ENVIROPEEL HOT SALT FOG TEST 4,500 HOURS REPORT In accordance to ASTM B117-11 4,500 hours | equivalent to 45 years in marine environment SEPTEMBER 2013 This document may contain confidential information that is intended for the use of the parties to whom it is addressed. If you are not an intended recipient you are hereby notified that any disclosure, copying, distribution or use of information in this document is strictly prohibited. If you receive this document in error please notify us as per contact details below. All information and attachments remain the property of A&E Systems and should be held as confidential. © A&E Group 2014. ALOCIT AND ENVIROPEEL WORLDWIDE ASIA +603 55694277 · [email protected] ׀AUSTRALIA +61 894183688 · [email protected] ׀EUROPE +44 1362694915 · [email protected] NORTH & SOUTH AMERICA +1 317 6319100 · [email protected] ׀WEBSITE www.ae-sys.com

Transcript of ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance...

Page 1: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

ENVIROPEEL HOT SALT FOG TEST 4,500 HOURS REPORT

In accordance to ASTM B117-11 4,500 hours | equivalent to 45 years in marine environment

SEPTEMBER 2013

This document may contain confidential information that is intended for the use of the parties to whom it is addressed. If you are not an intended recipient you are hereby

notified that any disclosure, copying, distribution or use of information in this document is strictly prohibited. If you receive this document in error please notify us as per

contact details below. All information and attachments remain the property of A&E Systems and should be held as confidential. © A&E Group 2014.

ALOCIT AND ENVIROPEEL WORLDWIDE

ASIA +603 55694277 · [email protected] ׀ AUSTRALIA +61 894183688 · [email protected] ׀ EUROPE +44 1362694915 · [email protected] NORTH & SOUTH AMERICA +1 317 6319100 · [email protected] ׀ WEBSITE www.ae-sys.com

Page 2: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY

2. HOT SALT FOG TEST AND METHODOLOGY

3. SUBSTRATE PREPARATION AND SPECIFICATION

4. RESULT AND OBSERVATION (0-4500 HOURS)

5. CHRONOLOGICAL CORROSION PROCESS OBSERVATION ON CONTROL FLANGE

6. RESULT ANALYSIS AT 4500 HOURS

7. CONCLUSION APPENDIX

1. Salt Spray Cabinet Specification

2. Salt Specification

Page 3: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

SUMMARY This document reports the findings of a Hot Salt Fog Exposure test on Enviropeel Corrosion Inhibiting Sprayable Thermoplastic (CIST), conducted by A&E Systems Technical Department in accordance with ASTM B117 standards. ASTM B117 ASTM B117 is a standardized test for coatings on steel substrates using a controlled hot-salt mist environment. The test is designed to evaluate the long-term performance of protective coatings by subjecting samples to a super-enhanced corrosion-inducing environment over extended periods of time and is widely regarded as providing a consistent indication of long-term performance in the most severe ‘real-world’ conditions. A standard nickel-plated carbon-steel bolt would be specified at 1000 hours (42 days) of testing - with a life expectancy of several years. For this CIST test, a continuous period of 4500 hours (188 days) has been chosen following earlier 3000 hour testing. ENVIROPEEL CIST Although CIST utilizes a radically different methodology to that of an ordinary passive coating, performance under standard ASTM B117 conditions is a reliable indicator of long-term performance under extreme conditions. CIST is a recyclable non-toxic zero-VOC thermoplastic developed to protect bolted systems such as flanges and valves. The material incorporates a continuously active corrosion-inhibitor and is spray applied as a two-layer coating. TESTING Test flanges were coated with one layer of epoxy zinc primer. Zinc-plated carbon steel bolts were used to join the flanges. All samples were placed in a controlled hot salt fog cabinet at 35oC for 4500 hours. All but one of the test flanges were coated according to standard procedures with CIST. The remaining flange without Enviropeel coating was also placed inside the cabinet as a control. After 4500 hours, the control flange was found to be severely corroded with heavy pitting and surface corrosion. No Enviropeel CIST coated samples showed any sign of deterioration within the encapsulated areas.

Page 4: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus. This is designed to provide a controlled corrosive environment for metal or coated metal samples. The Standard covers the apparatus, procedure and conditions required to create and maintain the salt spray environment. The salt spray cabinet used for this test is shown in Figure 1. SALT SPRAY CABINET SPECIFICATION Figure 1. Hot Salt Fog Spray Cabinet The test parameters for the Hot Salt Fog test are given in Table 1.

TEST PARAMETERS

Salinity, IN 5% Salinity, OUT 5%

pH Fog Collection Data

pH in 7.2 Fog Collector 1 2.0 ml/hr/80cm2

pH out 6.5 Fog Collector 2 1.8 ml/hr/80cm2

Temperature Pressure

Saturated Air Temp 47OC Chamber Pressure 1 bar

Chamber Temp 35OC Air Intake Pressure 0.9 MPa

Hygrometer Downtime

Wet Bulb 35OC From -

Dry Bulb 35OC To -

Total Hours

Page 5: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

The flanges used in this test are specially made to have closed ends and are coated with one coat of epoxy zinc primer. The flanges were coated with Enviropeel using our standard method of application: two coats of Enviropeel. Figure 2 below shows the preparation of the substrate. Figure 2. Specially made flanges with closed ends, welded, blasted and primed for Enviropeel application

Enviropeel application and specifications are given in Figure 3. All except bolts and nuts were single coated with primer.

Material: Mild Steel Size: 6”/4” Closed End - depending on available space Coating Spec: Flange - zinc-epoxy prime coat, fasteners - zinc-plated Enviropeel: 2 x layers E170 Test Nos: 6 x identical test pieces (2 for each test duration with different orientation) (Please refer to diagram below)

Figure 3. Enviropeel application specification

Sample welded to the neck with closed ends Blasted sample

Minimum coated single layer and prepared for Enviropeel

application

Page 6: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

Results and Observations The following series of photographs show the process of deterioration on the control flange compared with the condition of the Enviropeel coated samples from 0 to 4500 hours

0 HOUR

217 HOURS

513 HOURS

Page 7: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

1014 HOURS

2094 HOURS

2182 HOURS

Page 8: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

2349 HOURS

2679 HOURS

2846 HOURS

Page 9: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

3014 HOURS

3178 HOURS

3418 HOURS

Page 10: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

3586 HOURS

3850 HOURS

4090 HOURS

Page 11: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

CORROSION EVOLUTION OF THE CONTROL FLANGE 0-4500 HOURS

0 HOUR 217 HOURS 513 HOURS

1014 HOURS 2094 HOURS 2182 HOURS

2349 HOURS 2846 HOURS 2679 HOURS

Page 12: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

3014 HOURS 3178 HOURS 3418 HOURS

3586 HOURS 3850 HOURS 4090 HOURS

4517 HOURS

Page 13: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

After 4500 hours the control flange and one of the samples were taken out for analysis (the others are being left in for continued testing). The following series of photographs show the sequence and observations as the CIST coating is peeled away.

Hour meter reading: 4517 hours Arrangement of samples in Salt Spray Cabinet

Control flange was carefully taken out from the chamber

The flange was put on the stand for comparison

Side view of the Enviropeel coated sample Side view of the control flange. Note: Corrosion at the end cap. A single layer of primer is not able to protect

the weld joint.

Page 14: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

Angle view of the Control Flange Angle view of the Enviropeel coated flange

Side by side comparison on stands Side by side comparison

Commencing cutting off Enviropeel coating from the substrate

Enviropeel coating was cut in section to reveal the substrate underneath

Page 15: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

Side by side comparison on stands Enviropeel has been completely peeled off revealing substrate in perfect condition

Close up on the protected flange The bolt was opened to inspect the condition of the thread

The bolt was loosen by hand The thread shows no sign of corrosion

Page 16: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

Side by side comparison: After 4500 hours with and without Enviropeel protection

Close up comparison

Comparison against the control flange

Page 17: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

CONCLUSION After 4,500 hours of exposure the control flange has significantly deteriorated with high levels of corrosion whereas the Enviropeel coated sample is completely unaffected - preserved in its original condition. Bolt threads, nuts and all encapsulated surfaces are seen to be corrosion-free. The test has proven Enviropeel’s effectiveness in eliminating corrosion with the protected substrate showing no signs of deterioration and inhibitor levels in the Enviropeel after 4500 hours remaining satisfactory. A&E Systems will continue the test until 7500 hours and ultimately 10000 hours with the same configuration and some minor improvements. This test provides further confirmation of Enviropeel’s impeccable performance record, from successful 3000 hour pre-release testing in 1997, to the following 16 years of successful applications in some of the world’s most challenging environments.

1997

2013

Close up shot showing the condition of the bolts and nuts after severe exposure of salt environment for 4500 hours which equivalent to 45 years in real time.

Page 18: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

APPENDIX 1

HOT SALT FOG TEST CABINET SPECIFICATION MODEL: HD200

CAPACITY: 200 L

Page 19: ASTM 4500 hrs - ae-sys.com · Hot Salt Fog Test & Methodology The test was conducted in accordance with ASTM B117-11 Standard Practice for Operating Salt Spray (Fog) Apparatus.

APPENDIX 2

SALT SPECIFICATION SUPPLIER: MERCK GROUP

BRAND: EMSURE ORIGIN: GERMANY