The AFDJ’s AtoN system has been purchased from the German company Pintsch Bamag and it was put into operation in the autumn of 2008. Due to special geographical conditions, for some lighthouses the communication with the territorial stations was not possible using VHF and the satellite communication is too expensive for AFDJ RA Galati at present.This is valid too for the Danube sector between rkm 845.5 and rkm 1075, where the upstream lighthouses are not monitored for the time being.

General Facts

Page 3: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

System Description The main components of the System are:

• 5 territorial centers located in: Sulina, Galati, Calarasi, Giurgiu and Turnu Severin

• 1 central server in Galati• Equipment for buoys• Equipment for lighthouses

The structure of a territorial center is the following:• VHF aerial• VHF/UHF modem, radio• Hardware equipment (computer, monitor, UPS, printer)• Software equipment (CoDeSy program, data storage base)

Page 4: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

System Description The CoDeSy MKII CMS System represents a monitoring and control instrument of the process devices for navigation such as: lighthouses and buoys, retransmission relays. The CoDeSy MKII CMS Program permits the visualization, archiving and analysis of the process values of the navigation aids. The program runs on a standard PC – remote monitoring computer (RMC). The access to the process values of the navigation aids is given by VHF, UHF or communication modems via satellite.

Page 5: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

System Description The territorial centers are independent and they are monitoring buoys and lighthouses as follows:

• Sulina: 39 buoys and 23 lighthouses

• Galati: 22 buoys and 34 lighthouses

• Calarasi: 14 lighthouses

• Giurgiu: 27 lighthouses

• Tr. Severin: 21 lighthousesAt all territorial centers there are other unmonitored buoys, but on which the necessary equipment can be mounted so that they may be monitored.

Page 6: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

System Description

The connection between the territorial servers and the central one is realized via VPN (Virtual Private Network).

Page 7: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Equipment for buoys

Page 8: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Equipment for lighthouses

Page 9: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

System OperationThe visualizing program CoDeSy MKII CMS for the client is installed on all existing servers. In general, this visualizing program consists of two levels. The first level indicates a Danube map with ionized graphs of the locations which are monitored. After having selected a certain location, the second level displays a graph of the selected location with all its parameters. The characteristics of the objective can be updated also manually by the operator by simply using the “Data Request” button.

Page 10: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

First Level

Page 11: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Second LevelFor each objective the following can be monitored:

Parameters of the lamp

Page 12: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Parameters of the main battery

Page 13: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Parameters of the back-up battery

Page 14: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Parameters of the radio modem

Page 15: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Routing list

Page 16: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Parameters of the GPS module

Page 17: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Parameters of the collision sensor

Page 18: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Only the buoys are equipped with GPS module and collision sensor. In case of modification of the pre-established parameters, the stations receive warnings, acoustic and visual alarms which are continuous until the operator confirms the alarm reception. The confirmation of the alarm reception means that the acoustic alarm stops but the visual alarm goes on until the technicians’ team repairs the defect.For each buoy or lighthouse, individual parameters may be established for the generation of monitoring reports, daily, weekly or monthly.

Page 19: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Improvements needed

• Assure VHF radio coverage for entire river, according with radio simulations.

• Adding AIS modules on some buoys, as will be resulted from NEWADA activity.

• Implementing of software able to manage virtual AIS AtoN, based on existing AIS infrastructure

Page 20: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Example of radio coverage simulation

Page 21: AtoNs experiences in implementation in Romania Vukovar, 12-13 December, 2012.

Thank you for your attention!

Adrian Maizel – AFDJ RA Galati