Asta Powerproject Presentation Slides
-
Upload
lam-thanh-hoang -
Category
Documents
-
view
290 -
download
0
Transcript of Asta Powerproject Presentation Slides
-
8/10/2019 Asta Powerproject Presentation Slides
1/28
Crown Systems (Singapore) Pte. Ltd.
ASTA POWER PROJECT
-
8/10/2019 Asta Powerproject Presentation Slides
2/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Agenda
2
Company Profile
Asta PowerProject Overview
CostOS Cost Estimating Overview
Summary
-
8/10/2019 Asta Powerproject Presentation Slides
3/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
COMPANY PROFILE
3
-
8/10/2019 Asta Powerproject Presentation Slides
4/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
About Crown Systems
Headquarter in Singapore since 1997 with offices in Brunei, Indonesia,Malaysia, Philippines and Vietnam
Autodesk Gold Partner, Authorized Training Center and AuthorizedCertification Center
Oracle Certified Advantage Partner and HP Gold Partner
Expertise in Project Management Consulting, BIM Implementation, 3DModeling, Simulation and Visualization using Autodesk Applications
Large pool of highly experienced BIM Process Consultants and ApplicationEngineers specializing in Architectural, Structural and M&E domains
Working with Developers, Architects, Engineering Firms, A1 Contractors onlarge scale construction projects for BIM/ IPD implementation
-
8/10/2019 Asta Powerproject Presentation Slides
5/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Regional Presence
Singapore (HQ)
Brunei
Indonesia
Malaysia
Philippines
Viet Nam
5
-
8/10/2019 Asta Powerproject Presentation Slides
6/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
6
FINANCIAL HEALTH
VALUED SERVICES
PRODUCT LEADERSHIP
Marine Engineering Engineer ing & Construct ion
Shell Chemicals
Power, Energy & Proc ess
High Technolo gy OthersResearch & Developm ent
Our Client List (Project Management)
-
8/10/2019 Asta Powerproject Presentation Slides
7/28
-
8/10/2019 Asta Powerproject Presentation Slides
8/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
BIM 3D & Beyond - Solutions
BIM 3D - ModelingBIM 4D Clash
Detection & Time LinerBIM 5D Cost
EstimatesBIM 6D Facility
Management
-
8/10/2019 Asta Powerproject Presentation Slides
9/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
ASTA OVERVIEW
9
-
8/10/2019 Asta Powerproject Presentation Slides
10/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
About ASTA Development
Project, Portfolio and Resource management specialists
since 1988
Owned by a London listed parent company
Over 60,000 users worldwide
Sales, Support, Training and Consultancy
Dedicated to continuous improvement via feedback from
customers
-
8/10/2019 Asta Powerproject Presentation Slides
11/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
ASTA PowerProject
Effective Project Management and Planning Efficiency
Used by 90% of Top Main Contractors in UK
Sold Worldwide to 20 countries since 1988
Rated the No. 1 software in the UK building industry in a recent survey by the
Planning Engineers Organisation
Easy to use with excellent presentation capabilities
Companies Using ASTA: Bovis Lend Lease, Fosters and Partners
(architectural firm)
-
8/10/2019 Asta Powerproject Presentation Slides
12/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Client List
-
8/10/2019 Asta Powerproject Presentation Slides
13/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Projects that used Asta
The London Eye, UK
The Eden Project, UK
Jumeriah Park, Dubai
Reichstag in Berlin
Hong Kong Airport
Petrolnas Towers, Malaysia
The Space Shuttle, USA
Warsaw Metro LineThe Great Court @ British Museum
The London 2012 Olympic Game
Renewable Energy Projects, France
Commonwealth Games Village in India
Schipol Airport, Netherlands
Building the Education Revolution, Sydney
-
8/10/2019 Asta Powerproject Presentation Slides
14/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Multi-Users, Multi-Projects
-
8/10/2019 Asta Powerproject Presentation Slides
15/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Solution for all Issues
-
8/10/2019 Asta Powerproject Presentation Slides
16/28
-
8/10/2019 Asta Powerproject Presentation Slides
17/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Project, Resource & Cost Management
-
8/10/2019 Asta Powerproject Presentation Slides
18/28
-
8/10/2019 Asta Powerproject Presentation Slides
19/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Risk Analysis
-
8/10/2019 Asta Powerproject Presentation Slides
20/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Integration with Outlook
Integration with MS Outlook
-
8/10/2019 Asta Powerproject Presentation Slides
21/28
-
8/10/2019 Asta Powerproject Presentation Slides
22/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Earned Value Analysis
-
8/10/2019 Asta Powerproject Presentation Slides
23/28
-
8/10/2019 Asta Powerproject Presentation Slides
24/28
-
8/10/2019 Asta Powerproject Presentation Slides
25/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Demo Areas
Overview
ProjectCreation
RepetitiveScheduling
Resource &Cost
S-Curve
Line ofBalance
ProgressUpdates
-
8/10/2019 Asta Powerproject Presentation Slides
26/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
SUMMARY
26
-
8/10/2019 Asta Powerproject Presentation Slides
27/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
Summary and Conclusion
Advantages of our Consulting Approach (Why Us?)
Proven Track Record for Project Management & BIM Implementation/Methodology Work closely with BCA and familiar with BCA BIM submission
requirements
Long Term support and partnership commitment
Knowledge transferthrough customized/ tailored trainings and hand holdingsessions.
Direct access to our team of technical support staff through various
communication channels.
Empower your employees
Provide advisory services in planning for future growth
-
8/10/2019 Asta Powerproject Presentation Slides
28/28
CROWN SYSTEMS PTE LTD COPYRIGHT RESERVED
28
Question and Answer