ATLAS Data Challenges
US ATLAS Physics & Computing
ANLOctober 30th 2001
Gilbert PoulardCERN EP-ATC
ATLAS Plenary-18 October 2001 2
Outline
ATLAS Data Challenges & “LHC Computing Grid Project”
GoalsScenariosOrganization
ATLAS Plenary-18 October 2001 3
From CERN Computing Review
CERN Computing Review (December 1999 - February 2001)Recommendations:
organize the computing for the LHC eraLHC Grid project
• Phase 1: Development & prototyping (2001-2004)• Phase 2: Installation of the 1st production system (2005-2007)
Software & Computing Committee (SC2)Project accepted by the CERN council (20 September)
Ask the experiments to validate their Computing model by iterating on a set of Data Challenges of increasing complexity
However DC’s were in our plans
ATLAS Plenary-18 October 2001 4
LHC Computing GRID projectPhase1:
Prototype constructiondevelop Grid middlewareacquire experience with high-speed wide-area networkdevelop model for distributed analysisadapt LHC applicationsdeploy a prototype (CERN+Tier1+Tier2)
Softwarecomplete the development of the 1st version of the physics application and enable them for the distributed grid model
develop & support common libraries, tools & frameworks• including simulation, analysis, data management, ...
in parallel LHC collaborations must develop and deploy the first version of their core software
ATLAS Plenary-18 October 2001 5
ATLAS Data challenges Goal
understand and validate: our computing model, our data model and our softwareour technology choices
How?In iterating on a set of DCs of increasing complexity
Start with data which looks like real dataRun the filtering and reconstruction chainStore the output data into our databaseRun the analysisProduce physics results
To studyPerformances issues, database technologies, analysis scenarios, ...
To identifyweaknesses, bottle necks, etc… (but also good points)
ATLAS Plenary-18 October 2001 6
ATLAS Data challenges
But:Today we don’t have ‘real data’
Needs to produce ‘simulated data’ first so:
• Physics Event generation • Simulation • Pile-up • Detector response• Plus reconstruction and analysis
will be part of the first Data Challenges
we need also to “satisfy” the ATLAS communitiesHLT, Physics groups, ...
ATLAS Plenary-18 October 2001 7
ATLAS Data Challenges: DC0
DC0 November-December 2001'continuity' test through the software chain
aim is primarily to check the state of readiness for DC1We plan ~100k Z+jet events, or similarTo validate the software:
• issues to be checked include – G3 simulation running with the ‘latest’ version of
the geometry– reconstruction running
Re-analyze part of the Physics TDR data “reading from & writing to Objectivity”
Would test the “Objy database infrastructure”Complementary to the “continuity test”
ATLAS Plenary-18 October 2001 8
ATLAS Data Challenges: DC1
DC1 February-July 2002reconstruction & analysis on a large scale
learn about data model; I/O performances; identify bottle necks …
use of GRID as and when possible and appropriatedata management
Use (evaluate) more than one database technology (Objectivity and ROOT I/O)Learn about distributed analysis
should involve CERN & outside-CERN sitessite planning is going on, an incomplete list already includes sites from Canada, France, Italy, Japan, UK, US, Russia scale 107 events in 10-20 days, O(1000) PC’s
data needed by HLT & Physics groups (others?)Study performance of Athena and algorithms for use in HLTsimulation & pile-up will play an important role
checking of Geant4 versus Geant3
ATLAS Plenary-18 October 2001 9
ATLAS Data Challenges: DC1
DC1 will have two distinct phasesFirst, production of events for HLT TDR, where the primary concern is delivery of events to HLT community;Second, testing of software (G4, dBases, detector description,etc.) with delivery of events for physics studiesSoftware will change between these two phases
Simulation & pile-up will be of great importancestrategy to be defined (I/O rate, number of “event” servers?)
As we want to do it ‘world-wide’ we will ‘port’ our software to the GRID environment and use as much as possible the GRID middleware (ATLAS kit to be prepared)
ATLAS Plenary-18 October 2001 10
ATLAS Data Challenges: DC2
DC2 Spring-Autumn 2003Scope will depend on what has and has not been achieved in DC0 & DC1 At this stage the goal includes:
Use of ‘TestBed’ which will be built in the context of the Phase 1 of the “LHC Computing Grid Project”
• Scale at a sample of 108 events • System at a complexity ~50% of 2006-2007 system
Extensive use of the GRID middlewareGeant4 should play a major rolePhysics samples could(should) have ‘hidden’ new physicsCalibration and alignment procedures should be tested
May be to be synchronized with “Grid” developments
ATLAS Plenary-18 October 2001 11
DC scenario
Production Chain:Event generationDetector Simulation Pile-upDetectors responsesReconstructionAnalysis
These steps should be as independent as possible
ATLAS Plenary-18 October 2001 12
Production stream Input Output Framework
Event generation Pythia (others)
none Ntuple/FZ OO-db
Atlsim/Genz Athena
Detector Simulation Geant3 Dice Geant4
Ntuple/FZ OO-db
FZ OO-db
Atlsim FADS/Goofy
Pile-up & Detector responses
Atlsim Dice
FZ OO-db
FZ OO-db
Atlsim Athena
Data conversion FZ OO-db Athena
Reconstruction OO-db OO-db “Ntuple”
Athena “Atrecon?”
Analysis “Ntuple” Paw / Root Anaphe / Jas
“OO-db” is used for “OO database”, it could be Objectivity, ROOT/IO, …
ATLAS Plenary-18 October 2001 13
DC1
Ntuple
Pythia, Isajet,Herwig, MyGeneratorModule
HepMC Obj., Root ATLFAST OO
Ntuple
Obj., Root
GENZ
G3/DICE RD event ?OO-DB ?
ATHENA reconstruction
Comb. Ntuple
Obj., RootComb. Ntuple
G4Obj.
Missing:-- filter, trigger -- Detector description-- HepMC in Root -- Digitisation-- ATLFAST output in Root (TObjects) -- Pile-up-- Link MC truth - ATLFAST -- Reconstruction output in Obj., Root-- EDM (e.g. G3/DICE , G4 input to ATHENA)
Ntuple-like
ZEBRA
ATLAS Plenary-18 October 2001 14
Detector Simulation Geant3 and Geant4
For HLT & physics studies we will use Geant3Continuity with past studiesATLAS validation of Geant4 is proceeding well but not
completedDetector simulation in Atlsim (Zebra output)
Some production with Geant4 tooGoals to be defined with G4 and Physics groups It is important to get experience with ‘large production’ as part
of G4 validation it is important to use the same geometry input
In the early stage we could decide to use only part of the detector it would also be good to use the same sample of generated
eventsDetector simulation we propose to use the FADS/Goofy
frameworkOutput will be ‘Hits collections’ in OO-db
Detector responses (& pileup) has to be worked on in new framework
ATLAS Plenary-18 October 2001 15
Reconstruction
Reconstructionwe want to use the ‘new reconstruction’ code being run in Athena frameworkInput should be from OO-dbOutput in OO-db:
ESD (event summary data)AOD (analysis object data)TAG (event tag)
ATLAS Plenary-18 October 2001 16
Analysis
We are just starting to work on this but Analysis tools evaluation should be part of the DC
It will be a good test of the Event Data ModelPerformance issues should be evaluated
Analysis scenario It is important to know the number of analysis groups, the number of physicists per group, the number of people who want to access the data at the same timeIt is of ‘first’ importance to ‘design’ the analysis environment
• to measure the response time• to identify the bottle necks
for that users’ input is needed
ATLAS Plenary-18 October 2001 17
Data management
It is a key issue Evaluation of more than one technology is part of
DC1Infrastructure has to be put in place:
For Objectivity & ROOT I/O• Software, hardware, tools to manage the data
– creation, replication, distribution
discussed in database workshop Tools are needed to run the production
“bookkeeping” , “cataloguing” …Run number, random number allocation, …Working group now set-up
Job submission Close collaboration with ATLAS Grid (validation of Release 1)
ATLAS Plenary-18 October 2001 18
DC1-HLT - CPU
Number of events
Time per event sec SI95
Total time Sec SI95
Total timeHoursSI95
simulation107 3000
3 * 1010 107
reconstruction 107 640
6.4 * 109 2 * 106
ATLAS Plenary-18 October 2001 19
DC1-HLT - data
Number of events
Event sizeMB
Total size GB
Total sizeTB
simulation107 2 20000 20
reconstruction 107 0.5 5000 5
ATLAS Plenary-18 October 2001 20
DC1-HLT data with pile-up
L Number of events
Event size MB
Total size GB Total size TB
2 x 1033 1.5 x 106 (1) 2.6(2) 4.7
40007000
47
1034 1.5 x 106 (1) 6.5(2) 17.5
1000026000
1026
In addition to ‘simulated’ data, assuming ‘filtering’ after simulation (~14% of the events kept).
- (1) keeping only ‘digits’
- (2) keeping ‘digits’ and ‘hits’
ATLAS Plenary-18 October 2001 21
Ramp-up scenario @ CERN
0
50
100
150
200
250
300
350
400
7 11 16 20 24 25 26
CPU
Week in 2002
ATLAS Plenary-18 October 2001 22
What nextThis week:
Have an updated list of goals & requirements prepared with
HLT, Physics communities simulation, reconstruction, database communities people working on ‘infrastructure’ activities
• bookkeeping, cataloguing, ...
Have a list of tasksSome Physics orientedBut also like testing code, running production, …with ‘established’ responsibilities and priorities
And working groups in placeYou can join
ATLAS Plenary-18 October 2001 23
What next
In parallelDefine ATLAS validation plan for
EU-DataGrid Release 1ATLAS software for DC0 and DC1
Understand the involvement of Tier centersInsure that we have the necessary resources
@ CERN and outside CERNWe have already some input and a ‘table’ is being prepared
“And turn the key”