ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Transcript of ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Attachment 1, Authorizing Documentation Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att1_pg2_authorizingdocumentation_1of2.doc
ATTACHMENT1–AUTHORIZINGDOCUMENTATION Attached(Att1_PG2_CLWA_AuthorizingDocumentation_2of2)istheresolutionadoptedonFebruary8,2012bytheBoardofDirector’softheCastaicLakeWaterAgency(CLWA)designatingtheCLWA,anauthorizedrepresentative,tofileanapplicationforaRound2Proposition84IRWMPlanningGrantwiththeCaliforniaDepartmentofWaterResourcesandexecuteanagreementwiththeStateofCaliforniaforanIRWMRound2PlanningGrant.
Attachment 1, Authorizing Documentation Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att1_pg2_authorizingdocumentation_1of2.doc
Attachment 2, Eligible Applicant Documentation Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att2_pg2_eligibleapplicantdocumentation_1of1.doc
ATTACHMENT2–ELIGIBLEAPPLICANTDOCUMENTATION1. Is the applicant a local agency as defined in Appendix B of the Guidelines? Please explain. Answer:Yes.Theapplicant for the IntegratedRegionalWaterManagementPlanningGrant is theCastaic LakeWater Agency (CLWA). CLWA is a public agency, as defined in Appendix B of theGuidelines, which is defined as any city, county, city and county, special district, joint powersauthority,orotherpoliticalsubdivisionoftheState,apublicutilityasdefinedinSections216ofthePublicUtilitiesCode,oramutualwatercompanyasdefinedinSection2725ofthePublicUtilitiesCode(CaliforniaWaterCode§Section10535).TheCLWAisapublicagencyformedandestablishedby the California State Legislature in 1962 for the principal purpose of providing importedNorthern California water for use within and adjacent to the Santa Clarita Valley (refer CWCAppendix§Section103). 2. What is the statutory or other legal authority under which the applicant was formed and is authorized to operate? Answer: Applicant was formed and is authorized to operate pursuant to California Water CodeAppendix,Chapter103adoptedin1962. 3. Does the applicant have legal authority to enter into a grant agreement with the State of California? Answer:Yes.TheCLWAhasthelegalauthoritytoenterintoagrantagreementascitedintheFebruary8,2012resolution, which is attached (Att1_PG2_CLWA_AuthorizingDocumentation_2of2). The resolutionauthorizes the CLWA to file an application for a Round 2 Proposition 84 IRWMPlanning Grant,designates the CLWA as the authorized representative to file the applicationwith the CaliforniaDepartmentofWaterResourcesandauthorizesCLWAtoexecuteanagreementwith theStateofCaliforniaforanIRWMPlanningGrant. 4. Describe any legal agreements among partner agencies and/or organizations that ensure performance of the proposal and tracking of funds. Answer: CLWA may enter into an agreement with an outside entity to assist with grantadministrationfunctions.SuchanagreementwouldbeprepareduponawardoftheProposition84fundstoensureperformanceoftheproposalandthetrackingoffunds.ShouldCLWAenterintoagrantagreementwiththeState,thescopeofworkcontainedhereinwillbecomearequirementandwillbesubmittedalongwithotheritemsrequiredbythegrantcontract.
Attachment 2, Eligible Applicant Documentation Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att2_pg2_eligibleapplicantdocumentation_1of1.doc
Attachment 3, Work Plan Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
ATTACHMENT3‐WORKPLAN3.1 CurrentStatusinMeetingIRWMStandardsTheUpperSantaClaraRiverIRWMPisacompleteplanthathasbeenadoptedbyeachofsevenRWMGmembers,aswellascollectivelyastheRegionalWaterManagementGroup(RWMG).TheUpperSantaClaraRiverIRWMPcurrentlymeetsalloftheformerProposition50IRWMGuidelines,aswellasmeetingmanyofthenewProposition84Guidelines.TheregioniscurrentlyupdatingitsPlanandconductingtwotechnicalstudies,aclimatechangetechnicalstudyandaSaltandNutrientManagementPlanwithfundsreceivedinthePlanningGrantRound1forthoseProposition84Standardsthatneededfurtherdevelopment.
Thefollowingdiscussionidentifies,byProposition84Standard,astatusupdateastowherethePlanstandsintermsofcompliancewitheachofthesixteenseparatestandardsandindicateswheremoreworkisnecessaryorwheremodificationofthePlanisdesired.Specialnoteismadetohighlightwherethegrantworkplancontentwillhighlightorcontributetocompliancewiththesestandards.ThisisalsosummarizedinTable3‐1.
Workplantasksthatwillbeperformedaspartofthegrantproposalarediscussedinsection3.2andincludetheupdateoftheAgency’sRecycledWaterMasterPlanandassociatedCaliforniaEnvironmentalQualityActdocumentation,theupdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlan,andoverallGrantAdministration.
Figures3‐1and3‐2providetheIRWMPRegionboundaryandthehydrologicalfeatureswithintheRegion.
Castaic Lake
Lake Piru
Pyramid Lake
Santa Clara River
Saugus WRPValencia WRP
LOS ANGELES COUNTYVENTURA COUNTY
PACIF
IC
OCEAN
0 10 205 Miles
Legend
Water Reclamation Plants
Groundwater BasinEASTERN
PIRU
FILLMORE
SANTA PAULA
WatershedLower Santa Clara River
Upper Santa Clara River
Bouquet Reservoir
SAN GABRIEL MOUNTAINS
SANTA SUSANA MOUNTAINS
LIEBRE MOUNTAINS
SIERRA PELONA
TRANSVERSE RANGES
Figure 3-1Upper Santa Clara River Watershed
Hydrologic Features
Castaic Lake
Lake Piru
Santa Clara River
LOS ANGELES COUNTY
VENTURA COUNTY
0 2 4 6 8 101
Miles
Legend
Watershed
Upper Santa Clara River
Santa Clarita
Santa Clarita Valley Sanitation District
CLWA
Valencia Water Company
LA County WaterWorks District 36
Santa Clarita Water Company
Newhall County Water District
LA County WaterWorks District 37
US Forrest Service Boundary
LA County Flood Control Boundary
Lower Santa Clara River
Pyramid Lake
Bouquet Reservoir
California Aqueduct
Figure 3-2Upper Santa Clara River
Watershed/IRWMP Region
Page 2 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
TABLE3‐1CURRENTSTATUSINMEETINGTHEIRWMPLANSTANDARDS
PROPOSITION84
STANDARD STATUS SPECIFICSTANDARDSTATUSGovernance Standardwillbemetwithplanlanguage
beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan
anticipated(March2013).
TheRWMGgovernancestructureisbasedonanintentiontoensurebalancedrepresentationacrosstheIRWMP'sthreemainregionalobjectives(i.e.,watersupply,waterquality,andresourcesstewardship),aswellasgeographicdiversityacrosstheRegion.TheRWMGhastheparticipationofatleastthreepublicagencies,twoofwhichhavestatutoryauthorityoverwatermanagement.ThemembersoftheRWMGareCastaicLakeWaterAgency,CityofSantaClarita,LosAngelesCountyFloodControlDistrict,NewhallCountyWaterDistrict,SantaClaritaWaterDivisionofCastaicLakeWaterAgency,SantaClaritaValleySanitationDistrictofLosAngelesCounty,Valencia
WaterCompany,andtheSanGabrielandLowerLosAngelesSanGabrielRiversandMountainsConservancy.TheRWMG'sgovernancestructureinvolvescooperationfromthepublic,stakeholders,projectproponents,andRWMG
members.Ingeneral,theRWMGmonitorsIRWMPrequirements/developments,andmakesadministrativedecisions(includingmanagingthegrantapplication/administrationprocess,payingforconsultant(s),and
preparingstakeholderagendas/meetingmaterials).Broaderdecisionsthatareneeded(suchasnominatingRWMGmembers,makinganyrequiredchangestothePlannecessarytomeetfundingguidelines,andupdatingtheIRWMP)arebroughttothestakeholders,andadecisionissoughtthroughacollaborativeprocess,withstakeholdersvotingonthedecisionifneeded.ThroughtheIRWMPprocess,entitieshavebuiltworking
relationshipsthatguideongoingIRWMPplanningandimplementation.Additionally,thegovernancestructurefortheUpperSantaClaraRiverIRWMPisdesignedtoencourageregionalparticipationandtoacceptprojectproposals
onanongoingbasis.RegionDescription Standardwillbemetwithplanlanguage
beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan
anticipated(March2013).
TheIRWMPdiscussesthegeneralimpactsofclimatechangeinits descriptionofregionalwaterresourcesandfocusesofthepotentialimpactsofclimatechangeonthereliabilityofsupplyfromtheStateWaterProject.UsingPlanningGrantfundsreceivedfromRound1,theregiondescriptioniscurrentlybeingupdatedtofurtheridentifythepotentialvulnerabilitiestowaterresourcesintheIRWMPRegiontoprojectedclimatechange.Climatechangescenariosarebeingdefinedconsistentwiththe2011DraftDWRStateWaterProjectReliabilityReport.Vulnerable
watershedcharacteristicsarebeingdefinedandincludehydrology,watershedlandscape,watersupplyanddemand,groundwaterrecharge,ecosystem,andothercharacteristicssuchasweather,changesintheamount,intensity,timing,quality,andvariabilityofrunoffandrecharge;andeffectsofsealevelrise(onimportedwater
Attachment 3, Work Plan Page 3 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS
supplybyDWR).Theregiondescriptionisalsobeingupdatedto includeanassessmentandrankingofthesevulnerabilities.
Objectives StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse
EfficiencyStrategicPlanwillassistindevelopingtechnologicallyfeasibleandquantifiableobjectivesrelatingtowater
demandandwatersupply.ThetwoUpdatesmayalsoresultinupdatingofregional
priorities.
TheobjectivesintheIRWMParebeingassessedaspartoftheIRWMPcurrentupdateprocess.TheIRWMPobjectiveswillbediscussedinthecontextofclimatechangewithregardtopotentialforchangesintheamount,
intensity,timing,qualityandvariabilityofrunoffandrechargeinadditiontotheneedtoconsidertheeffectsofsealevelriseonwatersupplyconditionsandtoidentifysuitableadaptationmeasures.OneofthecurrentIRWMP
objectivesisanimprovementinwaterquality.TheincreaseinwatersupplybymeansofrecycledwateruseisanIRWMPobjective.UpdatingoftheRecycledWaterMasterPlanwillidentifythecurrentandfuturerecycledwaterdemandswithintheValley.Basedonthis,thequantifiableobjectivewillbemodified.Likewise,theSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillidentifyhowmuchconservationwillbeneededinthefuture,which
willassistinmodifyingthe‘reducewaterdemand’objectivetarget.
TheobjectivesintheIRWMParethefollowing.Onequantifiabletargetisprovidedforeach(howeverintheIRWMPtheremaybeadditionalquantifiabletargetsidentifiedforanyparticulartarget):
ReduceWaterDemandImplementtechnological,legislativeandbehavioralchangesthatwillreduceuserdemandsforwater.Ten(10)percentoverallreductioninprojectedurbanwaterdemandthroughouttheRegionby2030throughimplementationofwaterconservationmeasures.
IncreaseWaterSupplyUnderstandfutureregionaldemandsandobtainnecessarywatersupplysources.Increaseuseofrecycledwaterbyupto17,400acre‐feetperyear(AFY)by2030,consistentwithhealthandenvironmentalrequirements.
ImproveWaterQualitySupplydrinkingwaterwithappropriatequality;improvegroundwaterquality;andattainwaterqualitystandards.ComplywithexistingandfutureTotalMaximumDailyLoad(TMDLs).
ImproveOperationalEfficiencyMaximizewatersystemoperationalflexibilityandefficiency,includingenergyefficiency.Withassistanceoflocalenergyutility,performelectricalauditonallwholesaleandpurveyorwaterfacilitiesonce
Page 4 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS
everyfiveyears.ResourceManagement
StrategiesStandardwillbemetwithplan languagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse
EfficiencyStrategicPlanmayresultinupdatingoftheresourcemanagement
strategies.
TheIRWMPcurrentlyevaluates the24watermanagementstrategiescontainedwithintheCaliforniaWaterPlan.Sincethereleaseofthe2009UpdateoftheCaliforniaWaterPlan,thefollowingstrategieshavebeenadded,whichwillbeconsideredintheIRWMPUpdate:ForestManagement,LandUsePlanningandManagement(formerlyUrbanLandUseManagement),andImproveFloodManagement.ThestakeholdersconsideredtheseadditionalstrategiesatanIRWMPStakeholdermeetinginJanuary(2012)andevaluatedthemforapplicabilitytotheRegion.
Additionally,theIRWMPmustidentifyandimplement“No‐Regrets”AdaptationStrategiestothegeneraleffectsof
climatechange,suchasmeadowandforestrestoration,floodplainprotection,andwateruseefficiency.TheClimateChangeTechnicalStudywillhelptoidentifythe“No‐Regrets”AdaptationStrategiesthatwillbemosteffectiveandappropriateforthisRegion.ThesewillbediscusswiththeStakeholdersagaininthecontextof
climatechangeatafutureStakeholdermeeting.Integration Standardismetwithexistingplanlanguage. TheIRWMPhasasuccessfulframeworktoensurecollaborationbetweenentitiesandintegrationofprojectssoas
toachievemultiplebenefits.TheIRWMPmeetsthenewstandardandtheupdatethatiscurrentlyunderwaywillcontinuetousethissuccessfulformatforintegration.
ProjectReviewProcess StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillhelptoidentifynewcandidateprojectsforsubmittaltothe
IRWMP.
UsingPlanningGrantfundsreceivedfromRound1,theprojectreviewprocesswillberefinedoverthenext9monthstomeetthenewstandard.Aspartofthatprocess,projectsincludedintheIRWMP,andadditionalprojects
deemednecessary,willbeassessedfortheirabilitytoadapttopotentialclimatechangeimpactsandforthebenefitstheprojectwillprovide.Theprojectreviewprocesswillincludeasassessmentofthecontributionofthe
projectreducinggreenhousegas(GHG)emissionsascomparedtoprojectalternatives,andCaliforniaEnvironmentalQualityAce(CEQA)project‐levelanalysiswithrespecttoGHGemissions.TheIRWMPwillnotyetprovideacalculationofGHGemissionsonaproject‐by‐projectbasis,butitwillusetheresultsoftheClimate
ChangeTechnicalStudytodiscussthisonananalyticallevel.
Attachment 3, Work Plan Page 5 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS
ImpactsAndBenefits StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
TheIRWMPmeetsthemajorityofthenewstandard.However, thediscussioniscurrentlybeingupdatedtoincludethediscussionofimpactsandbenefitsbetweenregions,aswellasthosedirectlyaffectingdisadvantagedcommunities(DAC),EnvironmentalJusticerelatedconcerns,andNativeAmericantribalcommunities,and
includingthebenefitsofenvironmentalstewardshipinordertomeetthestandardcompletely.PlanPerformanceAnd
MonitoringStandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
TheplanperformanceandmonitoringdiscussioncontainedwithintheIRWMPmeetsthemajorityofthestandardbutiscurrentlybeingupdatedtoprovideadiscussionofpoliciesandproceduresthatpromoteadaptive
managementwithrespecttotheeffectsofclimatechange.TheStakeholdersandRWMGhavedevotedmonthlymeetingstothediscussionofupdatingexistingdata,IRWMPobjectives,regionalpriorities,andstatewidepriorities
forrelevanceandthesearebeingmodifiedasneededtoensuretheoverallIRWMPreflectsregionalchangingneeds.Additionally,CandidateProjectswillbereviewedandtheywillbeevaluatedaspartoftheUpdatescheduletoensurethatthecurrentplanobjectiveswillbemetandtheresultingPlanProjectsofferthegreatestbenefitpossible.Thisongoingreviewandupdateallowtheplantoundergo“adaptivemanagement”,e.g.,allowstheIRWMPtoevolvetochangingconditions,andincorporatenewdata(e.g.,climatechangevulnerabilities).
DataManagement StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
**DataobtainedfortheRecycledWater
MasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillbeusedtoupdatethetechnicalanalysisportionsanddatamanagementchapters.BothstudieswillalsobefillingindatadeficienciesidentifiedinthePlan.
UsingPlanningGrantfundsreceivedfromRound1,theIRWMPiscurrentlybeingupdatedwithaDataManagementSystemthatwillhelptrackanddocumenttheprogressofIRWMPimplementationandforstoringanddisseminatingdatafrommonitoringefforts.Adiscussionofhowfindingsor“lessonslearned”fromproject‐specificmonitoringeffortswillbeincludedtoimprovetheRWMG’sabilitytoimplementfutureprojectsintheIRWMPlan.
Page 6 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUSFinance Standardwillbemetwithplanlanguage
beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan
anticipated(March2013).
TheIRWMPmeetsmostofthenewfinancestandard.However,thediscussioniscurrentlybeingupdatedtoaddanexplanationofhowoperationandmaintenance(O&M)costsforprojectsthatimplementtheIRWMPwouldbe
coveredandthecertaintyofO&Mfundinginordertomeetthestandardcompletely.
TechnicalAnalysis StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse
EfficiencyStrategicPlanwillassistindevelopingtechnologicallyfeasibleandquantifiableobjectivesrelatingtowater
demandandwatersupply.
TheIRWMPmeetsmostofthetechnicalanalysisstandard.TheIRWMPincludesadetailedlistingandcategorizationofthedocumentsusedtodevelopthebaselineinformationandtechnicalanalyzesforthedevelopmentoftheIRWMP.UpdatingoftheIRWMPincludesareviewofthesedocumentsandupdatingif
necessaryaswellasidentifyingnewrelevanttechnicaldocumentsthatshouldbereviewedtosupporttheIRWMP.Giventhenewstandards,theexpandedscopeofthetechnicalanalysis,andreviewofcurrentplanningdocuments,anupdatedreportondeficiencies,priorityforfillingthegaps,andplantoaddressthemarepartofthecurrent
updateprocess.
RelationToLocalWaterPlanning
Standardismetwithexistingplanlanguage.
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillrequireclosecoordinationamongthewholesaleandretailwateragencies,potentialrecycledwatercustomers,andlandusedevelopers.
TheIRWMPcurrentlymeetsthisstandard.However,inorderforthePlantomeettherequirementsoftheclimatechangestandard,theIRWMPisbeingupdatedtoconsiderandincorporatethewatermanagementissuesand
climatechangeadaptationandmitigationstrategiesfromlocalplanningdocument.
Attachment 3, Work Plan Page 7 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS
RelationToLocalLandUsePlanning
Standardismetwithexistingplanlanguage.
**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillbothtieintothenextupdateoftheUrbanWaterManagementPlan(2015),andrequirecoordinationwithlocalplanningagenciesandwiththeLos
AngelesCountyandCityofSantaClarita’sOneValleyOneVisiondocumentGeneralPlan
Updates.
TheIRWMPcurrentlymeetsthisstandard.However,inorderforthePlantomeettherequirementsoftheclimatechangestandard,theIRWMPisbeingupdatedtoincludeadiscussionoftheregion’sdemonstratedinformation
sharingandcollaborationwithregionallandplanningeffortsbeingundertakeninordertomanagemultiplewaterdemandsthroughoutthestate,toadapttowatermanagementsystemstoclimatechange,andpotentiallyoffset
climatechangeimpactstowatersupplyinCalifornia.
StakeholderInvolvement
Standardismetwithexistingplanlanguage. TheIRWMPcurrentlymeetsthisstandard.TheIRWMPwas developedandcontinuestooperateviaabroadpublicprocessfocusedonoutreachthroughmeetings,communityevents,directemails,mailings,andfacetoface
interactiontomaintainStakeholderinvolvement.Stakeholders,includingDACs,wereandcontinuetobeabletodirectlyinteractwiththeIRWMPbyaddingprojectstothelistofCandidateProjectsforimplementationoftheIRWMP,assistingindevelopmentandupdatingoftheresourcemanagementstrategiesandobjectivesthrough
consensusbasedinteractivestakeholdermeetings.Coordination Standardwillbemetwithplanlanguage
beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan
anticipated(March2013).
TheIRWMPiscurrentlybeingupdatedtoincludementionofCaliforniaNaturalResourceAgency’sCaliforniaAdaptationStrategyprocessandtheRWMG’sconsiderationofmembershipintheCaliforniaClimateActionRegistrywhichisafutureStakeholdermeetingagendatopic.ThePlanwillalsobeupdatedwiththeRegion’s
coordinationongoingeffortswithotheradjacentplanningregionsincluding:thejointClimateChangeWorkshopthatisbeingsponsoredbetweentheWatershedCoalitionofVenturaCounty(WCVC),USCR,andSantaBarbara
CountyIRWMPRegions,theWatershedAwarenessMonthofMayactivitiesinwhichanumberofIRWMPprojectsarebeinghighlightedwithinthewatershedalsoco‐sponsoredbytheUSCRandWCVCIRWMPRegions,andthe
participationbyboththeWCVCandUSCRIRWMPmembersineachother’sregularStakeholdermeetingstoensurethattheentirewatershedisprotectedandmanagedappropriately.
Page 8 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS
ClimateChange StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning
GrantRound1funds.Revisedplananticipated(March2013).
UsingPlanningGrantfundsreceivedfromRound1,theRWMGhascommissionedaClimateChangeTechnicalStudythatwillidentifyvulnerabilityoftheRegiontoclimatechange,evaluatepotentialclimatechangeimpacts,identifyandevaluatepotentialadaptationstrategies,andwillmaderecommendationsastohowtocollectandutilizegreenhousegasemissionsdatawithintheIRWMPframework.Thestudywillthenbeusedtoupdatethe
IRWMPsothatitwillmeettherequirementsoftheclimatechangestandard.
Attachment 3, Work Plan Page 9 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
3.1.1 DisadvantagedCommunityOutreachProcess
DuringdevelopmentoftheIRWMP,nocommunitiesthatmetthedefinitionasdefinedintheWaterCodeofaDisadvantagedCommunity(DAC)wereidentified,buttherearepocketsoflowerincomeareasthatmayhaveissuessimilartoDACs,suchasinabilitytoaccesstoinformation,forexample.Inthespiritofproviding“asafe,clean,affordable,andsufficientwatersupplytomeettheneedsofCaliforniaresidents,farms,andbusinesses”,aDACOutreachSubcommitteewasformedalongwiththedevelopmentofaDACoutreachstrategytoreachthesecommunities,whichwillincludepartsofNewhallandCanyonCountry.Aspartofthisstrategy,theRWMGcontactedothergroupsknowntodealwithDACissues,suchastheCityofSantaClaritaHousingDepartmentandtheNewhallCommunityCenter.IndividualsworkingontheIRWMPvisitedtheNewhallCommunityCenterandspokewiththeirstaff.CenterstaffsuggestedtheRWMGworkwiththeirteacheroftheEnglishasaSecondLanguage(ESL)class.AprofessionaloutreachconsultantwasutilizedtopreparematerialsinbothEnglishandSpanishandtheNewhallCommunityCenterteacherusedthosematerialsaspartofthecoursework.Thiswasaveryeffectivewaytocommunicatetheseissuesratherthansimplyplacinganarticleinapublicationwithanoverlybroadtargetaudience.Thiswasfacetofaceinteractionbeingdeliveredbysomeonethisgroupofpeoplehadanexistingrelationshipwithandtrusted.Italsoaffordedtheopportunitytoexpandthenumberofpeoplewhoreceivedtheinformation.TheNewhallCommunityCenterisextensivelyusedandthecommunitywhouseittakegreatprideintheprogramsthatareofferedthere.WhentheCenterwasbeingplanned,thecommunitywasanintegralpartofthedesignandlocationofthebuildinganditfunctionsasanextendedfamilyformanythatuseit.SimilarresourcesexistinCanyonCountryincludingapubliclibrary.InadditiontoprovidingthisIRWMPinformationintheESLclasses,StakeholderspresentedIRWMPinformationattheEmergencyExpoandArborDayevents.BothareCityofSantaClaritaevents,attendedbythousandsofpeople,andwereverysuccessfulinengagingthecommunityonIRWMPissues.Openchannelsofcommunicationandgoodworkingrelationshipshavealsobeenestablishedbetweenagencies/companiesoftheSantaClaritaValleyandtheTataviamBandofMissionIndiansduetoseveraldevelopmentprojectsinvolvingtheirlands.Thesespecificeffortsofdirectemails,mailings,facetofaceinteraction,eventparticipation,classroominstruction,flyers,notices,surveys,andpresentationswereperformedtogetenvironmentalgroups,conservancygroups,wellownergroups,DACs,watersuppliers,municipalities,sanitationdistricts,floodcontroldistricts,AmericanIndianTribes,developers,landowners,adjacentIRWMareas,Stateagencies,electedrepresentatives,andtheliketotakepartintheIRWMP.WiththeinvolvementoftheStakeholders,thefacilitationmeetings,thetrackingofStakeholdercomments,andtheeffortstoincorporatethosecommentsintotheIRWMPthegrouphasbeenabletoincorporateabroadrangeofinputandideas.
Page 10 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
WiththerecentcompletionoftheCountyofLosAngeles’sOneValleyOneVision(OVOV)landuseplanningdocument,theOVOVupdateoftheCityofSantaClaritaGeneralPlan,andthe2010Censusdata,thereisawealthofnewinformationavailabletoassistinidentifyingexistingandpotentialnewstakeholders,includingDAC’s,tribalcommunities,andenvironmentaljusticecommunities.ThesetypesofoutreacheffortsarecontinualeffortsaspartoftheUSCRIRWMPandwillbethroughouttheIRWMPUpdate.
3.2 GrantWorkPlanContent(WorkPlanTasks)FundingisbeingrequestedfromtheRound2PlanningGrantsolicitationforthefollowingworkplantasks.ThesetechnicalstudiesdirectlysupportthetechnicalfeasibilityoftheobjectivesintheIRWMP.
Task1 RECYCLEDWATERMASTERPLANUPDATE
TheCLWArequiresanupdateofits2002RecycledWaterMasterPlaninordertocompilethelatestinformationwithregardtopotentialrecycledusers,designofinfrastructureandtheavailabilityofrecycledwatertoservethem.Theprojectwouldrequireaninvestigationtoidentifyalllargelandscapeirrigatorsandothernon‐potablewaterusersandtheirproximitytoanupdatedlistofpotentialsourcesofrecycledwater.Thisdatawillthenbeusedtopreparevariousrecycledwatersystemdesignsandcostevaluationstodetermineasuiteofoptionsforrecycledwaterdeliverythatreflectcurrentregulatoryrequirements.Therecycledwatersystemoptionswillthenbematchedwithpotentialwaterconservationprogramportfoliostoarriveatacost‐effectiveandrealisticstrategytomeettheState’srequirementsof20percentpercapitawaterconservationby2020(SBx7‐7).
Subtask1.1:RecycledWaterUserMapandHydraulicModelUpdate
1.1.1 Collectupdatedpotentialrecycledwaterusersfromwaterpurveyors.
1.1.2 MapthepotentialrecycledwaterusersinaGeographicInformationSystem(GIS)program.
1.1.3 Collectthepurveyor’spotablepressurezoneinformationandincorporatetheinformation inGIS.
1.1.4 Establishrecycledwaterpressurezones.1.1.5 Createahydraulicmodeltoincorporatethepotentialrecycledwateruserdemandsand pressurezones.
Attachment 3, Work Plan Page 11 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
Subtask1.2:DraftRecycledWaterSystemAnalysis
1.2.1 Evaluatethepotentialrecycledwaterusers,andtheirdemandsperpressurezone.1.2.2 Determinetherecycledwatersystemseasonalstoragerequirementsandidentifypotential seasonalstoragelocations.1.2.3 Evaluatetherecycledwatersystemanddetermineacosteffectivelayout.
Subtask1.3:DraftRecycledWaterMasterPlan
1.3.1 ReviewpreviousrecycledwaterdocumentstoincludebutnotlimitedtotheRecycledWater MasterPlandatedMay2002,RecycledWaterProgramEIRfortheMay2002Recycled WaterMasterPlan,RecycledWaterPhase2APreliminaryDesignReport,RecycledWater ProgramPhase2AEnvironmentalDocuments,HonbyPumpStationTechnical Memorandum,SeasonalStorageEvaluation,SystemOptimizationTechnicalMemorandum, andtheAmendedEngineer’sReportfortheexistingRecycledWaterSystem.1.3.2 ReviewthedraftrecycledwaterrulesandregulationsandSanitationDistrictAgreement andincorporaterelatedinformationintothemasterplan.1.3.3 Finalizethedraftrecycledwatersystemanalysisandcoordinatewiththewaterpurveyors andSanitationDistrictofLosAngelesCounty.1.3.4 Identifyandevaluatetherecycledwatersystemimplementationphasesincludingbutnot limitedtothephaselimits,phasedemands,costs,andschedule.1.3.5 Revisetherecycledwaterhydraulicmodeltoincorporatethelatestsystemanalysisand implementationphases.1.3.6 PreparetheDraftRecycledWaterMasterPlan.1.3.7 PresentandcoordinatetheDraftRecycledWaterMasterPlanwiththepurveyorsandthe SanitationDistrictofLosAngelesCounty.
Subtask1.4:FinalRecycledWaterMasterPlan
1.4.1 Reviewcommentsfromthevariousreviewersandrevisethemasterplanaccordingly.1.4.2 Finalizetherecycledwaterhydraulicmodelaccordingly.1.4.3 PreparetheFinalRecycledWaterMasterPlan.
Page 12 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
1.4.4 PresenttheFinalRecycledWaterMasterPlanwiththelocalwaterpurveyorsandtheSCV SanitationDistrictofLosAngelesCounty. Task1Deliverables:
RecycledWaterUserMap
HydraulicModel
DraftandFinalRecycledWaterMasterPlan
Task2 RECYCLEDWATERMASTERPLANENVIRONENTALIMPACTREPORT
UpdateoftheRecycledWaterMasterPlanwillrequirethepreparationofanewsubsequentProgrammaticEnvironmentalImpactReportpursuanttotheCaliforniaEnvironmentalQualityAct.
Subtask2.1:ProjectKick‐off
MeetwithAgencystaffinaprojectkick‐offmeetingtoreviewprogramtasks,schedule,existingdocumentsanddata,andaddressquestionsanddataneeds,andvisittheprojectsites.
Subtask2.2:NoticeofPreparation
PrepareNoticeofPreparationandmailtolistofappropriateagenciessuppliedbyCLWA.
Subtask2.3:ConductRegularMeetings
2.4.1 PrepareforandconductregularscheduledmeetingswithAgencystaffandGeneralCounseltoreviewprogressandaddressissues.
2.4.2 Provideallnecessaryexhibitsanddocumentsrequiredforpresentationonenvironmentaltopicsforpublicmeetingsandhearings.
2.4.3 PrepareandprovideminutestoAgencyforreviewandforthefilesforallproject‐relatedmeetingswithAgencystaffandoutsideentities.Assumeanaverageonetotwo‐hourmeetingevery4weeksovera12‐monthperiod.
Attachment 3, Work Plan Page 13 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
Subtask2.4:DraftEnvironmentalImpactReport(EIR)
2.4.1 PreparedraftEIRfortheRecycledWaterMasterPlanUpdate,necessarytosatisfythelatestrequirementsofCEQA.
2.4.2 PrepareNoticeofAvailabilityandfileNoticeofCompletionofthedraftEIRwiththeStateOfficeofPlanningandResearch.
2.4.3 DistributedraftEIR,eitherasaPDForasahardcopy,asspecifiedbyCLWAaccordingtolistofappropriateagenciessuppliedbyCLWA.
Subtask2.5:ReviewCommentsonDEIR
2.5.1 PreparedraftsoftheEIRatappropriatetimesforreviewbyAgencystaff.Providefive(5)copiesofeachdraftforAgencyreviewandcomments.
2.5.2 PrepareresponsestocommentsonthefinaldraftEIR,includingconsultationwithfederalandstateagenciesifendangeredspeciesorhabitatareidentified.
2.5.3 PrepareNoticeofDeterminationwithinfiveworkingdaysofdecidingtocarryouttheprojectandfilewiththeStateOfficeofPlanningandResearch.AlsofiletheNoticewiththecountyclerkofthecountyorcountiesinwhichtheprojectislocated.
Subtask2.6:PrepareFinalEIR
2.6.1 PrepareandprovidecopiesofFinalEIRdocumentsasnecessaryforreviewbylocal,state,federalagenciesandothers.
2.6.2 PrepareNoticeofDetermination
2.6.3 PreparetheadministrativerecordaspartoftheFinalEIR.
Subtask2.7:ProjectManagement
Theprimaryobjectivesoftheprojectmanagementtaskareto:1)ensurethatprojectscheduleandbudgetaremet;2)documentprojectactivities(progressreportsandmeetings);and3)ensurethatprojectworkanddeliverablesmeetqualityobjectives.
Task2Deliverables:
NoticeofPreparation
Page 14 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
DraftandFinalEIR
AdministrativeRecord
Task3 STRATEGICWATERUSEEFFICIENCYPLANUPDATE
TheSantaClaritaValleyFamilyofWaterSuppliers(theSuppliers)joinedtogetherin2007todevelopaplantoensuretheefficientuseofwaterintheSantaClaritaValley(Valley).TheSantaClaritaValleyWaterUseEfficiencyStrategicPlan(SCVWUESP)wasfinalizedin2008andincludedprogramsandprojectsthatweretargetedtoeffectivelyreducethepercapitawateruseintheValleybyatleast10%by2030.In2010/2011,theSupplierswereawardingfundingfromtheProposition84Round1ImplementationGrantProgramtofund4conservationprogramsidentifiedwithintheSCVWUESP.Withcurrentlaw(SBX7‐7)mandatinga20%reductioninwaterdemandby2020,itbecomesnecessarytoupdatetheSCVWUESP.Ataminimum,anupdateoftheSCVWUESPshallanalyzecurrentdataonwaterconsumptionintheValley,assesscurrentconservationeffortsthathavefollowedtheSCVWUESP,thosethathavedeviatedfromtheSCVWUESPbynecessityandthosethatareindependentoftheSCVWUESP,identifyadditionalwaterconservationprograms,analyzecostbenefits,andrecommendaplanofaction.ItisimportanttheSCVWUESPupdatealsoincludeaninteractivemodel(i.e.,spreadsheet)thatisabletobemodifiedbytheSuppliersasconditionschangeinyearstocome.
Subtask3.1:AnalysisofData
Usedatafromthe2010UrbanWaterManagementPlan(UWMP),databeingdevelopedtoupdatetheAgency’sRecycledWaterMasterPlanandtheoriginalSantaClaritaValleyWaterUseEfficiencyStrategicPlan(2008)aswellasmorerecentdatafromtheSuppliers(e.g.,surveyresultsfromO’RorkeandtheFamilyofWaterSuppliers,etc.)todescribehistoricalconsumptionpatterns,saturationofthemarketwithwater‐efficientfixtures,willingnessofthecommunitytoadoptvariousmeasures,compliancewiththeCUWCCMOU,andotherissuesortrendsastheyemerge.
Subtask3.2:AssessConservationEfforts
ReviewcurrentconservationprogramsattheSuppliers(retailersandwholesaler)termsofscopeandeffectivenessofwatersavings.
Attachment 3, Work Plan Page 15 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
Subtask3.3:IdentifyandDevelopWaterConservationMeasures
3.3.1 Describepotentialwaterconservationprogramsforresidential(singleandmulti‐family),commercial,industrial,institutionalandlandscapewaterusetoa. achieve10%reductioninGPCDby2015(inconjunctionwithrecycledwaterprograms
thatwillbeidentifiedintheRecycledWaterMasterPlanUpdate)b. achieve20%reductioninGPCDby2020(inconjunctionwithrecycledwaterprograms
thatwillbeidentifiedintheRecycledWaterMasterPlanUpdate)c. achieve“ontrack”statuswiththeCUWCC’sBestManagementPractice(BMP)
requirementsformembersoftheSuppliers3.3.2 Developindetailbothwaterconservationmeasuresthatarequantifiableandthosethatare
non‐quantifiable(e.g.,socialmarketing).3.3.3 Documenttheunderlyingassumptionsusedforcalculatingwatersavings.Subtask3.4:AssessCost‐EffectivenessTakingintoconsiderationalternativelevelsofrecycledwateruseidentifiedintheDraftUpdateoftheRecycledWaterMasterPlan,analyzeprospectivewaterconservationprogramsintermsofcost‐effectivenessandrankprogramsbytheirappropriatenesstotheSantaClaritaValley.Programsshouldbedividedbetweentheeffortsofthewholesalerandtheretailersaswellaspotentiallycooperativeefforts.Ideally,thewholesaleagencywouldprovidesomebaselineprograms(e.g.,HighEfficiencyToilet[HET]rebates)andtheretailagencieswouldprovideprogramsthatarespecifictotheirservicearea(e.g.,commercialandindustrialauditsinserviceareaswithCIIcustomers).Atthispoint,theSupplierswouldliketoreviewworkeffortstodatepriortodevelopmentoftheplan.
Subtask3.5:CreateaConservationPlan
3.5.1 Createacustomizedplanformultipleconservationprogramsthatincludescosts,benefits,socialacceptanceandpartnershipopportunitiesforachieving10%reductioningallonspercapitaperday(GPCD)by2015,20%reductioninGPCDby2020and“ontrack”statuswiththeCUWCC’sBMPrequirements.
3.5.2 Identifyamethodologyforanevaluationoftheconservationplanpost‐implementation.3.5.3 Assessconservationstaffinglevelsatwholesaleandretailagencies.3.5.4 Identifyanddescribepotentialfundingopportunities.
Page 16 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
3.5.5 EvaluatetheconservationrequirementsneededinconcertwithprojectedrecycledwaterusetomeetSBx7‐7requirements.Textwillbeprovided,eitherseparatelyorasanappendixthatcanfacilitatethecompletionoftheRecycledWaterMasterPlanUpdatetowardsthiseffort.
Subtask3.6:ProjectManagement
Theprimaryobjectivesoftheprojectmanagementtaskareto:1)provideclosecoordinationamongtheretailers,theprojectteam,andotherinvolvedparties;2)ensurethatprojectscheduleandbudgetaremet;3)documentprojectactivities(progressreportsandmeetings);and4)ensurethatprojectworkanddeliverablesmeetqualityobjectives.
Task3Deliverables:
DraftandFinalStrategicWaterUseEfficiencyPlanUpdate
Text/ChaptertosupporttheRecycledWaterMasterPlanUpdate
Task4 GRANTADMINISTRATION
Thistaskistoadministerandmanageprojectactivitiesandtheoverallprojectscheduleandbudgettoensurethattheprojectiscompletedefficientlyandsuccessfully.Projectmanagementactivitieswillincludebudgetandschedulecontrolandqualityassuranceandqualitycontrol(QA/QC)forthedurationoftheproject.ThistaskalsoincludesthedevelopmentandsubmittalofquarterlyreportstoDWR.Quarterlyreportswillincludeprojectprogressreports,upcomingwork,schedule,budget,andotherpertinentinformation.
Task4Deliverables:
ProposalQuarterlyReportsandInvoices
GrantAgreementCompletionFinalReport
3.3 AdditionalIRWMPlanWorkNoadditionalworkhasbeenidentifiedasneededtoproducestandardscompliantIRWMPlan.AsmentionedpreviouslyfundswerereceivedandworkiscurrentlybeingconductedtoprepareaSaltandNutrientManagementPlanaspartoftheIRWMP.TheCEQAdocumentforthatSNMPwillstillhavetobeprepared.However,itisnotnecessaryfortheIRWMPtobeconsideredacompliantplan.
Further,thefundsrequestedfromthisgrantfundingopportunityfordevelopmentoftheRecycledWaterMasterPlanUpdateandtheUpdatingoftheWaterUseEfficiencyStrategicPlandonotdirectlyfillthegapintermsofaneedforacompliantIRWMP.AsdescribedinTable3‐1above,muchoftheworkcurrentlyoccurringisbringingthePlanintoconcurrencewiththeProposition84
Attachment 3, Work Plan Page 17 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc
Standards.ThesetwotechnicalstudieshavesubstantialvaluetothetechnicalvalidityandfeasibilityoftheIRWMPandtheexistingandpotentialfutureprojectsthatwillbecomepartoftheIRWMPastheydeterminetheamountofoverallrecycledwaterdemandthatwillbeavailablewithintheRegion,andtheamountofanticipatedconservationthatwecanexpectgiventhecurrentlegislativerequirements,recenteconomicconditions,andhydrologicconditionsandhowthosehavecreatedatrendthatassumptionshavetobeplannedupon.TheresultsofthesestudieswillbeimportantdocumentstodiscusswiththeStakeholders,willbecomefoundationaltotheupcoming2015UpdateoftheUrbanWaterManagementPlan,andwillbeadditionalresourcedocumentstotheIRWMP.
Attachment 4, Budget Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
ATTACHMENT4–BUDGETBUDGETSPROVIDED:SUMMARYANDDETAILEDAsummarybudgetfortheProposalandeachoftheIRWMPUpdateplanningcomponentsisprovidedasTable4‐1.WorkPlanTasksinthisProposalarenumberedasfollows:1.RecycledWaterMasterPlanUpdate2.RecycledWaterMasterPlanUpdateEnvironmentalImpactReport3.SantaClaritaValleyWaterUseEfficiencyStrategicPlanUpdate4.GrantAdministrationTables4‐2through4‐5providedetailedbudgetsforeachoftheindividualworkplantasksconsistentwiththecategoriesprovidedintheGuidelines.Alsoprovidedarethedetailedfeeestimatesforeachtask,providedattheendofthisAttachment.CONSISTENCYWITHWORKPLANANDSCHEDULEBoththeWorkPlanandScheduleprovidediscussionsoftheworkitemsunderthegeneralcategoriesoutlinedinthebudgetandarethusconsistentwiththebudgetitemsprovidedinthisattachment.REASONABLENESSOFDETAILEDCOSTSANDSUPPORTINGDOCUMENTATIONAlldetailedcostsshownforeachplanningcomponentarereasonableand,whereapplicable,supportinginformationhasbeenprovidedtojustifythecostestimates.Supportinginformationincludeslaborrates,laborcategories,andlaborhours;percentageoftotalusedtoapproximatecosts;and/orengineer’sestimateorsubmittedlowbidfromcontractor.FUNDINGMATCHTheproposalincludesafundingmatchattherequired25%match.Additionallysomeoftheindividualplanningworkitemshasafundingmatchwellabovetherequired25%match.Theproposalfundingmatchis25%ofthetotalcostoftheProposal.Thematchingfundswillcomefrompropertytaxes,connectionfeesandrevenuefromrates.
Attachment 4, Budget Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
TABLE 4-1 Summary Budget
Proposal Title: Upper Santa Clara River IRWMP Round 2, Proposition 84 Planning Grant
Individual Planning Item Title
Non-State Share
(Funding Match)
Requested Grant Funding
(DWR Grant Amount)
Other State Funds Being Used
Total %
Funding Match
Task1RECYCLEDWATERMASTERPLANUPDATE
$120,000 $360,000 $0 $480,000 25%
Task2RECYCLEDWATERMASTERPLANENVIRONMENTALIMPACTREPORT
$62,500 $187,500 $0 $250,000 25%
Task3SANTACLARITAVALLEYWATERUSEEFFICIENCYPLANUPDATE
$62,500 $187,500 $0 $250,000 25%
Task4 GRANTADMINISTRATION $9,188 $27,563 $0 $36,750 25%
GrandTotal $245,000 $735,000 $0 $980,000 25%
Attachment 4, Budget Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
TABLE 4-2 Project Budget
Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant
Project Title: TASK 1 Recycled Water Master Plan Update
(a) (b) (c) (d) (e)
Budget Category
Non-State Share*
(Funding Match)
Requested Grant
Funding
Other State Funds Being Used
Total %
Funding Match
Schedule
Task1RecycledWaterMasterPlanUpdate
Subtask1.1
RecycledWaterUserMapandHydraulicModelUpdate
$50,000 $0 $0 $50,000 100% Sept2010‐July2011
Subtask1.2
DraftRecycledWaterSystemAnalysis
$70,000 $0 $0 $70,000 100% Sept2011‐Aug2012
Subtask1.3
DraftRecycledWaterMasterPlan
$0 $324,000 $0 $324,000 0% Aug2012‐Dec2013
Subtask1.4
FinalRecycledWaterMasterPlan
$0 $36,000 $0 $36,000 0% Jan2014‐Aug2014
GrandTotal $120,000 $360,000 $0 $480,000 25%
*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.
Attachment 4, Budget Page 3 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
TABLE 4-3 Project Budget
Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant
Project Title: TASK 2 Recycled Water Master Plan Update Environmental Impact Report
(a) (b) (c) (d) (e)
Budget Category
Non-State Share*
(Funding Match)
Requested Grant
Funding
Other State Funds Being Used
Total %
Funding Match
Schedule
Task2 RWMPEIR
Subtask2.1
ProjectKick‐Off $625 $1,875 $0 $2,500 25% Jan2013‐Jan2013
Subtask2.2
NoticeofPreparation
$5,000 $15,000 $0 $20,000 25% Jan2013‐Feb2013
Subtask2.3
ConductRegularMeetings
$1,250 $3,750 $0 $5,000 25% Jan2013‐May2014
Subtask2.4
PrepareDraftEnvironmentalImpactReport(EIR)
$36,875 $110,625 $0 $147,500 25% Mar2013‐Feb2014
Subtask2.5
ReviewCommentsonDraftEIR
$2,500 $7,500 $0 $10,000 25% Mar2014‐Apr2014
Subtask2.6 PrepareFinalEIR $11,250 $33,750 $0 $45,000 25%
Mar2014‐Jun2014
Subtask2.7
DirectProjectManagement $5,000 $15,000 $0 $20,000 25%
Jan2013‐Jun2014
(i)GrandTotal $62,500 $187,500 $0 $250,000 25%
*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.
Attachment 4, Budget Page 4 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
TABLE 4-3 Project Budget
Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant
Project Title: TASK 3 Santa Clarita Valley Water Use Efficiency Plan Update
(a) (b) (c) (d) (e)
Budget Category
Non-State Share*
(Funding Match)
Requested Grant
Funding
Other State Funds Being Used
Total %
Funding Match
Schedule
Task3
SantaClaritaValleyWaterUseEfficiencyPlanUpdate
Subtask3.1
AnalysisofData $12,625 $37,875 $0 $50,500 25% Oct2012‐Dec2012
Subtask3.2
AssessConservationEfforts
$7,800 $23,400 $0 $31,200 25% Jan2013‐Feb2013
Subtask3.3
IdentifyandDevelopWaterConservationMeasures
$7,825 $23,475 $0 $31,300 25% Mar2013‐Apr2013
Subtask3.4
AssessCost‐Effectiveness $7,500 $22,500 $0 $30,000 25%
May2013‐Jun2013
Subtask3.5
DevelopConservationPlan $23,250 $69,750 $0 $93,000 25%
Jul2013‐Oct2013
Subtask3.6
ProjectManagement
$3,500 $10,500 $0 $14,000 25% Oct2012‐Oct2013
GrandTotal $62,500 $187,500 $0 $250,000 25%
*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates,bothfromwholesaleandcontributionstowardsmatchfromretailers.
Attachment 4, Budget Page 5 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
TABLE 4-5 Project Budget
Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant
Project Title: TASK 4 Grant Administration
(a) (b) (c) (d) (e)
Budget Category
Non-State Share*
(Funding Match)
Requested Grant
Funding
Other State Funds Being Used
Total %
Funding Match
Schedule
Task4 Reports
Subtask4.1
QuarterlyReport1 $375 $1,125 $0 $1,500 25% Apr2012
QuarterlyReport2 $375 $1,125 $0 $1,500 25% Jul2012
QuarterlyReport3 $375 $1,125 $0 $1,500 25% Oct2012
QuarterlyReport4 $375 $1,125 $0 $1,500 25% Jan2013
QuarterlyReport5 $375 $1,125 $0 $1,500 25% Apr2013
QuarterlyReport6 $375 $1,125 $0 $1,500 25% Jul2013
QuarterlyReport7 $375 $1,125 $0 $1,500 25% Oct2013
QuarterlyReport8 $375 $1,125 $0 $1,500 25% Jan2014
QuarterlyReport9 $375 $1,125 $0 $1,500 25% Apr2014
Subtask4.2
GrantAgreementCompletionFinalReport
$1,775 $5,325 $0 $7,100 25% Jul2014
Subtask4.3
Administration $4,038 $12,113 $0 $16,150 25% Apr2012‐Jul2014
GrandTotal $9,188 $27,563 $0 $36,750 25%
*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.
Attachment 4, Budget Page 6 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc
USCR IRWMP R2 Prop 84_Recycled Water Master Plan Update Task 1
Sub
Classification: Total To
tal
Lab
or
Co
nsu
ltan
t
OD
Cs
Hourly Rate: $126 $124 $84 $63 $48 Hours Fees Fees Fees Fees
Task 1 - Recycled Water Master Plan Update
Subtask 1.1 Recycled Water User Map and Hydraulic Model Update See next backup sheet $50,000 $50,000
Subtask 1.2 - Draft Recycled Water System Analysis See next backup sheet $70,000 $70,000
Subtask 1.3 - Draft Recycled Water Master Plan 0 $0 $0 $0
1.3.1 Review Previous Documents 10 10 20 60 20 120 $8,920 $0 $8,920
1.3.2 Incorporate Regulations 10 10 10 20 0 50 $4,600 $0 $4,600
1.3.3 Finalize Analysis & Coordinate w/ Purveyors & SCV Sanitation District 20 40 80 20 40 200 $17,380 $500 $500 $17,880
1.3.4 Identify and Evaluate Recycled Water System Implementation Phases 60 60 80 40 0 240 $24,240 $0 $24,240
1.3.5 Revise Recycled Water Hydraulic Model 40 16 60 10 0 126 $12,694 $180,000 $180,000 $192,694
1.3.6 Prepare Draft Recycled Water Master Plan 40 20 100 120 80 360 $27,320 $2,000 $2,000 $29,320
1.3.7 Present and Coordinate Draft RWMP with Purveyors and SCV Sanitation District 20 20 20 10 16 86 $8,078 $0 $8,078
Subtask 1.4 - Final Recycled Water Master Plan 0 $0 $0 $0
1.4.1 Review comments on Draft RWMP 10 10 40 16 10 86 $7,348 $0 $7,348
1.4.2 Finalize Hydraulic Model 40 10 60 20 10 140 $13,060 $30,000 $30,000 $43,060
1.4.3 Prepare Final RWMP 20 20 40 80 40 200 $15,320 $1,500 $1,500 $16,820
1.4.4 Present Final RWMP to Purveyors and SCV Sanitation District 10 10 20 16 16 72 $5,956 $500 $500 $6,456
Task 3 - Subtotal 280 226 530 412 232 1680 $144,916 $210,000 $4,500 $334,500 $479,416
All Tasks Total 280 226 530 412 232 1680 $144,916 $210,000 $4,500 $334,500 $479,416
To
tal L
a bo
r +
Ex p
en
s es
To
tal E
xpen
ses
Bri
an F
ols
om
Jeff
Fo
rd
Jaso
n Y
im
Lau
ren
Eve
rett
Kat
hy
Fen
del
USCR IRWMP R2 Prop 84_Recycled Water Master Plan Update EIR Task 2
Je
ff F
ord
La
ure
n E
ve
rett
To
tal
La
bo
r +
E
xp
ens
es
Na
nc
y W
arf
el
To
tal
Ex
pe
ns
es
Sub
Classification: Total To
tal
La
bo
r
Co
mm
. C
ha
rge
s
Co
ns
ult
an
t
OD
Cs
Hourly Rate: $124 $63 $44 Hours Fees 0% Fees Fees Fees
Task 2 - Recycled Water Master Plan Update EIR
Subtask 2.1 Project Kick-Off 8 20 2 30 $2,340 $0 $150 $162 $2,502
Subtask 2.2 - Notice of Preparation 60 120 80 260 $18,520 $0 $1,500 $1,500 $20,020
Subtask 2.3 - Conduct Regular Meetings 14 40 6 60 $4,520 $0 $500 $500 $5,020
Subtask 2.4 - Prepare Draft EIR 140 180 64 384 $31,516 $0 $115,000 $1,000 $116,000 $147,516
Subtask 2.5 - Review Comments on Draft EIR 40 59 30 129 $9,997 $0 $0 $0 $9,997
Subtask 2.6 - Prepare Final EIR 20 44 16 80 $5,956 $0 $35,000 $4,000 $39,000 $44,956
Subtask 2.7 -Direct Project Management 60 165 27 252 $19,023 $0 $1,000 $1,000 $20,023
Task 2 - Subtotal 342 628 225 1195 $91,872 $0 $150,000 $8,150 $158,162 $250,034
All Tasks Total 342 628 225 1195 $91,872 $0 $150,000 $8,150 $158,162 $250,034
Je
ff F
ord
La
ure
n E
ve
rett
To
tal
La
bo
r +
E
xp
ens
es
Na
nc
y W
arf
el
To
tal
Ex
pe
ns
es
USCR IRWMP R2 Prop 84_Santa Clarita Valley Water Use Efficiency Strategic Plan Task 3
Sub
Classification: Total To
tal
Lab
or
Co
nsu
ltan
t
OD
Cs
Hourly Rate: $123 $67 $61 $54 $44 $40 $44 Hours Fees Fees Fees Fees
Task 3 - Santa Clarita Valley Water Use Efficiency Plan Update
Subtask 3.1 Analysis of Data 10 10 10 20 10 10 20 90 $5,310 $45,000 $200 $45,216 $50,526
Subtask 3.2 - Assess Conservation Efforts 10 20 20 40 20 20 80 210 $11,150 $20,000 $100 $20,100 $31,250
Subtask 3.3 - Identify and Develop Water Conservation Measures 10 5 5 40 5 5 40 110 $6,210 $25,000 $100 $25,100 $31,310
Subtask 3.4 - Assess Cost-Effectiveness 10 5 5 20 5 5 20 70 $4,250 $25,000 $500 $25,500 $29,750
Subtask 3.5 - Develop Conservation Plan 10 30 30 90 30 30 90 310 $16,410 $75,000 $1,500 $76,500 $92,910
Subtask 3.6 -Project Management 10 0 0 200 0 0 40 250 $13,790 $500 $500 $14,290
Task 3 - Subtotal 60 70 70 410 70 70 290 1040 $57,120 $190,000 $2,900 $192,916 $250,036
All Tasks Total 60 70 70 410 70 70 290 1040 $57,120 $190,000 $2,900 $192,916 $250,036
Dir
k M
arks
Cat
hy
Ho
llom
on
Mat
t D
icke
ns
Ste
ph
anie
An
ang
on
son
Ro
ber
t M
cLau
gh
lan
To
t al L
a bo
r +
Ex p
en
s es
Co
un
ty C
on
serv
atio
n C
oo
rdin
ato
r
Nan
cy W
arfe
l
To
tal E
xpen
ses
USCR IRWMP R2 Prop 84_Grant Admin Task 4
Je
ff F
ord
La
ure
n E
ve
rett
To
tal
Ex
pe
ns
es
To
tal
Lab
or +
E
xpe
ns
es
Na
nc
y W
arf
el
Classification: Total To
tal
La
bo
r
OD
Cs
Hourly Rate: $124 $63 $44 Hours Fees Fees Fees
Task 4 - Reports
Subtask 4.1 Quarterly Report 1 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 - Quarterly Report 2 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 - Quarterly Report 3 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 - Quarterly Report 4 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 - Quarterly Report 5 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 -Quarterly Report 6 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 -Quarterly Report 7 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1 -Quarterly Report 8 5 12 12 29 $1,904 $25 $25 $1,929
Subtask 4.1- Quarterly Report 9 5 12 12 29 $1,904 $25 $25 $1,929Subtask 4.2- Grant Agreement Completion Final Report 12 48 24 84 $5,568 $100 $100 $5,668
Subtask 1.3- Administration 40 100 50 190 $13,460 $260 $260 $13,720
Task 1 - Subtotal 97 256 182 535 $36,164 $585 $585 $36,749
All Tasks Total 97 256 182 535 $36,164 $585 $585 $36,749
Je
ff F
ord
La
ure
n E
ve
rett
To
tal
Ex
pe
ns
es
To
tal
Lab
or +
E
xpe
ns
es
Na
nc
y W
arf
el
Attachment 5, Schedule Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att5_pg2_clwa_schedule_1of2.doc
ATTACHMENT5–SCHEDULEINTRODUCTIONAdetailedschedulefortheProposalandeachofitscomponentsisprovidedasTable5‐1(Att5_PG2_CLWA_Schedule2of2).ThescheduleisconsistentwiththecategoriesprovidedintheGuidelines.ThescheduleshowsthesequenceandtimingofworkplanningitemspresentedintheProposalandassumestheeffectivedateofthegrantagreementtobeAugust6,2012.Thescheduleshowsthestartdates,enddates,andmilestonesforeachplanningitemcontainedintheAttachment3WorkPlan,andwhenapplicable,dependenceonpredecessorsisalsoshown.WorkPlanTasksinthisProposalarenumberedasfollows:1.RecycledWaterMasterPlanUpdate2.RecycledWaterMasterPlanUpdateEnvironmentalImpactReport3.SantaClaritaValleyWaterUseEfficiencyStrategicPlanUpdate4.GrantAdministrationCONSISTENCYWITHWORKPLANBoththeAttachment3WorkPlanandProposalscheduleprovidediscussionsoftheworkitemsunderthegeneralcategoriesoutlinedinthebudgetandarethusconsistentwitheachotherandthebudget.IRWMPDEVELOPMENTANDADOPTIONAllworkitemscontributetothedevelopmentandenhancementoftheIRWMP.TheIRWMPhasalreadybeenadoptedbytheindividualRWMGmembers,andcollectivelyasagroup.Re‐adoptionoftheplaninthefuturewilloccurafterthecurrentupdateofthePlaniscomplete;howevertimingisunknownandnotdependentontheseapplicationfunds.TheApplicantisaPublicAgency
Attachment 5, Schedule Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att5_pg2_clwa_schedule_1of2.doc
ID Task Name Start Finish
1 Effective Date of Grant Agreement Mon 8/6/12 Mon 8/6/122
3 Task 1 - Recycled Water Master Plan Update Thu 9/30/10 Fri 8/29/144 Subtask 1.1 Recycled Water User Map and Hydraulic Model Update Fri 9/3/10 Fri 7/29/115 Subtask 1.2 Draft Recycled Water System Analysis Fri 7/29/11 Fri 8/3/126 Subtask 1.3 Draft Recycled Water Master Plan Fri 8/3/12 Tue 12/31/137 Subtask 1.4 Final Recycled Water Master Plan Fri 5/30/14 Fri 8/29/148
9 Task 2 - Recycled Water Master Plan Update EIR Fri 1/4/13 Tue 6/24/1410 Subtask 2.1 Project Kick-Off Fri 1/4/13 Fri 1/4/1311 Subtask 2.2 Notice of Preparation Mon 1/7/13 Fri 2/15/1312 Subtask 2.3 Conduct Regular Meetings Fri 1/4/13 Fri 5/30/1413 Subtask 2.4 Prepare Draft Environmental Impact Report (EIR) Mon 3/11/13 Tue 2/11/1414 Subtask 2.5 Review Comments on Draft EIR Tue 3/11/14 Tue 4/15/1415 Subtask 2.6 Prepare Final EIR Tue 3/11/14 Tue 6/24/1416 Subtask 2.7 Direct Project Management Fri 1/4/13 Tue 6/24/1417
18 Task 3 - Santa Clarita Valley Water Use Efficiency Plan Update Thu 10/4/12 Thu 10/31/1319 Subtask 3.1 Analysis of Data Thu 10/4/12 Fri 12/28/1220 Subtask 3.2 Assess Conservation Efforts Tue 1/1/13 Thu 2/28/1321 Subtask 3.3 Identify and Develop Water Conservation Measures Fri 3/1/13 Tue 4/30/1322 Subtask 3.4 Assess Cost-Effectiveness Wed 5/1/13 Fri 6/28/1323 Subtask 3.5 Develop Conservation Plan Mon 7/1/13 Thu 10/31/1324 Subtask 3.6 Direct Project Management Thu 10/4/12 Thu 10/31/1325
26 Task 4 - Grant Administration Thu 10/25/12 Thu 7/24/1427 Grant Administration Thu 10/25/12 Thu 7/24/1428 Subtask 4.1 Combined Quarterly Reports Thu 10/25/12 Thu 7/24/1429 Submit Quarterly Report Thu 10/25/12 Thu 10/25/1230 Submit Quarterly Report Thu 1/24/13 Thu 1/24/1331 Submit Quarterly Report Thu 4/25/13 Thu 4/25/1332 Submit Quarterly Report Thu 7/25/13 Thu 7/25/1333 Submit Quarterly Report Thu 10/24/13 Thu 10/24/1334 Submit Quarterly Report Thu 1/23/14 Thu 1/23/1435 Submit Quarterly Report Thu 4/24/14 Thu 4/24/1436 Submit Quarterly Report Thu 7/24/14 Thu 7/24/1437 Subtask 4.2 Grant Agreement Completion Final Report Thu 7/24/14 Thu 7/24/1438 Subtask 4.3 Administration Thu 10/25/12 Thu 7/24/14
10/25
1/24
4/25
7/25
7/24
7/24
Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul SepQtr 3, 2010 Qtr 1, 2011 Qtr 3, 2011 Qtr 1, 2012 Qtr 3, 2012 Qtr 1, 2013 Qtr 3, 2013 Qtr 1, 2014 Qtr 3, 2014
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
Progress
Deadline
Table 5-1UPPER SANTA CLARA RIVER IRWMP ROUND 2, PLANNING GRANT
PROPOSAL SCHEDULE
Page 1
Project: IRWMP R2 Planning Grant_PrDate: Wed 3/7/12
Attachment 6, Program Preferences Page 1 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc
ATTACHMENT6–PROGRAMPREFERENCESTheRound1PlanningGrantapplicationdiscussedhowtheUpperSantaClaraIRWMPgroupintendedtoupdatetheIRWMPanddescribedhowtheIRWMPupdatewilladdresstheProgramPreferencesandStatewidePrioritiesinProposition84.TheIRWMPupdateiscurrentlyunderwayasisprogresstowardsmeetingtheseProgramPreferencesandStatewidePriorities.Further,thedevelopmentoftheRecycledWaterMasterPlanUpdate(RWMPUpdate)andassociatedCaliforniaEnvironmentalQualityAct(CEQA)document,andtheUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlan(SCVWUESP)proposedaspartofthisRound2PlanningGrantwillhelptofurtheraddresssomeofthespecificProgramPreferencesandStatewidePrioritiesinmuchmoredetail,assummarizedinthefollowingtableanddiscussedfurtherbelow.
ProgramPreferencesUpdateRecycled
WaterMasterPlan
andCEQADocument
SCVWaterUse
EfficiencyStrategic
PlanUpdate
INCLUDEREGIONALPROJECTS/PROGRAMS INTEGRATEWATERMANAGEMENTWITHINHYDROLOGICREGION EFFECTIVELYRESOLVESIGNIFICANTWATER‐RELATEDCONFLICTS CONTRIBUTETOATTAINMENTOFCALFEDBAY‐DELTAPROGRAM ADDRESSCRITICALWATERSUPPLY/QUALITYNEEDSOFADAC INTEGRATEWATERMANAGEMENTWITHLANDUSEPLANNING FORFLOODMANAGEMENTPROJECTSTHATPROVIDEMULTIPLEBENEFITS
ADDRESSSTATEWIDEPRIORITIESOF: A.DROUGHTPREPAREDNESS B.USEANDREUSEWATERMOREEFFICIENTLY C.CLIMATECHANGERESPONSEACTIONS D.EXPANDENVIRONMENTALSTEWARDSHIP E.PRACTICEINTEGRATEDFLOODMANAGEMENT F.PROTECTSURFACEWATERANDGROUNDWATERQUALITY G.IMPROVETRIBALWATERANDNATURALRESOURCES H.ENSUREEQUITABLEDISTRIBUTIONOFBENEFITS I.INTEGRATESTORMWATERRESOURCEPLANREQUIREMENTS
Attachment 6, Program Preferences Page 2
ProgramPreferences
IncludeRegionalProjectsorPrograms
TheSCVWUESPwasdevelopedoutofacollaborativeprocessofallthepublicwatersystemsintheValley(CastaicLakeWaterAgency(CLWA),ValenciaWaterCompany,SantaClaritaWaterDivision,NewhallCountyWaterDistrict,andLosAngelesWaterworksDistrict36)aswellasotherstakeholders.CurrentlyfourofthedemandmanagementprojectswithintheSCVWUESParebeingimplementedwithfundingtobereceivedfromProposition84Round1implementationfunds.UpdateoftheSCVWUESPwillaffecttheentireCLWAservicearea,includingtheserviceareasofthefourretailers.TheSCVWUESPwillbeusedtodevelopaconservationstrategydeterminingtheamountofconservationthatisrequiredtomeettheSBx7‐7(20x2020)demandgoals.Thiswillbeintertwinedwithastrategyofefficientrecycledwateruse,asacombinationofrecycledwaterandconservationcanbeusedtohelptheregioninmeetingitsfuture20x2020goals.Therefore,theupdateofCLWA’sRWMPandtheupdateoftheSCVWUESPareperfectlytimedtogether.TheupdateoftheRWMPincludestheregionalimplementationprojecttheSouthernEndRecycledWaterSystemProject(Phase2C)alsocurrentlybeingfundedbyRound1implementationfunds,andwillalsohelptoidentifythosefuturelocationsoftheremainingphasesofthebuildoutoftheRWMP.
IntegrateWaterManagementwithinHydrologicRegion
UpdatingoftheRWMPandtheSCVWUESPtogethermaximizetheinterconnectionbetweenconservationandprojectingofrecycledwaterusethatisanticipatedwithintheValley,andhelptoidentifywhatrecycledwaterprojectsandconservationstrategiesincombinationwillbethemosteffectivewithinCLWA’sandtheretailerserviceareas.UpdatingofthesedocumentsinthecontextoftheIRWMPwillallowforacombinationofthoseprojectsandstrategiestoachievemultiplegoalswithinacoordinatedimplementationeffort.
EffectivelyResolveSignificantWater‐RelatedConflicts
VarioususersoftheSantaClaraRiverhavebeenindisputeoveracceptablelevelsofchloridesaltintheriveraswellasacceptablemethodstomanageandreducechloridelevels.IntheUpperSantaClaraRiver,therivergainschloridesthroughthedischargeoftreatedwastewaterandtheuseofself‐regeneratingwatersofteners(nowbannedintheSantaClaritaValleySanitationDistrict[SCVSD]servicearea).Affecteddownstreamusersincludefarmersgrowingstrawberries,avocados,andnurserycrops.Thereinexiststheconflict,aneedtoprovidewaterandsanitaryservicestotheupperwatershedatareasonablecostandaneedtoprovidelow‐saltwatertodownstreamagriculturalusers.Droughtincreasesthesaltinthewatersuppliesfortheupperwatershedresultinginelevatedchloridelevelsintreatedwaterdischargedtotheriver.
Attachment 6, Program Preferences Page 3 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc
CLWA provides recycled water to the Santa Clarita Valley as the water wholesaler. In the current RWMP, CLWA projects an increasing need for recycled water that will reach 17,400 acre-feet per year by 2030. To meet the project objective of accommodating recycled water reuse opportunities, the SCVSD would make recycled water available in quantities needed to support CLWA’s RWMP. Using recycled water reduces the use of potable water and eases concerns of a water shortage during drought. Use of recycled water would use the expected growth in treated effluent as its source of supply. Therefore, updating of the RWMP will inform the capital program decisions facing the SCVSD in this effort.
ContributetoAttainmentofCALFEDBay‐DeltaProgram
ThefourCALFEDBay‐DeltaProgramobjectivescanbesummarizedasfollows:
1. EcosystemQuality
2. WaterSupply
3. WaterQuality
4. LeveeSystemIntegrityTheUpperSantaClaraIRWMPregionpartiallyreceivesStateWaterProjectwaterdeliveredthroughtheDelta;actionswithintheRegioncouldcontributetothesuccessofCALFEDBay‐DeltaProgramobjectives.TheIRWMPStakeholdersmadereductioninpotablewaterdemandoneoftheregionalobjectives.Thecurrenttargetforthatobjectiveisa“tenpercentoverallreductioninprojectedurbanwaterdemandthroughouttheRegionby2030throughimplementationofwaterconservationmeasures”.AnyreductioninwaterdemandwouldreducedemandonimportedwaterandcontributetotheattainmentofCALFEDobjectives.Additionally,SBx7‐7hasbeenenacted,mandatingthaturbanwatersuppliersreducestatewidewateruse(ingallonspercapitaperday)by20percentby2020.MethodsofcomplyingwithSBx7‐7includeenhancedwaterconservation,wateruseefficiency,anduseofrecycledwater.UpdatingoftheRWMPandtheSCVWUESPtogethermaximizetheinterconnectionbetweenconservationandprojectingofrecycledwaterusethatisanticipatedwithintheValley,andhelptoidentifywhatrecycledwaterprojectsandconservationstrategiesincombinationwillbemosteffectivewithinCLWA’sandtheretailerserviceareas.UpdatingofthesedocumentsinthecontextoftheIRWMPwillallowforacombinationofthoseprojectsandstrategiestoachievemultiplegoalswithinasingleimplementationeffort,andthereforewouldcontributetotheattainmentofCALFEDobjectives.
Attachment 6, Program Preferences Page 4
AddressWaterSupplyandWaterQualityNeedsofDisadvantagedCommunities
DuringdevelopmentoftheIRWMP,nocommunitiesthatmetthestrictStatedefinitionofaDisadvantagedCommunity(DAC)wereidentified.However,inthespiritofproviding“asafe,clean,affordable,andsufficientwatersupplytomeettheneedsofCaliforniaresidents,farms,andbusinesses”,anoutreacheffortdirectedatDACmemberswasdevelopedandaDACOutreachSubcommitteetotheRegionalWaterManagementGroupwasformed.TheDACOutreachsubcommitteecontactedDACmembersthroughopinionsurveysinareaswhereeconomicallydisadvantagedpeoplewerelikelytoseekservices.ThesesurveysdidnotidentifyanywaterqualityorsupplyissuesuniquetoDACs.WiththerecentcompletionoftheCountyofLosAngeles’sOneValleyOneVision(OVOV)landuseplanningdocument,theOVOVupdateoftheCityofSantaClaritaGeneralPlan,andthe2010Censusdata,thereisawealthofnewinformationavailabletoassistinidentifyingexistingandpotentialnewstakeholders,includingDAC’s,tribalcommunities,andenvironmentaljusticecommunities.ThesetypesofoutreacheffortsarecontinualeffortsaspartoftheUSCRIRWMPandwillbethroughouttheIRWMPUpdate.Itishopedthatthe2010CensuswillmakeiteasiertoidentifyandcoordinatewithDACsandtoidentifyandaddresspotentialwaterqualityorwatersupplyissuesofthesecommunities.
EffectivelyIntegrateWaterManagementwithLandUsePlanning
UpdatingoftheSCVWUESPandRWMPareadirectresponsetotheneedtoaccommodateanticipatedpopulationgrowth,intimeswhenimportedsuppliesmaybelessviableandthereisaneedtoreducedemand(20x2020).Twoprojectscurrentlybeingimplemented(andwhichreceivedImplementationGrantRound1funds),areprojectsfromwithintheSCVWUESPandtheRWMP.ThefourWUEprogramswithintheSCVWUESParedesignedtohelpCLWAandthewaterretailersmeettheir20x2020requirementsunderSBx7‐7.SantaClaritaValleyLargeLandscapeAudit&IncentiveProgramwilltargettheCityofSantaClaritaLandscapeMaintenanceDistricts,LosAngelesCountyParksandHomeowner’sAssociations.SantaClaritaValleyCIIAudit&CustomizedIncentiveProgramwilltargetmajornon‐residentialusersincludingamusementparks,collegesanduniversities,hotels,hospitalsandothercustomersidentifiedbytheretailwateragencies.ResidentialSCVLandscapeContractorCertificationandWeather‐BasedIrrigationcontroller(WBIC)ProgramwouldtargetalllandscapecontractorsandmaintenancecompaniesintheSantaClaritaValley.RecycledwaterfromtheSantaClaritaValleySouthernEndRecycledWaterProjectimplementationprojectwillbeusedforlandscapeassociatedwithparks,schoolsaswellasprivatedevelopment.InstallationofWBICscomplementstherecycledwaterprogramtoreducepotabledemandoflandscapesorstretchrecycledsuppliesfurther.
UpdatingoftheSCVWUESPandRWMPwillalsoinformthenextupdateoftheUrbanWaterManagementPlan(2015),andrequirecoordinationwithlocalplanningagenciesandwiththeLosAngelesCountyandCityofSantaClarita’sOneValleyOneVisiondocumentGeneralPlanUpdates.
Attachment 6, Program Preferences Page 5 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc
ForFloodManagement–ProjectsThatProvideMultipleBenefits
ThisapplicationisnotseekingProposition1EfundingandthereforethisProgramPreferenceisnotapplicable.
StatewidePriorities
DroughtPreparedness
ThreeofthefiveobjectiveswithintheIRWMPrelatetodroughtpreparedness:
o ReduceWaterDemandbyimplementingtechnological,legislativeandbehavioralchangesthatwillreduceusedemandsforwater.
o ImproveOperationalEfficiencybymaximizingwatersystemoperationalflexibilityandefficiency,includingenergyefficiency.
o IncreaseWaterSupplybyunderstandingfutureregionaldemandsandobtainnecessarywatersupplysources.
Onewaytolessentheseverityofadrought’seffectonSantaClaritaValleyistoprepareinadvanceby: (a) diversifying the various sources of supply, (b) developing a “drought‐proof” supply, (c)identifyingthetypesofwaterusesintheRegion,and(d)reducingdemandfromnon‐essentialuses.
UpdatingtheRWMPandSCVWUESPdirectlycontributetotheattainmentoftheseobjectivesbyreducingpotabledemands,bydevelopingaconservationstrategythatusesbothrecycledwaterandconservationinordertomeetfuture20x2020demandgoals.Additionally,datagatheredaspartofthetwoupdateswillprovideapictureofvariouswaterusesintheSantaClaritaValley.Thisdatawillhelptargetwaterdemandreductionsunderallconditions,butcouldbevitalinreducingnon‐essentialusesintheeventofadrought.
UseandReuseWaterMoreEfficiently
SBx7‐7mandatesthaturbanwatersuppliersreducestatewidewateruse(ingallonspercapitaperday)by20percentby2020.MethodsofcomplyingwithSBx7‐7includeenhancedwaterconservation,wateruseefficiency,andrecycledwateruse.TheSCVWUESPwillbeusedtodevelopaconservationstrategydeterminingtheamountofconservationthatisrequiredtomeettheSBx7‐7demandgoals.Thiswillbeintertwinedwithastrategyofefficientrecycledwateruse,asacombinationofrecycledwaterandconservationcanbeusedtohelptheregioninmeetingitsfuture20x2020goals.Therefore,theupdateoftheCLWA’sRWMPisperfectlytimedforanupdatewiththeSCVWUESP.TheupdateoftheIRWMPplanwillprovideaforumfortheRegionasawholetoaddresswateruseefficiencyandrecycledwateruse.
Attachment 6, Program Preferences Page 6
ClimateChangeResponseActions
Theprojectsproposedinthisproposaladdressadaptationtoclimatechange.ImplementationofthisproposalwoulddiversifythesupplysourcesavailableintheRegion,promotewateruseefficiency,andresultinincreasedwaterrecycling.Importantly,thenewrecycledwatersupplysourcewillrequirelessenergyandresultinfewergreenhousegasemissionsthanalikeamountofimportedwater.Energysavings(andgreenhousegasemissionreductions)arealsoenhancedbyreducedwaterdemands.TheconservationprogramsthatwillbedevelopedwithintheupdateoftheSCVWUESPwillreducenotonlywaterdemand,butwastewatertreatmentdemandsaswell.
ExpandEnvironmentalStewardship
The Environmental Impact Report (EIR) for the update of the RWMP will evaluate all of the direct, indirect and cumulative impacts that implementation of recycled water projects within the Santa Clarita Valley would have on the environment. Further, both projects promote stewardship through conservation of resources, and protection of water quality.
PracticeIntegratedFloodManagement
The SCVSD provides wastewater management services for the City of Santa Clarita and adjacent unincorporated areas. The SCVSD collects wastewater from households and businesses within its service area and treats the wastewater at its Saugus and Valencia Water Reclamation Plants. Most of the treated wastewater is not currently reused and is discharged to the Santa Clara River. TheRWMPUpdatewillseekoutadditionalwaysputmorewastewaterfromtheregiontobeneficialuseandtomakeitfeasibletodeliverrecycledwatertomoreendusersinthefuture.ThiswillchangetheflowsintotheSantaClaritaRiverwhichmayhaveanimpactonfloodingdownstream.ThiswillbeinfluencedbytheRWMPUpdateanddiscussedaspartoftheSCVSD’sEIRfortheirproject.
ProtectSurfaceWaterandGroundwaterQuality
Allprojectsassociatedwiththisproposalprotectsurfaceandgroundwaterquality.
ProgramswithintheSCVWUESPtargetoutdoorwaterapplication,includinglargelandscapeaudits,installationofWBICs,andspecializedtrainingforlandscapecontractorsandmaintenancecompanies.Theseprogramswilllimitapplicationofexcessivewaterand,therefore,undesirablesaltsandnutrientstothelandscape.Theseprogramswillreducerunoffandimprovethequalityofanyreceivingwaters.Inaddition,wateruseinformationfromtheauditsandlandscapeprogramswillallowtheRegiontobettermanagethesaltsandnutrientsthroughreductionsofwateruse,andgreateraccountingofwheresaltsandnutrientsareappliedinthewatershed.
UpdatingoftheRWMPwillhelptodevelopandimplementrecycledwaterprojectsthatbothsecurewatersuppliesforbeneficialuseswhileguardinggroundwaterquality.TheprojectswillneedtobeimplementedinconcertwiththeSaltandNutrientManagementPlancurrentlyindevelopmentfor
Attachment 6, Program Preferences Page 7 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc
thebasin.TheSaltandNutrientManagementPlanallowstheregiontomosteffectivelyuserecycledwaterwithoutdegradingthelocalgroundwatersupply.
ImproveTribalWaterandNaturalResources
TheSantaClaritaValleyiswithinthehistoricrangeoftheTataviamBandofMissionIndians,thoughtherearenodesignatedtriballandswithinthewatershed.TheIRWMPhassolicitedtheinputandparticipationfromabroadStakeholdergroup,includingaspecificsolicitationtotheTataviam.Unfortunately,notribalrepresentativeshaveparticipatedtodate.TheIRWMPStakeholderswillcontinuetosolicittribalparticipation.
EnsureEquitableDistributionofBenefits
Asdescribedearlier,theIRWMPhasnotidentifiedcommunitiesthatmettheStatedefinitionforaDAC.AdditionaloutreachdirectedateconomicallydisadvantagedareasandpopulationsdidnotfindanywaterqualityorsupplyissuesuniquetoDACs.Likewise,outreachtoCaliforniaNativeAmericanTribesdidnotidentifyanycriticaluniquewatersupplyorwaterqualityneeds.However,thisproposalcontainsregionalprojectandprogramsthatbenefitalargegeographicarea.Theprojectsandprogramsofthisproposaldonotadverselyaffectoneparticulargroupbutratherequitablydistributebenefitstoabroadgeographicareaandallresidentsandwaterusersofthatarea.
IntegrateStormwaterResourcePlanRequirements
Achievingincreasedwateruseefficiencyoutdoorsmeanslesswaterrunningofflandscapedareasintothestreets,stormdrains,andultimatelyintotheSantaClaraRiver.TheSCVWUESPcombineseducationeffortsandefficienttechnologiestoensurethatmoreofourvaluablewateraredeliveredtoappropriatelandscapingandlessofitpollutesourcommunitiesasurbanrunoff. Capturing,storing,treatingandusingurbanstormwaterrunoff(suchaspercolationtousableaquifers,domesticstormwatercapturesystems,orthecreationofcatchbasins),andtheincorporationandimplementationoflowimpactdevelopmentaremethodscouldaddflexibilitytotheareasoverallwatersuppliesandprovideincreasedefficiency.
Attachment 7, 1420 Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att7_pg2_clwa_1420_1of4.doc
ATTACHMENT7–AB1420ANDWATERMETERIMPLEMENTATIONCOMPLIANCE
CastaicLakeWaterAgency(CLWA)istheapplicantandalsotheUrbanWaterSupplierthatwillbereceivingfundingfromthisRound2PlanningGrantshouldtheAgencybeawardedfunding. Self‐certificationformsfordocumentingcompliancewithCaliforniaWaterCode(CWC)§525forWaterMeter Installation and Assembly Bill (AB) 1420 for Best Management Practice implementationwere originally provided as part of the Round 1 Planning Grant and Implementation Grantapplications.Therefore,currentforms,albeitnochangeshavebeenmadehavebeensubmittedasAtt7_PG2_CLWA_1420_2of4andAtt7_PG2_CLWA_1420_3of4.Inaddition,documentationprovidedas Att7_PG2_CLWA_1420_4of4 is DWR’s compliance letter which provides DWR’s review andacceptanceoftheAgency’sconformancewithAB1420.
Attachment 7, 1420 Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att7_pg2_clwa_1420_1of4.doc