate, and scan into PDF 90% 0.1 $10
Net Savings $90
Total Savings $90,000
![Page 36: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/36.jpg)
Return on Investment: LDAR Inventory/Retag
36
Task LDAR Inventory/RetagNo. of P&IDs 1,000
No. of Components 50,000Labor Category Bill Rate Time w/o (hrs) Cost w/o
Flagging Technician $50/hr 2500 $125,000 - Flag 4 P&IDs per Day Efficiency Gain Time w/ Cost w/o
50% 1250 $62,500 Bill Rate Time w/o (hrs) Cost w/o
Tagging Technician $30/hr 2000 $60,000 - Hang 250 Tags per Day Efficiency Gain Time w/ Cost w/
0% 2000 $60,000 Bill Rate Time w/o (hrs) Cost w/o
Documenting Technician $40/hr 2000 $80,000 - Document 250 Comps per Day Efficiency Gain Time w/ Cost w/
50% 1000 $40,000 Total Savings $102,500
![Page 37: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/37.jpg)
Return on Investment: LDAR MOC
37
Task MOC LDAR Updates
No. of MOCs/Year 500
Frequency Daily
Labor Category Bill Rate Time w/o (hrs) Cost w/o
MOC Technician $45/hr 4 $180
- 4 hours per P&ID Efficiency Gain Time w/ Cost w/
to inventory and monitor 33% 3 $135
Net Savings $45
Total Annual Savings $30,000
5-Year Return $150,000
![Page 38: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/38.jpg)
Concluding Thoughts
1. Shift from Analog to Digital: The need exists to begin process of converting your facility P&IDs into "smart P&IDs" that can fulfill the company's needs.
2. Technology Integration Reduces Operational Costs: Automating repetitive processes allows professionals to focus on solving problems computers cannot
3. Management Buy-in: There are several opportunities to gain Management buy-in, such as capital projects, P&ID revalidation, LDAR inventory/retag, etc.
38
![Page 39: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/39.jpg)
Concluding Thoughts (cont.)
4. Leading the Effort: As professionals, your knowledge is more valuable to the company than repetitive job tasks
5. Ask Questions, Learn More: The information presented today should provide a good introductory conversation with CAD, engineering and your Management on opportunities for automation.
39
![Page 40: Automation Opportunities in LDAR](https://reader035.fdocuments.us/reader035/viewer/2022062217/56814cf8550346895dba08f8/html5/thumbnails/40.jpg)
Don’t Let These Compliance Processes Continue to Chase You
40
LDAR Applicability
Management of Change
Fugitive Emissions Estimating
LDAR Inventory/
Retag
LDAR QA/QC
DataCompliance
Questions?