AURORA TOWN SQUARE Square.pdf · TOWN SQUARE Surface Parking Lot Pedestrian Areas Permanent Ice...
Transcript of AURORA TOWN SQUARE Square.pdf · TOWN SQUARE Surface Parking Lot Pedestrian Areas Permanent Ice...
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
AURORA TOWN SQUARE
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
AURORA TOWN SQUARE
CONCEPT: JAN. 30 2018 CONCEPT: JUNE 4 2018CURRENTPREVIOUS
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
CONCEPT 2A LOWERED SQUARE
Lower the square to connect Library and Cultural Centre. Relocate parking to the north.
A
PREVIOUS CONCEPT
B
Accessible Parking Parking
Deliveries
A. Yonge StreetB. 57m drive in from Yonge Street
10 SPACES
71 SPACES
5 SPACES
SURFACE PARKING LOT
YON
GE
STRE
ET
CHURCH STREET
VIC
TORI
A S
TREE
T
TOWN LIBRARY
CULTURAL CENTRE
NEW COMMUNITY FACILITY
VICTORIA HALL
86 TOTAL PARKING SPACES (not including street parking)
MOSLEY STREETPARKING AND LOADING
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
CONCEPT 2A LOWERED SQUARE
Lower the square to connect Library and Cultural Centre. Relocate parking to the north.
A
2 2
1
3
CURRENT CONCEPT
77 SPACESSURFACE PARKING LOT
YON
GE
STRE
ET
CHURCH STREET
VIC
TORI
A S
TREE
T
TOWN LIBRARY
CULTURAL CENTRE
NEW COMMUNITY FACILITY
VICTORIA HALL
MOSLEY STREET
10 SPACES
Accessible Parking Parking
Deliveries
Book drop off
A. 48m from Church Street
89 TOTAL PARKING SPACES (not including street parking or book drop off)
PARKING AND LOADING
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
CONCEPT 2A LOWERED SQUARE
Lower the square to connect Library and Cultural Centre. Relocate parking to the north.
CURRENT CONCEPTMOSLEY STREETCIRCULATION
Exterior Accessible Routes Interior Accessible Routes
Non-accessible routes
Municipal Sidewalks
SURFACE PARKING LOT
YON
GE
STRE
ET
CHURCH STREET
VIC
TORI
A S
TREE
T
TOWN LIBRARY
CULTURAL CENTRE
NEW COMMUNITY FACILITY
VICTORIA HALL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECKChurch Street
CONCERT PERFORMANCE
230 people sitting
Stage
CURRENT CONCEPTSQUARE - PROGRAMMING
Amphitheatre seating
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECKChurch Street
MOVIE NIGHT
550 people seating in the plaza
230 people in the amphitheater seatingScreen
Seating in Plaza
CURRENT CONCEPTSQUARE - PROGRAMMING
Amphitheatre seating
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COMMUNITY FAIR
1100 people standing
Standing Room
CURRENT CONCEPTSQUARE - PROGRAMMING
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
SKATING RINK
610 square meter
100 person skating capacity
Skating Rink
3m clear perimeter
CURRENT CONCEPTSQUARE - PROGRAMMING
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
MARKET
3mx3m tents4m walk aisle
32 tents
CURRENT CONCEPTSQUARE - PROGRAMMING
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
CURRENT CONCEPTSQUARE - PROGRAMMING
SEATING AND QUIET SPACES
230 people in the amphitheater seating
220 people on the seatwalls
15 tables (4 seats per table) in the cafe
35 tables (4 seats per table)in the outdoor reading room
Amphitheatre seating
Seatwalls
Cafe
Outdoor Reading Room
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
YO
NG
E S
TR
EE
T
VIC
TOR
IA S
TR
EE
T
EXISTING CULTURAL CENTRE
EXISTING LIBRARY
PROPOSED ADDITION
PROPOSED PLAZA
PARKING
PEDESTRIAN AXIS
CHURCH STREET
SITE INTEGRATION
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
PLAZA LEVEL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
GROUND FLOOR/ VICTORIA LEVEL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
THEATRE LEVEL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
PRECEDENTS
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
PRECEDENTS
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
PRECEDENTS
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
SOUTH VIEW
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
EAST VIEW
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
NORTH VIEW
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COSTARCHITECTURAL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COSTARCHITECTURAL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COSTARCHITECTURAL
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
VEHICULAR ZONE
YON
GE
STRE
ET
CHURCH STREET
VIC
TORI
A S
TREE
T
TOWN LIBRARY
CULTURAL CENTRE
NEW COMMUNITY FACILITY
VICTORIA HALL
MOSLEY STREET
COST MAGNITUDELANDSCAPE
Vehicular ZonePedestrian ZonePermanent Ice RinkTOTAL
$600,500.00 $3,899,500.00$500,000.00
$5,000,000.00
PEDESTRIAN ZONE
ICERINK
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COST MAGNITUDE
TOWN SQUARE
Surface Parking LotPedestrian Areas Permanent Ice Rink
TOTAL
$600,500.00 $3,899,500.00$500,000.00
$5,000,000.00
LANDSCAPE SUMMARY
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
COST MAGNITUDE
3 STOREY BUILDING ADDITION WITH THEATRE
Low Estimate
High Estimate
$14,397,900.00$17,015,700.00
(with 25% soft costs $17,996,250 to $21,269,625)
2 STOREY BUILDING ADDITION WITHOUT THEATRE
Low Estimate
High Estimate
$6,790,000.00
$7,638,750.00(with 20% soft costs $8,148,00.00 to $9,166,500.00)
2 STOREY BUILDING ADDITION WITH THEATRE
Low Estimate
High Estimate
$9,336,250.00
$11,033,750.00(with 25% soft costs $11,670,312.00 to $13,792,187.00)
ARCHITECTURAL SUMMARY
The Planning Partnership17086 - AURORA TOWN HALLPRECEDENT IMAGESNOVEMBER 24, 2017
CONCEPT 2 - DECK
AURORA TOWN SQUARE