Attachment 1 Attachment - Infrastructure Report.doc Attachment 1 Page 273 Atitjere Workshop Roof Willowra Works Sheds Harts Range Picnic Shelter ASSET MANAGEMENT ACQUISITIONS Core Services In the last reporting period the Shire has taken final delivery of rubbish trailers from Miegel Bros. These trailers have required some minor modifications with the installation of electric battery chargers and in the case of the Willowra unit, the adjustment to the height of the bin lifter pivot. Toyota Coaster Bus – Atitjere. CDEP 2 Galvanised 10 x 5 box tandem – Miegel Bros 1 Galvanised 8x5 Box Tandem – Miegel Bros. 3 Contractor Tandems – Treg Outstations Kubota Tractor was taken delivery of and an older unit was refurbished. 2 high side tandem box trailers – Classic Trailers. MAJOR REPAIRS Major repairs include a New Holland tractor, and to a lesser extent, the Mack Prime Mover and Triad Dropdeck Trailer. The Lajamanu Grader is in currently awaiting servicing and overhaul before re-commissioning at TiTree of being reconditioned. An

Transcript of Atitjere Workshop Roof Willowra Works Sheds Harts Range ... · Attachment 1 Attachment -...

Attachment 1

Attachment - Infrastructure Report.doc

Attachment 1 Page 273

Atitjere Workshop Roof

Willowra Works Sheds

Harts Range Picnic Shelter

ASSET MANAGEMENT ACQUISITIONS Core Services

In the last reporting period the Shire has taken final delivery of rubbish trailers from Miegel Bros. These trailers have required some minor modifications with the installation of electric battery chargers and in the case of the Willowra unit, the adjustment to the height of the bin lifter pivot. Toyota Coaster Bus – Atitjere. CDEP

2 Galvanised 10 x 5 box tandem – Miegel Bros 1 Galvanised 8x5 Box Tandem – Miegel Bros. 3 Contractor Tandems – Treg Outstations

Kubota Tractor was taken delivery of and an older unit was refurbished. 2 high side tandem box trailers – Classic Trailers. MAJOR REPAIRS

Major repairs include a New Holland tractor, and to a lesser extent, the Mack Prime Mover and Triad Dropdeck Trailer. The Lajamanu Grader is in currently awaiting servicing and overhaul before re-commissioning at TiTree of being reconditioned. An

Attachment 1

Attachment - Infrastructure Report.doc

Attachment 1 Page 274

upgrade is in process of a used vehicle trailer initially for use by Outstations. Some other smaller trailers have been refurbished and registered for community and central/loan use.

DISPOSALS

The following have been disposed by auction. 6 surplus CDEP box trailers Kia Pregio Landrover Defender 639802 Ford Courier 4WD 649009 Ford Courier 2WD 939865 Ford Falcon ute 639670 1 Bobcat (beyond economic repair) An old Coaster bus and Mazda Tipper were scrapped. Some vehicles and plant in the communities have registration renewal pending and in some cases, registration for the first time in the Shire’s name. The programming of an Access Database to facilitate planning and management of fleet acquisitions, utilisation and disposals has reached the point where it has been migrated to the 2010 Microsoft version, greatly enhancing its function. Further reporting tabulations are in process. The data stored therein remains in need of tidy-up. The completion of the field valuations by Liquid Pacific, and the majority of the fleet having recently been re-registered to the currently single common date provide

Attachment 1

Attachment - Infrastructure Report.doc

Attachment 1 Page 275

a sound basis for ensuring the data set is accurate and complete. Assets listed in Tech1 can then be properly reviewed to match the inventory and rationalised. OUTSTATION SERVICES Record rains have resulted in extensive buffel grass growth around all outstations, creating an emerging major fire risk. The focus of outstation staff has therefore been on slashing. In western outstations, the new works team of Dave Hoddard (OS Works Supervisor) and Leslie White (OS Field Worker) have been doing an excellent job. Pulardi, Garden Bore (Arrunge), Ten Mile and Karrinyarra have been fully cleared of rubbish, enabling comprehensive slashing to occur. Rubbish has been segregated into i) ferrous metal, stockpiled with old vehicles for later scrap metal removal; ii) non-ferrous scrap including loose radiators and aluminium car heads; iii) and general rubbish, placed in landfills. In the eastern outstations, the focus has similarly been on rubbish removal and slashing. Irrelirre outstation commenced an active CDEP program, with local man Kyle Dunn as CDEP Works Supervisor. Participants have been doing an excellent job clearing rubbish and slashing grass around their outstation, with the next phase being landfill improvement. A new Kubota tractor, 5’ slasher and refurbished plant trailer have been purchased for the Eastern team, with delivery expected in late November. MEETINGS ATTENDED 29 Sept Georgie Stewart & Danielle Campbell re Willowra Learning

Centre 29 Sept Shaneen Fanton re SIHIP 30 Sept Len Griffith re Territory housing 13 October Laramb Local Board Meeting 14 October Keiran Taylor, Chris Smith, Noel Mason, Katharine O’Donoghue,

Sascha McKell, Joel Orr, Marie re CDEP Progress Review. 25 October Atitjere re CDEP demountable 25 October Engawala re CDEP demountable 26 October TiTree re CDEP demountable 26 October Willowra re CDEP demountable 4-5 November LGANT infrastructure Forum 9-10 November SSD Meeting 12 November Len Griffiths re Territory Housing 18 November Laramba re CDEP demountables & other projects Timothy Day Director of Infrastructure

ORDINARY COUNCIL 8 DECEMBER 2010

- 276 -

INFRASTRUCTURE REPORTS

ITEM NUMBER 14.2

TITLE Land Transfer to Department of Education and Training

REFERENCE \10 - CORPORATE SERVICES\GOVERNANCE AND ADMINISTRATION\5.5.2.1 COUNCIL MEETINGS\2010 - 76535

AUTHOR Tim Day, Director, Infrastructure RECOMMENDATION: That Council endorse the excision of part of Lot 79 Laramba (Workshop / orchard) as an extension to Lot 73 Laramba (School)

SUMMARY: The Department of Training and Education wish to construct an Open Learning Centre adjacent to the existing school site. The Open Learning Centre will be used for sport, educational and cultural outdoor activities. Additional land is required to build this centre and it is proposed that an area from Lot 79 be made available for this purpose.

BACKGROUND The Laramba Local Board supports the construction of the Open Learning Area on land behind the school which is the southern end of the old orchard on Lot 79 behind the workshop. The Laramba Local Board does not want any land from Lot 93, the Child Care Centre, to be lost. ISSUES, CONSEQUENCES AND OPTIONS If Council adopts this recommendation advice will be given to FaHCSIA 5 year leases division to transfer the Shire’s administrative authority over this portion of the allotment to the Department of Education and Training.

ORDINARY COUNCIL 8 DECEMBER 2010

- 277 -

ATTACHMENTS: There are no attachments for this report.

ORDINARY COUNCIL 8 DECEMBER 2010

- 278 -

FINANCE COMMITTEE REPORTS

ITEM NUMBER 15.1

TITLE Finance & Audit Committee Report

REFERENCE \10 - CORPORATE SERVICES\GOVERNANCE AND ADMINISTRATION\5.5.2.1 COUNCIL MEETINGS\2010\2010 - 06 ORDINARY SHIRE COUNCIL MEETING 8 DECEMBER TI-TREE - 65536

AUTHOR Muhammad Waqas, Finance Manager RECOMMENDATION: That Council receive and note the Finance & Audit Committee report of 8th November 2010 and endorse the following recommendations to the Council:

1. The Committee endorses the Annual Report text and Annual Financial Statements for 2009-10 and authorises the CEO to finalise the graphical design and printing of the Annual Report.

2. That the Finance & Audit Committee Report is received and the actions contained therein adopted.

SUMMARY: The Finance & Audit Committee convenes on a bi-monthly basis to carry out the financial functions of the Council. The report from the November 8th meeting is tabled for noting.

BACKGROUND The Council has appointed the Finance & Audit Committee under Section 11 of the Local Government (Accounting) Regulations 2008 to undertake the financial functions of the Council in the months that the Council does not hold an ordinary meeting. The Finance & Audit Committee met on the 8th November 2010. The minutes and resolutions are detailed in the attachment. ISSUES, CONSEQUENCES AND OPTIONS Section 18 of the Local Government (Accounting) Regulations 2008 identifies the format and content of the financial reports to council. The Finance & Audit Committee report complies with legislative requirements.

DUE TO THE SIZE OF THE ANNUAL REPORT, PLEASE FIND IT TABLED.

ATTACHMENTS: 1 Attachment - CSD Finance Audit Committee (no AR).pdf

ORDINARY COUNCIL 8 DECEMBER 2010

- 279 -

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 280

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 281

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 282

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 283

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 284

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 285

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 286

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 287

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 288

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 289

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 290

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 291

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 292

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 293

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 294

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 295

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 296

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 297

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 298

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 299

Attachment 1 Attachment - CSD Finance Audit Committee (no AR).pdf

Attachment 1 Page 300