Automatic Vehicle Location (AVL)Mobile Workforce Management (MWM)
![Page 2: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/2.jpg)
AVL/MWM Project History
• IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution Cooperatives– 23 Cooperatives responded
A B C D E Totals
Advanced Metering Infrastructure (AMI) 13 5 2 2 1 23
Geographic Information System (GIS) 10 5 4 1 3 23
Automatic Vehicle Location (AVL) 2 1 13 1 5 22
Mobile Workforce Management/Mobile Data applications 0 3 14 2 3 22
Outage Management Systems (OMS) 10 2 6 2 3 23
Supervisory Control and Data Acquisition (SCADA) 1 4 6 2 9 22
Distribution Automation (beyond the substation) 0 1 8 5 8 22
Conservation Voltage Regulation 0 0 6 3 13 22
Other Smart Grid applications 0 0 8 1 11 20
![Page 3: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/3.jpg)
AVL/MWM Project History (con’t)
• June 17, 2010 PSE presentation of ‘Strategic Plan - Mobile Work Management and Automatic Vehicle Location’Cellular-based AVL/MWM system is a “bridge
technology “• PSE proposal to manage the RFP
procurement project - $17, 500• Standards Committee decision to handle
this project with an AVL/MWM sub-committee
Tim Holtan Riverland OperationsChad Schauf Oakdale ITSteve Stroshane Polk-Burnett EngineeringDave Patterson Peoples IT Jeff Olson Pierce-Pepin IT, E&O, GISEd West Dairyland Information ServicesKen Graves Dairyland Communications
![Page 4: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/4.jpg)
AVL/MWM Project
• AVL/MWM Proposal Review Process
• AVL-MWM Vendor Matrix 76 Services or system features were evaluated Top 10 (as identified by the Standards
Committee): Vendor or self hosted Satellite vs. cellular triangulation GSM/CDMA/Both Proprietary hardware Map Viewing Map Viewer Integration on users maps MultiSpeak compliance OMS Integration Initial costs Annual recurring costs
![Page 5: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/5.jpg)
AVL/MWM Project
• 6 page document titled “Request For Proposal To Provide An AVL Solution”
• 10 vendors received a request on September 13, 2010
Sage-Quest Clevest Teletrac Navtrak GPS Insight Wireless Matrix
No response Xora Trimble Navigation Sprint Nextel GeoNav
![Page 6: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/6.jpg)
AVL/MWM Benefits
Employee SafetyØ Safety timer alerts Ø Safety device monitoring alerts
Better response to R.O.P.E. events Optimize dispatching & shorten outage response time Line inspection records Fuel cost savings:
Ø Reduced mileageØ Idling
Reports/documentation:Ø “Bread Crumb” reportsØ Power Take-Off time is recorded / documentedØ Vehicle miles driven are recorded / documentedØ Accurate documentation for off-road tax reporting
Geo-Fencing
![Page 7: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/7.jpg)
Thoughts
We have been working as a committee on the premise that if we could work together as a large group (DPC and all 25 member cooperatives) we could realize many benefits. Some of these benefits include:
not “recreating the wheel”demonstrating the 6th Cooperative Principle – “cooperation
among cooperatives”assisting Dairyland with technology projects by designing
once for all and not (potentially) 25 different times
Of course, the one big benefit would be the overall cost reduction of a project through a quantity purchase (and in other areas). We have seen this happen in this project.
![Page 8: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/8.jpg)
Potential Savings
For one cooperative to go AVL alone they received a quote for 15 vehicles for the following:
First year costs = $ 70,110.00
Annual recurring = $ 7,300.00
Compared to the proposal just received (adjusted for 15 vehicles):First year costs = $ 33,000.00Annual recurring = $ 4,200.00
First year cost savings = $40,210.00 per Co-op or over $1M combined for all 25 dist. Co-ops
Annual recurring cost savings = $3,100.00 per Co-op
![Page 9: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/9.jpg)
Recommendations
Standards Committee:
AVL/MWM System Standard:
Use a cellular based system as a “bridge technology”
Clevest Solutions Inc. is the “vendor of choice”
Motion approved by PP&SO:
“DMA encourages it’s members to adopt the recommendations of the Standards Committee for AVL technology deployment”
![Page 10: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/10.jpg)
DPC Hosted(preferred method)
Solution Architecture
![Page 11: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/11.jpg)
Communications Network
![Page 12: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/12.jpg)
Daily Operations
![Page 13: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/13.jpg)
R.O.P.E. Operations
![Page 14: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/14.jpg)
Office Application
![Page 15: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/15.jpg)
Geo-Fencing
![Page 16: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/16.jpg)
Breadcrumb Reports
![Page 17: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/17.jpg)
Post-Incident Reports
Vehicle Stop / Start report
Vehicle speeding report
Vehicle excess idling report
Text messaging report
PTO hours report –
indicates the duration of “bucket-up” status on bucket trucks
Ignition on/off Report
After hours usage report –
Indicates vehicle usage outside a predetermine time frame
![Page 18: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/18.jpg)
WebAVLMore info at a glance (icon colors and shapes represent
different vehicle statuses) such as:- Bucket-up - Stopped - Idling - Out of coverage - In coverage and reporting - Moving (and which direction)
Satellite imagery or basic street map viewerSimilar features and functionality of Clevest office application
![Page 19: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/19.jpg)
WebAVL“Hover” over icon for additional info…Ø Vehicle speed
![Page 20: Automatic Vehicle Location (AVL) Mobile Workforce ... SAVL-MWM.pdf · AVL/MWM Project History • IT Standards Committee Survey – Emailed out on August 25, 2009 to all 25 Distribution](https://reader031.fdocuments.us/reader031/viewer/2022030405/5a7abc087f8b9a563b8b8b95/html5/thumbnails/20.jpg)
Thank You