Attachment 3 --PowerPoint Presentation...Attachment 3 --PowerPoint Presentation Item 4C- Attach 3...
Transcript of Attachment 3 --PowerPoint Presentation...Attachment 3 --PowerPoint Presentation Item 4C- Attach 3...
Attachment 3 -- PowerPoint Presentation
Item 4C- Attach 3 03-13-18
Page 1 of 14
» I
2018 Street Repair Program
.111 Iii
----------------------------------------------------------------------------------------- 0 -----------------------------------------------------------------------------------------
o Approve Amendment No. 1 to ProfessionalServices Agreement with BKF Engineers
Item 4C- Attach 3 03-13-18
Page 2 of 14
2016-19 Street Repair Program -----------------------------------------------------------------------------------------------------------0 -----------------------------------------------------------------------------------------------------------
City Hired BKF Engineers to develop the 2016-2019
Program:
o Crack Sealing
o Microsurf ace
o Repaving
o Structural patching
o Accessibility
Item 4C- Attach 3 03-13-18
Page 3 of 14
2010-17 Street Repair ProJects ----------------------------------------------------------------------------------------------------------- 0 --------------------------- -------------------------------------------------------------------------------
Project Year Construction Cost
2010 $794,000
2011 $1,329,519
2013 $1,473,344
2016 $483,273
2017 $616,438
Total $4,695,574
Item 4C- Attach 3 03-13-18
Page 4 of 14
_ __I STREETNAME
BULKLEY AVE
CLOUDVIEW RD.
CURREY AVE.
CURREY AVE.
SECOND ST.
SPENCER AVE.
BRIDGEWAY
BRIDGEWAY
BRIDGEWAY
BRIDGEWAY
BRIDGEWAY
BRIDGEWAY
HARBOR DR.
Proposed 2018 Street Repair II BEGINNING
SAN CARLOS AVE.
PROSPECT AVE.
GLEN DR.
PLATT AVE
SOUTH ST.
COOPER LN.
NEVADA ST.
COLOMA ST.
COLOMA ST.
PRINCESS ST.
JOHNSON ST.
NEVADA ST.
ROAD3
II ENDING
SANTA ROSA AVE
HWY 101
PLATT AVE
CRESCIENTA DR.
RICHARDSON ST.
PROSPECT AVE.
COLOMA ST. EAST
CITY LIMITS WEST
CITY LIMITS EAST
JOHNSON ST.
NAPA ST. (WEST SIDE)
COLOMA ST. WEST
GATE 5 RD.
II TREATMENT (Prelim)
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
CRACK SEAL
L __
Item 4C- Attach 3 03-13-18
Page 5 of 14
Proposed 2018 Street Re a1
STREETNAME BEGINNING ENDING TREATMENT Prelim
HUMBOLDT AVE. ANCHOR ST. BAY ST. CRACK SEAL
MARINSHIP WAY HARBOR DR. WATEREE CRACK SEAL
SPENCER AVE. PROSPECT AVE. HWY 101 CRACK SEAL
CENTRAL AVE SAN CARLOS AVE WEST CT. MICROSURFACE
LOWER BUTTE TOMALES BUTTE ST. MICROSURFACE
LITHO ST. BRIDGEWAY ST. CALEDONIA ST. MICROSURFACE
NAPA ST. BRIDGEWAY CALE DON IA ST. MICROSURFACE
PINE ST. BONITA ST. GIRARD ST. MICROSURFACE
TURNEY ST BRIDGEWAY BOAT RAMP MILL AND FILL
LOCUST ST. BRIDGEWAY END MILL AND FILL
BUTTE ST. LOWER ANCHORAGE SACRAMENTO AVE MILL AND FILL
CONCRETE REMOVAL/ 6
EXCELSIOR LN. BULKLEY AVE. STEPS TO BRIDGEWAY INCH AC
EASTERBY BRIDGEWAY/FILBERT PEARL ST. AC OVERLAY
CONCRETE REMOVAL/ 6
GIRARD AVE. JOHNSON ST TURNEY ST INCH AC
Item 4C- Attach 3 03-13-18
Page 6 of 14
Proposed 2018 Street epa1r ..... .................................................................. .............. ...................... 0 ··································----·---·-----··----········--···-······-···--······--------------------·
RICHARDSON BAY
CRACKSFAI
MICROSURFACI/\G
MILL MID FILL
ACOVF.Rl.AY
CONCRCTC AC .. 1O\JAL ! AC OVCRLAY
Item 4C- Attach 3 03-13-18
Page 7 of 14
Street Re air rogram -----------------------------------------------------------------------------------------------------------0 -----------------------------------------------------------------------------------------------------------
• How are streets identified?
City-wide Pavement Assessment.
Inspector(s) use standardized evaluation process to determine pavement condition
Inspection data entered into a Pavement Management System (Street Saver) to calculate Pavement Condition Index (PCI).
Budget levels are enter into Pavement Management System which calculates a 5-year work program which maximize pavement repair resources
Last Assessment completed 2014 - Update to be performed 2018
Item 4C- Attach 3 03-13-18
Page 8 of 14
Street Repai rogra _ ---------------------------------------------------------------------------------------------------------0 -----------------------------------------------------------------------------------------------------------
How are streets identified?
o Actual repair program is adjusted to take into consideration:
Streets in so poor condition that they otherwise would not get resources.
Utility Coordination
Unexpected conditions - sinkholes, accidents
Community priorities
Item 4C- Attach 3 03-13-18
Page 9 of 14
Street Progra . . . . . . ... .. . . .. .... ... . . . . ... . ... . . .. . . .. . ... . ... . .. . .. .. .. . . .. .... .... .. . . .. . ... . . . . . .. ... . . .. . . .. . . .. .. .. 0 ............... -----.. ----.............................. ------......... ---------. ---. -----.. --. -... -.. --.. .
Rodeo Ave
Item 4C- Attach 3 03-13-18
Page 10 of 14
Street Program ................. -------------.......... ---.. --........ ---. --.. ----------------. -------.... ··-. ------. ---. . 0 --.. --........ --......... ---.. --........ --.... ----. --. ------------------. --. ----------. ------. --. ---------.
Santa Rosa Ave.
Item 4C- Attach 3 03-13-18
Page 11 of 14
Street Program -----------------------------------------------------------------------------------------------------------0 ---------------------------------------------------------------------------- -------------------------------
Olima St. Lincoln Dr.
Item 4C- Attach 3 03-13-18
Page 12 of 14
Street Program -----------------------------------------------------------------------------------------------------------0 -----------------------------------------------------------------------------------------------------------
7' .
Pine St. Lot4
Item 4C- Attach 3 03-13-18
Page 13 of 14
Street Program ............................... ----. ---------------------. --------------. --. -----------·---------. ---------0 --------.. --.. ------.... ------. ---. ------. ------. ---. ---.. ----------------. ---.. --. -.. --.. --.. -. --. ---. ---.
Staff Recommendation
Adopt a Resolution of the nity Council of the City of Sausalito Approving and Authorizing the City Manager to Execute Amendment No. 1 to the Professional/Consulting Services Agreement with BKF Engineers for the City of Sausalito 2018
Street Rehabilitation Project.
Item 4C- Attach 3 03-13-18
Page 14 of 14