Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods...

18
Auto-Climbing System ACS50 & ACS100 47 The power of the Auto-Climbing System is the hydraulic system which includes the oil cylinder and two commentators. The Commentators can control the climbing of climbing rail and the bracket. Cranes are not needed during the construction. It’s easy to operate highly efficient and safe. Auto-Climbing System is the best choice for the construction of high buildings and bridges. There are mainly two types of standard auto climbing brackets, ACS50 and ACS100. The systems high load capacity means that special requirements such as platform levels, integrating concrete placing booms, or sustaining concrete loads from overhangs can be realized in an economic way. Auto-Climbing System ACS50 & ACS100 Introduction

Transcript of Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods...

Page 1: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

47

The power of the Auto-Climbing System is the hydraulic system which includes the oil cylinder and two commentators.The Commentators can control the climbing of climbing rail and the bracket.Cranes are not needed during the construction. It’s easy to operate highly efficient and safe.Auto-Climbing System is the best choice for the construction of high buildings and bridges.There are mainly two types of standard auto climbing brackets, ACS50 and ACS100. The systems high load capacity means that special requirements such as platform levels, integrating concrete placing booms, or sustaining concrete loads from overhangs can be realized in an economic way.

Auto-Climbing System ACS50 & ACS100Introduction

Page 2: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

48

ACS50 Structure Sketch

Structures

ACS100 Structure Sketch

Page 3: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

49

Accessories

64.63

36.80

274.22

05160100

05160200

05160400

Retrusive Set

Single Retrusive Set

Upright for Climbing Bracket

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

445.69

204.89

05160301

05160302

L=8000

L=6000

Climbing Rail Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 4: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

50

88.40

54.58

116.53

58.04

127.05

05160600

05160700

05160800

05160900

05160500

Pull-push Prop for Vertical Waling

Wall-attached Support

Retrusive Set Assembly

Connecting Rod

Main Beam

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 5: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

51

46.08

37.31

40.44

32.92

05161100

05161200

05161300

05161400

Beam

Connecting Rod No.1

Connecting Rod No.2

Platform Beam

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

29.63 05161000

Upright Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 6: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

52

17.76

127.67

108.16

05161700

05161500

05161600

Beam for Upper Platform

Vertical Waler No.1

Vertical Waler No.2

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

6.16

32.85

05161800

05161900

H=1350

Upright for Platform

Aligning Strut

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 7: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

53

1.22

10.56

05162200

05162300

Safe Pin

Adjusting Seat

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

1.09

0.65

1.05

1.6

05162401

05162402

05162501

05162502

D26.5

D20

M36*90

M42*90

Anchor Plate

Tensile Bolt

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

5.13 05162100

Bearing Pin Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 8: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

54

0.67

0.47

2.55

1.77

1.92

4.49

05162801

05162802

05162901

05162902

05162600

05162700

M42

M36

M42/D26.5

M36/D20

V-climbing cone Tool

V-climbing Cone

Waling-to-bracket Holder

Welded Adjusting Spindle

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

Remarks Weight(Kg) Item No. Spec. & tech. parameter

1.061.94

0216190102161902

D20/L=300Max. load:270kN D26.5/L=350Max. load:400kN

Other length can be supplied as required, the largest length is 12m, galvanized

Tie Rod Remarks Weight(Kg) Item No. Spec. & tech. parameter

Page 9: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

55

1. Assemble climbing bracket, fix upright for main platform.

2. Fix board for main platform.

Assemble Process

Page 10: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

56

3. Lift the brackets, hang them on the anchor shoes and insert the safe pins.

4. Connect vertical waling and pull-push prop with the formwork system, install operating platform.

5. Lift the formwork system and put them on the retrusive set, adjust the formwork.

Page 11: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

57

1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring.2. Remove the formwork after the first concreting and fix anchor shoes on the finished wall, lift the brackets and formwork, then install the middle platform, match the formwork and do the second concreting.3. Lift formwork and brackets to a higher floor; fix climbing rail, hydraulic system and suspended platform.4. Match the formwork to the right position and do the third concreting.5. Remove the formwork and fix anchor shoes on the finished wall, then climbing rails climb up.6. Brackets climb up to the right position.7. Match the formwork, do the concrete pouring, come into the standard climbing state.

Step 1

Standard Climbing Process

Sketches of Climbing Vertically

Step 1

Step 2

Page 12: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

58

Step 3

Step 4

Step 5

Step 6

Step 7

Page 13: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

59

Sketches of Climbing Slantwise

Step 1

Step 2 Step 3

Page 14: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

60

Step 4 Step 5

Step 6 Step 7

Page 15: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

61

Application

Page 16: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

62

Page 17: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

Auto-Climbing System ACS50 & ACS100

63

Page 18: Auto-Climbing System ACS50 & ACS100 · 2017. 3. 8. · 1. Set the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring. 2. Remove

WALL FORMWORK SYSTEM

64