Atrium slide show

8
Brickyard Bubble with Insulation August 2, 2010

Transcript of Atrium slide show

Page 1: Atrium slide show

Brickyard Bubble with Insulation August 2, 2010

Page 2: Atrium slide show

The Bubble was designed to Blend Well with Brickyard August 2, 2010

Page 3: Atrium slide show

Crews Working Diligently August 2, 2010

Page 4: Atrium slide show

The Bubble Seats 250 August 2, 2010

Page 5: Atrium slide show

The Left Side Currently Undergoing Heavy Construction August 2, 2010

Page 6: Atrium slide show

The Left Side will Feature the New Concepts August 2, 2010

Page 7: Atrium slide show

Heavy Construction August 2, 2010

Page 8: Atrium slide show

New Carpet in Temporary Serving Area August 2, 2010