Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic...

12
Attachment D Cyclical Maintenance Plan 99

Transcript of Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic...

Page 1: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

Attachment D

Cyclical Maintenance Plan

99

Page 2: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAINTENANCE PLAN 262 - 270 Liverpool Street, Darlinghurst

Former First Church of Christ Scientist

100

Page 3: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

Cover Image: Roof truss (Source: NBRS Architecture) NBRS & PARTNERS Pty Ltd Level 3, 4 Glen Street Milsons Point NSW 2061 Australia Telephone +61 2 9922 2344 - Facsimile +61 2 9922 1308 ABN: 16 002 247 565 Nominated Architects Geoffrey Deane: Reg No. 3766; Andrew Duffin: Reg No. 5602; Garry Hoddinett: Reg No 5286 This report has been prepared under the guidance of the Expert Witness Code of Conduct in the Uniform Civil Procedure Rules and the provisions relating to expert evidence This document remains the property of NBRS & PARTNERS Pty Ltd. The document may only be used for the purposes for which it was produced. Unauthorised use of the document in any form whatsoever is prohibited.

ISSUED REVIEW ISSUED BY 10 April 2019 Final Issue Alice Steedman

101

Page 4: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

Maintenance Plan - 262 - 270 Liverpool Street, Darlinghurst \\siza\synergy\Projects\18\18383\05_DOC\02_REPORTS\Annual Maintenance Plan\Maintenance Plan_Fmr First Church of Christ Scientist.docx iii

CONTENTS

1.0 INTRODUCTION ........................................................................................................................................... 1

1.1 Background ................................................................................................................................. 1 1.2 Methodology ............................................................................................................................... 1 1.3 Site Location ............................................................................................................................... 1 1.4 Heritage Management Framework ........................................................................................ 2 1.5 Authorship ................................................................................................................................... 2 1.6 Limitations ................................................................................................................................... 2 1.7 Copyright ..................................................................................................................................... 2

2.0 CONSERVATION POLICIES .......................................................................................................................... 3

3.0 CYCLICAL PLANNED MAINTENANCE SCHEDULE ....................................................................................... 4

LIST OF FIGURES

Figure 1: Aerial map with the subject site highlighted. (Source: NSW LRS, SIX Maps, maps.six.nsw.gov.au) ............................................................................................................................................................................................. 1

Figure 2: Street map with the subject site highlighted. (Source: NSW LRS, SIX Maps, maps.six.nsw.gov.au) ............................................................................................................................................................................................. 1

Figure 3: Excerpt from Heritage Map – Sheet HER_022 of the Sydney LEP 2012.The blue arrow indicates the subject site. (Source: NSW Legislation, Sheet HER_022 of the Sydney LEP 2012) ...................................... 2

102

Page 5: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAINTENANCE PLAN - 262 - 270 Liverpool Street, Darlinghurst \\siza\synergy\Projects\18\18383\05_DOC\02_REPORTS\Annual Maintenance Plan\Maintenance Plan_Fmr First Church of Christ Scientist.docx PAGE 1 OF 3

MAINTENANCE PLAN FOR

262 - 270 LIVERPOOL STREET, DARLINGHURST

1.0 INTRODUCTION 1.1 BACKGROUND

This Maintenance Plan has been prepared in accordance with the implementation and conservation management principles and policies contained within 260-270 Liverpool Street, Darlinghurst - Conservation Management Plan, Graham Brooks and Associates (2013) for.

1.2 METHODOLOGY This Maintenance Plan has been prepared in accordance with the principles of the Australia ICOMOS Charter for Places of Cultural Significance, 2013, known as The Burra Charter, and the New South Wales Heritage Office (now the Heritage Division of the NSW Office of Environment and Heritage) publication, NSW Heritage Manual. The Burra Charter provides definitions for terms used in heritage conservation and proposes conservation processes and principles for the conservation of an item. The terminology used, particularly the words place, cultural significance, fabric, and conservation, is as defined in Article 1 of The Burra Charter. The NSW Heritage Manual explains and promotes the standardisation of heritage investigation, assessment and management practices in NSW.

1.3 SITE LOCATION The site is located on the north-east corner of Forbes and Liverpool Streets in Darlinghurst, NSW, approximately 2.5 kilometres south-east of the Sydney CBD. It is located on a block bounded by Liverpool Street to the south, Forbes Street to the west, Clapton Place to the north-west, Farrell Street to the north-east and Darlinghurst Road to the east. It is identified as Lot 1 of DP 174206 by the NSW Land and Property Information (LPI).

Figure 1: Aerial map with the subject site highlighted. (Source: NSW LRS, SIX Maps, maps.six.nsw.gov.au)

Figure 2: Street map with the subject site highlighted. (Source: NSW LRS, SIX Maps, maps.six.nsw.gov.au)

103

Page 6: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAINTENANCE PLAN - 262 - 270 Liverpool Street, Darlinghurst \\siza\synergy\Projects\18\18383\05_DOC\02_REPORTS\Annual Maintenance Plan\Maintenance Plan_Fmr First Church of Christ Scientist.docx PAGE 2 OF 3

1.4 HERITAGE MANAGEMENT FRAMEWORK The subject site at 262-270 Liverpool Street, Darlinghurst is listed as an item of local heritage significance on Schedule 5 of the Sydney LEP 2012 as ‘First Church of Christ Scientist including interior’, item number I357. The subject site is also located within the Oxford Street and Victoria Street Heritage Conservation Area, listed on Schedule 5 of the Sydney LEP 2012, identified as C12. It is also located in the vicinity of numerous heritage items, as seen on the map below.

Figure 3: Excerpt from Heritage Map – Sheet HER_022 of the Sydney LEP 2012.The blue arrow indicates the subject site. (Source: NSW Legislation, Sheet HER_022 of the Sydney LEP 2012)

1.5 AUTHORSHIP This report was prepared by Alice Steedman, Senior Heritage Architect, of NBRSARCHITECTURE.

1.6 LIMITATIONS This report is limited to the assessment of potential impacts on the European cultural heritage values of the site and does not include Aboriginal and Archaeological assessment. This report only addresses the relevant planning provisions that relate to heritage. It references previous reports and likely cyclical maintenance of significant historic fabric. It refers to new fabric only to the extent where periodic maintenance impacts upon the conservation of the building as a whole. It does not refer to maintenance required to introduced contemporary materials. Cyclical maintenance does not include maintenance and inspections that may be necessary after extreme weather events. It is recommended that a full inspection of the exterior fabric occur following such events and that any necessary repairs are carried out.

1.7 COPYRIGHT Copyright of this report remains with the author, NBRSARCHITECTURE. Unless otherwise noted, all images are by the author.

104

Page 7: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAINTENANCE PLAN - 262 - 270 Liverpool Street, Darlinghurst \\siza\synergy\Projects\18\18383\05_DOC\02_REPORTS\Annual Maintenance Plan\Maintenance Plan_Fmr First Church of Christ Scientist.docx PAGE 3 OF 3

2.0 CONSERVATION POLICIES The Maintenance Plan is developed in response to the policies contained in the Conservation Management Plan for the place. The following text is derived directly from 260-272 Liverpool Street, Darlinghurst - Conservation Management Plan, Graham Brooks and Associates, 2013.

Background

Appropriate and prompt maintenance and repair is an essential component of the conservation of any significant place. To ensure the on-going conservation of significant fabric a regular maintenance schedule should be implemented which provides for regular inspection and remedial action to be taken where necessary. Policy 6.20.1 A planned cyclical maintenance and repair program should be instigated for the building based on a comprehensive understanding of the building’s use, character and materials with regular inspections and prompt appropriate preventive maintenance and repair when required. Policy 6.20.12

Consultants, tradespeople and supervisory staff should be appropriately qualified in their relevant fields and have knowledge and experience of sound conservation practices. Policy 6.20.13 No maintenance or repair work should negatively impact on the significance of the fabric. Policy 6.20.14 The On-going Maintenance Schedule should be reviewed and updated every five years to coincide with a review of the Conservation Plan, or prior to major programs of upgrading or reuse. Policy 6.20.15 The appropriate level of significance of any part or element of the building shall be determined from this plan prior to determining the acceptable level of intervention or action appropriate. Before any works are undertaken, review all available documentary and physical evidence in order to guide effective conservation work.

The policies contained within the Conservation Management Plan should be referred to in the planning and implementation of any works or maintenance to the place. Where specific issues are not addressed in the Conservation Management Plan, the planning and implementation of maintenance should be carried out within the principles of the Burra Charter. The advice of a heritage architect should be sought.

105

Page 8: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAI

NTE

NAN

CE P

LAN

- 26

2 - 2

70 L

iverp

ool S

treet

, Dar

lingh

urst

\\

siza

\syn

ergy

\Pro

ject

s\18

\183

83\0

5_DO

C\02

_REP

ORTS

\Ann

ual M

aint

enan

ce P

lan\

Mai

nten

ance

Pla

n_Fm

r Firs

t Chu

rch

of C

hris

t Sci

entis

t.doc

x

PAGE

4 O

F 5

3.0

CYCL

ICAL

PLA

NNED

MAI

NTEN

ANCE

SCH

EDUL

E R

ef

No.

Co

mpo

nent

M

aint

enan

ce ta

sk

Trad

e Fr

eque

ncy

Every 6 months

2019/20

2020/21

2021/22

2022/23

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

EXTE

RIO

R 1.

0 Ro

of

1.1

Stee

l roo

fing

In

spec

t for

dam

age

and

repa

ir Co

ntra

ctor

An

nual

ly

1.2

Flas

hing

s

Insp

ect f

or d

amag

e an

d re

pair

Cont

ract

or

Bi-a

nnua

lly

1.3

Acce

ss p

oint

s an

d pe

netr

atio

ns

In

spec

t for

dam

age

and

repa

ir Co

ntra

ctor

Bi

-ann

ually

2.0

Rai

nwat

er g

oods

2.

1 G

utte

rs,

dow

npip

es, f

ixin

gs

Cl

ean

out d

ebris

and

rod

dow

npip

es.

Cont

ract

or

Bi-a

nnua

lly

Insp

ect f

or d

amag

e an

d re

pair

Cont

ract

or

Bi-a

nnua

lly

3.0

Mas

onry

3.

1 Ce

men

t ren

der

In

spec

t for

dam

age

and

repa

ir M

ason

Ev

ery

3 ye

ars

Insp

ect f

or th

e ap

pear

ance

of

crac

ks. M

onito

r as

requ

ired.

M

ason

/ st

ruct

ural

en

gine

er

Ever

y 3

year

s

Rem

ove

any

vege

tatio

n, o

ther

or

gani

c gr

owth

, bird

dr

oppi

ngs

Cont

ract

or

Ever

y 3

year

s

Clea

n fa

çade

Co

ntra

ctor

Ev

ery

10 y

ears

3.

2 Re

info

rced

co

ncre

te li

ntel

s

Insp

ect f

or d

amag

e an

d m

onito

r con

ditio

n. R

epai

r as

nece

ssar

y.

Mas

on/

stru

ctur

al

engi

neer

Ever

y 3

year

s

106

Page 9: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAI

NTE

NAN

CE P

LAN

- 26

2 - 2

70 L

iverp

ool S

treet

, Dar

lingh

urst

\\

siza

\syn

ergy

\Pro

ject

s\18

\183

83\0

5_DO

C\02

_REP

ORTS

\Ann

ual M

aint

enan

ce P

lan\

Mai

nten

ance

Pla

n_Fm

r Firs

t Chu

rch

of C

hris

t Sci

entis

t.doc

x

PAGE

5 O

F 5

Ref

N

o.

Com

pone

nt

Mai

nten

ance

task

Tr

ade

Freq

uenc

y

Every 6 months

2019/20

2020/21

2021/22

2022/23

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

3.3

Ston

e or

mas

onry

st

airs

In

spec

t for

dam

age

and

repa

ir as

requ

ired

St

onem

ason

Ev

ery

3 ye

ars

3.4

Pavi

ng

Insp

ect a

nd re

ctify

dam

aged

or

une

ven

surf

aces

, fal

ls to

dr

aina

ge, b

lock

ed d

rain

s,

orga

nic

grow

th.

Cont

ract

or

Annu

ally

4.0

Met

alw

ork

4.1

Stee

l win

dow

fr

ames

and

sa

shes

Insp

ect f

or c

orro

sion

. Rep

air

and

repa

int a

s re

quire

d.

Pain

ter

Ever

y 5

year

s

4.2

Oth

er e

xter

nal

met

alw

ork

Chec

k fo

r det

erio

ratio

n of

m

etal

wor

k an

d fix

ings

. Pa

int

and

repa

ir as

nec

essa

ry

Cont

ract

or/

Pain

ter

Ever

y 5

year

s

5.0

Exte

rnal

Joi

nery

5.

1 Do

ors

Repa

ir an

d re

finis

h as

re

quire

d Ca

rpen

ter/

Pa

inte

r Ev

ery

3 ye

ars

5.2

Har

dwar

e Re

pair

as re

quire

d Sp

ecia

list

Ever

y 3

year

s

Ch

eck

hing

es, b

olts

, lock

s,

latc

hes

and

lubr

icat

e as

ne

cess

ary

Mai

nten

ance

st

aff

Annu

ally

107

Page 10: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAI

NTE

NAN

CE P

LAN

- 26

2 - 2

70 L

iverp

ool S

treet

, Dar

lingh

urst

\\

siza

\syn

ergy

\Pro

ject

s\18

\183

83\0

5_DO

C\02

_REP

ORTS

\Ann

ual M

aint

enan

ce P

lan\

Mai

nten

ance

Pla

n_Fm

r Firs

t Chu

rch

of C

hris

t Sci

entis

t.doc

x

PAGE

6 O

F 5

Ref

N

o.

Com

pone

nt

Mai

nten

ance

task

Tr

ade

Freq

uenc

y

Every 6 months

2019/20

2020/21

2021/22

2022/23

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

INTE

RIO

R 6.

0 In

tern

al S

truc

ture

6.

1 In

tern

al s

truc

ture

an

d fa

bric

In

spec

t int

erna

l str

uctu

re a

nd

fabr

ic in

clud

ing

roof

fram

ing

and

repo

rt o

n an

y si

gns

of

stru

ctur

al m

ovem

ent,

dam

p,

fung

al g

row

th, r

ot o

r pes

t in

fest

atio

n. T

reat

as

nece

ssar

y

Cont

ract

or

Annu

ally

7.0

Inte

rnal

Joi

nery

7.

1 Do

ors

Insp

ect f

or d

amag

e or

wea

r of

fini

shes

and

mat

eria

l. Re

pair

and

refin

ish

as

requ

ired

Carp

ente

r/

Pain

ter

Ever

y 3

year

s

7.2

Skirt

ings

, ar

chitr

aves

, etc

In

spec

t for

dam

age

or w

ear

of fi

nish

es a

nd m

ater

ial.

Repa

ir an

d re

finis

h as

re

quire

d

Carp

ente

r/

Pain

ter

Ever

y 3

year

s

7.3

Stai

r han

drai

ls

Insp

ect f

or d

amag

e or

wea

r of

fini

shes

and

mat

eria

l. Re

pair

and

refin

ish

as

requ

ired

Carp

ente

r/

Pain

ter

Ever

y 3

year

s

7.4

Tim

ber p

anel

ling

Insp

ect f

or d

amag

e or

wea

r of

fini

shes

and

mat

eria

l. Re

pair

and

refin

ish

as

requ

ired

Carp

ente

r/

Pain

ter

Ever

y 3

year

s

7.4

Orig

inal

furn

iture

ite

ms

In

spec

t for

dam

age

or w

ear

of fi

nish

es a

nd m

ater

ial.

Repa

ir an

d re

finis

h as

re

quire

d

Carp

ente

r/

Pain

ter

Ever

y 3

year

s

108

Page 11: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAI

NTE

NAN

CE P

LAN

- 26

2 - 2

70 L

iverp

ool S

treet

, Dar

lingh

urst

\\

siza

\syn

ergy

\Pro

ject

s\18

\183

83\0

5_DO

C\02

_REP

ORTS

\Ann

ual M

aint

enan

ce P

lan\

Mai

nten

ance

Pla

n_Fm

r Firs

t Chu

rch

of C

hris

t Sci

entis

t.doc

x

PAGE

7 O

F 5

Ref

N

o.

Com

pone

nt

Mai

nten

ance

task

Tr

ade

Freq

uenc

y

Every 6 months

2019/20

2020/21

2021/22

2022/23

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

8.0

Inte

rnal

fini

shes

8.

1 Al

l pai

nted

/ oile

d or

sea

led

elem

ents

Repa

ir an

d re

pain

t/re

finis

h as

re

quire

d. D

o no

t pai

nt

prev

ious

ly u

npai

nted

su

rfac

es.

Pain

ter

Ever

y 7

year

s

9.0

Floo

ring

9.1

Tim

ber f

loor

ing

and

parq

uetr

y M

onito

r any

dam

age

or w

ear

to s

urfa

ce.

Repa

ir an

d re

finis

h as

requ

ired

Spec

ialis

t Co

ntra

ctor

Ev

ery

two

year

s

Co

ncre

te a

nd ti

led

floor

s M

onito

r for

sig

ns o

f m

ovem

ent a

nd w

ear.

Rep

air

as n

eces

sary

Cont

ract

or

Annu

ally

10.0

Ce

iling

s

10

.1

Reta

ined

her

itage

ce

iling

s M

onito

r any

dam

age

or s

igns

of

wat

er in

gres

s Co

ntra

ctor

An

nual

ly

SERV

ICES

11

.0

Build

ing

serv

ices

11

.1

Stor

mw

ater

dr

aina

ge

Chec

k su

mps

and

cle

ar a

s ne

cess

ary

Cont

ract

or

Annu

ally

11.2

Se

wer

age

Insp

ect s

umps

for d

amag

ed

grat

es a

nd e

nsur

e th

ese

are

not d

rain

ing

surf

ace

wat

er

Cont

ract

or

Ever

y 2

year

s

11.3

W

ater

In

spec

t for

drip

s an

d ea

se o

f op

erat

ion.

Che

ck ta

ps a

nd

surf

ace

mou

nted

pip

es a

re

secu

red

to w

alls

or s

uppo

rts.

Cont

ract

or

Ever

y 2

year

s

11.4

W

iring

& e

lect

rical

in

stal

latio

ns,

inte

rnal

& e

xter

nal

light

s

Insp

ect a

ll w

iring

and

el

ectr

ical

inst

alla

tions

, in

clud

ing

all p

orta

ble

elec

tric

al e

quip

men

t, in

Cont

ract

or

Annu

ally

109

Page 12: Attachment E Cover Sheet - City of Sydney · surfaces, falls to drainage, blocked drains, organic growth. Contractor Carpenter/ Annually 4.0 Metalwork 4.1 frames and and repaint as

MAI

NTE

NAN

CE P

LAN

- 26

2 - 2

70 L

iverp

ool S

treet

, Dar

lingh

urst

\\

siza

\syn

ergy

\Pro

ject

s\18

\183

83\0

5_DO

C\02

_REP

ORTS

\Ann

ual M

aint

enan

ce P

lan\

Mai

nten

ance

Pla

n_Fm

r Firs

t Chu

rch

of C

hris

t Sci

entis

t.doc

x

PAGE

8 O

F 5

Ref

N

o.

Com

pone

nt

Mai

nten

ance

task

Tr

ade

Freq

uenc

y

Every 6 months

2019/20

2020/21

2021/22

2022/23

2023/24

2024/25

2025/26

2026/27

2027/28

2028/29

acco

rdan

ce w

ith c

urre

nt

regu

latio

ns.

11.5

La

mps

and

fix

ture

s Vi

sual

ly in

spec

t, re

pair

as

nece

ssar

y Co

ntra

ctor

/ sp

ecia

list

Annu

ally

11.6

Fi

re a

nd s

ecur

ity

serv

ices

and

eq

uipm

ent

Test

sys

tem

and

vis

ually

in

spec

t all

serv

ices

, m

onito

ring

and

war

ning

de

vice

s an

d eq

uipm

ent

Spec

ialis

t co

ntra

ctor

An

nual

ly

110