Assignment Model

7
ASSIGNMENT MODEL 1. A company has four districts, North, South, East and West to sell its production and four salesmen A, B, C and D for it. The district-wise cost of allocation of each salesman is given below. Determine the area allocation so that the allocation cost is minimized. A B C D P 42 0 350 280 210 Q 30 0 250 200 150 R 30 0 250 200 150 S 24 0 200 160 120 How should the assignments be made? Answer Job Employee Cost P D 210 Q C 200 R B 250 S A 240 Total cost=Rs 900 2. There are four manufacturing sections and five supervisors in the industry. Four of the five supervisors are to be promoted at foremen. The efficiency matrix of the supervisors is given below: M1 M2 M3 M4 A 90 96 72 88 B 95 90 0 85 C 85 80 75 0 D 78 95 0 80 E 93 91 70 8

description

assignment model imp

Transcript of Assignment Model

ASSIGNMENT MODEL1. A company has four districts, North, South, East and West to sell its production and four salesmen A, B, C and D for it. The district-wise cost of allocation of each salesman is given below. Determine the area allocation so that the allocation cost is minimized.

A B C D

P420350280210

Q300250200150

R300250200150

S240200160120

How should the assignments be made?

Answer Job Employee Cost

P D 210

QC200

RB250

SA240

Total cost=Rs 900

2. There are four manufacturing sections and five supervisors in the industry. Four of the five supervisors are to be promoted at foremen. The efficiency matrix of the supervisors is given below: M1M2M3M4

A90967288

B9590085

C8580750

D7895080

E 9391708

Which four supervisors should be promoted as supervisors of which manufacturing sections so as to maximize the efficiency of the industry?

Answer Job Mahine Cost

ADummy 0

B30

C 280

D178

E48

Cost = Rs 166

3. The owner of a small machine shop has four machinists available to assign to jobs for the day. Five jobs are offered with the expected profit (in Rs) for each machinist on each job as follows:12345

A6207805001010820

B710840610730590

C8709201110710810

D480640870770800

Find the assignment of machinists to jobs that will maximize the profits. Which jobs should be declined?

Answer Job Worker Cost

A3500

B5590

C4710

D1480

Dummy 20

Cost = Rs 2280

4. The cost structure (in lakhs of rupees) of contractors against tenders is given below:12345

A1622132125

B1412171120

C1821201721

D2629223331

E1915171620

How should you assign the contracts for minimum cost?Answer Contractor Tender Cost

A116

B411

C521

D322

E 215

Cost = Rs 85 lakhs

5. A caterer has four chefs. He has received orders for four parties. He has evaluated and rated his chefs (100 is best rating) on the basis of their abilities and the kind of cuisine preferred at each party and these are shown in the table below:1234

A70604060

B70206050

C60203040

D40301030

How should he assign the chefs?

Answer Chef Party Rating sore

A 260

B 360

C160

D430

210

6. Find minimum assignment costs

105131516

3918136

107222

7119712

7910412

Answer Job Employee Cost

A25

B13

C52

D39

E 44

Cost Rs 23

911151011

129-109

-1114117

1481278

Answer Job Men Cost

A19

B29

C57

D47

E 30

Cost Rs 32

7. Maximize profits82-54

109284

5496-

36287

561043

Answer JobMenProfit

A18

B29

C46

D57

E310

Profit Rs 40

18242832

8131719

10151922

Answer Job Worker Profit

A 432

B 317

C215

D 10

Profit Rs 64

1398101214

1287111413

109691212

1211991011

9788910

141210101114

Answer Job Machine Profit

A 614

B514

C49

D211

E38

F114

Profit = Rs 70

1236-59

411-5-8

8210975

-7861210

589461

Answer Job Worker Profit

A 112

B211

C49

D512

E39

F 60

Profit = Rs 53