PRIESKA PROJECTA strong foundation for near-term base metal development and long-term growth
Johannesburg Indaba Presentation: October 2019
PAGEPAGE
DISCLAIMER
This presentation contains summary information about OrionMinerals Ltd and its subsidiaries (Orion or Company) and theiractivities and is current as at 30 August 2019. The information inthis presentation is a general background and does not purportto be complete or provide all information that an investorshould consider when making an investment decision.
No representation or warranty, express or implied, is provided inrelation to the accuracy or completeness of the information.Statements in this presentation are made only as of the date ofthis presentation unless otherwise stated and the information inthis presentation remains subject to change without notice.
The Company is not responsible for updating, nor undertakes toupdate, this presentation. It should be read in conjunction withthe Company’s other periodic and continuous disclosureannouncements lodged with the Australian Securities Exchange(ASX), which are available at www.asx.com.au and theJohannesburg Stock Exchange (JSE), which are available atwww.jse.co.za.
Certain statements contained in this presentation, includinginformation as to the future financial or operating performance
ofOrion and its projects, are forward-looking statements. Suchforward-looking statements:
• are necessarily based upon a number of estimates andassumptions that, while considered reasonable by OrionMinerals Ltd, are inherently subject to significanttechnical, business, economic, competitive, politicaland social uncertainties and contingencies;
• involve known and unknown risks and uncertainties thatcould cause actual events or results to differ materiallyfrom estimated or anticipated events or results reflectedin such forward-looking statements; and
• may include, among other things, statements regarding
targets, estimates and assumptions in respect of metalproduction and prices, operating costs and results,capital expenditures, mineral reserves and mineralresources and anticipated grades and recovery rates,and are or may be based on assumptions andestimates related to future technical, economic,market, political, social and other conditions.
Orion disclaims any intent or obligation to update publicly anyforward-looking statements whether as a result of newinformation, future events or results or otherwise.
The words ‘believe’, ‘expect’, ‘anticipate’, ‘indicate’,‘contemplate’, ‘target’, ‘plan’, ‘intends’, ‘continue’, ‘budget’,‘estimate’, ‘may’, ‘will’, ‘schedule’ and similar expressionsidentify forward looking statements.
All forward-looking statements made in this presentation arequalified by the foregoing cautionary statements. Investors arecautioned that forward-looking statements are not guaranteesof future performance and accordingly investors are cautionednot to put undue reliance on forward-looking statements due tothe inherent uncertainty therein.
All information in respect of Exploration Results and othertechnical information should be read in conjunction with therelevant ASX announcements released by the Company.
Orion is not aware of any new information or data thatmaterially
affects the information for the Mineral Resource and confirmsthat
all material assumptions and technical parametersunderpinning the estimates in the relevant Orion ASX releases(as referenced in the presentation) continue to apply and havenot materially changed.Orion confirms that the form and context in which theCompetent Person’s findings are presented have not materiallychanged.
To the maximum extent permitted by law, Orion and any of itsrelated bodies corporate and affiliates and their officers,employees, agents, associates and advisers:
• disclaim any obligations or undertaking to release anyupdates or revisions to the information to reflect anychange in expectations or assumptions;
• do not make any representation or warranty, express orimplied, as to the accuracy, reliability or completenessof the information in this presentation, or likelihood offulfilment of any forward looking statement or any eventor results expressed or implied in any forward-lookingstatement; and
• disclaim all responsibility and liability for these forwardlooking statements (including, without limitation, liabilityfor negligence).
Nothing contained in this presentation constitutes investment,legal, tax or other advice. The information does not take intoaccount the investment objectives, financial situation orparticular needs of any recipient. Before making an investmentdecision, each recipient of this presentation should make itsown assessment and take independent professional advice inrelation to the information and any action taken on the basis ofthis presentation.
2
PAGEPAGE
Q: WHO IS BUILDING BASE METAL MINES?
A: ANYONE THAT CAN UNDERSTAND THE SIMPLEST FORMULA FOR SUCCESS
3
Supply <<< Demand = Base Metal Prices
PAGE
PROBLEM LOOMING: COPPER SUPPLY CHAIN
4Cecilia Jamasmie: Mining (Dot) Com April 10 2018
PAGE
LARGE COPPER MINES HAVE A VERY LONG LEAD TIME
5Mining(dot)Com: Visual Capitalist; 23 June 2015
PAGE
ADD A MAJOR NEW DEMAND DRIVER
6
PAGE
ZINC CONCENTRATE SUPPLY – NEW MINES TAKE TIME
7
PAGE
ZINC DEMAND – CONSISTENT CONSUMPTION GROWTH
8
PAGE
ORION MINERALS – COMPELLING INVESTMENT CASE
THE OREBODY
• Globally significant VMS Resource: 30.49Mt @ 1.2% Cu, 3.7% Zn
• Mineral Reserve: 13.62Mt @ 1.06% Cu, 3.18% Zn
FOUNDATION PHASE BFS OUTCOMES
• Initial 10-year, 2.4Mtpa operation targeting 22ktpa Cu & 70ktpa Zn
• Strong operating margins and financials
o Pre-tax free cash flow of R11bn (post-tax R8.2bn)
o Pre-tax NPV8% of R5.7bn (post-tax R4bn)
o Peak funding of R3.8bn
o Payback period of three years from first production
o All-in sustaining margin of 44%
PERMITTING
• Environmental Authorisation awarded July 2019
• Mining Right for initial 24 years (renewable) granted August 2019
THE FUTURE
• Exceptional exploration and growth pipeline
9Refer ASX releases 26 June 2019, 8 July 2019 and 3 September 2109
PAGE
PRIESKA: MINE OF THE FUTURE
Implementing a modern operating philosophy (4IR enabled) can contribute to achieving quantum
changes in key output parameters that are traditionally slow to improve or have regressed in the local
mining industry, including:
• Safety and health improvements
• Improved environmental conditions, reduced pollution and contamination
• Improved energy efficiency and lower energy costs
• Productivity improvements
• Operating cost reductions
10
Benchmark Globally
Implement Enablers
Be Fast Followers
Always Make Commercial
Sense
PAGE
ASX/JSE: ORN
For further information, contact:
Orion Minerals Limited
Phone: +61 (0)3 8080 7170
Email: [email protected]