Assure Project Harmonizer
-
Upload
shirgold -
Category
Technology
-
view
917 -
download
1
Transcript of Assure Project Harmonizer
![Page 1: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/1.jpg)
Assure Project Harmonizer
Unleash the true power of HP Quality Center
![Page 2: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/2.jpg)
John is late for dinner… again.
![Page 3: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/3.jpg)
John has to provide a Test Completion report for all business units in the
company…but their projects don’t quite align.
![Page 4: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/4.jpg)
Assure Project Harmonizer brings John home in time…
…as well as saves his company big
money!
![Page 5: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/5.jpg)
Here’s how:
![Page 6: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/6.jpg)
HP Quality Center Premier – the best of them all
QC Premier, with its advanced features, is ideal for mature companies with a quality Center of Excellence (CoE).
Aimed for enterprises that manage releases across multiple projects that need to be tested and released together
Introduces QC Project Templates - enabling the reuse of assets and cross project reporting
![Page 7: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/7.jpg)
HP Quality Center Premier: Key Value Proposition
Reduce cost by enforcing centralized management of consistent workflows and processes
Reduce cost by eliminating duplication of effort through asset sharing and reuse
Reduce risk by increasing visibility to quality status, requirements coverage and defect trends across projects
![Page 8: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/8.jpg)
But guess what…With Assure, the best just got better.
![Page 9: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/9.jpg)
Assure has a line of products for unleashing the true power of HP Quality Center!
ASSURE PROJECT HARMONIZER
ASSURE ADMIN CONSOLE
ASSURE QC OVERDRIVE
ASSURE TEST DATA INTEGRITY
ASSURE QC LIGHTVIEW
ASSURE TRASHBIN
ASSURE RSS FEED GENERATOR
![Page 10: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/10.jpg)
Assure is trusted by HP.
![Page 11: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/11.jpg)
So let’s have a look at…
ASSURE PROJECT HARMONIZER
![Page 12: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/12.jpg)
With HP Quality Center 10, asset sharing is a breeze.
![Page 13: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/13.jpg)
LIBRARY
Asset Sharing with HP QC 10
Project A Project B Project CBASELINE
BASELINEBASELINE
BASELINE
A Library and a Baseline are created from
Test Assets of Project A
Other Projects can import the Baseline
If Test Assets are updated, new Baseline can be
created, compared and imported again
BASELINEBASELINE
![Page 14: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/14.jpg)
But what if your QC projects are not perfectly aligned?
![Page 15: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/15.jpg)
Library
Asset Sharing with HP QC 10
Project A Project B Project CBASELINE
BASELINEBASELINE
A Library and a Baseline are created from
Test Assets of Project A
Other Projects cannot import the Baseline
![Page 16: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/16.jpg)
Process Enablement feature in QC 10!
Doesn’t it solve this problem?
![Page 17: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/17.jpg)
Template
Project A Project B Project C
Software Version
Software Version Software Version Software Version
A Template project is created.
Projects are created and linked to the
Template
A new field, Software Version is
introduced in the Template
Field is added to Linked Projects through
Cross-Customization
Process Enablement…
![Page 18: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/18.jpg)
Process Enablement Feature works great for new QC projects
But – let’s see what happens with your existing projects
![Page 19: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/19.jpg)
Template
Project A Project B Project C
Software Version
Software VersionSoftware Version Software Build
Software Version
Software Version
A Field, Software Version is introduced in the template
To an empty project, the cross-customization will
go through
If a Field already exists with the same name, customization fails
If a Field exists with different name, the field is duplicated
Process Enablement…
![Page 20: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/20.jpg)
If your projects are not aligned, you will face challenges with:
Process Enablement Asset Sharing Cross-project reporting
![Page 21: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/21.jpg)
And while aligning 100 projects manually…
… John won’t make it for dinner.
![Page 22: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/22.jpg)
Assure Project Harmonizer for the rescue!
Turnkey solutionEasy to useSolves the problem of mismatching QC projectsHP Enterprise Management Alliance Program (EMAP) certified
![Page 23: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/23.jpg)
So, if the testing terminology varies between projects…
Project A Project B Project C
“Software Version”
“Software Build” “Release”
I represent a tester person
![Page 24: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/24.jpg)
Integrations
Cross-P
roject Reporting
…and the Data is in different Locations
Project C
Project A Project B Project C
“Software Version”
“Software Build” “Release”
“Software Version”
BG_USER_01
“Software Build”
BG_USER_02Release
BG_USER_03
Integrations
Cross-P
roject Reporting
![Page 25: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/25.jpg)
Assure Harmonizer to the Rescue!
Project A Project B Project C
“Software Version”
“Software Build” “Release”
“Software Version”
“Software Version”
![Page 26: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/26.jpg)
Plug-and-play Integrations and Reporting
Project C
Project A Project B Project C
“Software Version”
“Software Build” “Release”
“Software Version”
“Software Version”
Software Version
BG_USER_TEMPLATE_11
Integrations
Software Version
BG_USER_TEMPLATE_11
Software Version
BG_USER_TEMPLATE_11
Cross-P
roject Reporting
![Page 27: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/27.jpg)
Process of harmonization
THIS IS WHAT YOU NEED TO DO, ONE WAY OR ANOTHER
PROJECT CONVERSION
• Applying the changes into the database
MAPPING PHASE
• Map the differences between the Template and the Project
SETUP PHASE
• Gather best practices
• Design and Create Templates
![Page 28: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/28.jpg)
Without Assure Harmonizer
Aligning 100 projects might take one year…
ConversionMapping
52 weeks
Setup Solution Creation
![Page 29: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/29.jpg)
And with Harmonizer!
With Harmonizer, all projects aligned in record time
12 weeks
Mapping ConversionSetup
![Page 30: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/30.jpg)
Harmonizer brings value for your investment from day #1
THE BENEFIT FROM QC10 WITH
HARMONIZER
TIME
WITHOUT HARMONIZER
All projects using Process enablement
![Page 31: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/31.jpg)
Simple and intuitive user interface
![Page 32: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/32.jpg)
Benefits
Harmonized QC projects bring you the following benefits:
Common Reporting on all projectsCommon integrations can be usedSame 'testing language' and processes across the organizationSame Customizations can be used in all projectsSharing and copying of test assets is possible and easyHP Quality Center Premier features unleashed for all projectsQuality Center as the platform for Quality Center of Excellence
![Page 33: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/33.jpg)
And what’s more…
John’s dinner won’t get cold.
![Page 34: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/34.jpg)
35 projects harmonized – QC 9.2Took total of 40 calendar daysDelivered as a serviceThe main drivers for the Harmonizer were the integration between PPM and QC, and a fragmented environment with several template versions and very different ways of working
Customer Case – TeliaSonera
![Page 35: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/35.jpg)
Mats Nordenbäck from TeliaSonera MDE:
"Previously a minor upgrade took 3 hours of manual work for 10 projects and we could not deploy any bug fixes since it would have taken so much time“
"Now we have harmonized projects that are upgraded in seconds, up-to-date documentation and we are able to give our developers more time to concentrate on the essentials."
![Page 36: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/36.jpg)
Assure Harmonizer – the right choice for HP QC 10 users
HP QC 10 UNLEASHED
Common Integrations
Common Processes
Common Reporting
![Page 37: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/37.jpg)
Assure Project HarmonizerWhat will it do for you
Documentation of the template fields
Mapping of fields between projects and templates for these entities:
CycleDefectReleaseReleaseFolderRequirementRunTestTestInstanceTestSetTestStep
Project Conversion - for each mapped field any item that contains this field will be updated with the new field:
Favoritesdata hiding filtersReportsGraphsHistory
Project Conversion - for each mapped field - field properties will be updated:
SizeTypeAttributes
HistoryVerify ValueRequired
A link between the project and the template will be created in QC
Reports:Description of the template fields in excel formatThe mapping information - which existing field will change to what field
(e.g.: BG_USER_01 -> BG_TEMPLATE_USER_12)
Other benefitsHarmonization process descriptionharmonization project plan template including tasks and rolesless risk as you are using a tested technologySignificant time savings
![Page 38: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/38.jpg)
Release quality on time
About Assure
Our core competence is HP Quality CenterWe work with some of the world’s biggest and advanced HP QC customersHP BTO Partner of the Year in Finland 2008Strong co-operation with HP QC TeamRevenue 2008: 3M$
![Page 39: Assure Project Harmonizer](https://reader035.fdocuments.us/reader035/viewer/2022062401/546b156baf7959221d8b6750/html5/thumbnails/39.jpg)
03.05.2023 Esittäjä/Aihe 39
I want to know more!Contact Assure
Check us out on the webAssure Web SiteHP Web Site
Contact one of our partners!