ATTACHMENT 1 AUTHORIZING DOCUMENTATION

56
Attachment 1, Authorizing Documentation Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att1_pg2_authorizingdocumentation_1of2.doc ATTACHMENT 1 – AUTHORIZING DOCUMENTATION Attached (Att1_PG2_CLWA_AuthorizingDocumentation_2of2) is the resolution adopted on February 8, 2012 by the Board of Director’s of the Castaic Lake Water Agency (CLWA) designating the CLWA, an authorized representative, to file an application for a Round 2 Proposition 84 IRWM Planning Grant with the California Department of Water Resources and execute an agreement with the State of California for an IRWM Round 2 Planning Grant.

Transcript of ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 1: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 1, Authorizing Documentation Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att1_pg2_authorizingdocumentation_1of2.doc

ATTACHMENT1–AUTHORIZINGDOCUMENTATION Attached(Att1_PG2_CLWA_AuthorizingDocumentation_2of2)istheresolutionadoptedonFebruary8,2012bytheBoardofDirector’softheCastaicLakeWaterAgency(CLWA)designatingtheCLWA,anauthorizedrepresentative,tofileanapplicationforaRound2Proposition84IRWMPlanningGrantwiththeCaliforniaDepartmentofWaterResourcesandexecuteanagreementwiththeStateofCaliforniaforanIRWMRound2PlanningGrant.

Page 2: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 1, Authorizing Documentation Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att1_pg2_authorizingdocumentation_1of2.doc

Page 3: ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Page 4: ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Page 5: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 2, Eligible Applicant Documentation Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att2_pg2_eligibleapplicantdocumentation_1of1.doc

ATTACHMENT2–ELIGIBLEAPPLICANTDOCUMENTATION1. Is the applicant a local agency as defined in Appendix B of the Guidelines? Please explain. Answer:Yes.Theapplicant for the IntegratedRegionalWaterManagementPlanningGrant is theCastaic LakeWater Agency (CLWA). CLWA is a public agency, as defined in Appendix B of theGuidelines, which is defined as any city, county, city and county, special district, joint powersauthority,orotherpoliticalsubdivisionoftheState,apublicutilityasdefinedinSections216ofthePublicUtilitiesCode,oramutualwatercompanyasdefinedinSection2725ofthePublicUtilitiesCode(CaliforniaWaterCode§Section10535).TheCLWAisapublicagencyformedandestablishedby the California State Legislature in 1962 for the principal purpose of providing importedNorthern California water for use within and adjacent to the Santa Clarita Valley (refer CWCAppendix§Section103). 2. What is the statutory or other legal authority under which the applicant was formed and is authorized to operate? Answer: Applicant was formed and is authorized to operate pursuant to California Water CodeAppendix,Chapter103adoptedin1962. 3. Does the applicant have legal authority to enter into a grant agreement with the State of California? Answer:Yes.TheCLWAhasthelegalauthoritytoenterintoagrantagreementascitedintheFebruary8,2012resolution, which is attached (Att1_PG2_CLWA_AuthorizingDocumentation_2of2). The resolutionauthorizes the CLWA to file an application for a Round 2 Proposition 84 IRWMPlanning Grant,designates the CLWA as the authorized representative to file the applicationwith the CaliforniaDepartmentofWaterResourcesandauthorizesCLWAtoexecuteanagreementwith theStateofCaliforniaforanIRWMPlanningGrant. 4. Describe any legal agreements among partner agencies and/or organizations that ensure performance of the proposal and tracking of funds. Answer: CLWA may enter into an agreement with an outside entity to assist with grantadministrationfunctions.SuchanagreementwouldbeprepareduponawardoftheProposition84fundstoensureperformanceoftheproposalandthetrackingoffunds.ShouldCLWAenterintoagrantagreementwiththeState,thescopeofworkcontainedhereinwillbecomearequirementandwillbesubmittedalongwithotheritemsrequiredbythegrantcontract.

Page 6: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 2, Eligible Applicant Documentation Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att2_pg2_eligibleapplicantdocumentation_1of1.doc

Page 7: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

ATTACHMENT3‐WORKPLAN3.1 CurrentStatusinMeetingIRWMStandardsTheUpperSantaClaraRiverIRWMPisacompleteplanthathasbeenadoptedbyeachofsevenRWMGmembers,aswellascollectivelyastheRegionalWaterManagementGroup(RWMG).TheUpperSantaClaraRiverIRWMPcurrentlymeetsalloftheformerProposition50IRWMGuidelines,aswellasmeetingmanyofthenewProposition84Guidelines.TheregioniscurrentlyupdatingitsPlanandconductingtwotechnicalstudies,aclimatechangetechnicalstudyandaSaltandNutrientManagementPlanwithfundsreceivedinthePlanningGrantRound1forthoseProposition84Standardsthatneededfurtherdevelopment.

Thefollowingdiscussionidentifies,byProposition84Standard,astatusupdateastowherethePlanstandsintermsofcompliancewitheachofthesixteenseparatestandardsandindicateswheremoreworkisnecessaryorwheremodificationofthePlanisdesired.Specialnoteismadetohighlightwherethegrantworkplancontentwillhighlightorcontributetocompliancewiththesestandards.ThisisalsosummarizedinTable3‐1.

Workplantasksthatwillbeperformedaspartofthegrantproposalarediscussedinsection3.2andincludetheupdateoftheAgency’sRecycledWaterMasterPlanandassociatedCaliforniaEnvironmentalQualityActdocumentation,theupdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlan,andoverallGrantAdministration.

Figures3‐1and3‐2providetheIRWMPRegionboundaryandthehydrologicalfeatureswithintheRegion.

Page 8: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Castaic Lake

Lake Piru

Pyramid Lake

Santa Clara River

Saugus WRPValencia WRP

LOS ANGELES COUNTYVENTURA COUNTY

PACIF

IC

OCEAN

0 10 205 Miles

Legend

Water Reclamation Plants

Groundwater BasinEASTERN

PIRU

FILLMORE

SANTA PAULA

WatershedLower Santa Clara River

Upper Santa Clara River

Bouquet Reservoir

SAN GABRIEL MOUNTAINS

SANTA SUSANA MOUNTAINS

LIEBRE MOUNTAINS

SIERRA PELONA

TRANSVERSE RANGES

Figure 3-1Upper Santa Clara River Watershed

Hydrologic Features

Page 9: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Castaic Lake

Lake Piru

Santa Clara River

LOS ANGELES COUNTY

VENTURA COUNTY

0 2 4 6 8 101

Miles

Legend

Watershed

Upper Santa Clara River

Santa Clarita

Santa Clarita Valley Sanitation District

CLWA

Valencia Water Company

LA County WaterWorks District 36

Santa Clarita Water Company

Newhall County Water District

LA County WaterWorks District 37

US Forrest Service Boundary

LA County Flood Control Boundary

Lower Santa Clara River

Pyramid Lake

Bouquet Reservoir

California Aqueduct

Figure 3-2Upper Santa Clara River

Watershed/IRWMP Region

Page 10: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 2 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

TABLE3‐1CURRENTSTATUSINMEETINGTHEIRWMPLANSTANDARDS

PROPOSITION84

STANDARD STATUS SPECIFICSTANDARDSTATUSGovernance Standardwillbemetwithplanlanguage

beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan

anticipated(March2013).

TheRWMGgovernancestructureisbasedonanintentiontoensurebalancedrepresentationacrosstheIRWMP'sthreemainregionalobjectives(i.e.,watersupply,waterquality,andresourcesstewardship),aswellasgeographicdiversityacrosstheRegion.TheRWMGhastheparticipationofatleastthreepublicagencies,twoofwhichhavestatutoryauthorityoverwatermanagement.ThemembersoftheRWMGareCastaicLakeWaterAgency,CityofSantaClarita,LosAngelesCountyFloodControlDistrict,NewhallCountyWaterDistrict,SantaClaritaWaterDivisionofCastaicLakeWaterAgency,SantaClaritaValleySanitationDistrictofLosAngelesCounty,Valencia

WaterCompany,andtheSanGabrielandLowerLosAngelesSanGabrielRiversandMountainsConservancy.TheRWMG'sgovernancestructureinvolvescooperationfromthepublic,stakeholders,projectproponents,andRWMG

members.Ingeneral,theRWMGmonitorsIRWMPrequirements/developments,andmakesadministrativedecisions(includingmanagingthegrantapplication/administrationprocess,payingforconsultant(s),and

preparingstakeholderagendas/meetingmaterials).Broaderdecisionsthatareneeded(suchasnominatingRWMGmembers,makinganyrequiredchangestothePlannecessarytomeetfundingguidelines,andupdatingtheIRWMP)arebroughttothestakeholders,andadecisionissoughtthroughacollaborativeprocess,withstakeholdersvotingonthedecisionifneeded.ThroughtheIRWMPprocess,entitieshavebuiltworking

relationshipsthatguideongoingIRWMPplanningandimplementation.Additionally,thegovernancestructurefortheUpperSantaClaraRiverIRWMPisdesignedtoencourageregionalparticipationandtoacceptprojectproposals

onanongoingbasis.RegionDescription Standardwillbemetwithplanlanguage

beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan

anticipated(March2013).

TheIRWMPdiscussesthegeneralimpactsofclimatechangeinits descriptionofregionalwaterresourcesandfocusesofthepotentialimpactsofclimatechangeonthereliabilityofsupplyfromtheStateWaterProject.UsingPlanningGrantfundsreceivedfromRound1,theregiondescriptioniscurrentlybeingupdatedtofurtheridentifythepotentialvulnerabilitiestowaterresourcesintheIRWMPRegiontoprojectedclimatechange.Climatechangescenariosarebeingdefinedconsistentwiththe2011DraftDWRStateWaterProjectReliabilityReport.Vulnerable

watershedcharacteristicsarebeingdefinedandincludehydrology,watershedlandscape,watersupplyanddemand,groundwaterrecharge,ecosystem,andothercharacteristicssuchasweather,changesintheamount,intensity,timing,quality,andvariabilityofrunoffandrecharge;andeffectsofsealevelrise(onimportedwater

Page 11: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 3 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS

supplybyDWR).Theregiondescriptionisalsobeingupdatedto includeanassessmentandrankingofthesevulnerabilities.

Objectives StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse

EfficiencyStrategicPlanwillassistindevelopingtechnologicallyfeasibleandquantifiableobjectivesrelatingtowater

demandandwatersupply.ThetwoUpdatesmayalsoresultinupdatingofregional

priorities.

TheobjectivesintheIRWMParebeingassessedaspartoftheIRWMPcurrentupdateprocess.TheIRWMPobjectiveswillbediscussedinthecontextofclimatechangewithregardtopotentialforchangesintheamount,

intensity,timing,qualityandvariabilityofrunoffandrechargeinadditiontotheneedtoconsidertheeffectsofsealevelriseonwatersupplyconditionsandtoidentifysuitableadaptationmeasures.OneofthecurrentIRWMP

objectivesisanimprovementinwaterquality.TheincreaseinwatersupplybymeansofrecycledwateruseisanIRWMPobjective.UpdatingoftheRecycledWaterMasterPlanwillidentifythecurrentandfuturerecycledwaterdemandswithintheValley.Basedonthis,thequantifiableobjectivewillbemodified.Likewise,theSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillidentifyhowmuchconservationwillbeneededinthefuture,which

willassistinmodifyingthe‘reducewaterdemand’objectivetarget.

TheobjectivesintheIRWMParethefollowing.Onequantifiabletargetisprovidedforeach(howeverintheIRWMPtheremaybeadditionalquantifiabletargetsidentifiedforanyparticulartarget):

ReduceWaterDemandImplementtechnological,legislativeandbehavioralchangesthatwillreduceuserdemandsforwater.Ten(10)percentoverallreductioninprojectedurbanwaterdemandthroughouttheRegionby2030throughimplementationofwaterconservationmeasures.

IncreaseWaterSupplyUnderstandfutureregionaldemandsandobtainnecessarywatersupplysources.Increaseuseofrecycledwaterbyupto17,400acre‐feetperyear(AFY)by2030,consistentwithhealthandenvironmentalrequirements.

ImproveWaterQualitySupplydrinkingwaterwithappropriatequality;improvegroundwaterquality;andattainwaterqualitystandards.ComplywithexistingandfutureTotalMaximumDailyLoad(TMDLs).

ImproveOperationalEfficiencyMaximizewatersystemoperationalflexibilityandefficiency,includingenergyefficiency.Withassistanceoflocalenergyutility,performelectricalauditonallwholesaleandpurveyorwaterfacilitiesonce

Page 12: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 4 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS

everyfiveyears.ResourceManagement

StrategiesStandardwillbemetwithplan languagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse

EfficiencyStrategicPlanmayresultinupdatingoftheresourcemanagement

strategies.

TheIRWMPcurrentlyevaluates the24watermanagementstrategiescontainedwithintheCaliforniaWaterPlan.Sincethereleaseofthe2009UpdateoftheCaliforniaWaterPlan,thefollowingstrategieshavebeenadded,whichwillbeconsideredintheIRWMPUpdate:ForestManagement,LandUsePlanningandManagement(formerlyUrbanLandUseManagement),andImproveFloodManagement.ThestakeholdersconsideredtheseadditionalstrategiesatanIRWMPStakeholdermeetinginJanuary(2012)andevaluatedthemforapplicabilitytotheRegion.

Additionally,theIRWMPmustidentifyandimplement“No‐Regrets”AdaptationStrategiestothegeneraleffectsof

climatechange,suchasmeadowandforestrestoration,floodplainprotection,andwateruseefficiency.TheClimateChangeTechnicalStudywillhelptoidentifythe“No‐Regrets”AdaptationStrategiesthatwillbemosteffectiveandappropriateforthisRegion.ThesewillbediscusswiththeStakeholdersagaininthecontextof

climatechangeatafutureStakeholdermeeting.Integration Standardismetwithexistingplanlanguage. TheIRWMPhasasuccessfulframeworktoensurecollaborationbetweenentitiesandintegrationofprojectssoas

toachievemultiplebenefits.TheIRWMPmeetsthenewstandardandtheupdatethatiscurrentlyunderwaywillcontinuetousethissuccessfulformatforintegration.

ProjectReviewProcess StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillhelptoidentifynewcandidateprojectsforsubmittaltothe

IRWMP.

UsingPlanningGrantfundsreceivedfromRound1,theprojectreviewprocesswillberefinedoverthenext9monthstomeetthenewstandard.Aspartofthatprocess,projectsincludedintheIRWMP,andadditionalprojects

deemednecessary,willbeassessedfortheirabilitytoadapttopotentialclimatechangeimpactsandforthebenefitstheprojectwillprovide.Theprojectreviewprocesswillincludeasassessmentofthecontributionofthe

projectreducinggreenhousegas(GHG)emissionsascomparedtoprojectalternatives,andCaliforniaEnvironmentalQualityAce(CEQA)project‐levelanalysiswithrespecttoGHGemissions.TheIRWMPwillnotyetprovideacalculationofGHGemissionsonaproject‐by‐projectbasis,butitwillusetheresultsoftheClimate

ChangeTechnicalStudytodiscussthisonananalyticallevel.

Page 13: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 5 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS

ImpactsAndBenefits StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

TheIRWMPmeetsthemajorityofthenewstandard.However, thediscussioniscurrentlybeingupdatedtoincludethediscussionofimpactsandbenefitsbetweenregions,aswellasthosedirectlyaffectingdisadvantagedcommunities(DAC),EnvironmentalJusticerelatedconcerns,andNativeAmericantribalcommunities,and

includingthebenefitsofenvironmentalstewardshipinordertomeetthestandardcompletely.PlanPerformanceAnd

MonitoringStandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

TheplanperformanceandmonitoringdiscussioncontainedwithintheIRWMPmeetsthemajorityofthestandardbutiscurrentlybeingupdatedtoprovideadiscussionofpoliciesandproceduresthatpromoteadaptive

managementwithrespecttotheeffectsofclimatechange.TheStakeholdersandRWMGhavedevotedmonthlymeetingstothediscussionofupdatingexistingdata,IRWMPobjectives,regionalpriorities,andstatewidepriorities

forrelevanceandthesearebeingmodifiedasneededtoensuretheoverallIRWMPreflectsregionalchangingneeds.Additionally,CandidateProjectswillbereviewedandtheywillbeevaluatedaspartoftheUpdatescheduletoensurethatthecurrentplanobjectiveswillbemetandtheresultingPlanProjectsofferthegreatestbenefitpossible.Thisongoingreviewandupdateallowtheplantoundergo“adaptivemanagement”,e.g.,allowstheIRWMPtoevolvetochangingconditions,andincorporatenewdata(e.g.,climatechangevulnerabilities).

DataManagement StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

**DataobtainedfortheRecycledWater

MasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillbeusedtoupdatethetechnicalanalysisportionsanddatamanagementchapters.BothstudieswillalsobefillingindatadeficienciesidentifiedinthePlan.

UsingPlanningGrantfundsreceivedfromRound1,theIRWMPiscurrentlybeingupdatedwithaDataManagementSystemthatwillhelptrackanddocumenttheprogressofIRWMPimplementationandforstoringanddisseminatingdatafrommonitoringefforts.Adiscussionofhowfindingsor“lessonslearned”fromproject‐specificmonitoringeffortswillbeincludedtoimprovetheRWMG’sabilitytoimplementfutureprojectsintheIRWMPlan.

Page 14: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 6 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUSFinance Standardwillbemetwithplanlanguage

beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan

anticipated(March2013).

TheIRWMPmeetsmostofthenewfinancestandard.However,thediscussioniscurrentlybeingupdatedtoaddanexplanationofhowoperationandmaintenance(O&M)costsforprojectsthatimplementtheIRWMPwouldbe

coveredandthecertaintyofO&Mfundinginordertomeetthestandardcompletely.

TechnicalAnalysis StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUse

EfficiencyStrategicPlanwillassistindevelopingtechnologicallyfeasibleandquantifiableobjectivesrelatingtowater

demandandwatersupply.

TheIRWMPmeetsmostofthetechnicalanalysisstandard.TheIRWMPincludesadetailedlistingandcategorizationofthedocumentsusedtodevelopthebaselineinformationandtechnicalanalyzesforthedevelopmentoftheIRWMP.UpdatingoftheIRWMPincludesareviewofthesedocumentsandupdatingif

necessaryaswellasidentifyingnewrelevanttechnicaldocumentsthatshouldbereviewedtosupporttheIRWMP.Giventhenewstandards,theexpandedscopeofthetechnicalanalysis,andreviewofcurrentplanningdocuments,anupdatedreportondeficiencies,priorityforfillingthegaps,andplantoaddressthemarepartofthecurrent

updateprocess.

RelationToLocalWaterPlanning

Standardismetwithexistingplanlanguage.

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillrequireclosecoordinationamongthewholesaleandretailwateragencies,potentialrecycledwatercustomers,andlandusedevelopers.

TheIRWMPcurrentlymeetsthisstandard.However,inorderforthePlantomeettherequirementsoftheclimatechangestandard,theIRWMPisbeingupdatedtoconsiderandincorporatethewatermanagementissuesand

climatechangeadaptationandmitigationstrategiesfromlocalplanningdocument.

Page 15: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 7 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS

RelationToLocalLandUsePlanning

Standardismetwithexistingplanlanguage.

**TheRecycledWaterMasterPlanUpdateandUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlanwillbothtieintothenextupdateoftheUrbanWaterManagementPlan(2015),andrequirecoordinationwithlocalplanningagenciesandwiththeLos

AngelesCountyandCityofSantaClarita’sOneValleyOneVisiondocumentGeneralPlan

Updates.

TheIRWMPcurrentlymeetsthisstandard.However,inorderforthePlantomeettherequirementsoftheclimatechangestandard,theIRWMPisbeingupdatedtoincludeadiscussionoftheregion’sdemonstratedinformation

sharingandcollaborationwithregionallandplanningeffortsbeingundertakeninordertomanagemultiplewaterdemandsthroughoutthestate,toadapttowatermanagementsystemstoclimatechange,andpotentiallyoffset

climatechangeimpactstowatersupplyinCalifornia.

StakeholderInvolvement

Standardismetwithexistingplanlanguage. TheIRWMPcurrentlymeetsthisstandard.TheIRWMPwas developedandcontinuestooperateviaabroadpublicprocessfocusedonoutreachthroughmeetings,communityevents,directemails,mailings,andfacetoface

interactiontomaintainStakeholderinvolvement.Stakeholders,includingDACs,wereandcontinuetobeabletodirectlyinteractwiththeIRWMPbyaddingprojectstothelistofCandidateProjectsforimplementationoftheIRWMP,assistingindevelopmentandupdatingoftheresourcemanagementstrategiesandobjectivesthrough

consensusbasedinteractivestakeholdermeetings.Coordination Standardwillbemetwithplanlanguage

beingrevisedoramendedwithPlanningGrantRound1funds.Revisedplan

anticipated(March2013).

TheIRWMPiscurrentlybeingupdatedtoincludementionofCaliforniaNaturalResourceAgency’sCaliforniaAdaptationStrategyprocessandtheRWMG’sconsiderationofmembershipintheCaliforniaClimateActionRegistrywhichisafutureStakeholdermeetingagendatopic.ThePlanwillalsobeupdatedwiththeRegion’s

coordinationongoingeffortswithotheradjacentplanningregionsincluding:thejointClimateChangeWorkshopthatisbeingsponsoredbetweentheWatershedCoalitionofVenturaCounty(WCVC),USCR,andSantaBarbara

CountyIRWMPRegions,theWatershedAwarenessMonthofMayactivitiesinwhichanumberofIRWMPprojectsarebeinghighlightedwithinthewatershedalsoco‐sponsoredbytheUSCRandWCVCIRWMPRegions,andthe

participationbyboththeWCVCandUSCRIRWMPmembersineachother’sregularStakeholdermeetingstoensurethattheentirewatershedisprotectedandmanagedappropriately.

Page 16: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 8 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

PROPOSITION84STANDARD STATUS SPECIFICSTANDARDSTATUS

ClimateChange StandardwillbemetwithplanlanguagebeingrevisedoramendedwithPlanning

GrantRound1funds.Revisedplananticipated(March2013).

UsingPlanningGrantfundsreceivedfromRound1,theRWMGhascommissionedaClimateChangeTechnicalStudythatwillidentifyvulnerabilityoftheRegiontoclimatechange,evaluatepotentialclimatechangeimpacts,identifyandevaluatepotentialadaptationstrategies,andwillmaderecommendationsastohowtocollectandutilizegreenhousegasemissionsdatawithintheIRWMPframework.Thestudywillthenbeusedtoupdatethe

IRWMPsothatitwillmeettherequirementsoftheclimatechangestandard.

Page 17: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 9 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

3.1.1 DisadvantagedCommunityOutreachProcess

DuringdevelopmentoftheIRWMP,nocommunitiesthatmetthedefinitionasdefinedintheWaterCodeofaDisadvantagedCommunity(DAC)wereidentified,buttherearepocketsoflowerincomeareasthatmayhaveissuessimilartoDACs,suchasinabilitytoaccesstoinformation,forexample.Inthespiritofproviding“asafe,clean,affordable,andsufficientwatersupplytomeettheneedsofCaliforniaresidents,farms,andbusinesses”,aDACOutreachSubcommitteewasformedalongwiththedevelopmentofaDACoutreachstrategytoreachthesecommunities,whichwillincludepartsofNewhallandCanyonCountry.Aspartofthisstrategy,theRWMGcontactedothergroupsknowntodealwithDACissues,suchastheCityofSantaClaritaHousingDepartmentandtheNewhallCommunityCenter.IndividualsworkingontheIRWMPvisitedtheNewhallCommunityCenterandspokewiththeirstaff.CenterstaffsuggestedtheRWMGworkwiththeirteacheroftheEnglishasaSecondLanguage(ESL)class.AprofessionaloutreachconsultantwasutilizedtopreparematerialsinbothEnglishandSpanishandtheNewhallCommunityCenterteacherusedthosematerialsaspartofthecoursework.Thiswasaveryeffectivewaytocommunicatetheseissuesratherthansimplyplacinganarticleinapublicationwithanoverlybroadtargetaudience.Thiswasfacetofaceinteractionbeingdeliveredbysomeonethisgroupofpeoplehadanexistingrelationshipwithandtrusted.Italsoaffordedtheopportunitytoexpandthenumberofpeoplewhoreceivedtheinformation.TheNewhallCommunityCenterisextensivelyusedandthecommunitywhouseittakegreatprideintheprogramsthatareofferedthere.WhentheCenterwasbeingplanned,thecommunitywasanintegralpartofthedesignandlocationofthebuildinganditfunctionsasanextendedfamilyformanythatuseit.SimilarresourcesexistinCanyonCountryincludingapubliclibrary.InadditiontoprovidingthisIRWMPinformationintheESLclasses,StakeholderspresentedIRWMPinformationattheEmergencyExpoandArborDayevents.BothareCityofSantaClaritaevents,attendedbythousandsofpeople,andwereverysuccessfulinengagingthecommunityonIRWMPissues.Openchannelsofcommunicationandgoodworkingrelationshipshavealsobeenestablishedbetweenagencies/companiesoftheSantaClaritaValleyandtheTataviamBandofMissionIndiansduetoseveraldevelopmentprojectsinvolvingtheirlands.Thesespecificeffortsofdirectemails,mailings,facetofaceinteraction,eventparticipation,classroominstruction,flyers,notices,surveys,andpresentationswereperformedtogetenvironmentalgroups,conservancygroups,wellownergroups,DACs,watersuppliers,municipalities,sanitationdistricts,floodcontroldistricts,AmericanIndianTribes,developers,landowners,adjacentIRWMareas,Stateagencies,electedrepresentatives,andtheliketotakepartintheIRWMP.WiththeinvolvementoftheStakeholders,thefacilitationmeetings,thetrackingofStakeholdercomments,andtheeffortstoincorporatethosecommentsintotheIRWMPthegrouphasbeenabletoincorporateabroadrangeofinputandideas.

Page 18: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 10 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

WiththerecentcompletionoftheCountyofLosAngeles’sOneValleyOneVision(OVOV)landuseplanningdocument,theOVOVupdateoftheCityofSantaClaritaGeneralPlan,andthe2010Censusdata,thereisawealthofnewinformationavailabletoassistinidentifyingexistingandpotentialnewstakeholders,includingDAC’s,tribalcommunities,andenvironmentaljusticecommunities.ThesetypesofoutreacheffortsarecontinualeffortsaspartoftheUSCRIRWMPandwillbethroughouttheIRWMPUpdate.

3.2 GrantWorkPlanContent(WorkPlanTasks)FundingisbeingrequestedfromtheRound2PlanningGrantsolicitationforthefollowingworkplantasks.ThesetechnicalstudiesdirectlysupportthetechnicalfeasibilityoftheobjectivesintheIRWMP.

Task1 RECYCLEDWATERMASTERPLANUPDATE

TheCLWArequiresanupdateofits2002RecycledWaterMasterPlaninordertocompilethelatestinformationwithregardtopotentialrecycledusers,designofinfrastructureandtheavailabilityofrecycledwatertoservethem.Theprojectwouldrequireaninvestigationtoidentifyalllargelandscapeirrigatorsandothernon‐potablewaterusersandtheirproximitytoanupdatedlistofpotentialsourcesofrecycledwater.Thisdatawillthenbeusedtopreparevariousrecycledwatersystemdesignsandcostevaluationstodetermineasuiteofoptionsforrecycledwaterdeliverythatreflectcurrentregulatoryrequirements.Therecycledwatersystemoptionswillthenbematchedwithpotentialwaterconservationprogramportfoliostoarriveatacost‐effectiveandrealisticstrategytomeettheState’srequirementsof20percentpercapitawaterconservationby2020(SBx7‐7).

Subtask1.1:RecycledWaterUserMapandHydraulicModelUpdate

1.1.1 Collectupdatedpotentialrecycledwaterusersfromwaterpurveyors.

1.1.2 MapthepotentialrecycledwaterusersinaGeographicInformationSystem(GIS)program.

1.1.3 Collectthepurveyor’spotablepressurezoneinformationandincorporatetheinformation inGIS.

1.1.4 Establishrecycledwaterpressurezones.1.1.5 Createahydraulicmodeltoincorporatethepotentialrecycledwateruserdemandsand pressurezones.

Page 19: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 11 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

Subtask1.2:DraftRecycledWaterSystemAnalysis

1.2.1 Evaluatethepotentialrecycledwaterusers,andtheirdemandsperpressurezone.1.2.2 Determinetherecycledwatersystemseasonalstoragerequirementsandidentifypotential seasonalstoragelocations.1.2.3 Evaluatetherecycledwatersystemanddetermineacosteffectivelayout.

Subtask1.3:DraftRecycledWaterMasterPlan

1.3.1 ReviewpreviousrecycledwaterdocumentstoincludebutnotlimitedtotheRecycledWater MasterPlandatedMay2002,RecycledWaterProgramEIRfortheMay2002Recycled WaterMasterPlan,RecycledWaterPhase2APreliminaryDesignReport,RecycledWater ProgramPhase2AEnvironmentalDocuments,HonbyPumpStationTechnical Memorandum,SeasonalStorageEvaluation,SystemOptimizationTechnicalMemorandum, andtheAmendedEngineer’sReportfortheexistingRecycledWaterSystem.1.3.2 ReviewthedraftrecycledwaterrulesandregulationsandSanitationDistrictAgreement andincorporaterelatedinformationintothemasterplan.1.3.3 Finalizethedraftrecycledwatersystemanalysisandcoordinatewiththewaterpurveyors andSanitationDistrictofLosAngelesCounty.1.3.4 Identifyandevaluatetherecycledwatersystemimplementationphasesincludingbutnot limitedtothephaselimits,phasedemands,costs,andschedule.1.3.5 Revisetherecycledwaterhydraulicmodeltoincorporatethelatestsystemanalysisand implementationphases.1.3.6 PreparetheDraftRecycledWaterMasterPlan.1.3.7 PresentandcoordinatetheDraftRecycledWaterMasterPlanwiththepurveyorsandthe SanitationDistrictofLosAngelesCounty.

Subtask1.4:FinalRecycledWaterMasterPlan

1.4.1 Reviewcommentsfromthevariousreviewersandrevisethemasterplanaccordingly.1.4.2 Finalizetherecycledwaterhydraulicmodelaccordingly.1.4.3 PreparetheFinalRecycledWaterMasterPlan.

Page 20: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 12 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

1.4.4 PresenttheFinalRecycledWaterMasterPlanwiththelocalwaterpurveyorsandtheSCV SanitationDistrictofLosAngelesCounty. Task1Deliverables:

RecycledWaterUserMap

HydraulicModel

DraftandFinalRecycledWaterMasterPlan

Task2 RECYCLEDWATERMASTERPLANENVIRONENTALIMPACTREPORT

UpdateoftheRecycledWaterMasterPlanwillrequirethepreparationofanewsubsequentProgrammaticEnvironmentalImpactReportpursuanttotheCaliforniaEnvironmentalQualityAct.

Subtask2.1:ProjectKick‐off

MeetwithAgencystaffinaprojectkick‐offmeetingtoreviewprogramtasks,schedule,existingdocumentsanddata,andaddressquestionsanddataneeds,andvisittheprojectsites.

Subtask2.2:NoticeofPreparation

PrepareNoticeofPreparationandmailtolistofappropriateagenciessuppliedbyCLWA.

Subtask2.3:ConductRegularMeetings

2.4.1 PrepareforandconductregularscheduledmeetingswithAgencystaffandGeneralCounseltoreviewprogressandaddressissues.

2.4.2 Provideallnecessaryexhibitsanddocumentsrequiredforpresentationonenvironmentaltopicsforpublicmeetingsandhearings.

2.4.3 PrepareandprovideminutestoAgencyforreviewandforthefilesforallproject‐relatedmeetingswithAgencystaffandoutsideentities.Assumeanaverageonetotwo‐hourmeetingevery4weeksovera12‐monthperiod.

Page 21: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 13 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

Subtask2.4:DraftEnvironmentalImpactReport(EIR)

2.4.1 PreparedraftEIRfortheRecycledWaterMasterPlanUpdate,necessarytosatisfythelatestrequirementsofCEQA.

2.4.2 PrepareNoticeofAvailabilityandfileNoticeofCompletionofthedraftEIRwiththeStateOfficeofPlanningandResearch.

2.4.3 DistributedraftEIR,eitherasaPDForasahardcopy,asspecifiedbyCLWAaccordingtolistofappropriateagenciessuppliedbyCLWA.

Subtask2.5:ReviewCommentsonDEIR

2.5.1 PreparedraftsoftheEIRatappropriatetimesforreviewbyAgencystaff.Providefive(5)copiesofeachdraftforAgencyreviewandcomments.

2.5.2 PrepareresponsestocommentsonthefinaldraftEIR,includingconsultationwithfederalandstateagenciesifendangeredspeciesorhabitatareidentified.

2.5.3 PrepareNoticeofDeterminationwithinfiveworkingdaysofdecidingtocarryouttheprojectandfilewiththeStateOfficeofPlanningandResearch.AlsofiletheNoticewiththecountyclerkofthecountyorcountiesinwhichtheprojectislocated.

Subtask2.6:PrepareFinalEIR

2.6.1 PrepareandprovidecopiesofFinalEIRdocumentsasnecessaryforreviewbylocal,state,federalagenciesandothers.

2.6.2 PrepareNoticeofDetermination

2.6.3 PreparetheadministrativerecordaspartoftheFinalEIR.

Subtask2.7:ProjectManagement

Theprimaryobjectivesoftheprojectmanagementtaskareto:1)ensurethatprojectscheduleandbudgetaremet;2)documentprojectactivities(progressreportsandmeetings);and3)ensurethatprojectworkanddeliverablesmeetqualityobjectives.

Task2Deliverables:

NoticeofPreparation

Page 22: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 14 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

DraftandFinalEIR

AdministrativeRecord

Task3 STRATEGICWATERUSEEFFICIENCYPLANUPDATE

TheSantaClaritaValleyFamilyofWaterSuppliers(theSuppliers)joinedtogetherin2007todevelopaplantoensuretheefficientuseofwaterintheSantaClaritaValley(Valley).TheSantaClaritaValleyWaterUseEfficiencyStrategicPlan(SCVWUESP)wasfinalizedin2008andincludedprogramsandprojectsthatweretargetedtoeffectivelyreducethepercapitawateruseintheValleybyatleast10%by2030.In2010/2011,theSupplierswereawardingfundingfromtheProposition84Round1ImplementationGrantProgramtofund4conservationprogramsidentifiedwithintheSCVWUESP.Withcurrentlaw(SBX7‐7)mandatinga20%reductioninwaterdemandby2020,itbecomesnecessarytoupdatetheSCVWUESP.Ataminimum,anupdateoftheSCVWUESPshallanalyzecurrentdataonwaterconsumptionintheValley,assesscurrentconservationeffortsthathavefollowedtheSCVWUESP,thosethathavedeviatedfromtheSCVWUESPbynecessityandthosethatareindependentoftheSCVWUESP,identifyadditionalwaterconservationprograms,analyzecostbenefits,andrecommendaplanofaction.ItisimportanttheSCVWUESPupdatealsoincludeaninteractivemodel(i.e.,spreadsheet)thatisabletobemodifiedbytheSuppliersasconditionschangeinyearstocome.

Subtask3.1:AnalysisofData

Usedatafromthe2010UrbanWaterManagementPlan(UWMP),databeingdevelopedtoupdatetheAgency’sRecycledWaterMasterPlanandtheoriginalSantaClaritaValleyWaterUseEfficiencyStrategicPlan(2008)aswellasmorerecentdatafromtheSuppliers(e.g.,surveyresultsfromO’RorkeandtheFamilyofWaterSuppliers,etc.)todescribehistoricalconsumptionpatterns,saturationofthemarketwithwater‐efficientfixtures,willingnessofthecommunitytoadoptvariousmeasures,compliancewiththeCUWCCMOU,andotherissuesortrendsastheyemerge.

Subtask3.2:AssessConservationEfforts

ReviewcurrentconservationprogramsattheSuppliers(retailersandwholesaler)termsofscopeandeffectivenessofwatersavings.

Page 23: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 15 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

Subtask3.3:IdentifyandDevelopWaterConservationMeasures

3.3.1 Describepotentialwaterconservationprogramsforresidential(singleandmulti‐family),commercial,industrial,institutionalandlandscapewaterusetoa. achieve10%reductioninGPCDby2015(inconjunctionwithrecycledwaterprograms

thatwillbeidentifiedintheRecycledWaterMasterPlanUpdate)b. achieve20%reductioninGPCDby2020(inconjunctionwithrecycledwaterprograms

thatwillbeidentifiedintheRecycledWaterMasterPlanUpdate)c. achieve“ontrack”statuswiththeCUWCC’sBestManagementPractice(BMP)

requirementsformembersoftheSuppliers3.3.2 Developindetailbothwaterconservationmeasuresthatarequantifiableandthosethatare

non‐quantifiable(e.g.,socialmarketing).3.3.3 Documenttheunderlyingassumptionsusedforcalculatingwatersavings.Subtask3.4:AssessCost‐EffectivenessTakingintoconsiderationalternativelevelsofrecycledwateruseidentifiedintheDraftUpdateoftheRecycledWaterMasterPlan,analyzeprospectivewaterconservationprogramsintermsofcost‐effectivenessandrankprogramsbytheirappropriatenesstotheSantaClaritaValley.Programsshouldbedividedbetweentheeffortsofthewholesalerandtheretailersaswellaspotentiallycooperativeefforts.Ideally,thewholesaleagencywouldprovidesomebaselineprograms(e.g.,HighEfficiencyToilet[HET]rebates)andtheretailagencieswouldprovideprogramsthatarespecifictotheirservicearea(e.g.,commercialandindustrialauditsinserviceareaswithCIIcustomers).Atthispoint,theSupplierswouldliketoreviewworkeffortstodatepriortodevelopmentoftheplan.

Subtask3.5:CreateaConservationPlan

3.5.1 Createacustomizedplanformultipleconservationprogramsthatincludescosts,benefits,socialacceptanceandpartnershipopportunitiesforachieving10%reductioningallonspercapitaperday(GPCD)by2015,20%reductioninGPCDby2020and“ontrack”statuswiththeCUWCC’sBMPrequirements.

3.5.2 Identifyamethodologyforanevaluationoftheconservationplanpost‐implementation.3.5.3 Assessconservationstaffinglevelsatwholesaleandretailagencies.3.5.4 Identifyanddescribepotentialfundingopportunities.

Page 24: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Page 16 Attachment 3, Work Plan p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

3.5.5 EvaluatetheconservationrequirementsneededinconcertwithprojectedrecycledwaterusetomeetSBx7‐7requirements.Textwillbeprovided,eitherseparatelyorasanappendixthatcanfacilitatethecompletionoftheRecycledWaterMasterPlanUpdatetowardsthiseffort.

Subtask3.6:ProjectManagement

Theprimaryobjectivesoftheprojectmanagementtaskareto:1)provideclosecoordinationamongtheretailers,theprojectteam,andotherinvolvedparties;2)ensurethatprojectscheduleandbudgetaremet;3)documentprojectactivities(progressreportsandmeetings);and4)ensurethatprojectworkanddeliverablesmeetqualityobjectives.

Task3Deliverables:

DraftandFinalStrategicWaterUseEfficiencyPlanUpdate

Text/ChaptertosupporttheRecycledWaterMasterPlanUpdate

Task4 GRANTADMINISTRATION

Thistaskistoadministerandmanageprojectactivitiesandtheoverallprojectscheduleandbudgettoensurethattheprojectiscompletedefficientlyandsuccessfully.Projectmanagementactivitieswillincludebudgetandschedulecontrolandqualityassuranceandqualitycontrol(QA/QC)forthedurationoftheproject.ThistaskalsoincludesthedevelopmentandsubmittalofquarterlyreportstoDWR.Quarterlyreportswillincludeprojectprogressreports,upcomingwork,schedule,budget,andotherpertinentinformation.

Task4Deliverables:

ProposalQuarterlyReportsandInvoices

GrantAgreementCompletionFinalReport

3.3 AdditionalIRWMPlanWorkNoadditionalworkhasbeenidentifiedasneededtoproducestandardscompliantIRWMPlan.AsmentionedpreviouslyfundswerereceivedandworkiscurrentlybeingconductedtoprepareaSaltandNutrientManagementPlanaspartoftheIRWMP.TheCEQAdocumentforthatSNMPwillstillhavetobeprepared.However,itisnotnecessaryfortheIRWMPtobeconsideredacompliantplan.

Further,thefundsrequestedfromthisgrantfundingopportunityfordevelopmentoftheRecycledWaterMasterPlanUpdateandtheUpdatingoftheWaterUseEfficiencyStrategicPlandonotdirectlyfillthegapintermsofaneedforacompliantIRWMP.AsdescribedinTable3‐1above,muchoftheworkcurrentlyoccurringisbringingthePlanintoconcurrencewiththeProposition84

Page 25: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 3, Work Plan Page 17 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att3_pg2_clwa_workplan_1of1.doc

Standards.ThesetwotechnicalstudieshavesubstantialvaluetothetechnicalvalidityandfeasibilityoftheIRWMPandtheexistingandpotentialfutureprojectsthatwillbecomepartoftheIRWMPastheydeterminetheamountofoverallrecycledwaterdemandthatwillbeavailablewithintheRegion,andtheamountofanticipatedconservationthatwecanexpectgiventhecurrentlegislativerequirements,recenteconomicconditions,andhydrologicconditionsandhowthosehavecreatedatrendthatassumptionshavetobeplannedupon.TheresultsofthesestudieswillbeimportantdocumentstodiscusswiththeStakeholders,willbecomefoundationaltotheupcoming2015UpdateoftheUrbanWaterManagementPlan,andwillbeadditionalresourcedocumentstotheIRWMP.

Page 26: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

ATTACHMENT4–BUDGETBUDGETSPROVIDED:SUMMARYANDDETAILEDAsummarybudgetfortheProposalandeachoftheIRWMPUpdateplanningcomponentsisprovidedasTable4‐1.WorkPlanTasksinthisProposalarenumberedasfollows:1.RecycledWaterMasterPlanUpdate2.RecycledWaterMasterPlanUpdateEnvironmentalImpactReport3.SantaClaritaValleyWaterUseEfficiencyStrategicPlanUpdate4.GrantAdministrationTables4‐2through4‐5providedetailedbudgetsforeachoftheindividualworkplantasksconsistentwiththecategoriesprovidedintheGuidelines.Alsoprovidedarethedetailedfeeestimatesforeachtask,providedattheendofthisAttachment.CONSISTENCYWITHWORKPLANANDSCHEDULEBoththeWorkPlanandScheduleprovidediscussionsoftheworkitemsunderthegeneralcategoriesoutlinedinthebudgetandarethusconsistentwiththebudgetitemsprovidedinthisattachment.REASONABLENESSOFDETAILEDCOSTSANDSUPPORTINGDOCUMENTATIONAlldetailedcostsshownforeachplanningcomponentarereasonableand,whereapplicable,supportinginformationhasbeenprovidedtojustifythecostestimates.Supportinginformationincludeslaborrates,laborcategories,andlaborhours;percentageoftotalusedtoapproximatecosts;and/orengineer’sestimateorsubmittedlowbidfromcontractor.FUNDINGMATCHTheproposalincludesafundingmatchattherequired25%match.Additionallysomeoftheindividualplanningworkitemshasafundingmatchwellabovetherequired25%match.Theproposalfundingmatchis25%ofthetotalcostoftheProposal.Thematchingfundswillcomefrompropertytaxes,connectionfeesandrevenuefromrates.

Page 27: ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Page 28: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

TABLE 4-1 Summary Budget

Proposal Title: Upper Santa Clara River IRWMP Round 2, Proposition 84 Planning Grant

Individual Planning Item Title

Non-State Share

(Funding Match)

Requested Grant Funding

(DWR Grant Amount)

Other State Funds Being Used

Total %

Funding Match

Task1RECYCLEDWATERMASTERPLANUPDATE

$120,000 $360,000 $0 $480,000 25%

Task2RECYCLEDWATERMASTERPLANENVIRONMENTALIMPACTREPORT

$62,500 $187,500 $0 $250,000 25%

Task3SANTACLARITAVALLEYWATERUSEEFFICIENCYPLANUPDATE

$62,500 $187,500 $0 $250,000 25%

Task4 GRANTADMINISTRATION $9,188 $27,563 $0 $36,750 25%

GrandTotal $245,000 $735,000 $0 $980,000 25%

Page 29: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

TABLE 4-2 Project Budget

Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant

Project Title: TASK 1 Recycled Water Master Plan Update

(a) (b) (c) (d) (e)

Budget Category

Non-State Share*

(Funding Match)

Requested Grant

Funding

Other State Funds Being Used

Total %

Funding Match

Schedule

Task1RecycledWaterMasterPlanUpdate

Subtask1.1

RecycledWaterUserMapandHydraulicModelUpdate

$50,000 $0 $0 $50,000 100% Sept2010‐July2011

Subtask1.2

DraftRecycledWaterSystemAnalysis

$70,000 $0 $0 $70,000 100% Sept2011‐Aug2012

Subtask1.3

DraftRecycledWaterMasterPlan

$0 $324,000 $0 $324,000 0% Aug2012‐Dec2013

Subtask1.4

FinalRecycledWaterMasterPlan

$0 $36,000 $0 $36,000 0% Jan2014‐Aug2014

GrandTotal $120,000 $360,000 $0 $480,000 25%

*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.

Page 30: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 3 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

TABLE 4-3 Project Budget

Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant

Project Title: TASK 2 Recycled Water Master Plan Update Environmental Impact Report

(a) (b) (c) (d) (e)

Budget Category

Non-State Share*

(Funding Match)

Requested Grant

Funding

Other State Funds Being Used

Total %

Funding Match

Schedule

Task2 RWMPEIR

Subtask2.1

ProjectKick‐Off $625 $1,875 $0 $2,500 25% Jan2013‐Jan2013

Subtask2.2

NoticeofPreparation

$5,000 $15,000 $0 $20,000 25% Jan2013‐Feb2013

Subtask2.3

ConductRegularMeetings

$1,250 $3,750 $0 $5,000 25% Jan2013‐May2014

Subtask2.4

PrepareDraftEnvironmentalImpactReport(EIR)

$36,875 $110,625 $0 $147,500 25% Mar2013‐Feb2014

Subtask2.5

ReviewCommentsonDraftEIR

$2,500 $7,500 $0 $10,000 25% Mar2014‐Apr2014

Subtask2.6 PrepareFinalEIR $11,250 $33,750 $0 $45,000 25%

Mar2014‐Jun2014

Subtask2.7

DirectProjectManagement $5,000 $15,000 $0 $20,000 25%

Jan2013‐Jun2014

(i)GrandTotal $62,500 $187,500 $0 $250,000 25%

*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.

Page 31: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 4 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

TABLE 4-3 Project Budget

Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant

Project Title: TASK 3 Santa Clarita Valley Water Use Efficiency Plan Update

(a) (b) (c) (d) (e)

Budget Category

Non-State Share*

(Funding Match)

Requested Grant

Funding

Other State Funds Being Used

Total %

Funding Match

Schedule

Task3

SantaClaritaValleyWaterUseEfficiencyPlanUpdate

Subtask3.1

AnalysisofData $12,625 $37,875 $0 $50,500 25% Oct2012‐Dec2012

Subtask3.2

AssessConservationEfforts

$7,800 $23,400 $0 $31,200 25% Jan2013‐Feb2013

Subtask3.3

IdentifyandDevelopWaterConservationMeasures

$7,825 $23,475 $0 $31,300 25% Mar2013‐Apr2013

Subtask3.4

AssessCost‐Effectiveness $7,500 $22,500 $0 $30,000 25%

May2013‐Jun2013

Subtask3.5

DevelopConservationPlan $23,250 $69,750 $0 $93,000 25%

Jul2013‐Oct2013

Subtask3.6

ProjectManagement

$3,500 $10,500 $0 $14,000 25% Oct2012‐Oct2013

GrandTotal $62,500 $187,500 $0 $250,000 25%

*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates,bothfromwholesaleandcontributionstowardsmatchfromretailers.

Page 32: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 5 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

TABLE 4-5 Project Budget

Proposal Title: Upper Santa Clara River IRWMP Round 2, Prop 84 Planning Grant

Project Title: TASK 4 Grant Administration

(a) (b) (c) (d) (e)

Budget Category

Non-State Share*

(Funding Match)

Requested Grant

Funding

Other State Funds Being Used

Total %

Funding Match

Schedule

Task4 Reports

Subtask4.1

QuarterlyReport1 $375 $1,125 $0 $1,500 25% Apr2012

QuarterlyReport2 $375 $1,125 $0 $1,500 25% Jul2012

QuarterlyReport3 $375 $1,125 $0 $1,500 25% Oct2012

QuarterlyReport4 $375 $1,125 $0 $1,500 25% Jan2013

QuarterlyReport5 $375 $1,125 $0 $1,500 25% Apr2013

QuarterlyReport6 $375 $1,125 $0 $1,500 25% Jul2013

QuarterlyReport7 $375 $1,125 $0 $1,500 25% Oct2013

QuarterlyReport8 $375 $1,125 $0 $1,500 25% Jan2014

QuarterlyReport9 $375 $1,125 $0 $1,500 25% Apr2014

Subtask4.2

GrantAgreementCompletionFinalReport

$1,775 $5,325 $0 $7,100 25% Jul2014

Subtask4.3

Administration $4,038 $12,113 $0 $16,150 25% Apr2012‐Jul2014

GrandTotal $9,188 $27,563 $0 $36,750 25%

*Listsourcesoffunding:Propertytaxes,connectionfeesandrevenuefromrates.

Page 33: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 4, Budget Page 6 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att4_pg2_clwa_budget_1of2.doc

Page 34: ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Page 35: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

USCR IRWMP R2 Prop 84_Recycled Water Master Plan Update Task 1

Sub

Classification: Total To

tal

Lab

or

Co

nsu

ltan

t

OD

Cs

Hourly Rate: $126 $124 $84 $63 $48 Hours Fees Fees Fees Fees

Task 1 - Recycled Water Master Plan Update

Subtask 1.1 Recycled Water User Map and Hydraulic Model Update See next backup sheet $50,000 $50,000

Subtask 1.2 - Draft Recycled Water System Analysis See next backup sheet $70,000 $70,000

Subtask 1.3 - Draft Recycled Water Master Plan 0 $0 $0 $0

1.3.1 Review Previous Documents 10 10 20 60 20 120 $8,920 $0 $8,920

1.3.2 Incorporate Regulations 10 10 10 20 0 50 $4,600 $0 $4,600

1.3.3 Finalize Analysis & Coordinate w/ Purveyors & SCV Sanitation District 20 40 80 20 40 200 $17,380 $500 $500 $17,880

1.3.4 Identify and Evaluate Recycled Water System Implementation Phases 60 60 80 40 0 240 $24,240 $0 $24,240

1.3.5 Revise Recycled Water Hydraulic Model 40 16 60 10 0 126 $12,694 $180,000 $180,000 $192,694

1.3.6 Prepare Draft Recycled Water Master Plan 40 20 100 120 80 360 $27,320 $2,000 $2,000 $29,320

1.3.7 Present and Coordinate Draft RWMP with Purveyors and SCV Sanitation District 20 20 20 10 16 86 $8,078 $0 $8,078

Subtask 1.4 - Final Recycled Water Master Plan 0 $0 $0 $0

1.4.1 Review comments on Draft RWMP 10 10 40 16 10 86 $7,348 $0 $7,348

1.4.2 Finalize Hydraulic Model 40 10 60 20 10 140 $13,060 $30,000 $30,000 $43,060

1.4.3 Prepare Final RWMP 20 20 40 80 40 200 $15,320 $1,500 $1,500 $16,820

1.4.4 Present Final RWMP to Purveyors and SCV Sanitation District 10 10 20 16 16 72 $5,956 $500 $500 $6,456

Task 3 - Subtotal 280 226 530 412 232 1680 $144,916 $210,000 $4,500 $334,500 $479,416

All Tasks Total 280 226 530 412 232 1680 $144,916 $210,000 $4,500 $334,500 $479,416

To

tal L

a bo

r +

Ex p

en

s es

To

tal E

xpen

ses

Bri

an F

ols

om

Jeff

Fo

rd

Jaso

n Y

im

Lau

ren

Eve

rett

Kat

hy

Fen

del

Page 36: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

USCR IRWMP R2 Prop 84_Recycled Water Master Plan Update EIR Task 2

Je

ff F

ord

La

ure

n E

ve

rett

To

tal

La

bo

r +

E

xp

ens

es

Na

nc

y W

arf

el

To

tal

Ex

pe

ns

es

Sub

Classification: Total To

tal

La

bo

r

Co

mm

. C

ha

rge

s

Co

ns

ult

an

t

OD

Cs

Hourly Rate: $124 $63 $44 Hours Fees 0% Fees Fees Fees

Task 2 - Recycled Water Master Plan Update EIR

Subtask 2.1 Project Kick-Off 8 20 2 30 $2,340 $0 $150 $162 $2,502

Subtask 2.2 - Notice of Preparation 60 120 80 260 $18,520 $0 $1,500 $1,500 $20,020

Subtask 2.3 - Conduct Regular Meetings 14 40 6 60 $4,520 $0 $500 $500 $5,020

Subtask 2.4 - Prepare Draft EIR 140 180 64 384 $31,516 $0 $115,000 $1,000 $116,000 $147,516

Subtask 2.5 - Review Comments on Draft EIR 40 59 30 129 $9,997 $0 $0 $0 $9,997

Subtask 2.6 - Prepare Final EIR 20 44 16 80 $5,956 $0 $35,000 $4,000 $39,000 $44,956

Subtask 2.7 -Direct Project Management 60 165 27 252 $19,023 $0 $1,000 $1,000 $20,023

Task 2 - Subtotal 342 628 225 1195 $91,872 $0 $150,000 $8,150 $158,162 $250,034

All Tasks Total 342 628 225 1195 $91,872 $0 $150,000 $8,150 $158,162 $250,034

Je

ff F

ord

La

ure

n E

ve

rett

To

tal

La

bo

r +

E

xp

ens

es

Na

nc

y W

arf

el

To

tal

Ex

pe

ns

es

Page 37: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

USCR IRWMP R2 Prop 84_Santa Clarita Valley Water Use Efficiency Strategic Plan Task 3

Sub

Classification: Total To

tal

Lab

or

Co

nsu

ltan

t

OD

Cs

Hourly Rate: $123 $67 $61 $54 $44 $40 $44 Hours Fees Fees Fees Fees

Task 3 - Santa Clarita Valley Water Use Efficiency Plan Update

Subtask 3.1 Analysis of Data 10 10 10 20 10 10 20 90 $5,310 $45,000 $200 $45,216 $50,526

Subtask 3.2 - Assess Conservation Efforts 10 20 20 40 20 20 80 210 $11,150 $20,000 $100 $20,100 $31,250

Subtask 3.3 - Identify and Develop Water Conservation Measures 10 5 5 40 5 5 40 110 $6,210 $25,000 $100 $25,100 $31,310

Subtask 3.4 - Assess Cost-Effectiveness 10 5 5 20 5 5 20 70 $4,250 $25,000 $500 $25,500 $29,750

Subtask 3.5 - Develop Conservation Plan 10 30 30 90 30 30 90 310 $16,410 $75,000 $1,500 $76,500 $92,910

Subtask 3.6 -Project Management 10 0 0 200 0 0 40 250 $13,790 $500 $500 $14,290

Task 3 - Subtotal 60 70 70 410 70 70 290 1040 $57,120 $190,000 $2,900 $192,916 $250,036

All Tasks Total 60 70 70 410 70 70 290 1040 $57,120 $190,000 $2,900 $192,916 $250,036

Dir

k M

arks

Cat

hy

Ho

llom

on

Mat

t D

icke

ns

Ste

ph

anie

An

ang

on

son

Ro

ber

t M

cLau

gh

lan

To

t al L

a bo

r +

Ex p

en

s es

Co

un

ty C

on

serv

atio

n C

oo

rdin

ato

r

Nan

cy W

arfe

l

To

tal E

xpen

ses

Page 38: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

USCR IRWMP R2 Prop 84_Grant Admin Task 4

Je

ff F

ord

La

ure

n E

ve

rett

To

tal

Ex

pe

ns

es

To

tal

Lab

or +

E

xpe

ns

es

Na

nc

y W

arf

el

Classification: Total To

tal

La

bo

r

OD

Cs

Hourly Rate: $124 $63 $44 Hours Fees Fees Fees

Task 4 - Reports

Subtask 4.1 Quarterly Report 1 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 - Quarterly Report 2 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 - Quarterly Report 3 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 - Quarterly Report 4 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 - Quarterly Report 5 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 -Quarterly Report 6 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 -Quarterly Report 7 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1 -Quarterly Report 8 5 12 12 29 $1,904 $25 $25 $1,929

Subtask 4.1- Quarterly Report 9 5 12 12 29 $1,904 $25 $25 $1,929Subtask 4.2- Grant Agreement Completion Final Report 12 48 24 84 $5,568 $100 $100 $5,668

Subtask 1.3- Administration 40 100 50 190 $13,460 $260 $260 $13,720

Task 1 - Subtotal 97 256 182 535 $36,164 $585 $585 $36,749

All Tasks Total 97 256 182 535 $36,164 $585 $585 $36,749

Je

ff F

ord

La

ure

n E

ve

rett

To

tal

Ex

pe

ns

es

To

tal

Lab

or +

E

xpe

ns

es

Na

nc

y W

arf

el

Page 39: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 5, Schedule Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att5_pg2_clwa_schedule_1of2.doc

ATTACHMENT5–SCHEDULEINTRODUCTIONAdetailedschedulefortheProposalandeachofitscomponentsisprovidedasTable5‐1(Att5_PG2_CLWA_Schedule2of2).ThescheduleisconsistentwiththecategoriesprovidedintheGuidelines.ThescheduleshowsthesequenceandtimingofworkplanningitemspresentedintheProposalandassumestheeffectivedateofthegrantagreementtobeAugust6,2012.Thescheduleshowsthestartdates,enddates,andmilestonesforeachplanningitemcontainedintheAttachment3WorkPlan,andwhenapplicable,dependenceonpredecessorsisalsoshown.WorkPlanTasksinthisProposalarenumberedasfollows:1.RecycledWaterMasterPlanUpdate2.RecycledWaterMasterPlanUpdateEnvironmentalImpactReport3.SantaClaritaValleyWaterUseEfficiencyStrategicPlanUpdate4.GrantAdministrationCONSISTENCYWITHWORKPLANBoththeAttachment3WorkPlanandProposalscheduleprovidediscussionsoftheworkitemsunderthegeneralcategoriesoutlinedinthebudgetandarethusconsistentwitheachotherandthebudget.IRWMPDEVELOPMENTANDADOPTIONAllworkitemscontributetothedevelopmentandenhancementoftheIRWMP.TheIRWMPhasalreadybeenadoptedbytheindividualRWMGmembers,andcollectivelyasagroup.Re‐adoptionoftheplaninthefuturewilloccurafterthecurrentupdateofthePlaniscomplete;howevertimingisunknownandnotdependentontheseapplicationfunds.TheApplicantisaPublicAgency

Page 40: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 5, Schedule Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att5_pg2_clwa_schedule_1of2.doc

Page 41: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

ID Task Name Start Finish

1 Effective Date of Grant Agreement Mon 8/6/12 Mon 8/6/122

3 Task 1 - Recycled Water Master Plan Update Thu 9/30/10 Fri 8/29/144 Subtask 1.1 Recycled Water User Map and Hydraulic Model Update Fri 9/3/10 Fri 7/29/115 Subtask 1.2 Draft Recycled Water System Analysis Fri 7/29/11 Fri 8/3/126 Subtask 1.3 Draft Recycled Water Master Plan Fri 8/3/12 Tue 12/31/137 Subtask 1.4 Final Recycled Water Master Plan Fri 5/30/14 Fri 8/29/148

9 Task 2 - Recycled Water Master Plan Update EIR Fri 1/4/13 Tue 6/24/1410 Subtask 2.1 Project Kick-Off Fri 1/4/13 Fri 1/4/1311 Subtask 2.2 Notice of Preparation Mon 1/7/13 Fri 2/15/1312 Subtask 2.3 Conduct Regular Meetings Fri 1/4/13 Fri 5/30/1413 Subtask 2.4 Prepare Draft Environmental Impact Report (EIR) Mon 3/11/13 Tue 2/11/1414 Subtask 2.5 Review Comments on Draft EIR Tue 3/11/14 Tue 4/15/1415 Subtask 2.6 Prepare Final EIR Tue 3/11/14 Tue 6/24/1416 Subtask 2.7 Direct Project Management Fri 1/4/13 Tue 6/24/1417

18 Task 3 - Santa Clarita Valley Water Use Efficiency Plan Update Thu 10/4/12 Thu 10/31/1319 Subtask 3.1 Analysis of Data Thu 10/4/12 Fri 12/28/1220 Subtask 3.2 Assess Conservation Efforts Tue 1/1/13 Thu 2/28/1321 Subtask 3.3 Identify and Develop Water Conservation Measures Fri 3/1/13 Tue 4/30/1322 Subtask 3.4 Assess Cost-Effectiveness Wed 5/1/13 Fri 6/28/1323 Subtask 3.5 Develop Conservation Plan Mon 7/1/13 Thu 10/31/1324 Subtask 3.6 Direct Project Management Thu 10/4/12 Thu 10/31/1325

26 Task 4 - Grant Administration Thu 10/25/12 Thu 7/24/1427 Grant Administration Thu 10/25/12 Thu 7/24/1428 Subtask 4.1 Combined Quarterly Reports Thu 10/25/12 Thu 7/24/1429 Submit Quarterly Report Thu 10/25/12 Thu 10/25/1230 Submit Quarterly Report Thu 1/24/13 Thu 1/24/1331 Submit Quarterly Report Thu 4/25/13 Thu 4/25/1332 Submit Quarterly Report Thu 7/25/13 Thu 7/25/1333 Submit Quarterly Report Thu 10/24/13 Thu 10/24/1334 Submit Quarterly Report Thu 1/23/14 Thu 1/23/1435 Submit Quarterly Report Thu 4/24/14 Thu 4/24/1436 Submit Quarterly Report Thu 7/24/14 Thu 7/24/1437 Subtask 4.2 Grant Agreement Completion Final Report Thu 7/24/14 Thu 7/24/1438 Subtask 4.3 Administration Thu 10/25/12 Thu 7/24/14

10/25

1/24

4/25

7/25

7/24

7/24

Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul Sep Nov Jan Mar May Jul SepQtr 3, 2010 Qtr 1, 2011 Qtr 3, 2011 Qtr 1, 2012 Qtr 3, 2012 Qtr 1, 2013 Qtr 3, 2013 Qtr 1, 2014 Qtr 3, 2014

Task

Split

Milestone

Summary

Project Summary

External Tasks

External Milestone

Inactive Task

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

Progress

Deadline

Table 5-1UPPER SANTA CLARA RIVER IRWMP ROUND 2, PLANNING GRANT

PROPOSAL SCHEDULE

Page 1

Project: IRWMP R2 Planning Grant_PrDate: Wed 3/7/12

Page 42: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 1 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc

ATTACHMENT6–PROGRAMPREFERENCESTheRound1PlanningGrantapplicationdiscussedhowtheUpperSantaClaraIRWMPgroupintendedtoupdatetheIRWMPanddescribedhowtheIRWMPupdatewilladdresstheProgramPreferencesandStatewidePrioritiesinProposition84.TheIRWMPupdateiscurrentlyunderwayasisprogresstowardsmeetingtheseProgramPreferencesandStatewidePriorities.Further,thedevelopmentoftheRecycledWaterMasterPlanUpdate(RWMPUpdate)andassociatedCaliforniaEnvironmentalQualityAct(CEQA)document,andtheUpdateoftheSantaClaritaValleyWaterUseEfficiencyStrategicPlan(SCVWUESP)proposedaspartofthisRound2PlanningGrantwillhelptofurtheraddresssomeofthespecificProgramPreferencesandStatewidePrioritiesinmuchmoredetail,assummarizedinthefollowingtableanddiscussedfurtherbelow.

ProgramPreferencesUpdateRecycled

WaterMasterPlan

andCEQADocument

SCVWaterUse

EfficiencyStrategic

PlanUpdate

INCLUDEREGIONALPROJECTS/PROGRAMS INTEGRATEWATERMANAGEMENTWITHINHYDROLOGICREGION EFFECTIVELYRESOLVESIGNIFICANTWATER‐RELATEDCONFLICTS CONTRIBUTETOATTAINMENTOFCALFEDBAY‐DELTAPROGRAM ADDRESSCRITICALWATERSUPPLY/QUALITYNEEDSOFADAC INTEGRATEWATERMANAGEMENTWITHLANDUSEPLANNING FORFLOODMANAGEMENTPROJECTSTHATPROVIDEMULTIPLEBENEFITS

ADDRESSSTATEWIDEPRIORITIESOF: A.DROUGHTPREPAREDNESS B.USEANDREUSEWATERMOREEFFICIENTLY C.CLIMATECHANGERESPONSEACTIONS D.EXPANDENVIRONMENTALSTEWARDSHIP E.PRACTICEINTEGRATEDFLOODMANAGEMENT F.PROTECTSURFACEWATERANDGROUNDWATERQUALITY G.IMPROVETRIBALWATERANDNATURALRESOURCES H.ENSUREEQUITABLEDISTRIBUTIONOFBENEFITS I.INTEGRATESTORMWATERRESOURCEPLANREQUIREMENTS

Page 43: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 2

ProgramPreferences

IncludeRegionalProjectsorPrograms

TheSCVWUESPwasdevelopedoutofacollaborativeprocessofallthepublicwatersystemsintheValley(CastaicLakeWaterAgency(CLWA),ValenciaWaterCompany,SantaClaritaWaterDivision,NewhallCountyWaterDistrict,andLosAngelesWaterworksDistrict36)aswellasotherstakeholders.CurrentlyfourofthedemandmanagementprojectswithintheSCVWUESParebeingimplementedwithfundingtobereceivedfromProposition84Round1implementationfunds.UpdateoftheSCVWUESPwillaffecttheentireCLWAservicearea,includingtheserviceareasofthefourretailers.TheSCVWUESPwillbeusedtodevelopaconservationstrategydeterminingtheamountofconservationthatisrequiredtomeettheSBx7‐7(20x2020)demandgoals.Thiswillbeintertwinedwithastrategyofefficientrecycledwateruse,asacombinationofrecycledwaterandconservationcanbeusedtohelptheregioninmeetingitsfuture20x2020goals.Therefore,theupdateofCLWA’sRWMPandtheupdateoftheSCVWUESPareperfectlytimedtogether.TheupdateoftheRWMPincludestheregionalimplementationprojecttheSouthernEndRecycledWaterSystemProject(Phase2C)alsocurrentlybeingfundedbyRound1implementationfunds,andwillalsohelptoidentifythosefuturelocationsoftheremainingphasesofthebuildoutoftheRWMP.

IntegrateWaterManagementwithinHydrologicRegion

UpdatingoftheRWMPandtheSCVWUESPtogethermaximizetheinterconnectionbetweenconservationandprojectingofrecycledwaterusethatisanticipatedwithintheValley,andhelptoidentifywhatrecycledwaterprojectsandconservationstrategiesincombinationwillbethemosteffectivewithinCLWA’sandtheretailerserviceareas.UpdatingofthesedocumentsinthecontextoftheIRWMPwillallowforacombinationofthoseprojectsandstrategiestoachievemultiplegoalswithinacoordinatedimplementationeffort.

EffectivelyResolveSignificantWater‐RelatedConflicts

VarioususersoftheSantaClaraRiverhavebeenindisputeoveracceptablelevelsofchloridesaltintheriveraswellasacceptablemethodstomanageandreducechloridelevels.IntheUpperSantaClaraRiver,therivergainschloridesthroughthedischargeoftreatedwastewaterandtheuseofself‐regeneratingwatersofteners(nowbannedintheSantaClaritaValleySanitationDistrict[SCVSD]servicearea).Affecteddownstreamusersincludefarmersgrowingstrawberries,avocados,andnurserycrops.Thereinexiststheconflict,aneedtoprovidewaterandsanitaryservicestotheupperwatershedatareasonablecostandaneedtoprovidelow‐saltwatertodownstreamagriculturalusers.Droughtincreasesthesaltinthewatersuppliesfortheupperwatershedresultinginelevatedchloridelevelsintreatedwaterdischargedtotheriver.

Page 44: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 3 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc

CLWA provides recycled water to the Santa Clarita Valley as the water wholesaler. In the current RWMP, CLWA projects an increasing need for recycled water that will reach 17,400 acre-feet per year by 2030. To meet the project objective of accommodating recycled water reuse opportunities, the SCVSD would make recycled water available in quantities needed to support CLWA’s RWMP. Using recycled water reduces the use of potable water and eases concerns of a water shortage during drought. Use of recycled water would use the expected growth in treated effluent as its source of supply. Therefore, updating of the RWMP will inform the capital program decisions facing the SCVSD in this effort.

ContributetoAttainmentofCALFEDBay‐DeltaProgram

ThefourCALFEDBay‐DeltaProgramobjectivescanbesummarizedasfollows:

1. EcosystemQuality

2. WaterSupply

3. WaterQuality

4. LeveeSystemIntegrityTheUpperSantaClaraIRWMPregionpartiallyreceivesStateWaterProjectwaterdeliveredthroughtheDelta;actionswithintheRegioncouldcontributetothesuccessofCALFEDBay‐DeltaProgramobjectives.TheIRWMPStakeholdersmadereductioninpotablewaterdemandoneoftheregionalobjectives.Thecurrenttargetforthatobjectiveisa“tenpercentoverallreductioninprojectedurbanwaterdemandthroughouttheRegionby2030throughimplementationofwaterconservationmeasures”.AnyreductioninwaterdemandwouldreducedemandonimportedwaterandcontributetotheattainmentofCALFEDobjectives.Additionally,SBx7‐7hasbeenenacted,mandatingthaturbanwatersuppliersreducestatewidewateruse(ingallonspercapitaperday)by20percentby2020.MethodsofcomplyingwithSBx7‐7includeenhancedwaterconservation,wateruseefficiency,anduseofrecycledwater.UpdatingoftheRWMPandtheSCVWUESPtogethermaximizetheinterconnectionbetweenconservationandprojectingofrecycledwaterusethatisanticipatedwithintheValley,andhelptoidentifywhatrecycledwaterprojectsandconservationstrategiesincombinationwillbemosteffectivewithinCLWA’sandtheretailerserviceareas.UpdatingofthesedocumentsinthecontextoftheIRWMPwillallowforacombinationofthoseprojectsandstrategiestoachievemultiplegoalswithinasingleimplementationeffort,andthereforewouldcontributetotheattainmentofCALFEDobjectives.

Page 45: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 4

AddressWaterSupplyandWaterQualityNeedsofDisadvantagedCommunities

DuringdevelopmentoftheIRWMP,nocommunitiesthatmetthestrictStatedefinitionofaDisadvantagedCommunity(DAC)wereidentified.However,inthespiritofproviding“asafe,clean,affordable,andsufficientwatersupplytomeettheneedsofCaliforniaresidents,farms,andbusinesses”,anoutreacheffortdirectedatDACmemberswasdevelopedandaDACOutreachSubcommitteetotheRegionalWaterManagementGroupwasformed.TheDACOutreachsubcommitteecontactedDACmembersthroughopinionsurveysinareaswhereeconomicallydisadvantagedpeoplewerelikelytoseekservices.ThesesurveysdidnotidentifyanywaterqualityorsupplyissuesuniquetoDACs.WiththerecentcompletionoftheCountyofLosAngeles’sOneValleyOneVision(OVOV)landuseplanningdocument,theOVOVupdateoftheCityofSantaClaritaGeneralPlan,andthe2010Censusdata,thereisawealthofnewinformationavailabletoassistinidentifyingexistingandpotentialnewstakeholders,includingDAC’s,tribalcommunities,andenvironmentaljusticecommunities.ThesetypesofoutreacheffortsarecontinualeffortsaspartoftheUSCRIRWMPandwillbethroughouttheIRWMPUpdate.Itishopedthatthe2010CensuswillmakeiteasiertoidentifyandcoordinatewithDACsandtoidentifyandaddresspotentialwaterqualityorwatersupplyissuesofthesecommunities.

EffectivelyIntegrateWaterManagementwithLandUsePlanning

UpdatingoftheSCVWUESPandRWMPareadirectresponsetotheneedtoaccommodateanticipatedpopulationgrowth,intimeswhenimportedsuppliesmaybelessviableandthereisaneedtoreducedemand(20x2020).Twoprojectscurrentlybeingimplemented(andwhichreceivedImplementationGrantRound1funds),areprojectsfromwithintheSCVWUESPandtheRWMP.ThefourWUEprogramswithintheSCVWUESParedesignedtohelpCLWAandthewaterretailersmeettheir20x2020requirementsunderSBx7‐7.SantaClaritaValleyLargeLandscapeAudit&IncentiveProgramwilltargettheCityofSantaClaritaLandscapeMaintenanceDistricts,LosAngelesCountyParksandHomeowner’sAssociations.SantaClaritaValleyCIIAudit&CustomizedIncentiveProgramwilltargetmajornon‐residentialusersincludingamusementparks,collegesanduniversities,hotels,hospitalsandothercustomersidentifiedbytheretailwateragencies.ResidentialSCVLandscapeContractorCertificationandWeather‐BasedIrrigationcontroller(WBIC)ProgramwouldtargetalllandscapecontractorsandmaintenancecompaniesintheSantaClaritaValley.RecycledwaterfromtheSantaClaritaValleySouthernEndRecycledWaterProjectimplementationprojectwillbeusedforlandscapeassociatedwithparks,schoolsaswellasprivatedevelopment.InstallationofWBICscomplementstherecycledwaterprogramtoreducepotabledemandoflandscapesorstretchrecycledsuppliesfurther.

UpdatingoftheSCVWUESPandRWMPwillalsoinformthenextupdateoftheUrbanWaterManagementPlan(2015),andrequirecoordinationwithlocalplanningagenciesandwiththeLosAngelesCountyandCityofSantaClarita’sOneValleyOneVisiondocumentGeneralPlanUpdates.

Page 46: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 5 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc

ForFloodManagement–ProjectsThatProvideMultipleBenefits

ThisapplicationisnotseekingProposition1EfundingandthereforethisProgramPreferenceisnotapplicable.

StatewidePriorities

DroughtPreparedness

ThreeofthefiveobjectiveswithintheIRWMPrelatetodroughtpreparedness:

o ReduceWaterDemandbyimplementingtechnological,legislativeandbehavioralchangesthatwillreduceusedemandsforwater.

o ImproveOperationalEfficiencybymaximizingwatersystemoperationalflexibilityandefficiency,includingenergyefficiency.

o IncreaseWaterSupplybyunderstandingfutureregionaldemandsandobtainnecessarywatersupplysources.

Onewaytolessentheseverityofadrought’seffectonSantaClaritaValleyistoprepareinadvanceby: (a) diversifying the various sources of supply, (b) developing a “drought‐proof” supply, (c)identifyingthetypesofwaterusesintheRegion,and(d)reducingdemandfromnon‐essentialuses.

UpdatingtheRWMPandSCVWUESPdirectlycontributetotheattainmentoftheseobjectivesbyreducingpotabledemands,bydevelopingaconservationstrategythatusesbothrecycledwaterandconservationinordertomeetfuture20x2020demandgoals.Additionally,datagatheredaspartofthetwoupdateswillprovideapictureofvariouswaterusesintheSantaClaritaValley.Thisdatawillhelptargetwaterdemandreductionsunderallconditions,butcouldbevitalinreducingnon‐essentialusesintheeventofadrought.

UseandReuseWaterMoreEfficiently

SBx7‐7mandatesthaturbanwatersuppliersreducestatewidewateruse(ingallonspercapitaperday)by20percentby2020.MethodsofcomplyingwithSBx7‐7includeenhancedwaterconservation,wateruseefficiency,andrecycledwateruse.TheSCVWUESPwillbeusedtodevelopaconservationstrategydeterminingtheamountofconservationthatisrequiredtomeettheSBx7‐7demandgoals.Thiswillbeintertwinedwithastrategyofefficientrecycledwateruse,asacombinationofrecycledwaterandconservationcanbeusedtohelptheregioninmeetingitsfuture20x2020goals.Therefore,theupdateoftheCLWA’sRWMPisperfectlytimedforanupdatewiththeSCVWUESP.TheupdateoftheIRWMPplanwillprovideaforumfortheRegionasawholetoaddresswateruseefficiencyandrecycledwateruse.

Page 47: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 6

ClimateChangeResponseActions

Theprojectsproposedinthisproposaladdressadaptationtoclimatechange.ImplementationofthisproposalwoulddiversifythesupplysourcesavailableintheRegion,promotewateruseefficiency,andresultinincreasedwaterrecycling.Importantly,thenewrecycledwatersupplysourcewillrequirelessenergyandresultinfewergreenhousegasemissionsthanalikeamountofimportedwater.Energysavings(andgreenhousegasemissionreductions)arealsoenhancedbyreducedwaterdemands.TheconservationprogramsthatwillbedevelopedwithintheupdateoftheSCVWUESPwillreducenotonlywaterdemand,butwastewatertreatmentdemandsaswell.

ExpandEnvironmentalStewardship

The Environmental Impact Report (EIR) for the update of the RWMP will evaluate all of the direct, indirect and cumulative impacts that implementation of recycled water projects within the Santa Clarita Valley would have on the environment. Further, both projects promote stewardship through conservation of resources, and protection of water quality.

PracticeIntegratedFloodManagement

The SCVSD provides wastewater management services for the City of Santa Clarita and adjacent unincorporated areas. The SCVSD collects wastewater from households and businesses within its service area and treats the wastewater at its Saugus and Valencia Water Reclamation Plants. Most of the treated wastewater is not currently reused and is discharged to the Santa Clara River. TheRWMPUpdatewillseekoutadditionalwaysputmorewastewaterfromtheregiontobeneficialuseandtomakeitfeasibletodeliverrecycledwatertomoreendusersinthefuture.ThiswillchangetheflowsintotheSantaClaritaRiverwhichmayhaveanimpactonfloodingdownstream.ThiswillbeinfluencedbytheRWMPUpdateanddiscussedaspartoftheSCVSD’sEIRfortheirproject.

ProtectSurfaceWaterandGroundwaterQuality

Allprojectsassociatedwiththisproposalprotectsurfaceandgroundwaterquality.

ProgramswithintheSCVWUESPtargetoutdoorwaterapplication,includinglargelandscapeaudits,installationofWBICs,andspecializedtrainingforlandscapecontractorsandmaintenancecompanies.Theseprogramswilllimitapplicationofexcessivewaterand,therefore,undesirablesaltsandnutrientstothelandscape.Theseprogramswillreducerunoffandimprovethequalityofanyreceivingwaters.Inaddition,wateruseinformationfromtheauditsandlandscapeprogramswillallowtheRegiontobettermanagethesaltsandnutrientsthroughreductionsofwateruse,andgreateraccountingofwheresaltsandnutrientsareappliedinthewatershed.

UpdatingoftheRWMPwillhelptodevelopandimplementrecycledwaterprojectsthatbothsecurewatersuppliesforbeneficialuseswhileguardinggroundwaterquality.TheprojectswillneedtobeimplementedinconcertwiththeSaltandNutrientManagementPlancurrentlyindevelopmentfor

Page 48: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 6, Program Preferences Page 7 c:\users\leverett\desktop\r2 planning grant\!att6_pg2_clwa_pref_1of1.doc

thebasin.TheSaltandNutrientManagementPlanallowstheregiontomosteffectivelyuserecycledwaterwithoutdegradingthelocalgroundwatersupply.

ImproveTribalWaterandNaturalResources

TheSantaClaritaValleyiswithinthehistoricrangeoftheTataviamBandofMissionIndians,thoughtherearenodesignatedtriballandswithinthewatershed.TheIRWMPhassolicitedtheinputandparticipationfromabroadStakeholdergroup,includingaspecificsolicitationtotheTataviam.Unfortunately,notribalrepresentativeshaveparticipatedtodate.TheIRWMPStakeholderswillcontinuetosolicittribalparticipation.

EnsureEquitableDistributionofBenefits

Asdescribedearlier,theIRWMPhasnotidentifiedcommunitiesthatmettheStatedefinitionforaDAC.AdditionaloutreachdirectedateconomicallydisadvantagedareasandpopulationsdidnotfindanywaterqualityorsupplyissuesuniquetoDACs.Likewise,outreachtoCaliforniaNativeAmericanTribesdidnotidentifyanycriticaluniquewatersupplyorwaterqualityneeds.However,thisproposalcontainsregionalprojectandprogramsthatbenefitalargegeographicarea.Theprojectsandprogramsofthisproposaldonotadverselyaffectoneparticulargroupbutratherequitablydistributebenefitstoabroadgeographicareaandallresidentsandwaterusersofthatarea.

IntegrateStormwaterResourcePlanRequirements

Achievingincreasedwateruseefficiencyoutdoorsmeanslesswaterrunningofflandscapedareasintothestreets,stormdrains,andultimatelyintotheSantaClaraRiver.TheSCVWUESPcombineseducationeffortsandefficienttechnologiestoensurethatmoreofourvaluablewateraredeliveredtoappropriatelandscapingandlessofitpollutesourcommunitiesasurbanrunoff. Capturing,storing,treatingandusingurbanstormwaterrunoff(suchaspercolationtousableaquifers,domesticstormwatercapturesystems,orthecreationofcatchbasins),andtheincorporationandimplementationoflowimpactdevelopmentaremethodscouldaddflexibilitytotheareasoverallwatersuppliesandprovideincreasedefficiency.

Page 49: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 7, 1420 Page 1 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att7_pg2_clwa_1420_1of4.doc

ATTACHMENT7–AB1420ANDWATERMETERIMPLEMENTATIONCOMPLIANCE

CastaicLakeWaterAgency(CLWA)istheapplicantandalsotheUrbanWaterSupplierthatwillbereceivingfundingfromthisRound2PlanningGrantshouldtheAgencybeawardedfunding. Self‐certificationformsfordocumentingcompliancewithCaliforniaWaterCode(CWC)§525forWaterMeter Installation and Assembly Bill (AB) 1420 for Best Management Practice implementationwere originally provided as part of the Round 1 Planning Grant and Implementation Grantapplications.Therefore,currentforms,albeitnochangeshavebeenmadehavebeensubmittedasAtt7_PG2_CLWA_1420_2of4andAtt7_PG2_CLWA_1420_3of4.Inaddition,documentationprovidedas Att7_PG2_CLWA_1420_4of4 is DWR’s compliance letter which provides DWR’s review andacceptanceoftheAgency’sconformancewithAB1420.

Page 50: ATTACHMENT 1 AUTHORIZING DOCUMENTATION

Attachment 7, 1420 Page 2 p:\uscr irwmp\p84 planning grant\r2 planning grant\!att7_pg2_clwa_1420_1of4.doc

Page 51: ATTACHMENT 1 AUTHORIZING DOCUMENTATION
Page 52: ATTACHMENT 1 AUTHORIZING DOCUMENTATION