Start
Conduct a Name Search
Submit followingdocument
Registration feeds for sharecapital
End
-
8/14/2019 Assistant General Manager
3/32
IMPORTANT IN CONDUCT A NAMEIMPORTANT IN CONDUCT A NAME
SEARCHSEARCH
Fill and complied the 13A formFill and complied the 13A form
-
8/14/2019 Assistant General Manager
4/32
Pay RM30.00 for each named appliedPay RM30.00 for each named applied Important in document submit
Original copy stampedRM100.00 stamp office in Memorandum and
Articles.
Form 6 must be complied
-
8/14/2019 Assistant General Manager
5/32
Example form 6
-
8/14/2019 Assistant General Manager
6/32
Original copy of form 13AOriginal copy of form 13A
A copy of the letter approving the nameA copy of the letter approving the name
A copy of I/c of each director and companyA copy of I/c of each director and companysecretarysecretary
Important for registrations feedsImportant for registrations feeds
-
8/14/2019 Assistant General Manager
7/32
END THE PROCEDUREEND THE PROCEDURE
Issue of the Certificate Of IncorporationIssue of the Certificate Of Incorporation
When the following certificate will beWhen the following certificate will be
issued in all document registration 2 formissued in all document registration 2 form
registration are in order .registration are in order .
1.1. Form 8 : certificate of public companyForm 8 : certificate of public company
2.2. Form 9 : certificate of private companyForm 9 : certificate of private company
-
8/14/2019 Assistant General Manager
8/32
EXAMPLE FORM FOREXAMPLE FORM FOR
REGISTRATION LOCALREGISTRATION LOCAL
COMPANYCOMPANY
-
8/14/2019 Assistant General Manager
9/32
HUMANHUMAN
RESOURCERESOURCEMANAGERMANAGER
(HR)(HR)
-
8/14/2019 Assistant General Manager
10/32
SALARY OFSALARY OF
ALLALLDEPARTMENDEPARTMEN
TT
-
8/14/2019 Assistant General Manager
11/32
DEPARTMENTDEPARTMENT
MANAGEMENTMANAGEMENTGeneral ManagerGeneral Manager = RM 5,000= RM 5,000Assistant General ManagerAssistant General Manager = RM 4,000= RM 4,000
Human Resource ManagerHuman Resource Manager = RM 3,000= RM 3,000Finance ManagerFinance Manager = RM 3,500= RM 3,500Safety ManagerSafety Manager = RM 3,500= RM 3,500
SecretarySecretary = RM 2,800= RM 2,800
-
8/14/2019 Assistant General Manager
12/32
DEPARTMENT LOGISTIC,DEPARTMENT LOGISTIC,
PURCHASING & WAREHOUSEPURCHASING & WAREHOUSE
Head Of DepartmentHead Of Department = RM 3,500= RM 3,500
SecretarySecretary = RM 2,200= RM 2,200Engineer LogisticEngineer Logistic = RM 2,500= RM 2,500Engineer WarehouseEngineer Warehouse = RM 2,500= RM 2,500
Engineer Purchasing = RM 2,500Engineer Purchasing = RM 2,500AccountantAccountant = RM 2,300= RM 2,300
-
8/14/2019 Assistant General Manager
13/32
DEPARTMENT TECHNICALDEPARTMENT TECHNICAL
Head Of DepartmentHead Of Department = RM 3,500= RM 3,500
Engineer ProcessEngineer Process = RM 2,500= RM 2,500Engineer Machine &Engineer Machine &
MaintenanceMaintenance = RM 2,500= RM 2,500
Engineer R & DEngineer R & D = RM 2,500= RM 2,500Engineer EquipmentEngineer Equipment = RM 2,500= RM 2,500
-
8/14/2019 Assistant General Manager
14/32
DEPARTMENT MARKETINGDEPARTMENT MARKETING
Head of DepartmentHead of Department = RM 3,500= RM 3,500
New Product Planer = RM 2,000New Product Planer = RM 2,000Public Relationship Manager = RM 1,800Public Relationship Manager = RM 1,800Sales ManagerSales Manager = RM 1,800= RM 1,800
Advertisement ManagerAdvertisement Manager = RM 1,800= RM 1,800
-
8/14/2019 Assistant General Manager
15/32
DEPARTMENT PRODUCTIONDEPARTMENT PRODUCTION
Head Of DepartmentHead Of Department = RM 3,500= RM 3,500 Assistant Head Of Department= RM 3,000Assistant Head Of Department= RM 3,000 Engineer ChefEngineer Chef = RM 2,500= RM 2,500 Engineer PackagingEngineer Packaging = RM 2,500= RM 2,500 Engineer Technical 1Engineer Technical 1 = RM 2,500= RM 2,500 Engineer Technical 2Engineer Technical 2 = RM 2,500= RM 2,500
DEPARTMENT QUALITYDEPARTMENT QUALITY
-
8/14/2019 Assistant General Manager
16/32
DEPARTMENT QUALITYDEPARTMENT QUALITY
CONTROL & QUALITYCONTROL & QUALITY
ASSURANCEASSURANCEHead Of DepartmentHead Of Department = RM 3,500= RM 3,500SecretarySecretary = RM 2,200= RM 2,200
Engineer ChemicalEngineer Chemical = RM 2,500= RM 2,500Engineer DesignEngineer Design = RM 2,500= RM 2,500Engineer PackagingEngineer Packaging
OrganizerOrganizer = RM 2,500= RM 2,500
-
8/14/2019 Assistant General Manager
17/32
SALARY WORKERSSALARY WORKERS
OPERATOROPERATOR = RM= RM 2 per hours2 per hours
working hours = 9hours per days (8 A.M 5 P.M)working hours = 9hours per days (8 A.M 5 P.M)
9hours per days x RM2 = RM18 per days9hours per days x RM2 = RM18 per days RM18 x 22 days = RM396 per monthRM18 x 22 days = RM396 per month
12 operator x RM396 = RM4752 per month12 operator x RM396 = RM4752 per month
GUARD SECURITYGUARD SECURITY= 3 persons= 3 persons
= 3 x RM400 per month= 3 x RM400 per month
= RM1200 per month= RM1200 per month Workers for this NyumNyum Bakery Sdn Bhd totallyWorkers for this NyumNyum Bakery Sdn Bhd totallyare 48 workers. 33 manager, 12 operator and 3 guardare 48 workers. 33 manager, 12 operator and 3 guardsecurity.security.
-
8/14/2019 Assistant General Manager
18/32
GANTTGANTT
CHARTCHART
-
8/14/2019 Assistant General Manager
19/32
-
8/14/2019 Assistant General Manager
20/32
SAFETY ANDSECURITY
-
8/14/2019 Assistant General Manager
21/32
INTRODUCTIONINTRODUCTION OBJECTIVESOBJECTIVES
SAFETY TIPSSAFETY TIPS EMERGENCY LAYOUTSEMERGENCY LAYOUTS
FACTORYFACTORY EACH DEPARTMENTSEACH DEPARTMENTS
EMERGENCY EQUIPMENTSEMERGENCY EQUIPMENTS FIREFIRE INJURYINJURY
SAFETY SYMBOLSSAFETY SYMBOLS
CCTVCCTV SAFETY GUARDSAFETY GUARD
-
8/14/2019 Assistant General Manager
22/32
INTRODUCTIONINTRODUCTION
Safety is the state of being safe, theSafety is the state of being safe, thecondition of being protected against anycondition of being protected against anytypes or event which could be consideredtypes or event which could be considered
non-desirable.non-desirable.Protected from the event or from exposureProtected from the event or from exposure
to something that causes health orto something that causes health oreconomical losses.economical losses.
The workplace has to be a place that canThe workplace has to be a place that canavoid workers from any danger.avoid workers from any danger.
-
8/14/2019 Assistant General Manager
23/32
OBJECTIVESOBJECTIVES
Safety training to management, staff andSafety training to management, staff and
workersworkers
Investigations of workplace accidentsInvestigations of workplace accidents
Regular safety surveys of variousRegular safety surveys of various
workplaces and the factory area andworkplaces and the factory area and
walkwayswalkways
A wide variety of safety programsA wide variety of safety programs
-
8/14/2019 Assistant General Manager
24/32
SAFETY TIPSSAFETY TIPS
Maintain a clean work area to provide more productive workplaceMaintain a clean work area to provide more productive workplace
environment for employees.environment for employees.
Use guards and engineering solutions wherever possible instead ofUse guards and engineering solutions wherever possible instead of
relying on Personal Protective Equipment (PPE).relying on Personal Protective Equipment (PPE).
Assume your employees want to work safely and give them thatAssume your employees want to work safely and give them thatchance. Give the incentive programs based on safety and security.chance. Give the incentive programs based on safety and security.
Give clear work instructions. Make sure employees know the rightGive clear work instructions. Make sure employees know the right
way to do what company expects of them.way to do what company expects of them.
If a machine is becoming unsafe, shut it down before someone getsIf a machine is becoming unsafe, shut it down before someone gets
hurt.hurt. Maintain the machinery in good working order.Maintain the machinery in good working order.
Avoid unnecessary hazards.Avoid unnecessary hazards.
-
8/14/2019 Assistant General Manager
25/32
FACTORY LAYOUTFACTORY LAYOUT
-
8/14/2019 Assistant General Manager
26/32
-
8/14/2019 Assistant General Manager
27/32
DEPARTMENT LAYOUT BDEPARTMENT LAYOUT B
For Technical, Marketing and Quality Control DepartmentFor Technical, Marketing and Quality Control Department
-
8/14/2019 Assistant General Manager
28/32
SAFETY EQUIPMENTS - FIRESAFETY EQUIPMENTS - FIRE
FIRE EXTINGUISHERFIRE EXTINGUISHER
FIRE HOSE REELFIRE HOSE REEL
SPRINKLER FLOW SYSTEMSPRINKLER FLOW SYSTEMAUTO RING BELLAUTO RING BELL
-
8/14/2019 Assistant General Manager
29/32
SAFETY EQUIPMENTS -SAFETY EQUIPMENTS -
INJURYINJURYFIRST AID KITFIRST AID KIT
-
8/14/2019 Assistant General Manager
30/32
SAFETY SYMBOLSSAFETY SYMBOLS
SAFETY FIRSTSAFETY FIRST
DANGERDANGER
MACHINE HAS A PROBLEMMACHINE HAS A PROBLEM
-
8/14/2019 Assistant General Manager
31/32
CLOSED-CIRCUIT TELEVISIONCLOSED-CIRCUIT TELEVISION
(CCTV)(CCTV)
Use of video cameras to transmit a signalUse of video cameras to transmit a signal
to a specific place, on a limited set ofto a specific place, on a limited set of
monitorsmonitors
For this company, CCTV is used toFor this company, CCTV is used to
observe parts of a process from a centralobserve parts of a process from a central
control room.control room.
-
8/14/2019 Assistant General Manager
32/32
TIME DUTY FOR SAFETY GUARDTIME DUTY FOR SAFETY GUARD
No Shift # of person Duration Time
1 Morning 1 10 hours 7.00 am 5.00 pm
2 Evening & Night 2 14 hours 5.00 pm 7.00 am