AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline...
Transcript of AtAGlance - 포스코건설 · 2020. 6. 25. · Jun-06 ~ Mar-10 EPC Kangneung Sewerage Pipeline...
SHAREHOLDERS
POSCO 52.8 %PIF 38.0 %Others 9.2 %
TOTAL ASSETS
KRW 6.6 trillion
USD 6.0 billion
STAFF STRENGTH
> 5,000
employees
GLOBAL PRESENCE
25 Countries
In 4 continents
At A Glance
Main Business in Water & Environment
- 7 -
Advanced Wastewater Treatment
(Sewage & Industrial Wastewater)
Sewarage Pipelines & Maintenance
Reuse of Wastewater
Water & Wastewater Treatment Facilities
Desalination Plant
Reverse Osmosis (RO)
Thermal (MSF, MED)
Pipe Line
Waste Treatment & Incineration Facilities
Water Treatment
Water Supply System
Residential Waste Incineration Plant
(Waste to Energy, SRF System)
Sludge Incineration Plant
(Sewage and Industrial Waste Sludge)
Waste Water Treatment (1)
- 12 -
Water Treatment Plants
Name
Anyang, Korea Location Ho Chi Minh, Vietnam
250,000㎥/day Capacity 328,000 ㎥/day
CSBR-method(A2O+SBR) Process Conventional Activated Sludge
Apr. 2013 ~ Jan. 2017 Construction Jul. 2015 ~ Jan. 2020
Waste Water Treatment (2)
- 13 -
Water Treatment Plants
Name
Seoul, Korea Location Incheon, Korea
5,324 Liter/sec (460,000㎥/day) Capacity 1,447 Liter/sec (125,000㎥/day)
A2O BNR Process Bio-SAC BNR
Feb. 2004 ~ Oct. 2007 Construction Aug. 2005 ~ Aug. 2008
Waste Water Treatment (3)
- 14 -
Water Treatment Plants
Name
Incheon, Korea Location Gumi City, Korea
4,050 Liter/sec (350,000㎥/day) Capacity 3,819 Liter/sec (330,000㎥/day)
MLE Process Bio-SAC BNR
Dec. 2007 ~ Oct. 2010 Construction Aug. 2001 ~ Jul. 2005
Water Treatment (4)
- 15 -
Water Treatment Plants
Name
Yanbu, KSA Location Yangon, Myanmar
54,050㎥/day Capacity 50,000㎥(Reservoirs), 20,210 ㎥/hr (Pump)
MLE(Modified Ludzack-Ettinger) Process
Jan. 2011 ~ Apr. 2016 Construction Jan. 2018 ~ May. 2020
- 16 -
Water & Wastewater Treatment
Bio-SAC BNR Process which is
our own specialized technology
Wide range of water & wastewater
treatment businesses by constant
attempts and innovation
Various experiences in Korea,
Saudi Arabia, UAE, Brazil,
Indonesia , Vietnam, Myanmar and other
countries.
- 17 -
KSA Yanbu, Rehabilitation & Expansion of SWTP
Major purpose
Rehabilitation & Expansion of
existing SWTP up to capacity
of 54,050㎥/day (EPC Turn-Key)
Major Facilities
- Rehabilitation : 27,000㎥/day
- Expansion : 27,050㎥/day
* MLE(Modified Ludzack-Ettinger) Process
Client : MARAFIQ
Power and Water Utility Company for
Jubail & Yanbu
Project Period
Jan. 2011 ~ Apr. 2016
Existing Facility
(Rehabilitation)
New Facility
(Expansion)
PJT site view
Bioreactor
Sludge Pump Station
& 2nd Sedimentation
- 18 -
Major Experience References (EPC)
Water Treatment & Supply System (Construction)
Projects[Country] Description Complete Role
Greater Yangon Water Supply Project [Myanmar]
Reservors : 50,000㎥Pumping Stations : 20,210 ㎥/hr
May-20 PC
Gwangyang Seawater RODesalination Plant [Korea]
SWRO Capacity: 30,000㎥/day Jul-14 EPC
Brazil CSP EnvironmentalFacilities [Brazil]
Capacity: 74,000㎥/day Jun-16 EPC
Taebak Water DistributionPipelines [Korea]
Distribution Pipeline: 124kmRanging DN15 to DN400
Dec-15 EPC
Abu Dhabi StrategicWater Storage & Supply[UAE]
Transmission Pipeline: 161km426 Storage Well, 4 P/SRanging DN 900 to DN 1200
Mar-16 EPC
Jeonju Water DistributionPipelines [Korea]
Distribution Pipeline: 703kmRanging DN15 to DN700
Dec-16 EPC
Indonesia Water Supply Facility[Indonesia]
Capacity: 42,000㎥/day Apr-13 EPC
Gongchon Water Treatment,Phase 2 [Korea]
Exist Renovation: 250,000㎥/dayExpansion : 163,000㎥/dayTransmission pipeline: 2.3km
Jul-11 EPC
Pohang Water Treatment Facility [Korea]
Capacity: 250,000㎥/day Aug-08 EPC
- 19 -
Major Experience References (EPC)
Sewage Treatment Plant (Construction)
Projects[Country] Description Complete Role
Hochiminh City Water
Environment Improvement
[Vietnam]
Capacity : 328,000㎥/dayTreatment Method : Activated Sludge
Jan-20 PC
Anyang Bakdal Advanced STP
[Korea]
Capacity : 250,000㎥/dayTreatment Method : A2O BNR
Feb-17 EPC
Daegu Seobu STP
Phosphorus Treatment
[Korea]
Capacity : 478,000㎥/dayTreatment Method : Chemical
Jun-12 EPC
Jungrang Advanced STP
[Korea]
Capacity : 460,000㎥/dayTreatment Method : A2O BNR
Oct-07 EPC
Ansan Advanced STP
[Korea]
Capacity : 385,000㎥/dayTreatment Method : Symbio
May-09 PC
Gajwa Advanced STP
[Korea]
Capacity : 350,000㎥/dayTreatment Method : MLE
Oct-10 EPC
Gumi Advanced STP
[Korea]
Capacity : 330,000㎥/dayTreatment Method : Bio-SAC BNR
Jul-05 EPC
Suwon Advanced STP
[Korea]
Capacity : 220,000㎥/dayTreatment Method : Tec-BNR
Aug-09 EPC
- 20 -
Major Experience References (EPC)
Sewage Treatment Plant (Construction)
Projects[Country] Description Complete Role
Pohang STP, Phase 2
[Korea]
Capacity : 152,000㎥/day
Collecting pipeline: 35.7km
Treatment Method : Bio-SAC BNR
Nov-07 EPC
Hagik STP
[Korea]
Capacity : 125,000㎥/day
Collecting pipeline: 10.875km
Treatment Method : Bio-SAC BNR
Aug-08 EPC
Yanbu STP
[Saudi Arabia]
Expansion : 20,000㎥/day
Rehabilitation : 27,000㎥/day
Treatment Method : MLE
Mar-16 EPC
Gimpo STP
[Korea]
Capacity : 92,600㎥/day
Collecting pipeline : 28.9km
Treatment Method : Bio-SAC BNR
Oct-12 EPC
Gongchon STP
[Korea]
Capacity : 65,000㎥/day
Treatment Method : MBRApr-12 EPC
Sungnam Pangyo STP
[Korea]
Capacity : 47,000㎥/day
Treatment Method : Bio-SAC BNRMay-09 EPC
- 21 -
Major Experience References (EPC)
Industrial Wastewater Treatment Plant (Construction)
Projects[Country] Description Complete Role
Brazil CSP EnvironmentalFacilities[Brazil]
Water Supply : 74,000㎥/dayWastewater : 24,000㎥/daySewage : 10,000㎥/day
Aug-15 EPC
Indonesia WastewaterTreatment and Reuse Facility[Indonesia]
Wastewater : 28,000㎥/dayReuse : 7,000㎥/day
Apr-13 EPC
Gyungsan Industrial ComplexWastewater AdvancedTreatment Plant [Korea]
Capacity : 100,000㎥/day Mar-10 EPC
Gwangyang No.4 Wastewater Treatment Plant[Korea]
Capacity : 34,000㎥/day Apr-10 EPC
Munsan WastewaterTreatment Plant [Korea]
Capacity : 10,000㎥/day Mar-08 EPC
Paju LCD Industrial Complex Wastewater Treatment Plant 2nd phase [Korea]
Capacity : 35,000㎥/day Sep-07 EPC
Paju LCD Industrial Complex Wastewater Treatment Plant 1st phase [Korea]
Capacity : 70,000㎥/day Nov-06 EPC
- 22 -
Major Experience References (EPC)
Sewerage Pipeline & Drainage (Construction)
Projects[Country] Description Complete Role
Iksan Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 91.9kmDrainage facility: 6,643 units
Aug-14 EPC
Gimpo Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 131kmDrainage facility: 6,254 units
Mar-14 EPC
Mungyeong Sewerage Pipeline BTL [Korea]
Sewerage Pipeline: 134kmDrainage facility: 13,324 units
Nov-12 EPC
Wonju Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 142.8kmDrainage facility: 8,305 units
Oct-12 EPC
Uljin Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 67.6kmDrainage facility: 4,384 units
Mar-12 EPC
Cheongju Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 137kmDrainage facility: 12,706 units
Dec-11 EPC
Paju Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 106kmDrainage facility: 6,216 units
Jul-11 EPC
Seogwipo Sewerage Pipeline BTL[Korea]
Sewerage Pipeline: 100.5KmDrainage facility: 4,884 units
Apr-11 EPC
Jangheung Sewerage Pipeline BTL [Korea]
Sewerage Pipeline: 85kmDrainage facility: 1,900 units
Oct-10 EPC
- 23 -
Major Experience References (O&M)
Environmental Facilities Operation & Maintenance
Projects[Country] Description O&M Period Role
Jeonju Daeseong Water Treatment
Plant O&M [Korea] WTP Capacity: 60,000㎥/day
Nov-12 ~ Nov-13
(1 year)O&M
Gwangyang Seawater RO DesalinationPlant O&M [Korea]
SWRO Capacity: 30,000㎥/dayIntake & Pump Station: 70,000㎥/d
Aug-14 ~ Jul-44
(30 years)O&M
Krakatau Wastewater Treatment & Reusing System O&M [Indonesia]
WWTP Capacity: 28,000㎥/dayReusing System: 7,000㎥/day
Sep-13 ~ May-31
(7 years)O&M
Gimpo City Sewerage Facilities O&M
[Korea]
Gimpo STP : 80,000㎥/day
Tongjin STP : 40,000㎥/day
Gochon STP : 10,000㎥/day
Pump Stations: 6 units
Collecting Pipeline : 15.7km
Sunlight Generation : 1 lot
Jul-11 ~ Jul-32
(20 years)O&M
Anyang Sewage Treatment Plant O&M
[Korea]
Seoksu STP: 300,000㎥/day
Bakdal STP: 150,000㎥/day
Dec-14 ~ Nov-17
(3 years)O&M
Cheonan Sewerage Pipeline O&M[Korea]
Sewerage Pipeline: 216km
Drainage facilities: 8,845 units
May-11 ~ May-31
(20 years)O&M
- 24 -
Major Experience References (O&M)
Environmental Facilities Operation & Maintenance
Projects[Country] Description O&M Period Role
Gimpo Sewerage Pipeline O&M[Korea]
Sewerage Pipeline: 131km
Drainage facilities: 6,254 units
Mar-14 ~ Mar-34
(20 years)O&M
Paju Sewerage Pipeline, Phase 1 O&M[Korea]
Sewerage Pipeline: 185km
Drainage facilities : 5,412units
Jul-11 ~ Jul-31
(20 years)O&M
Paju Sewerage Pipeline, Phase 2 O&M[Korea]
Sewerage Pipeline : 229km
Manhole Pump : 43 units
Jan-17 ~ Dec-36
(20 years)O&M
Pohang Sewerage Pipeline O&M[Korea]
Sewerage Pipeline: 141km
Pump Station: 3 units
Drainage facilities: 4,950 units
Apr-16 ~ Mar-36
(20 years)O&M
National WWTP Sludge Facilities O&M[Korea]
Incineration Plant: 230 ton/dayMar-14 ~ Mar-29
(15 years)O&M
Yangsan Energy Recovery Plant O&M[Korea]
Recycling Select: 80 ton/day
Incineration Plant: 200 ton/day
Jan-14 ~ Dec-16
(3 years)O&M
Gwangju Solid Refuse Fuel Plant O&M[Korea]
SRF Capacity: 800 ton/dayNov-16 ~ Nov-31
(15 years)O&M
- 25 -
PPP(Public Private Partnership) Experiences
Experiences as Lead Developer
Projects[Country] TypeEquity
ShareDescription
Construction
PeriodRole
Sangju Sewerage Pipeline [Korea]
BTL 6.0%Sewerage Pipeline: 98kmDrainage facilities : 5,756units
May-06 ~ Mar-10 EPC
Suwon Sewerage Pipeline [Korea]
BTO 27.5% Capacity : 450ton/day Jun-07 ~ Dec-09 EPC
Seoguipo Sewerage Pipeline [Korea]
BTL 5.1%Sewerage Pipeline : 112kmDrainage facilities : 4,955units
Feb-08 ~ Apr-11 EPC
Chungju Sewerage Pipeline [Korea]
BTL 6.0%Sewerage Pipeline : 120kmDrainage facilities : 12,706units
Dec-08 ~ Dec-11 EPC
Jangrang Sewage TreatmentPlant [Korea]
BTO 25.0%Capacity : 15,000ton/dayMain Trunk Line : 11.6km
Apr-08 ~ Nov-10 EPC
Cheonan Sewerage Pipeline [Korea]
BTL 13.19%Sewerage Pipeline : 194kmDrainage facilities : 15,386units
May 08 ~ May-11 EPC
Paju Sewerage Pipeline [Korea]
BTL 8.83%Sewerage Pipeline :105kmDrainage facilities : 6,216units
Sep-08 ~ Jul-11 EPC
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate
- 26 -
PPP(Public Private Partnership) Experiences
Experiences as Lead Developer
Projects[Country] TypeEquity
ShareDescription
Construction
PeriodRole
Wonju Sewerage Pipeline [Korea]
BTL 6.34%Sewerage Pipeline : 133kmDrainage facilities : 8,8266units
Apr-09 ~ Oct-12 EPC
Gimpo Sewage TreatmentPlant [Korea]
BTO 29.58%Capacity : 130,000ton/dayMain Trunk Line : 28.7km
Jul-09 ~ Jul-12 EPC
Gimpo Sewerage Pipeline [Korea]
BTL 28.79%Sewerage Pipeline : 131kmDrainage facilities : 6,254units
Sep-10 ~ Mar-14 EPC
Iksan Sewerage Pipeline [Korea]
BTL 23.5%Sewerage Pipeline : 81.8km
Drainage facilities : 6,643unitsFeb-11 ~ Aug-14 EPC
Pohang Sewerage Pipeline, Phase 3 [Korea]
BTL 14.3%Sewerage Pipeline : 47.7km
Drainage facilities : 4,950unitsJun-12 ~ Mar-16 EPC
Paju Sewerage Pipeline, Phase 2 [Korea]
BTL 5.5%Sewerage Pipeline : 128.4km
Drainage facilities : 4,748unitsMay-13 ~ Nov-16 EPC
Gwangju Solid Refuse Fuel[Korea]
BTO 19.0% Capacity : 800ton/day Dec-13 ~ Sep-16 EPC
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate
- 27 -
PPP(Public Private Partnership) Experiences
Experiences as Partner Developer
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate
Projects[Country] TypeEquity
ShareDescription
Construction
PeriodRole
Paju Gumchon Sewage Treatment Plant [Korea]
BTO 40.0%Capacity : 27,000ton/day
Main Trunk Line : 9.98kmMar-03 ~ Mar-05 EPC
Kimhae Sewerage Pipeline [Korea]
BTL 3.6%Sewerage Pipeline : 102km
Drainage facilities : 10,610unitsMay-06 ~ Apr-10 EPC
Kyungju Sewerage Pipeline [Korea]
BTL 8.52%Sewerage Pipeline : 134km
Drainage facilities : 7,241unitsOct-06 ~ May-10 EPC
Jeongup SSewerage Pipeline [Korea]
BTL 19.0%Sewerage Pipeline : 77km
Drainage facilities : 6,922unitsJun-06 ~ Mar-10 EPC
Kangneung Sewerage Pipeline [Korea]
BTL 2.7%Sewerage Pipeline : 78km
Drainage facilities : 4,014unitsSep-07 ~ Aug-10 EPC
Ansung Sewage TreatmentPlant [Korea]
BTO 10.0%Capacity : 18,000ton/day
Main Trunk Line : 189kmMar-08 ~ Mar-14 EPC
Jangheung Sewage TreatmentPlant & Pipeline [Korea]
BTO/
BTL10.32%
Capacity : 15,000ton/day
Sewerage Pipeline : 114km
Drainage facilities : 4,372units
Apr-08 ~ Mar-11 EPC
- 28 -
PPP(Public Private Partnership) Experiences
Experiences as Partner Developer
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate
Projects[Country] TypeEquity
ShareDescription
Construction
PeriodRole
Uljin Sewerage Pipeline [Korea]
BTL 3.0%Sewerage Pipeline : 68km
Drainage facilities : 4,384unitsJan-09 ~ Mar-12 EPC
Munkyung Sewerage Pipeline [Korea]
BTL 4.17%Sewerage Pipeline : 134km
Drainage facilities : 13,324unitsFeb-09 ~ Nov-12 EPC
Pyungtaek Sewerage Pipeline [Korea]
BTL 6.8%Sewerage Pipeline : 119km
Drainage facilities : 6,931unitsNov-09 ~ Aug-13 EPC
Incheon Sewerage Pipeline [Korea]
BTL 15.84%Sewerage Pipeline : 85km
Drainage facilities : 4,961unitsJan-10 ~ Oct-13 EPC
Tongyoung Sewerage Pipeline [Korea]
BTL 20.4%Sewerage Pipeline : 91km
Drainage facilities : 10,831unitsMay-10 ~ Jun-13 EPC
Gwangju Sewerage Pipeline [Korea]
BTL 18.0%Sewerage Pipeline : 150km
Drainage facilities : 12,811unitsMay-10 ~ May-13 EPC
Cheonan Sewerage Pipeline,Phase 2 [Korea]
BTL 12.8%Sewerage Pipeline : 68km
Drainage facilities : 3,172unitsJul-10 ~ Nov-13 EPC
- 29 -
PPP(Public Private Partnership) Experiences
Experiences as Partner Developer
Note) BTL : Build-Transfer-Lease, BTO : Build-Transfer-Operate
Projects[Country] TypeEquity
ShareDescription
Construction
PeriodRole
Chuncheon Sewerage Pipeline [Korea]
BTL 15.4%Sewerage Pipeline : 103km
Drainage facilities : 7,423unitsFeb-11 ~ Feb-15 EPC
Youngju Sewerage Pipeline [Korea]
BTL 11.2%Sewerage Pipeline : 87km
Drainage facilities : 6,730unitsJan-11 ~ Mar-14 EPC
Sihoung Bangsan SewageTreatment Plant [Korea]
BTO 3.24%Capacity : 63,000ton/day
Main Trunk Line : 15.6kmApr-14 ~ Dec-16 EPC
- 30 -
Waste to Energy / Waste Treatment
FWW to biogas facility
- Capacity: 30ton/day
- HRT: 20days
- 50m3/ton of FWW
Experiences in Korea, Leading EPC Company in WtE Biz.
- 31 -
WtE / Waste treatment Facilities
Resource Recycling Facility - Korea
Yangsan Resource Recycling Facility Name Goyang Resources Recycling Facilities
Yangsan, Korea Location Goyang , Korea
100 ton/day x 2lines & Direct Melting System Capacity 150 ton/day x 2lines ⇒ 5.2MW & Direct Melting System
Oct. 2004 ~ Feb. 2010 Construction May 2006 ~ Dec. 2010
- 32 -
WtE / Waste treatment Facilities
WtE (Incineration Plant) - POLAND Sludge Fuelization Facility-KOREA
Krakow Incineration(WtE) Plant Name Suwon Sludge Fuelization Facility
Krakow, Poland Location Suwon, Korea
340 ton/day × 2 Set, 10.7Mw/h Capacity 450 ton/day, Drying & Solidification Technology
Oct. 2012 ~ Jun. 2016 Construction Jun. 2007 ~ Dec. 2009
- 33 -
Krakow WtE Project - General
Category Content
Location - Krakow City, Poland
Details
- 220,000t/y (340t/d x 2lines)
- Electricity Generation:
10.74MW
Construction
Period- 1,100days
Client- K.H.K(Krakowski Holding
Komunalny S.A.)
Consortium
Type
- Sole(Shares 100%)
☞ Technology: Stoker type
(Doosan Lentjes/German)
Budget- Poland National Fund
+ EU Fund
Jan. 2015, Under Construction
June 2016, Completion & Taking-Over
- 34 -
Krakow WtE Project - Site Layout
Future
Extension
site
Management
Building
Incinerator/
Boiler
Management
Building
- Story : 2F
- Building Area: 852.0m2
(Operation/Office/HR)
Incinerator/Boiler
- Story : 6F
- Building Area: 8,953m2
(Boiler, Turbin/ Generation,
Condensor, Coolling Tower)
Ash Treatment Building
- Story : 2F
- Building Area: 5,705m2
(Flue gas Treatment Facilities,
Bottom Ash Treatment)
SITE
Vistula River
Ash Treatment
Building
Category Contents
Site Area 56,737㎡
Building Wide
Area28.89%
Parking lot 83 lots(Included 3 Handicapped)
Max. Height Incinerator, Boiler: 40M, Stack : 80M
Building TypeCombination of
Steel –Frame and Steel-Concrete
- 35 -
Krakow WtE Project - Incineration Type
Incinerator
Combustion
Air to GrateBottom ash
Transferor
Feeder NgOH
Nozzle
Blower
Burner
▶ Principle
- Composition of grate, incinerator which
move forward and backward by oil
pressure equipment
- Incinerator is divided by Dry step,
Combustion Step, After-combustion Step
- Combustion Air is combusted by Heating
air from bottom of grate and radiant heat
from furnace wall.
▶ Advantage
- Ease to burn without pre-treatment even
though the waste is huge
- Ease to recover heat by small variation of
combusting calories
- Stabilization of Technologies through
numerous construction and test-run
experiences
Stoker Type
- 36 -
Krakow WtE Project - Programme
Submission of
Building Permit
17/May.
Mechanical
Work Start
Final
Completion
June 2016
Contract
31/Oct. 14/March 1/Apr.
Power
Receiving
22/Mar.
Test Start
06/Nov.
Construction-
Assembly
Work Start
23/Dec.
EIC
Work Start
○ Project Period
Construction Period : October 2012
~ June 2016
○ Main Event
Submission of Application for Building
Permit : May 2013
Beginning : Nov 2013
Test : Apr 2015
Complete : Jun 2016
20132012 2014 20162015
- 37 -
Kwinana WtE Project - General
Category Content
Location - Kwinana City, Australia
Details
- 400,000t/y (606t/d x 2lines)
- Electricity Generation:
35 MW
Process Type - Stoker(Martin Grate)
Project
Scheme- BOT(30 years)
Employer - Kwinana WtE Project Co.
Current Status
- ECI(Early Contractor
Involvement) conducted by
POSCO E&C
- 38 -
Major Experience References
Waste Treatment/ Waste to Energy (Incineration)
Project Start End Project Overview
Krakow WtE Plant in Poland Jul. 2013 Jun. 2016Scope: Design, Facility supply, Construction, Test-run
Capacity: 340 ton/day x 2EA, 10.74 MWe + 35MWth
Kwinana WtE Plant in Australia Sep.2015 Mar.2016Scope: Basic Engineering(ECI)
Capacity: 606 ton/day x 2EA(Stoker Type), 35MWe
Busan WtE Plant(SRF) Aug. 2010 Mar. 2013Scope : EPC Turn-Key Main Facility
Solid Recovered Fuel Facility (900Ton/day)
Power Generation Facility(25MW)
Pohang WtE Plant(SRF) Dec. 2012 May. 2015Scope : EPC Turn-Key Main Facility
Solid Recovered Fuel Facility (500Ton/day)
Power Generation Facility(12.1MW)
Goyang WtE Plant May 2006 Dec. 2010Scope: Design, Facility supply, Construction, Test-run
Pyrolysis and melting facility: 150 ton/day x 2 units, 5.2MW
Recycling facility: 50 ton/day
Yangsan WtE Plant Oct. 2004 Feb. 2010Scope: Design, Facility supply, Construction, Test-run
Pyrolysis and melting facility: 100ton/day x 2 units
Recycling facility: 80ton/day x 1 unit
Gwangyang WtE Plant Dec. 1993 Jul. 1995Scope: Design, Facility supply, Construction, Test-run
Capacity: 91.2ton/day
SRF power plant using metropolit
an landfill Nov. 2007 Mar. 2010
Scope : EPC Turn-Key Main Facility
Solid Recovered Fuel Facility (1,800Ton/day)
Power Generation Facility(30MW) Pre-treatment: 200t/day
Yangsan Sewage Sludge Treatme
nt facility Feb. 2008 Dec. 2009
Scope: Design, Facility supply, Construction, Test-run
Capacity: 60m³/day x 2 units
Metropolitan Sludge Solidification
facility for reclaimed area Dec. 1996 Oct. 1998
Scope: Design, Facility supply, Construction, Test-run
Capacity: 75ton/day
- 39 -
Major Experience References
Waste Treatment/ Waste to Energy (Incineration)
Project Start End Project Overview
Suwon Sewage
treatment facility Jun. 2007 Dec. 2009
Scope: Design, Facility supply, Construction, Test-run
Capacity: 450m³/day
Naepo New Town
Automatic Clean net Oct. 2010 Oct. 2013
Scope: Design, Facility supply, Construction, Test-run Collection sites: 2units
Pipeline: 40.2km
Songdo 5, 7 Section
Automatic Waste collecting facility Aug. 2010 Mar. 2013
Scope: Design, Facility supply, Construction, Test-run Collection sites: 2units
Pipeline: 17.5km
Paju Unjeong Automatic Waste col
lecting facility Sep. 2007 Aug. 2012
Scope: Design, Facility supply, Construction, Test-run Collection sites: 4 units
Inlets: 1,282 units
Incheon Cheongna
Automatic Clean net Apr. 2008 Mar. 2012
Scope: Design, Facility supply, Construction, Test-run Pipeline: 45.7km Colle
ction
Sites: 5 units Inlets: 2,013 units
Yongin Heungdeok
Automatic Clean net Sep. 2006 Mar. 2009
Scope: Design, Facility supply, Construction, Test-run Collection sites: 1 unit
Inlets: 425 units
- 9 -
Abu Dhabi Water Storage & Recovery Plant Name Desalination Facility for Power Generation
Liwa, Abu Dhabi Location Ventanas & Antofagasta, Chile
2,700 mil. ton of DSW (Infiltration & storage) Capacity 3,000 m3/day ~ 5,000 m3/day (3 plants)
161km pipeline, 3 well fields, 4 pump stations Remark Under Operation
Water Storage& Recovery -UAE Desalination Facility - CHILE
Water Storage/Supply & Desalination
- 10 -
Abu Dhabi Strategic Water Storage & Supply Project
Dubai
Abu Dhabi
Liwa
Mirfa
Major purpose
Infiltration and storage of 2,700
million tons of DSW
in a shallow dune sand aquifer
Major Facilities
- Water Pipe 161 km (D900,D1200)
- 3 well field scheme
- 4 pumps stations
Client : ADWEA
Abu Dhabi Water & Electricity Authority
Project Period
Aug. 2010 ~ Mar. 2016
- 11 -
Desalination Plants
Desal. Plant for Gwangyang Steel Plant
- Capacity : 30,000 m³/d (Korea, SWRO)
- Location : Gwangyang , Korea
- Construction Period: Jan. 2013 ~ Jul. 2014
Desal. Plant for Power Plants
(MED-MVC, MED-TVC)
- Capacity: 3,000 m3/d ~ 5,000 m3/d (3 plants, Chile)
- Client: AES
- Status: Under operation
Desal. Plant for Indonesia
Steel Plant
- Plant for Indonesian Steel Plant
- Status: Plan & Design (2016)