The NO2/NOx In-Stack Ratio: At the Intersection of NAAQS Modeling,
Permitting, and Compliance
for the:
Presented by:
Shirley F. Rivera Resource Catalysts
![Page 2: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/2.jpg)
NAAQS Modeling
Compliance
Permitting
![Page 3: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/3.jpg)
At the intersection… (pt. 1)
PATIENCE and HARD WORK! You TIMELY received a DRAFT permit
to construct with the conditions you WANTED, completing the Tier 3, 1-hour NO2 NAAQS modeling, even with a significant impact where (if required) you modeled NEARBY sources.
![Page 4: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/4.jpg)
At the intersection… (pt. 2)
CONGRATS! You TIMELY received a FINAL permit
to construct with the conditions you WANTED, after the agency successfully responded to PUBLIC COMMENTS and there were NO appeals.
![Page 5: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/5.jpg)
NAAQS Modeling
Compliance
Permitting
About me
![Page 6: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/6.jpg)
Presentation Overview
…will not address details of 1-hour NO2 modeling and
guidance interpretation details of emissions measurement,
testing, test process considerations recommended permit conditions recommended ISRs
![Page 7: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/7.jpg)
Presentation Overview
…will address EPA efforts for a national database April 2013 R/S/L Modelers Workshop
excerpts examples – projects, modeling guidance “magic wand”
Audience check
![Page 8: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/8.jpg)
What’s the right ISR?
IMPROV warm-up Yell out your first name
I am holding something in my hand that is … What is it?
I am thinking of a number between 0 and 0.49 … What is it?
![Page 9: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/9.jpg)
Sample of ISRs
GT SU/SD
GT norm
RICE
Boilers
0.10 0.50 - -> 0.50
EPA GTs EPA Diesel Eng
0.20 0.30 0.40
CAPCOA
![Page 10: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/10.jpg)
Take Away, Call to Action POPULATE the EPA database
COLLECTIVE cross-communicate within and among - – Agencies, Businesses, Consultants, Test Firms – Equipment manufacturers / representatives
START at the “Source” – Stationary source, source test results – Source test firms – Manufacturer Information
![Page 11: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/11.jpg)
NAAQS Modeling
Compliance
Permitting
What we know
![Page 12: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/12.jpg)
NAAQS Modeling
Modeling protocol
1-hour NAAQS air quality modeling triggered – If Tier 1 and 2 do not work,
Tier 3 is pursued, using default 0.50 or a lower, justified alternative
May need ISRs for nearby sources
![Page 13: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/13.jpg)
Permitting
Pre-application efforts
Application completeness determination
Coordinating with AQ modeler, applicant contact
Permit prep & issue
![Page 14: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/14.jpg)
Compliance
EPA Method 7E for NOx sources
May be equipped with CEMS
Air agency may/may not require ISR demonstration
Permit condition option
![Page 15: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/15.jpg)
April 2013 R/S/L Modelers Workshop
![Page 16: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/16.jpg)
Modelers’ Presentations
EPA RTP’s Chris Owen
EPA Region 9’s Cleveland Holladay
San Joaquin Valley APCD’s Leland Villavazo (California)
![Page 17: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/17.jpg)
![Page 18: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/18.jpg)
![Page 19: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/19.jpg)
![Page 20: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/20.jpg)
Examples – Projects, Modeling Guidance
![Page 21: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/21.jpg)
Examples
Pio Pico ICE project AZDEQ Modeling Guidelines(Sept 2013) CAPCOA Modeling Guidance (Oct 2011)
additional inspiration
EUEC 2015 Session Suggestions
![Page 22: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/22.jpg)
Pio Pico (June 2012)
![Page 23: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/23.jpg)
Internal Combustion Eng
![Page 24: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/24.jpg)
AZDEQ Modeling Guidelines
September 2013 Hierarchy for ISR selection and
justification – Agency-verified source test data – Literature review/compilation of like-kind
source – Use of default value = 0.50
![Page 25: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/25.jpg)
CAPCOA Modeling Guidance
October 2011 Appendix C – Table of ISRs
– Natural gas-fired: boiler, engine, turbine, dryer, process heater, glass furnace
– ICE: waste gas, biogas, diesel – Trucks/Cars: light, medium, heavy duty
![Page 26: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/26.jpg)
EUEC Session Suggestions
Track A A4. NSR A4.5 – Air Permitting for Small Gas Turbines
Track B B5.3 – GT Regs with focus on CEMS & Part 75 B5.4 – Low level emissions testing with CARB B6. Modeling
![Page 27: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/27.jpg)
“Magic Wand”
![Page 28: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/28.jpg)
“Magic Wand”
NAAQS Modeling
Modeling protocol addresses the approach and resources for ISRs – project and nearby sources (if applicable)
Bonus: Clear agency protocol expectations.
![Page 29: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/29.jpg)
“Magic Wand” Assurance of properly
conducting Method 7E source test for determining ISR
Bonus: Equipment manufacturers provide a range of ISRs. Common agency and/or source approach to data collection.
Compliance
![Page 30: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/30.jpg)
“Magic Wand”
Permitting
Common project organizational approach to air permitting, esp. at the intersection
Bonus: An “AP-42” style of ISRs that complements the EPA database.
![Page 31: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/31.jpg)
“Magic Wand” of ISRs
Equip A
Equip B
Equip C
Equip D
0.10 0.50 - -> 0.50 0.20 0.30 0.40
![Page 32: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/32.jpg)
REMINDER: Call to Action POPULATE the EPA database
COLLECTIVE cross-communicate within and among - – Agencies, Businesses, Consultants, Test Firms – Equipment manufacturers / representatives
START at the “Source” – Stationary source, source test results – Source test firms – Manufacturer Information
![Page 33: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/33.jpg)
Thank you for your time
for | AIR QUALITY |
| ENERGY PROJECTS | | ENVIRONMENTAL COMMUNICATIONS |
| BEHAVIOR DESIGN-BASED EH&S PRACTICES |
Shirley F. Rivera [email protected] | 619-733-7228 | @R_Catalysts
https://resourcecatalysts.wordpress.com
![Page 34: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/34.jpg)
References
EPA Website with Database – http://www.epa.gov/scram001/
no2_isr_database.htm
April 2013 R/S/L Modelers Workshop – Agenda
http://www.cleanairinfo.com/regionalstatelocalmodelingworkshop/archive/2013/agenda.htm
![Page 35: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/35.jpg)
References
40 CFR 51, Appendix W – http://www.gpo.gov/fdsys/granule/
CFR-2011-title40-vol2/CFR-2011-title40-vol2-part51-appW
San Joaquin Valley APCD PSD Resources – http://www.valleyair.org/busind/pto/
Tox_Resources/AirQualityMonitoring.htm#modeling_guidance
![Page 36: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/36.jpg)
References
Arizona DEQ Modeling Guidance (2013) – http://www.azdeq.gov/environ/air/
download/modeling.pdf CAPCOA Modeling Guidance (Oct 2011)
– http://www.valleyair.org/busind/pto/Tox_Resources/CAPCOANO2GuidanceDocument10-27-11.pdf
![Page 37: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/37.jpg)
References
Pio Pico – CEC, Energy Siting:
http://www.energy.ca.gov/sitingcases/piopico/
– EPA, PSD: http://www.regulations.gov/#!docketDetail;D=EPA-R09-OAR-2011-0978
![Page 38: At the Intersection of NAAQS Modeling, Permitting, and Compliance](https://reader031.fdocuments.us/reader031/viewer/2022022413/58edd3981a28ab934b8b464d/html5/thumbnails/38.jpg)
References
Behavior Design, Choice Model – BJ Fogg work:
http://bjfogg.org/ – Fogg Behavior model:
http://behaviormodel.org/ – Fogg Method:
http://www.foggmethod.com/ – Fogg Choice Model:
http://choicemodel.org/