Attachment C4-11.1: Metric Values by Project
Transcript of Attachment C4-11.1: Metric Values by Project
Coastal Protection and Restoration Authority 150 Terrace Avenue, Baton Rouge, LA 70802 | [email protected] | www.coastal.la.gov
2017 Coastal Master Plan
Attachment C4-11.1:
Metric Values by Project
Report: Final
Date: April 2017
Prepared By: Denise Reed, Ann Hijuelos, Scott Hemmerling, and Eric White (The Water Institute of
the Gulf); Jordan Fischbach (RAND Corporation); Mandy Green and Melanie Saucier (Coastal
Protection and Restoration Authority)
2017 Coastal Master Plan: Metric Values by Project
Page | ii
Coastal Protection and Restoration Authority
This document was prepared in support of the 2017 Coastal Master Plan being prepared by the
Coastal Protection and Restoration Authority (CPRA). CPRA was established by the Louisiana
Legislature in response to Hurricanes Katrina and Rita through Act 8 of the First Extraordinary
Session of 2005. Act 8 of the First Extraordinary Session of 2005 expanded the membership, duties
and responsibilities of CPRA and charged the new authority to develop and implement a
comprehensive coastal protection plan, consisting of a master plan (revised every five years)
and annual plans. CPRA’s mandate is to develop, implement and enforce a comprehensive
coastal protection and restoration master plan.
Suggested Citation:
Reed, D. J., Hijuelos, A. C., Hemmerling, S. A., White, E., Fischbach, J., Green, M., and Saucier, M.
(2017). 2017 Coastal Master Plan: Attachment C4-11.1: Metric Values by Project. Version Final.
(pp. 1-17). Baton Rouge, Louisiana: Coastal Protection and Restoration Authority.
2017 Coastal Master Plan: Metric Values by Project
Page | iii
Acknowledgements
This document was developed as part of a broader Model Improvement Plan in support of the
2017 Coastal Master Plan under the guidance of the Master Plan Delivery Team (MPDT).
The Louisiana State University Agricultural Center provided literature used in developing some of
the metrics. Input was provided from members of the MPDT, other advisors and focus groups
convened as part of the 2017 Coastal Master Plan planning process.
This effort was funded by the CPRA of Louisiana under Cooperative Endeavor Agreement
Number 2503-12-58, Task Order No. 03.
2017 Coastal Master Plan: Metric Values by Project
Page | iv
List of Tables
Table 1: Metric Values by Project for the Low, Medium, and High Scenarios. ..................................... 1
Table 2: Total Number of Historic Properties Flooded in FWOA and the Percent Protected.. ......... 12
Table 3: Total Number of Strategic Assets (All Asset Categories Summed) Flooded in FWOA and
the Percent Protected.. ................................................................................................................................. 13
2017 Coastal Master Plan: Metric Values by Project
Page | 1
Table 1: Metric Values by Project for the Low, Medium, and High Scenarios.
Project Number Metric Low Scenario Medium Scenario High Scenario
001.DI.02 NAV -0.147 -0.147 -0.179
001.DI.100 NAV 0.025 0.024 0.004
001.DI.101 NAV -0.266 -0.265 -0.262
001.DI.102 NAV 0.003 0.002 0.005
001.DI.103 NAV -0.493 -0.496 -0.490
001.DI.17 NAV -0.492 -0.497 -0.489
001.DI.18 NAV -0.083 -0.090 -0.090
001.DI.21 NAV 0.001 0.001 0.001
001.DI.23 NAV -0.120 -0.123 -0.119
001.DI.29 NAV 0.003 0.001 0.001
001.HP.04 NAV 0.000 0.000 0.000
001.HP.05 NAV -0.200 -0.200 -0.200
001.HP.08 NAV -0.200 -0.200 -0.200
001.HP.13 NAV 0.000 0.000 0.000
001.HR.100 NAV -0.023 -0.037 -0.039
001.MC.02 NAV -0.025 -0.041 -0.042
001.MC.05 NAV 0.025 -0.029 -0.041
001.MC.06a NAV -0.026 -0.042 -0.043
001.MC.07a NAV -0.013 0.015 -0.041
001.MC.08a NAV -0.019 -0.042 -0.044
001.MC.09 NAV -0.024 -0.039 -0.041
001.MC.100 NAV -0.024 0.015 -0.043
001.MC.101 NAV 0.046 0.015 0.000
001.MC.102 NAV -0.025 -0.041 -0.042
001.MC.103 NAV -0.015 -0.040 -0.042
001.MC.104 NAV -0.013 -0.027 -0.042
001.MC.105 NAV -0.011 -0.033 -0.042
001.MC.106 NAV -0.023 -0.038 -0.042
001.MC.107 NAV 0.046 0.015 0.000
001.MC.108 NAV 0.047 0.016 0.002
001.MC.13 NAV -0.009 -0.036 -0.037
001.MC.17 NAV -0.024 0.018 -0.041
001.OR.01a NAV -0.024 -0.040 -0.039
001.OR.100 NAV 0.049 0.028 0.007
001.RC.01 NAV 0.051 0.021 0.002
001.RC.100 NAV 0.081 0.036 -0.001
001.RC.102 NAV -0.025 -0.040 -0.042
001.RC.103 NAV -0.025 -0.031 -0.037
001.SP.01 NAV -0.025 -0.040 -0.041
001.SP.03 NAV -0.024 -0.040 -0.041
001.SP.04 NAV -0.022 -0.037 -0.038
2017 Coastal Master Plan: Metric Values by Project
Page | 2
Project Number Metric Low Scenario Medium Scenario High Scenario
001.SP.05 NAV -0.022 -0.038 -0.039
001.SP.100 NAV -0.025 -0.041 -0.042
001.SP.101 NAV -0.008 -0.031 -0.037
001.SP.102 NAV -0.019 -0.036 -0.037
001.SP.103 NAV -0.023 -0.038 -0.040
001.SP.104 NAV -0.023 -0.039 -0.040
002.BH.04 NAV -0.022 -0.038 -0.040
002.BH.05 NAV -0.022 -0.037 -0.040
002.DI.03 NAV -0.499 -0.498 -0.494
002.DI.03a NAV -0.495 -0.497 -0.500
002.DI.100 NAV -0.499 -0.498 -0.496
002.DI.101 NAV -0.499 -0.498 -0.496
002.DI.15 NAV -0.216 -0.215 -0.212
002.HP.06 NAV -0.200 -0.200 -0.200
002.HP.07 NAV -0.200 -0.200 -0.200
002.HP.100 NAV 0.000 0.000 0.000
002.HP.101 NAV 0.000 0.000 0.000
002.HP.102 NAV 0.000 0.000 0.000
002.MC.04a NAV -0.006 -0.027 -0.037
002.MC.05e NAV -0.007 -0.034 -0.035
002.MC.07 NAV 0.003 -0.003 -0.019
002.MC.08 NAV -0.015 -0.027 -0.036
002.MC.100 NAV -0.008 0.039 -0.019
002.RC.01 NAV -0.021 -0.036 -0.040
002.RC.02 NAV -0.006 -0.029 -0.037
002.RC.100 NAV 0.050 0.021 0.003
002.RC.101 NAV -0.021 -0.036 -0.039
002.RC.102 NAV -0.022 -0.037 -0.039
002.RC.103 NAV -0.021 -0.036 -0.039
002.SP.100 NAV -0.019 -0.035 -0.039
002.SP.101 NAV 0.027 -0.028 -0.041
002.SP.102 NAV -0.021 -0.037 -0.039
002.SP.103 NAV -0.021 -0.036 -0.039
002.SP.104 NAV -0.012 -0.037 -0.040
002.SP.105 NAV 0.049 0.019 0.003
002.SP.106 NAV -0.021 -0.036 -0.039
002.SP.107 NAV -0.018 -0.035 -0.038
002.SP.108 NAV -0.025 -0.040 -0.042
002.SP.109 NAV -0.018 -0.041 -0.042
004.BS.01 NAV -0.007 -0.032 -0.032
004.BS.02 NAV -0.016 -0.029 -0.031
004.BS.05 NAV -0.022 0.022 -0.035
2017 Coastal Master Plan: Metric Values by Project
Page | 3
Project Number Metric Low Scenario Medium Scenario High Scenario
004.HP.15 NAV -0.200 -0.200 -0.200
004.HR.06 NAV -0.002 -0.019 -0.024
004.MC.01 NAV -0.020 -0.032 -0.034
004.MC.04 NAV 0.049 0.021 0.008
004.MC.07 NAV -0.002 -0.020 -0.019
004.MC.10 NAV -0.022 -0.033 -0.034
004.MC.100 NAV -0.001 0.032 -0.020
004.MC.101 NAV -0.014 0.029 -0.026
004.MC.102 NAV -0.016 -0.028 -0.034
004.MC.103 NAV -0.019 -0.032 -0.035
004.MC.104 NAV -0.020 -0.035 -0.036
004.MC.105 NAV -0.012 0.019 -0.035
004.MC.106 NAV -0.022 -0.034 -0.034
004.MC.107 NAV -0.021 -0.034 -0.035
004.MC.13 NAV -0.023 -0.035 -0.035
004.MC.16 NAV 0.028 -0.024 -0.035
004.MC.19 NAV -0.006 -0.013 -0.026
004.MC.23 NAV -0.008 -0.027 -0.035
004.MC.25 NAV -0.017 -0.037 -0.037
004.RC.01 NAV -0.024 -0.029 -0.036
004.RC.02 NAV -0.015 -0.028 -0.025
004.RC.03 NAV -0.020 -0.033 -0.034
004.RC.05 NAV -0.023 -0.039 -0.041
004.SP.02 NAV -0.022 -0.036 -0.037
004.SP.03 NAV 0.062 0.047 0.029
004.SP.05a NAV 0.051 0.021 0.002
004.SP.07 NAV -0.022 -0.036 -0.036
004.SP.08 NAV 0.046 0.016 0.000
004.SP.100 NAV 0.050 0.023 0.008
004.SP.102 NAV 0.047 0.017 0.000
03a.BH.03 NAV -0.024 -0.037 -0.041
03a.BH.04 NAV -0.024 -0.038 -0.040
03a.BS.100 NAV -0.020 -0.031 -0.036
03a.DI.01 NAV 0.001 0.001 0.001
03a.DI.05 NAV 0.000 0.000 0.000
03a.HP.02b NAV -0.200 -0.200 -0.200
03a.HP.20 NAV 0.000 0.000 0.000
03a.HR.02 NAV -0.014 -0.013 -0.019
03a.HR.100 NAV -0.018 -0.031 -0.032
03a.MC.07 NAV 0.086 0.045 0.005
03a.MC.09b NAV 0.047 0.019 0.003
03a.MC.100 NAV 0.052 0.023 0.004
2017 Coastal Master Plan: Metric Values by Project
Page | 4
Project Number Metric Low Scenario Medium Scenario High Scenario
03a.MC.101 NAV 0.059 0.044 0.024
03a.RC.01 NAV -0.014 -0.024 -0.025
03a.RC.02 NAV 0.047 0.019 0.003
03a.RC.03 NAV -0.013 -0.023 -0.024
03a.RC.04 NAV -0.016 -0.028 -0.027
03a.RC.05 NAV 0.047 0.019 0.003
03a.RC.06 NAV -0.022 0.019 -0.040
03a.SP.100 NAV 0.047 0.019 0.003
03b.DI.04 NAV 0.000 0.000 0.000
03b.HP.08 NAV -0.200 -0.200 -0.200
03b.HP.10 NAV 0.000 0.000 0.000
03b.HP.12 NAV -0.200 -0.200 -0.200
03b.HP.13 NAV -0.200 -0.200 -0.200
03b.HP.14 NAV -0.200 -0.200 -0.200
03b.MC.03 NAV -0.016 -0.028 -0.028
03b.MC.07 NAV 0.054 0.027 0.014
03b.MC.09 NAV 0.056 0.030 0.015
03b.MC.100 NAV 0.090 0.049 0.014
03b.MC.101 NAV 0.054 0.028 0.014
03b.SP.01 NAV 0.061 0.038 0.026
03b.SP.05 NAV -0.022 -0.036 -0.036
03b.SP.06a NAV -0.014 -0.027 -0.026
03b.SP.08 NAV -0.016 -0.027 -0.027
03b.SP.100 NAV -0.017 -0.028 -0.027
03b.SP.101 NAV -0.011 -0.025 -0.024
001.DI.02 PRG 0.008357 0.007424 0.003345
001.DI.100 PRG -0.000015 0.000046 0.003680
001.DI.101 PRG 0.005820 -0.011116 -0.020052
001.DI.102 PRG -0.018155 -0.015870 0.011799
001.DI.103 PRG 0.001269 0.006371 0.005112
001.DI.17 PRG -0.017718 -0.001517 0.018291
001.DI.18 PRG 0.005604 0.002936 0.006449
001.DI.21 PRG 0.012026 -0.003125 -0.000718
001.DI.23 PRG 0.011993 0.010092 0.004326
001.DI.29 PRG 0.004683 -0.016042 -0.004014
001.HP.04 PRG 0.000000 0.000000 0.000000
001.HP.05 PRG 0.000000 0.000000 0.000000
001.HP.08 PRG 0.000000 0.000000 0.000000
001.HP.13 PRG 0.000000 0.000000 0.000000
001.HR.100 PRG 0.002244 -0.001082 0.001330
001.MC.02 PRG 0.001152 -0.000011 -0.000021
001.MC.05 PRG 0.011030 0.010332 0.010067
2017 Coastal Master Plan: Metric Values by Project
Page | 5
Project Number Metric Low Scenario Medium Scenario High Scenario
001.MC.06a PRG 0.007122 -0.001170 -0.000086
001.MC.07a PRG 0.002669 -0.000050 -0.000139
001.MC.08a PRG 0.001813 0.000017 0.000008
001.MC.09 PRG 0.010071 0.001188 -0.000005
001.MC.100 PRG 0.000440 -0.000086 0.000025
001.MC.101 PRG 0.000400 0.000257 -0.000067
001.MC.102 PRG 0.011361 0.006638 0.004002
001.MC.103 PRG 0.002640 0.001973 -0.000086
001.MC.104 PRG 0.001070 0.000044 0.000003
001.MC.105 PRG 0.000626 0.000623 0.000364
001.MC.106 PRG 0.002809 0.001880 -0.000034
001.MC.107 PRG 0.001872 -0.000167 0.000008
001.MC.108 PRG 0.000595 0.000310 0.000704
001.MC.13 PRG 0.002228 0.000143 -0.000255
001.MC.17 PRG 0.003932 -0.000070 -0.000002
001.OR.01a PRG -0.000001 -0.000001 0.000000
001.OR.100 PRG -0.000041 -0.000017 -0.000003
001.RC.01 PRG 0.000348 -0.000031 0.000026
001.RC.100 PRG -0.000271 0.000502 0.000230
001.RC.102 PRG 0.000244 0.002371 -0.000620
001.RC.103 PRG 0.000220 0.001378 0.000156
001.SP.01 PRG -0.000002 0.000020 0.000129
001.SP.03 PRG 0.000002 0.000000 0.000000
001.SP.04 PRG 0.000027 0.000025 0.000037
001.SP.05 PRG 0.000002 0.000000 0.000000
001.SP.100 PRG 0.000012 0.000024 0.000032
001.SP.101 PRG 0.000002 0.000000 0.000000
001.SP.102 PRG 0.000151 0.000011 0.000042
001.SP.103 PRG 0.000194 0.000011 0.000023
001.SP.104 PRG 0.000002 0.000007 0.000708
002.BH.04 PRG 0.003038 0.002121 0.000771
002.BH.05 PRG 0.001542 0.000812 0.000343
002.DI.03 PRG 0.023123 0.009735 -0.016085
002.DI.03a PRG 0.028367 0.009589 -0.021819
002.DI.100 PRG 0.019040 0.008520 -0.019453
002.DI.101 PRG 0.032596 0.014823 -0.026860
002.DI.15 PRG 0.016932 -0.000840 -0.002897
002.HP.06 PRG 0.000000 0.000000 0.000000
002.HP.07 PRG 0.000000 0.000000 0.000000
002.HP.100 PRG 0.000000 0.000000 0.000000
002.HP.101 PRG 0.000000 0.000000 0.000000
002.HP.102 PRG 0.000000 0.000000 0.000000
2017 Coastal Master Plan: Metric Values by Project
Page | 6
Project Number Metric Low Scenario Medium Scenario High Scenario
002.MC.04a PRG 0.016311 0.011311 0.003329
002.MC.05e PRG 0.006904 0.005113 0.000236
002.MC.07 PRG 0.001604 -0.000025 -0.000557
002.MC.08 PRG 0.015389 0.002899 0.002577
002.MC.100 PRG 0.007431 0.000684 0.001955
002.RC.01 PRG 0.000098 -0.000682 -0.000702
002.RC.02 PRG -0.000030 0.000551 0.000048
002.RC.100 PRG -0.000544 0.000780 -0.000070
002.RC.101 PRG 0.000153 0.000159 0.000128
002.RC.102 PRG 0.000168 0.000243 0.000165
002.RC.103 PRG 0.000300 0.000152 0.000090
002.SP.100 PRG 0.000045 0.000019 0.000034
002.SP.101 PRG 0.000009 -0.000052 0.000027
002.SP.102 PRG 0.000064 0.000079 0.000037
002.SP.103 PRG 0.000044 0.000020 0.000032
002.SP.104 PRG 0.000015 -0.000052 -0.000010
002.SP.105 PRG -0.000090 -0.000156 -0.000069
002.SP.106 PRG 0.000045 0.000055 0.000034
002.SP.107 PRG 0.000020 0.000174 0.000057
002.SP.108 PRG 0.000000 0.000006 0.000001
002.SP.109 PRG -0.000025 0.000012 -0.000100
004.BS.01 PRG 0.000022 -0.000004 -0.000084
004.BS.02 PRG -0.000002 -0.000005 0.000000
004.BS.05 PRG 0.000002 -0.000137 -0.000003
004.HP.15 PRG 0.000000 0.000000 0.000000
004.HR.06 PRG 0.011127 0.007245 -0.000275
004.MC.01 PRG 0.005482 0.003422 0.000545
004.MC.04 PRG 0.002664 0.000037 0.000007
004.MC.07 PRG 0.004264 0.001410 0.003536
004.MC.10 PRG 0.005271 -0.000061 0.000115
004.MC.100 PRG 0.002630 -0.000689 0.003363
004.MC.101 PRG 0.000970 -0.000234 0.003644
004.MC.102 PRG 0.002453 0.006833 -0.000040
004.MC.103 PRG 0.000401 -0.001396 0.000027
004.MC.104 PRG 0.003498 -0.000270 -0.000002
004.MC.105 PRG 0.006697 0.005230 0.000064
004.MC.106 PRG 0.015772 0.011694 0.000097
004.MC.107 PRG 0.005482 -0.000181 -0.000038
004.MC.13 PRG 0.002690 0.002256 0.000207
004.MC.16 PRG 0.006934 0.000530 -0.000196
004.MC.19 PRG 0.011562 -0.000400 -0.000174
004.MC.23 PRG 0.001764 -0.000064 -0.000015
2017 Coastal Master Plan: Metric Values by Project
Page | 7
Project Number Metric Low Scenario Medium Scenario High Scenario
004.MC.25 PRG 0.000239 0.000021 -0.000015
004.RC.01 PRG 0.000014 0.000022 -0.000015
004.RC.02 PRG -0.002264 0.000140 -0.000459
004.RC.03 PRG 0.000031 0.000113 -0.000022
004.RC.05 PRG -0.000034 -0.000001 0.000017
004.SP.02 PRG 0.000001 0.000007 0.000003
004.SP.03 PRG -0.001017 -0.000831 0.005506
004.SP.05a PRG 0.000023 -0.000118 -0.000120
004.SP.07 PRG -0.000001 0.000075 -0.000048
004.SP.08 PRG -0.000005 -0.000011 -0.000001
004.SP.100 PRG -0.000048 -0.002570 -0.000239
004.SP.102 PRG 0.000002 -0.000006 -0.000004
03a.BH.03 PRG 0.001723 0.000265 0.000488
03a.BH.04 PRG -0.000255 -0.000333 -0.000016
03a.BS.100 PRG -0.000254 0.000310 0.000046
03a.DI.01 PRG 0.002466 -0.006394 0.002389
03a.DI.05 PRG 0.002690 -0.005596 0.003957
03a.HP.02b PRG 0.000000 0.000000 0.000000
03a.HP.20 PRG 0.000000 0.000000 0.000000
03a.HR.02 PRG 0.003944 0.000417 0.001459
03a.HR.100 PRG 0.000071 -0.000648 0.000675
03a.MC.07 PRG 0.016380 0.010067 -0.000415
03a.MC.09b PRG 0.003520 0.000709 0.000027
03a.MC.100 PRG 0.013751 0.010477 0.000551
03a.MC.101 PRG 0.008004 0.004099 0.005715
03a.RC.01 PRG -0.000159 -0.001264 -0.000186
03a.RC.02 PRG -0.000279 0.000129 -0.000112
03a.RC.03 PRG 0.000942 -0.000544 -0.000191
03a.RC.04 PRG 0.000554 0.000334 0.000767
03a.RC.05 PRG -0.000220 0.000006 -0.000021
03a.RC.06 PRG -0.000001 -0.000086 0.000264
03a.SP.100 PRG -0.000347 -0.001085 -0.000010
03b.DI.04 PRG 0.014088 0.000642 0.004829
03b.HP.08 PRG 0.000000 0.000000 0.000000
03b.HP.10 PRG 0.000000 0.000000 0.000000
03b.HP.12 PRG 0.000000 0.000000 0.000000
03b.HP.13 PRG 0.000000 0.000000 0.000000
03b.HP.14 PRG 0.000000 0.000000 0.000000
03b.MC.03 PRG 0.005663 0.004382 -0.000358
03b.MC.07 PRG 0.002510 -0.000058 0.003852
03b.MC.09 PRG 0.008019 0.001982 0.003444
03b.MC.100 PRG 0.003820 -0.000246 0.003337
2017 Coastal Master Plan: Metric Values by Project
Page | 8
Project Number Metric Low Scenario Medium Scenario High Scenario
03b.MC.101 PRG -0.000279 -0.000030 0.004069
03b.SP.01 PRG -0.000182 -0.002820 0.000957
03b.SP.05 PRG 0.000006 0.000110 0.000003
03b.SP.06a PRG 0.000552 0.000349 -0.000442
03b.SP.08 PRG 0.000606 0.000199 -0.000200
03b.SP.100 PRG 0.000062 -0.000051 -0.000030
03b.SP.101 PRG -0.000231 -0.000735 -0.000101
001.DI.02 UNP 0.514 0.514 0.514
001.DI.100 UNP 0.000 0.000 0.000
001.DI.101 UNP 0.514 0.514 0.514
001.DI.102 UNP 0.419 0.419 0.419
001.DI.103 UNP 0.574 0.574 0.574
001.DI.17 UNP 1.000 1.000 1.000
001.DI.18 UNP 0.412 0.412 0.412
001.DI.21 UNP 0.400 0.400 0.400
001.DI.23 UNP 0.477 0.477 0.477
001.DI.29 UNP 0.404 0.404 0.404
001.HP.04 UNP 0.000 0.000 0.000
001.HP.05 UNP -0.800 -0.800 -0.800
001.HP.08 UNP -0.600 -0.600 -0.600
001.HP.13 UNP 0.000 0.000 0.000
001.HR.100 UNP 0.000 0.000 0.000
001.MC.02 UNP 0.100 0.100 0.100
001.MC.05 UNP 0.100 0.100 0.100
001.MC.06a UNP 0.100 0.100 0.100
001.MC.07a UNP 0.100 0.100 0.100
001.MC.08a UNP 0.100 0.100 0.100
001.MC.09 UNP 0.237 0.237 0.234
001.MC.100 UNP 0.108 0.108 0.108
001.MC.101 UNP 0.106 0.106 0.106
001.MC.102 UNP 0.279 0.280 0.286
001.MC.103 UNP 0.100 0.100 0.100
001.MC.104 UNP 0.118 0.118 0.118
001.MC.105 UNP 0.108 0.108 0.108
001.MC.106 UNP 0.100 0.100 0.100
001.MC.107 UNP 0.129 0.129 0.129
001.MC.108 UNP 0.100 0.100 0.100
001.MC.13 UNP 0.100 0.100 0.100
001.MC.17 UNP 0.100 0.100 0.100
001.OR.01a UNP 0.000 0.000 0.000
001.OR.100 UNP 0.000 0.000 0.000
001.RC.01 UNP 1.000 1.000 1.000
2017 Coastal Master Plan: Metric Values by Project
Page | 9
Project Number Metric Low Scenario Medium Scenario High Scenario
001.RC.100 UNP 0.337 0.337 0.337
001.RC.102 UNP 0.207 0.207 0.207
001.RC.103 UNP 0.169 0.169 0.169
001.SP.01 UNP 0.000 0.000 0.000
001.SP.03 UNP 0.000 0.000 0.000
001.SP.04 UNP 0.000 0.000 0.000
001.SP.05 UNP 0.000 0.000 0.000
001.SP.100 UNP 0.000 0.000 0.000
001.SP.101 UNP 0.000 0.000 0.000
001.SP.102 UNP 0.000 0.000 0.000
001.SP.103 UNP 0.000 0.000 0.000
001.SP.104 UNP 0.000 0.000 0.000
002.BH.04 UNP 0.400 0.400 0.400
002.BH.05 UNP 0.226 0.226 0.227
002.DI.03 UNP 0.574 0.574 0.574
002.DI.03a UNP 1.000 1.000 1.000
002.DI.100 UNP 0.547 0.547 0.547
002.DI.101 UNP 0.531 0.531 0.531
002.DI.15 UNP 0.514 0.514 0.514
002.HP.06 UNP -0.600 -0.600 -0.600
002.HP.07 UNP -0.200 -0.200 -0.200
002.HP.100 UNP 0.000 0.000 0.000
002.HP.101 UNP 0.000 0.000 0.000
002.HP.102 UNP 0.000 0.000 0.000
002.MC.04a UNP 0.313 0.313 0.320
002.MC.05e UNP 0.227 0.227 0.226
002.MC.07 UNP 0.118 0.118 0.117
002.MC.08 UNP 0.345 0.345 0.341
002.MC.100 UNP 0.210 0.210 0.212
002.RC.01 UNP 0.016 0.016 0.016
002.RC.02 UNP 0.070 0.070 0.070
002.RC.100 UNP 0.016 0.016 0.016
002.RC.101 UNP 0.035 0.035 0.035
002.RC.102 UNP 0.056 0.056 0.056
002.RC.103 UNP 0.004 0.004 0.004
002.SP.100 UNP 0.000 0.000 0.000
002.SP.101 UNP 0.000 0.000 0.000
002.SP.102 UNP 0.000 0.000 0.000
002.SP.103 UNP 0.000 0.000 0.000
002.SP.104 UNP 0.000 0.000 0.000
002.SP.105 UNP 0.000 0.000 0.000
002.SP.106 UNP 0.000 0.000 0.000
2017 Coastal Master Plan: Metric Values by Project
Page | 10
Project Number Metric Low Scenario Medium Scenario High Scenario
002.SP.107 UNP 0.000 0.000 0.000
002.SP.108 UNP 0.000 0.000 0.000
002.SP.109 UNP 0.000 0.000 0.000
004.BS.01 UNP 0.000 0.000 0.000
004.BS.02 UNP 0.000 0.000 0.000
004.BS.05 UNP 0.000 0.000 0.000
004.HP.15 UNP -0.200 -0.200 -0.200
004.HR.06 UNP 0.590 0.590 0.590
004.MC.01 UNP 0.157 0.157 0.158
004.MC.04 UNP 0.132 0.132 0.134
004.MC.07 UNP 0.137 0.137 0.139
004.MC.10 UNP 0.147 0.147 0.150
004.MC.100 UNP 0.120 0.120 0.122
004.MC.101 UNP 0.109 0.109 0.110
004.MC.102 UNP 0.134 0.134 0.138
004.MC.103 UNP 0.107 0.107 0.107
004.MC.104 UNP 0.131 0.131 0.134
004.MC.105 UNP 0.174 0.174 0.177
004.MC.106 UNP 0.267 0.268 0.290
004.MC.107 UNP 0.161 0.161 0.165
004.MC.13 UNP 0.121 0.121 0.121
004.MC.16 UNP 0.175 0.175 0.178
004.MC.19 UNP 0.237 0.237 0.242
004.MC.23 UNP 0.119 0.119 0.119
004.MC.25 UNP 0.102 0.102 0.102
004.RC.01 UNP 0.000 0.000 0.000
004.RC.02 UNP 0.000 0.000 0.000
004.RC.03 UNP 0.000 0.000 0.000
004.RC.05 UNP 0.000 0.000 0.000
004.SP.02 UNP 0.000 0.000 0.000
004.SP.03 UNP 0.000 0.000 0.000
004.SP.05a UNP 0.000 0.000 0.000
004.SP.07 UNP 0.000 0.000 0.000
004.SP.08 UNP 0.000 0.000 0.000
004.SP.100 UNP 0.000 0.000 0.000
004.SP.102 UNP 0.000 0.000 0.000
03a.BH.03 UNP 0.301 0.301 0.300
03a.BH.04 UNP 0.204 0.204 0.204
03a.BS.100 UNP 0.000 0.000 0.000
03a.DI.01 UNP 0.000 0.000 0.000
03a.DI.05 UNP 0.000 0.000 0.000
03a.HP.02b UNP -1.000 -1.000 -1.000
2017 Coastal Master Plan: Metric Values by Project
Page | 11
Project Number Metric Low Scenario Medium Scenario High Scenario
03a.HP.20 UNP 0.000 0.000 0.000
03a.HR.02 UNP 0.039 0.039 0.039
03a.HR.100 UNP 0.006 0.006 0.006
03a.MC.07 UNP 0.100 0.100 0.100
03a.MC.09b UNP 0.100 0.100 0.100
03a.MC.100 UNP 0.100 0.100 0.100
03a.MC.101 UNP 0.260 0.260 0.257
03a.RC.01 UNP 0.004 0.004 0.004
03a.RC.02 UNP 0.000 0.000 0.000
03a.RC.03 UNP 0.014 0.014 0.014
03a.RC.04 UNP 0.000 0.000 0.000
03a.RC.05 UNP 0.000 0.000 0.000
03a.RC.06 UNP 0.190 0.190 0.190
03a.SP.100 UNP 0.000 0.000 0.000
03b.DI.04 UNP 0.000 0.000 0.000
03b.HP.08 UNP -0.200 -0.200 -0.200
03b.HP.10 UNP -0.200 -0.200 -0.200
03b.HP.12 UNP 0.000 0.000 0.000
03b.HP.13 UNP -0.200 -0.200 -0.200
03b.HP.14 UNP -0.200 -0.200 -0.200
03b.MC.03 UNP 0.160 0.160 0.164
03b.MC.07 UNP 0.138 0.138 0.143
03b.MC.09 UNP 0.207 0.207 0.210
03b.MC.100 UNP 0.146 0.146 0.148
03b.MC.101 UNP 0.104 0.104 0.104
03b.SP.01 UNP 0.000 0.000 0.000
03b.SP.05 UNP 0.000 0.000 0.000
03b.SP.06a UNP 0.000 0.000 0.000
03b.SP.08 UNP 0.000 0.000 0.000
03b.SP.100 UNP 0.000 0.000 0.000
03b.SP.101 UNP 0.000 0.000 0.000
2017 Coastal Master Plan: Metric Values by Project
Page | 12
Table 2: Total Number of Historic Properties Flooded in FWOA and the Percent Protected. Negative
Values Indicate Induced Flooding with the Project Compared to FWOA. (A – Medium Scenario; B –
High Scenario).
A - Medium Scenario
Archaeological Historic Sites Historic Districts
Project
Number
FWOA
Number
Flooded
%
Protected
FWOA
Number
Flooded
%
Protected
FWOA
Number
Flooded
%
Protected
001.HP.04 1 -200%
001.HP.05 14 64% 1 100%
001.HP.08 247 9%
001.HP.13 6 83% 1 100%
002.HP.06 265 6% 12 -8%
002.HP.07 55 56%
002.HP.102 61 2%
004.HP.15 12 67%
03a.HP.02b 547 8% 11 64%
03a.HP.102 547 8% 11 64%
03a.HP.103 547 8% 11 64%
03a.HP.20 6 67%
03b.HP.08 94 -1%
03b.HP.12 17 12%
03b.HP.13 26 -4%
03b.HP.14 57 7% 1 100% 1 100%
B - High Scenario
Archaeological Historic Sites Historic Districts
Project
Number
FWOA
Number
Flooded
%
Protected
FWOA
Number
Flooded
%
Protected
FWOA
Number
Flooded
%
Protected
001.HP.04 10 70%
001.HP.05 37 27% 1 100%
001.HP.08 244 5% 4 25%
001.HP.13 6 83%
002.HP.06 409 2% 9 44%
002.HP.07 244 13% 0 -1%
002.HP.102
004.HP.15 14 50 2 50%
03a.HP.02b 379 16% 20 65% 1 100%
03a.HP.102 379 16% 20 65% 1 100%
03a.HP.103 379 16% 20 65% 1 100%
03a.HP.20 6 67%
03b.HP.08 142 8% 2 100%
03b.HP.10 2 -50%
03b.HP.12 19 11% 6 67%
03b.HP.13
03b.HP.14 43 5% 7 29% 1 100%
2017 Coastal Master Plan: Metric Values by Project
Page | 13
Table 3: Total Number of Strategic Assets (All Asset Categories Summed) Flooded in FWOA and the
Percent Protected. Negative Values Indicate Induced Flooding with the Project Compared to
FWOA.
Medium Scenario High Scenario
Project
Number
Number of
Assets Flooded
FWOA % Protected
Number of
Assets Flooded
FWOA % Protected
001.HP.04 5 80%
001.HP.05 5 100% 7 100%
001.HP.08 18 61% 12 50%
001.HP.13 1 100% 1 100%
002.HP.06 20 65% 23 70%
002.HP.07 1 100% 1 100%
004.HP.15 9 44% 4 75%
03a.HP.02b 27 56% 33 21%
03a.HP.101 3 -33%
03a.HP.102 27 56% 33 21%
03a.HP.103 27 56% 33 21%
03a.HP.20 6 100% 6 100%
03b.HP.08 14 50% 15 40%
03b.HP.12 13 77% 15 60%
03b.HP.14 11 64% 10 60%