SEOC LEVEL

1Activation

Page 3: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

SEOC OPERATIONAL HOURS

0700 – 1900 All ESFs

0000 – 2400 Operations & Planning

Page 4: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Up next – FEMA

SERT CHIEF

Mike DeLorenzo

Page 5: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

FEMA

Up next – Meteorology

Page 6: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

METEOROLOGY

Page 7: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Current Southeast U.S. Surface Map

Page 8: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Florida Radar – 6:00 PM EDT

Page 9: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Recovery Forecast

Monday:

•Scattered showers and thunderstorms, mainly after 11 AM•Partly cloudy, with a high near 89•Heat indices as high as 98•Chance of rain 50 percent

Tonight:

•Scattered showers and thunderstorms likely, mainly before 8pm•Chance of rain 70 percent•Low near 74•West-southwest wind at 6 mph becoming calm

Page 10: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Current Satellite - Tropical Atlantic

Tropical Storm Formation Not Expected Through Tuesday

Up next – Operations Chief

Page 11: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Up next – Emergency Services

OPERATIONS CHIEF

Page 12: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

EMERGENCY SERVICES

Page 13: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

EMERGENCY SERVICES• Current Operations –

– ESF 8 is working on Norwalk Virus outbreak, patients being isolated and treated; boil water alert still in effect.

– ESF 8: working with CDC and Department of Agriculture on establishing a mosquito spraying program.

– ESF 4/9 is working on 7 temp. facilities for fire stations; Providing backfill to local agencies

– No change in death count @ 25– Port-o-lets!– ESF 16 fulfilling all tasked missions and relieving workers

• Unmet Needs – – Mosquito spraying- needed– Lack of staff for medical needs still an issue

• Future Operations –– Demob: USAR, Strike teams etc. ~75% by Tues.– LE opening new command post in Hardee Co.– Preparing for transition to forward SERT – Follow up in asset deployment status (CISD Teams / Crisis Counselors,

Medical Professionals, DCHAT Teams, Strike Teams, Emergency Transports, Port-o-lets, Dumpsters

Emergency Services

Up next – Human Services

Page 14: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

HUMAN SERVICES

1.3 MILLION MEALS SERVED

Page 15: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

• Current Operations – – 50 canteens, 3 kitchens trailers and 30 comfort stations– 18 shelters remain open with 900 evacuees. 178 in Special

Needs Shelters– 1.3 m meals served as of 2400 on 8-22-04– 597 trucks of water (2.9 m) gals have been distributed– 363 trucks of ice (14.5 lbs) have been distributed– 631,000 meals have beep delivered to various sites– 42,086 cases of baby food and formula have been distributed– Call Center is averaging about 20 calls per hour– Volunteer Florida has registered 4390 volunteers– DeSoto, Seminole, Orange and Sarasota (2) have Volunteer

Reception Centers open– 4 staging sites are operational for animal feed donations and

distribution through EOC– Code 3 Mobile Hospital continues to operate

Human Services

Page 16: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

• Unmet Needs – – None at this time

• Future Operations –– Continue to feed and supply operations– Continue to monitor and re-supply as needed– Continue to register volunteers and donations– Continue to match goods/services with identified

needs– Continue to monitor and assess needs for additional

feed/equipment/veterinary supplies

Human Services

Up next – Infrastructure

Page 17: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

INFRASTRUCTURE

Page 18: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Infrastructure• Current Operations –

– 77,578 customers without electric service (9,000 customers are on the barrier Islands.)

– Continue fuel support for impacted county operations (diesel, gasoline and LP)

– Continue support of roadway debris clearance & traffic control system repairs

– 13,581 wire line POTs customers are out of service – >98% wireless customers have service in Southwest Florida– Coordinating radio, satellite, cell, POTs and internet connectivity

telecom requests • Unmet Needs –

– None at this time• Future Operations –

– Continue to support fuel and telecommunications requests– Continue to monitor transportation, electrical, telecom, potable

and waste water system restoration

Up next – Military Support

Page 19: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

ESF 13 – MILITARY SUPPORT

Page 20: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Military Support• Current Operations –

– 3059 Soldiers on State Active Duty as of 1500hrs today– 798 Soldiers are performing Security Missions– Rotary Wing aircraft continue to support relief efforts– Continue to support LSA 1 & 2.

• Unmet needs – – None at this time

• Future Operations – – Continue to provide security for hospitals in Charlotte

County– Continue to provide logistical and humanitarian support.– Right sizing our forces

Up next – Logistics

Page 21: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

LOGISTICS

Page 22: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Logistics• Current Operations –

– Continuing to work Tracker messages.• Unmet needs –

– None at this time• Future Operations –

– No changes

Up next – Finance & Administration

Page 23: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

FINANCE & ADMINISTRATION

Page 24: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Finance & Administration• Current Operations –

– Issued several PO's• Unmet Needs –

– None at this time• Future Operations –

– Continue to track costs– Prepare for deployment to Charley Command

Up next – Public Information

Page 25: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

ESF 14 – PUBLIC INFORMATION

Up next – Recovery

Page 26: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

RECOVERY

Page 27: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Recovery• Current Operations –

– Continuing Recovery Operations• Unmet needs –

– Staffing• Future Operations –

– Started the field work

Up next – SERT Chief

Page 28: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

SERT CHIEF

Mike DeLorenzo

Page 29: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

Don’t forget to turn your Don’t forget to turn your phone’s ringer back on!phone’s ringer back on!

Thanks for your cooperation

Page 30: August 23, 2004 1830 hrs. SEOC LEVEL 1 Activation.

August 24 at 0730

Branch Chiefs

NEXT BRIEFING