Assignment 2

30
PROJECT 3 : THE PROJECT PROPOSAL NAME: MICHELLE TUNG MAN KAYE ( 0324175 ) RAVEENDER SINGH ( 0322490 ) TUTOR: PN. HASMANIRA COURSE: FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE) MODULE: INTRODUCTION TO THE CONSTRUCTION INDUSTRY [QSB30105] INTAKE: MARCH 2015

Transcript of Assignment 2

Page 1: Assignment 2

PROJECT 3 :

THE PROJECT PROPOSAL

NAME: MICHELLE TUNG MAN KAYE ( 0324175 )

RAVEENDER SINGH ( 0322490 )

TUTOR: PN. HASMANIRA

COURSE: FOUNDATION IN NATURAL AND BUILT ENVIRONMENT

(FNBE)

MODULE: INTRODUCTION TO THE CONSTRUCTION INDUSTRY

[QSB30105]

INTAKE: MARCH 2015

Page 2: Assignment 2

CONTENT

1. Project Introduction

2. Introduction to the site

3. Location & Key plan

4. Site plan

5. Site context

6. Site analysis & Observation

- Circulation

- Microclimate

- Wind flow direction

- Drainage

7. Advantages and Disadvantages

8. Michelle Tung ( Individual proposal )

9. Raveender Singh ( Individual proposal )

Page 3: Assignment 2

1.1 PROJECT INTRODUCTION

This is the final project of Introduction to Construction Industry. For this

assignment, we were assigned to search for a specific empty land that the size of the

land shall between 50m x 50m (2500𝑚2) – 50mx70m (3500𝑚2) to initiative a small

construction project and come out with a proposal.

In the project brief, we are required to serve one of the purposes mentioned.

Which includes: Recreation area, Commercial area, Industrial area, Agricultural area,

Tourism area and Residential area.

The objective of this project is to enable us to develop an understanding of the

construction team, its organization, duties and inter-relations.This project also help us to

develop an awareness of the professional responsibilities and to appreciate their

profession in the construction industry.

Page 4: Assignment 2

INTRODUCTION TO THE SITE

We choose this site for our project which is located at Jalan USJ 1/3g Taman

Subang Mewah, 47500 Subang Jaya, Selangor. The plot of land we have chosen is an

empty and undeveloped piece of barren land approximately around 50m x 60m. Thus

we have decided that this piece of land is a suitable area to develop as it has many

potentials. There are many good reasons why we choose this location to develop, but

the main reasons are because it is located in a prime location surrounded by residential

areas and many food and retail outlets.Thus, this site has lots of potential for further

development.

Page 5: Assignment 2

2.1 SITE LOCATION

Location:

Jalan USJ 1/3g Taman Subang Mewah, 47500 Subang Jaya, Selangor.

Key Plan

Page 6: Assignment 2

SITE PLAN

Page 7: Assignment 2

SITE CONTEXT

Page 8: Assignment 2

OBSERVATION

CIRCULATION

Circulation 1

Circulation 2

Circulation 3

People can enter to the site easily through circulation 1, circulation 2 and

circulation 3 which have shown in the figure above. Thus, this site can be accessed

easily.

Page 9: Assignment 2

MICROCLIMATE

WIND FLOW DIRECTION

The sun rises from the east and sets in the west. In addition, our site will be a nice spot

to enjoy watching the sun set in the evening and sun rise in the morning. Wind

circulates from the west to east making the site cool both during day and night.

SUN

RISE

SUN

SET

Page 10: Assignment 2

DRAINAGE

Page 11: Assignment 2

SITE ANALYSIS

Site Context

Image

Distance

Time

Masjid Al-Irsyad USJ 1

92m

1 min

PETRONAS - Taman

Subang Mewah

170m

2 min

USJ 1 One Avenue

450m

5 min

Jati Apartment Subang

Mewah

500m

6 min

Page 12: Assignment 2

Restoren USJ Avenue

150m

2 min

SJK(C) Chee Wen

Selangor

200m

3 min

Page 13: Assignment 2

7. ADVANTAGES AND DISADVANTAGES OF SITE

ADVANTAGES

The site contains many advantages, some of them are that it is located in a very prime

area and is easily reachable from various locations. Secondly, it is surrounded by trees

that will provide cool breeze and also shade to the site. There is also a nearby school

located by the site. In addition, there is also a mosque located right beside the site to

allow people to perform their prayers.

DISADVANTAGES

As we all know, no site is ever perfect and may contain some disadvantages. These are

some of the disadvantages of our site. The site is located quite near to the road which is

a safety hazard and also the cars passing by will produce a significant amount of carbon

dioxide therefore decreasing the air quality there.

Page 14: Assignment 2

FINAL PROJECT :

A Relaxation Commercial Centre

Development Plan Proposal

NAME: MICHELLE TUNG MAN KAYE

STUDENT ID: 0324175

TUTOR: PN. HASMANIRA

COURSE: FOUNDATION IN NATURAL AND BUILT ENVIRONMENT

(FNBE)

MODULE: INTRODUCTION TO THE CONSTRUCTION INDUSTRY

[QSB30105]

INTAKE: MARCH 2015

Page 15: Assignment 2

CONTENT

Topic

Page

Introduction

3

Objective & Benefits

4

Bubble diagram

5 - 6

Sketch plan

7 - 9

Facilities

10 - 12

Project concept

13

Professions

14 - 16

Costing

17

Page 16: Assignment 2

INTRODUCTION

In this final project of Introduction to Construction Industry. We were given a task

to find a specific empty land to initiate a small construction project which the land shall

between 50m x 50m (2500𝑚2) – 50m x 70m (3500𝑚2) and come out with a proposal.

In the project brief, we are required to serve one of the purposes mentioned.

Which includes: Recreation area, Commercial area, Industrial area, Agricultural area,

Tourism area and Residential area. Next, we should include suggestion, rationale,

benefits, site analysis, evaluation and the requirement of the project.

For our group, we come out with an outcome to use the empty land which

located in Subang Jaya, Selangor. Thus, I decided to develop a commercial area on the

land that we found. I plan to build a relaxation and comfortable building on that empty

land for my individual report.

Page 17: Assignment 2

OBJECTIVE

To build a relaxation and comfortable commercial centre for the people around

Taman Subang Mewah.

To provide a complete equipped environment for the residents.

To increase the relation between residents.

To maintain the residents health.

To improve their overall health and quality of life

To provide a clean, comfortable and convenient area.

BENEFITS

People who are busy can relax and release their stress in this spa centre.

Citizen stay around in that area can also drop by to enjoy and feel the nature

.

This relaxation commercial centre is surrounded by residential area which will

make the residents more convents to come and relax.

There will be enough spaces which allows car to park.

There will be lots of green plants which will provide a healthier and fresher area

for the residents.

This relaxing commercial area will provide a healthier lifestyle for the residents.

Page 18: Assignment 2
Page 19: Assignment 2
Page 20: Assignment 2
Page 21: Assignment 2
Page 22: Assignment 2
Page 23: Assignment 2

FACILITIES

SAUNA o A small room used as a steam bath

for calming and refreshing the body. o To help people be

more healthy though it causes stress on the body by overheating.

o Good for our body and provides a pampering retreat where we can relax and restore body.

SWIMMING POOL o A container that is filled with water to

allow for swimming or other leisure activities and a great recreational activity for people of all ages.

o Swimming is a great workout because you need to move your whole body against the resistance of the water which also a good way to relax and feel good.

GYM o A place where provides a range of

facilities designed to improve and maintain physical fitness and health.

o Exercising daily strengthens your heart and allows it to pump more efficiently with less strain.

o Exercise also lowers your blood pressure, which measures the force on your artery walls each time your heart beats.

Page 24: Assignment 2

MINI THEATRE o For viewing movies. o Projected with a movie projector onto

a large projection screen at the front of the auditorium while the dialogue, sounds and music are played through a number of speakers.

ROOFTOOP CAFÉ o An open space café located at the top

of the building. o Enjoy and relaxing space. o Spend time to chit chat with people

around to increase the relationship.

MASSAGE THERAPY o Massage therapy is manual

manipulation of soft body tissues to enhance a person’s health.

o To reduce stress and anxiety, relax muscles, rehabilitate injuries, reduce pain, and promote overall health and wellness.

MANICURE & PEDICURE o A cosmetic beauty treatment for

the fingernails and hands.

o Filing and shaping of the free edge, pushing and clipping any nonliving tissue from the nail plate, treatments, massage of the hand and the application of polish.

o Include painting of pictures or designs on the nails or applying small decals or imitation jewels.

Page 25: Assignment 2

FACIAL CARE o A beauty treatment for the face. o Involving a variety of skin treatments

such as steam, exfoliation, extraction, creams, lotions, facial masks, peels, and massage.

o A common spa treatment.

FISH SPA o To stimulate blood flow and improve

circulation, remove bacteria and reduce foot odour.

o To regulate the nervous system, relax the body and release fatigue.

o To remove dry and dead skin.

WASHROOM o A hygiene and comfort area for the

residents and staff.

RECEPTION o To greet and receive calls when

customers make an appointment. o Receiving something sent, given or

inflicted. o To announce the latest news.

Page 26: Assignment 2

PROJECT CONCEPT

The construction plan is design on 50m x 60m empty land in Jalan USJ 1/3g

Taman Subang Mewah, 47500 Subang Jaya, Selangor. I have decided to develop a

commercial area which able to provide a comfortable and relaxing area for the people

around.

The aim of this project is to transform an empty land into a place that benefits the

people and the residents nearby.

Futhermore, I have decided to build a comfortable and relaxing area because I

found out that there is no any place for the people around to enjoy and relax. Thus, I

decided to start a construction of a comfortable and relaxing place on this empty land.

Which include lots of facilities such as sauna , swimming pool, gym, mini theatre,

rooftop café and more to provide a sufficient space for the residents to enjoy under a

complete equipped environment.

Page 27: Assignment 2

PROFESSIONS

Professions involved and their task:

a) Landscape Architect

b) Architect

c) Civil Engineer

d) Structural Engineer

e) Electrical Engineer

f) Quantity Surveyor

g) Interior Designer

Landscape Architect

A person who design of outdoor public areas, landmarks, and structures to achieve

environmental, social-behavioral, or aesthetic outcomes. It involves the systematic

investigation of existing social, ecological, and soil conditions and processes in the

landscape, and the design of interventions that will produce the desired outcome. His

jobs can range from small scale to a very large scale level and he designs, estimate and

also implement the process of landscape element development.

Architect

A person who give professional supports to the clients not only on the design of the

building. The work of an architect is extensive because they are generally closer to your

clients than every other building professionals. He is in the best position to know what

meets your dreams and how to help achieve it. He conceives or dream and put pen to

paper and sketch out what you have in mind, gives you to criticize to suit what you want

properly, and make the necessary adjustments.

Page 28: Assignment 2

Civil Engineer

A professional engineering discipline that deals with the design, construction, and

maintenance of the physical and naturally built environment, including works like roads,

bridges, canals, dams, and buildings. Civil engineering is the second-oldest engineering

discipline after military engineering, and it is defined to distinguish non-military

engineering from military engineering. He prepares structural detail drawings to guide

the construction operation.

Structural Engineer

A field of engineering dealing with the analysis and design of structures that support or

resist loads. They are most commonly involved in the design of buildings and large non-

building structures but they can also be involved in the design of machinery, medical

equipment, vehicles or any item where structural integrity affects the item's function or

safety. Structural engineers must ensure their designs satisfy given design criteria,

predicated on safety serviceability and performance.

Electrical Engineer

Engineering that generally deals with the study and application of electricity, electronics,

and electromagnetism. They give instructions to the electrician on large project sites.

Page 29: Assignment 2

Quantity Surveyor

A person who manages all costs relating to building and civil engineering projects, from the initial calculations to the final figures. They seek to minimize the costs of a project and enhance value for money, while still achieving the required standards and quality. Many of these are specified by statutory building regulations, which they need to understand and adhere to. A quantity surveyor may work for either the client or the contractor, working in an office or on site. They are involved in a project from the start, preparing estimates and costs of the work. When the project is in progress, quantity surveyors keep track of any variations to the contract that may affect costs and create reports to show profitability.

Interior Designer

A person who responsible for designing spaces inside buildings. They work on

specification of stylish finishing such as cornice on ceiling, colours, texture of wall,

curtains, blinding and furniture and also works with architect on layout of rooms.

Page 30: Assignment 2

COSTING

DESCRIPTION

QUANTITY

AMOUNT (RM)

1. Facial equipment - 50,000

2. Gym equipment - 40,000

3. Massage equipment - 50,000

4. Café equipment - 20,000

5. Swimming pool 300m2 90,000

6. Toilet equipment 18 units 15,000

7. Fish spa 1 unit 1,000

8. Sauna 1 unit 3,000

9. Cinema 1 unit 4,000

10. Manicure & Pedicure - 10,000

11. Drainage system 1 line 3,000

12. Central air conditioning 2 units 4,000

13. Lighting - 1,000

14. Furniture - 30,000

15. Flooring - 37,500

16. Smoke detector 9 units 3,000

TOTAL

361,500