ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt...
Transcript of ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt...
![Page 1: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/1.jpg)
Helping to keep the lights on, businesses running and communities strong®
ATC Project UpdateMay 2011
Mary CarpenterATC Customer Meeting
May 24, 2011
![Page 2: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/2.jpg)
2
Badger Coulee Project
![Page 3: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/3.jpg)
www.atcllc.com
Badger Coulee Project
• Approximately 150 miles from northern Dane County to La Crosse area
• Multiple benefits– Improve reliability in Southwest WI region– Provide economic savings by improving access– Improve access to renewable energy
• Approximate cost: $425 million• In-service date: 2018
3
![Page 4: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/4.jpg)
www.atcllc.com
Where Are We Now?
• Open houses in Sept/October 2010 introduced the project as a broad study area– Over 1800 attendees at 8 open houses
• Second round of open houses coming up last two weeks in June will identify a number of potential corridors
• Public outreach will continue through 2012• Application filing anticipated in 2013
4
![Page 5: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/5.jpg)
5
Pleasant Prairie to
ZionProject
![Page 6: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/6.jpg)
www.atcllc.com
Pleasant Prairie to Zion Project
• Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation
• Benefits:– Relieves congestion in the region– Enables most efficient generators
to supply power– Strengthens access and market
• Approximate cost: $21 million - $25 million• In-service date: early 2014
6
![Page 7: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/7.jpg)
www.atcllc.com
Where Are We Now?
• Introduced the project in April with two route corridor options
• Identify preferred and alternate routes to be included in regulatory filings in both Wisconsin and Illinois in late 2011
• Public outreach continues
7
![Page 8: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/8.jpg)
Western Milwaukee County Electric Reliability Project
8
![Page 9: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/9.jpg)
www.atcllc.com
Western Milwaukee County Electric Reliability Project
• New We Energies substation adjacent to the existing substation and plant
• Two 2-mile, 138,000-volt transmissions lines• Need:
– Addresses forecasted overloads on distribution system
– Provides critical service to medical complex– Strengthens access and market
• Approximate cost: $35 million• In-service date: Spring 2015
9
![Page 10: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/10.jpg)
www.atcllc.com
Where Are We Now?
• Open houses held Fall 2010 and March 2011
• Finalizing routes to be included in regulatory application to be file in early 2012
• Open house in Fall 2011 to show final routes
10
![Page 11: ATC Project Update · Pleasant Prairie to Zion Project • Approximately 5.3 mile, 345,000-volt transmission line from Pleasant Prairie Substation to Zion Energy Center Substation](https://reader033.fdocuments.us/reader033/viewer/2022060603/60580344a60fc82c074a8d3e/html5/thumbnails/11.jpg)
www.atcllc.com
Questions
11