![Page 1: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/1.jpg)
Australian Energy Regulator
Predetermination conference:
AER draft decisions on NSW electricity distribution regulatory
proposals 2015-19
8 December 2014
![Page 2: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/2.jpg)
AER draft decisions on NSW regulatory proposals
Warwick Anderson
2
![Page 3: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/3.jpg)
ContentsHigh level generalised presentationThe businesses The AER and our roleOverview of the proposals and draft decisionsKey driversMain elements
◦RAB◦Capex◦Opex◦Rate of return
Next steps
3
![Page 4: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/4.jpg)
The NSW distribution businesses
4
![Page 5: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/5.jpg)
Ausgrid’s service area
5
![Page 6: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/6.jpg)
Endeavour Energy’s service area
6
![Page 7: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/7.jpg)
Essential Energy’s servicearea
7
![Page 8: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/8.jpg)
Electricity industry structure
8
![Page 9: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/9.jpg)
Contribution to total bill
9
![Page 10: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/10.jpg)
The AER and our role
10
![Page 11: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/11.jpg)
The current processDraft decisions released on 27 Nov 2014 for:
◦4 distribution businesses (1 in ACT, 3 in NSW) ◦3 transmission businesses (2 in NSW, 1 in Tasmania)◦1 gas distribution business (Jemena Gas Networks NSW)
Final decisions due 30 April 2015 (Jemena a bit later)We are also assessing three regulatory proposals for Qld/SA
distribution businessesPreliminary decisions on the Qld/SA proposals are to be
released by 30 Apr 2015 and final decisions by 31 Oct 2015
11
![Page 12: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/12.jpg)
The NEO
Our task – to set a maximum allowance that the networks are permitted to recover from customers consistent with the NEO:
To promote efficient investment in, and efficient operation and use of, electricity services for the long term interests of consumers of electricity with respect to –◦Price, quality, safety, reliability and security of supply of
electricity; and◦The reliability, safety and security of the national
electricity system
12
![Page 13: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/13.jpg)
Better regulationExpenditure forecast assessment guidelineExpenditure incentives guidelineRate of return guidelineConsumer engagement guidelineShared assets guidelineConfidentiality guideline
13
![Page 14: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/14.jpg)
The proposals and AER draft decision
14
![Page 15: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/15.jpg)
AER draft decisionsNot to accept proposalsWe are not satisfied the proposals advance the NEO to the
greatest degreeInstead we have made draft decisions that we are satisfied
reflects the underlying driversWe see the influence of these drivers in the main
components of our draft decision
15
![Page 16: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/16.jpg)
Total revenue
16
![Page 17: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/17.jpg)
Total revenue - Ausgrid
17
![Page 18: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/18.jpg)
Total revenue – Endeavour Energy
18
![Page 19: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/19.jpg)
Total revenue – Essential Energy
19
![Page 20: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/20.jpg)
Key drivers
20
![Page 21: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/21.jpg)
Key drivers
Our draft decisions reflect the key drivers:Opportunities for services to be provided more efficientlyAssessment and management of riskDemandFinancial market conditions
21
![Page 22: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/22.jpg)
Key driver – efficiency
22
![Page 23: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/23.jpg)
Better Regulation benchmarking consultation started in 2012
Produced robust, consistent data setModels prepared by benchmarking consultant – Economic
InsightsOverall benchmarks (MTFP) indicate:
◦Productivity across the sector been in decline ◦VIC / SA DNSPs most productive◦NSW/ACT less productive
Key driver - efficiency
![Page 24: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/24.jpg)
Key driver – efficiency
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2006 2007 2008 2009 2010 2011 2012 2013
SA
VIC
QLD
NSW
ACT
TAS
MTFP Index
![Page 25: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/25.jpg)
Key driver – risk assessment and management
25
![Page 26: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/26.jpg)
Issues in risk assessment and management
Evidence that the businesses have overstated asset riskNSW government has adjusted reliability standardsIn addition, trend improvement in high level indicators of
risk on the networks◦Asset age◦Utilisation◦Service performance
26
![Page 27: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/27.jpg)
Residual asset lives – Ausgrid
27
![Page 28: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/28.jpg)
Network utilisation - Ausgrid
28
![Page 29: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/29.jpg)
Ausgrid SAIFI performance – CBD and urban
29
![Page 30: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/30.jpg)
Key driver - demand
30
![Page 31: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/31.jpg)
Summer peak demand – Ausgrid
31
![Page 32: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/32.jpg)
Key driver – financial market conditions
32
![Page 33: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/33.jpg)
Financial market conditions
33
![Page 34: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/34.jpg)
Main elements of the decision
34
![Page 35: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/35.jpg)
Elements• Regulatory Asset Base (RAB)• Capital expenditure (capex)• Operating expenditure (opex)• Rate of Return (RoR)• Meters• Public lighting
35
![Page 36: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/36.jpg)
Regulatory asset base (RAB)
36
![Page 37: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/37.jpg)
RAB• Our draft decisions provide for increases in the
businesses’ RAB• But at a lower rate than proposed
37
![Page 38: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/38.jpg)
RAB - Ausgrid
38
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
Opening RAB($m, nominal)
Actual (incl. meters) Proposed (excl. meters) Draft Decision (excl. meters)
![Page 39: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/39.jpg)
RAB – Endeavour Energy
39
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Opening RAB($m, nominal)
Actual (incl. meters) Proposed (excl. meters) Draft Decision (excl. meters)
![Page 40: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/40.jpg)
RAB – Essential Energy
40
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
Opening RAB($m, nominal)
Actual (incl. meters) Proposed (excl. meters) Draft Decision (excl. meters)
![Page 41: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/41.jpg)
Capital expenditure (Capex)
41
![Page 42: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/42.jpg)
CapexAugmentation expenditure (augex)
• Key drivers of augmentation expenditure are• maximum demand and • reliability standards
Replacement expenditure (repex)◦Replacing an asset with its modern equivalent where the
asset has reached the end of its economic life.
42
![Page 43: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/43.jpg)
Ausgrid – Augex
43
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
100
200
300
400
500
600
700
Actual Ausgrid's Proposal AER Draft Decision
Capex($m 2013-14)
![Page 44: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/44.jpg)
Endeavour Energy – Augex
44
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
50
100
150
200
250
300
Actual Endeavour Energy's Proposal AER Draft Decision
Capex($m 2013-14)
![Page 45: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/45.jpg)
Essential Energy – Augex
45
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
50
100
150
200
250
300
350
Actual Essential Energy's Proposal AER Draft Decision
Capex($m 2013-14)
![Page 46: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/46.jpg)
Ausgrid – Repex
46
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
100
200
300
400
500
600
700
800
900
1 000
Actual Ausgrid's Proposal AER Draft Decision
Capex($m 2013-14)
![Page 47: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/47.jpg)
Endeavour Energy – Repex
47
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
50
100
150
200
250
Actual Endeavour Energy's Proposal AER Draft Decision
Capex($m 2013-14)
![Page 48: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/48.jpg)
Essential Energy – Repex
48
2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19
20
40
60
80
100
120
140
160
180
200
Actual Essential Energy's Proposal
Capex($m 2013-14)
![Page 49: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/49.jpg)
Operating expenditure (Opex)
49
![Page 50: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/50.jpg)
Opex criteria
50
The opex criteria provide that the total forecast must reasonably reflect: ◦the efficient costs of achieving the operating expenditure
objectives◦the costs that a prudent operator would require to
achieve the operating expenditure objectives◦a realistic expectation of the demand forecast and cost
inputs required to achieve the operating expenditure objectives.
![Page 51: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/51.jpg)
OpexBase-step-trend approach
• Select an efficient base level• Typically the revealed cost in a particular year• In this case we have looked carefully at the efficiency of
the base year• Step changes to take account of external drivers such as
changes to regulatory obligations• Trend underlying costs such as labour cost escalations
51
![Page 52: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/52.jpg)
Base opex
52
In light of previous productivity estimates we have carefully reviewed the efficiency of the base opex of each business
Developed cost modelling and other detailed assessments◦ Accounts for customer density, demand density and underground
assets◦ Also considered voltages, asset age and climate
Peers in other states are able to provide safe reliable services at lower overall levels of opex
![Page 53: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/53.jpg)
Benchmarking
53
![Page 54: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/54.jpg)
Contributing factors
54
Labour and workforce management◦relatively inflexible workforces ◦Labour costs above peer costs◦Management of costs e.g. overtime◦Less outsourcing than more efficient peers
Full benefits of Networks NSW efficiency programs not reflected in base year
![Page 55: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/55.jpg)
Adjustment to base opex
55
The combination of evidence indicated that base opex for the NSW DNSPs could not be used as our starting point
Cost modelling and benchmarking used to determine scope of adjustment
![Page 56: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/56.jpg)
Step changes
56
Significant list of step changes from the 3 businessesLargely not accepted because they are internally generated
rather than external
![Page 57: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/57.jpg)
Rate of return
57
![Page 58: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/58.jpg)
Rate of Return
2009–14Decision
2015–19Ausgrid's proposal
2015–19AER draft decision
Nominal risk free rate (cost of equity)
5.82% 4.78% 3.55%
Nominal post–tax return on equity 11.82% 10.11% 8.1%
Nominal pre–tax return on debt 8.82% 7.98% 6.51%
Nominal vanilla WACC 10.02% 8.83% 7.15%
![Page 59: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/59.jpg)
Return on Equity (RoE)
59
No single objective measure of expected RoEEmploy a 6 step process to make use of all available
information according to its meritsUse Capital Asset Pricing Model (CAPM) as our foundation
modelThen review outcome of foundation model against other
information that can inform our decisionOutcome of foundation model consistent with other
indicators
![Page 60: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/60.jpg)
Return on Equity
60
![Page 61: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/61.jpg)
Return on Debt (RoD)
61
How to estimate RoD?◦RBA series or Bloomberg series
Type of methodology◦On-the-day, trailing average or some combination
Advantages and disadvantages of each approach, but we selected the trailing average approach◦Wide support from customers and networks◦Reduces volatility in prices between regulatory periods◦Reduces interest rate risk for networks
![Page 62: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/62.jpg)
How to commence the trailing average?
62
We applied the approach set out in our RoR guideline◦New debt incorporated as it is progressively refinanced
each year◦Our starting point for existing debt is continuation of on-
the-day approach◦Consistent with the application of the benchmark
efficient approach◦Avoids windfall gains and losses◦Preserves the outcomes and risk profile of the debt
strategies chosen by the businesses under incentive regulation
![Page 63: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/63.jpg)
Gamma
63
No single objective indicatorDraw on a wide range of material to inform our decisionIn guideline we said 0.5After reviewing material and latest estimates we have
updated to 0.4
![Page 64: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/64.jpg)
Metering
64
![Page 65: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/65.jpg)
Metering
65
No exit fees Residual capital costs will be classified as a
standard control service and recovered from the general network customer base
An annual charge for existing customers will recover the costs associated with the existing meter regulatory asset base
![Page 66: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/66.jpg)
Public lighting
66
![Page 67: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/67.jpg)
Public lightingWe amended proposed maintenance costs associated with:bulk light replacementspot replacements per day lamp spot failure labour and overheadsOutcomesEssential Energy’s revenue up 5 per cent from current levels
(proposed 60 per cent increase)Ausgrid and Endeavour’s revenue down 20 per cent from
existing levels
67
![Page 68: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/68.jpg)
Consumer engagement
68
![Page 69: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/69.jpg)
Consumer engagement
69
Seen as increasingly important◦AEMC in its 2012 rule determination require◦ .. the NSP to indicate in its regulatory proposal the extent to which it
has engaged with consumer representatives. The NSP must also include an overview paper in its proposal for consumers…
Still a work in progress from all parties, but we are making advances◦Unprecedented level of consumer engagement in the AER’s
decision making process◦Better regulation process◦Submissions◦Engagement activities of businesses
![Page 70: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/70.jpg)
Consumer Challenge Panel (CCP)
70
On 1 July 2013, the AER established the CCP as part of our Better Regulation program
The CCP assists the AER to make better regulatory determinations by providing input on issues of importance to consumers.
In December 2013 the AER published its consumer engagement guideline
![Page 71: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/71.jpg)
Summary of submissions
71
Around 80 submissionsMost submissions considered regulatory proposals are not in
the long term interests of consumersWe have taken all submissions from stakeholders into account
in reaching our draft decisionBased on the submissions and our consultation with
consumers, we are not satisfied that the proposals adequately reflects the views of consumers
![Page 72: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/72.jpg)
Next steps
72
Task Date
Pre-determination conference/ public forum on AER draft decisions
8 December 2014
Distributors submit revised revenue proposals
20 January 2015
Stakeholder submissions on AER draft decisions and revised revenue proposals close
13 February 2015
AER issues final decision By 30 April 2015
![Page 73: Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals 2015-19 8 December 2014.](https://reader036.fdocuments.us/reader036/viewer/2022062408/56649ec55503460f94bcfba3/html5/thumbnails/73.jpg)