ATM sulzer 110 MW power plant rev1€¦ · Technical specification: Alfa Laval, FOPX 613 TFD‐20,...
Transcript of ATM sulzer 110 MW power plant rev1€¦ · Technical specification: Alfa Laval, FOPX 613 TFD‐20,...
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
110 MW HFOpower plant
10 gensets Sulzer16ZA40S
ATM sulzer 110 MW power plant rev1.docx
Page 1/18
1 General overview:This power plant is located in a very dry area in the desert, almost 20 km from the sea
shore, at 1200m up to sea level, then naturally protected from corrosion.
This power plant was built at the end of 2009, using 10 gensets Sulzer 16ZAV40S of 11
MW each. On that time, all gensets were almost 30.000 hours of operation from new, and they
received a full major overhaul performed by Wärtsilä at the time of the power plant installation.
In 2016 and 2017, the owner launched a huge maintenance program destinated to
perform the 24.000 h overhaul in all units. Unfortunately, by the end of 2017, the country power
market changed dramatically, and the plant began to operate less and less hours until having been
decommissioned in 2018.
Nowadays, all equipment remains in place, all fuel and auxiliary fluids tanks were emptied
and cleaned, and the plant is disconnected from the grid.
2 Sulzer 16 ZAV40 S Genset
ATM sulzer 110 MW power plant rev1.docx
Page 2/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
Engine:
Nº de cylinders: 16 Output per cylinder: 720 kW MCR (Maximum Continuous Rating): 11.520 kW
Turbochargers:
ABB VTR454‐21
Generators:
Nominal output: 14.700 kVA Power factor: 0,76 Cos øNominal power: 11.172 kW Speed: 500 rpm
ATM sulzer 110 MW power plant rev1.docx
Page 3/18
Frequency: 50 Hz
At the time of the plant disconnection from the grid, all engines were 55.000 to 63.000
hours of operation from new.
All engines were in 24.000 h maintenance process when the owner decided to close the
plant. Then almost 90% of the required new or refurbished parts are on site, ready to be installed on
the engines.
3 BOP:
3.1 Fuel booster:1 module for 2 gensets:
ATM sulzer 110 MW power plant rev1.docx
Page 4/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
Technical specification: Alfa Laval, FOPX 613 TFD‐20, B&K Filter
3.2 Lube oil storage and treatment:1 module per genset: Alfa Laval, LOPX 710 FD‐34
LUBE OIL FILTER LAM 280‐BN ALFA LAVAL MOATTI
IBERMAT MAIN OIL PUMP 550 m3/H
ATM sulzer 110 MW power plant rev1.docx
Page 5/18
3.3 Engines cooling systemTechnical specification: plates heat exchanger APV BAKER M60 and M92. HT and LT
cooling systems
LT WATER PUMP AN 150/400SECONDARY CIRCUIT PUMP MN50/160CYLINDER WATER PUMP CP40/130FUEL VALVE WATER PUMP CP40/160
ATM sulzer 110 MW power plant rev1.docx
Page 6/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
3.4 Main cooling system
Each genset is equipped with a battery of 35 V shape radiators.
The radiators are Alfa Laval, model VDDS907CD74 BST with electric turbo fans, and
were installed new in 2009 when the plant was built.
ATM sulzer 110 MW power plant rev1.docx
Page 7/18
ATM sulzer 110 MW power plant rev1.docx
Page 8/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
3.5 Heat recovery system:1 boiler per engine, located vertical on the base of the stack. Equipped with one
chemical control module.
ATM sulzer 110 MW power plant rev1.docx
Page 9/18
3.6 HP compressed air system:Engines starting system:
The air compressors were removed and aren’t anymore available. 1 HP tank for 5
engines.
ATM sulzer 110 MW power plant rev1.docx
Page 10/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
3.7 MV switchyard:Technical specification: (marca, modelo, algo de salsa)
ATM sulzer 110 MW power plant rev1.docx
Page 11/18
ATM sulzer 110 MW power plant rev1.docx
Page 12/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
ATM sulzer 110 MW power plant rev1.docx
Page 13/18
3.8 Control systemEven if half of the control system was upgraded to modern technology in 2012, we
highly recoment not to recover the existing equipment nor the control room and replace
everything by an up to date simple, efficient and reliable DCS.
3.9 Main fuel treatment systemTechnical specification: FOPX 613 TDB‐20
ATM sulzer 110 MW power plant rev1.docx
Page 14/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
3.10 Building general arrangement and main scketches
ATM sulzer 110 MW power plant rev1.docx
Page 15/18
ATM sulzer 110 MW power plant rev1.docx
Page 16/18
Austral Technical ManagementBL: C217030107
Office 113, 2nd Floor Medine MewsLa Chaussée Street
Port Louis,MAURITIUS
ATM sulzer 110 MW power plant rev1.docx
Page 17/18