Asset Information Management System (AIMS) Report
Agency Reconciliation
The City of New York Office of Management and Budget Dean Fuleihan, Director Fiscal Year 2014
RECONCILIATION SUMMARY
Introduction ………………………………………………………………… 1
2015-2018 “State of Good Repair” Needs Capital Reconciliation ………… 3
2015 Maintenance Needs Expense Reconciliation ………………………… 11
APPENDICES
“State of Good Repair” Activities Reconciliation:
New York Public Library A1 ……………….…………………... Appendix A
Brooklyn Public Library B1 ……………….……………………. Appendix B
Queens Public Library C1 ……………….……………………… Appendix C
Department of Education D1-100 ..…………….……………….. Appendix D
City University of New York E1-6 ……………….…………….. Appendix E
Police Department F1-15 ……………….………………………. Appendix F
Fire Department G1 ...……………….………………………….. Appendix G
Administration for Children’s Services H1……………….…….. Appendix H
Department of Homeless Services I1-2 .………………...……... Appendix I
Department of Correction J1-2 ……………….………………… Appendix J
Human Resources Administration K1 ……………….…………. Appendix K
Department for the Aging L1……………….…………………... Appendix L
Department of Cultural Affairs M1-7 ……………….………….. Appendix M
Division of Youth & Family Justice N1 ………….…..…….….... Appendix N
Taxi & Limousine Commission O1 .…………….…..…….…..... Appendix O
Department of Small Business Services P1-3 ……………….…. Appendix P
Department of Health & Mental Hygiene Q1-3 ………………... Appendix Q
Health and Hospitals Corporation R1-11 …………….…..…….. Appendix R
Department of Sanitation S1-4 ……………….………………… Appendix S
Department of Transportation T1-17 ……………….………….. Appendix T
Department of Parks and Recreation U1-16 ...…………….…… Appendix U
Department of Citywide Administrative Services V1-6 ...……... Appendix V
Assets to be Replaced/Abandoned W1-2 .………….………….. Appendix W
Table of Contents
This page left intentionally blank.
1
Introduction
The City of New York has reported on Major Portions of the City’s Fixed Assets through the
AIMS Report for Fiscal Year 2014. The Executive Summary document, published each Fall,
reports financially unconstrained repair and maintenance schedules on a Citywide and on an
agency basis by classes of assets and special systems. In addition, a more detailed Asset Survey
Report portrays funding needs required to achieve and maintain a “State of Good Repair” on an
asset basis and is available for review at the Office of Management and Budget. The
methodology used to compile the condition assessment and maintenance schedules is contained in
the Executive Summary.
Based on the recommended funding projections in the Asset Survey Report, participating
agencies were asked to indicate their respective Capital and Expense funding for the “State of
Good Repair” and maintenance activities detailed in the schedules. It is important to note that the
agencies’ planned activities indicated in this Agency Reconciliation do not represent specific
amounts in the Budget. The results are presented here as comparisons between agencies’ planned
activities and the Executive Summary’s recommendations.
Citywide “State of Good Repair” and Major Maintenance Needs from Executive Summary
FY 2015-2018 Capital (“State of Good Repair”)
FY 2015 Expense (Major Maintenance)
Buildings 2,936,397,000 262,593,000
Piers, Bulkheads & Marinas/Docks 169,965,000 11,614,000
Bridges & Tunnels 541,661,000 31,407,000
Parks Systems 288,660,000 6,795,000
Streets & Highways 2,184,920,000 -
Special Systems* 80,377,000 65,694,000
Total $ 6,201,980,000 $ 378,104,000
* includes street lighting, traffic signal systems, ferries, vessels and Rikers Island utilities.
Reconciliation Summary
2
Items Excluded from Study
While the study is comprehensive, a number of items and considerations were excluded from the condition review & costing estimates. They were not considered directly related to the structural integrity of the asset as defined by the Charter. These include but are not limited to:
Most equipment (fixed and movable)
Special operating systems within assets
Aesthetic considerations
Landscaping and outdoor elements
Statuary or ornamental edifices
Components not readily observable or accessible by professionals in the field
Handicapped access requirements
Information obtained through testing or probing
Hazardous material identification and removal
Programmatic needs not related to structural integrity
Programmatic efficiency improvements
Swing space/phasing costs, or premium time costs on an as-needed basis
Components deficient in code or local law compliance that do not impact on the integrity of the asset
Assets known to be scheduled for near-term replacement
Asset Survey Report Context
The asset condition and maintenance schedule within the AIMS Report is not a budget document, but rather a broad, unconstrained analysis of a subset of general needs. It will serve as a planning tool and resource in addressing overall Citywide funding requirements. The report does not attempt in any manner to balance the City’s asset and infrastructure requirements against other important City needs, nor does it attempt to make any funding recommendations for different agencies. There is a general prioritization presented within individual assets of the relative importance of various repairs and maintenance items in terms of preserving the assets.
Due to the complexity of the analysis, the large scale of the survey effort, the time frame for completion, the amount of estimation required, and the necessary methodology constraints, there are inherent limitations to the level of accuracy possible at the detailed asset and component level.
In this context it should be noted that the actual cost for a project may vary substantially from the amount estimated in this report when a detailed scope of work and cost estimate is completed. Agencies will not be restricted to any asset specific number contained in the reports when planning and developing their budget requests. It is further understood that there will be work items (i.e. programmatic) excluded from this study which may require additional expenditures.
3
As an annual reconciliation effort, agencies indicate their recently performed and planned activities as compared to the activities required to bring their assets up to a “State of Good Repair” which are listed in the Asset Survey Report and defined in the Executive Summary.
Responses were based on information available for the publication of the FY 2014 January Plan. These responses, together with their footnotes, represent a characterization of the agencies’ activities to achieve a “State of Good Repair”.
Agency Planned Activities
Activities as estimated in the Asset Survey Report including those that are: a) Planned for FY 2015-2018; b) Already performed since last survey; c) Being undertaken. Cost estimate of activities is not necessarily the amount funded in the Budget.
“State of Good Repair” Need Dollar amounts represented by cost estimates from the Asset Survey Report that are required
to bring the Agency’s assets included in the survey up to a “State of Good Repair”.
Percentage Agency Planned Activities/”State of Good Repair” Need
NEW YORK PUBLIC LIBRARY (NYPL) Number of Assets 16
Total Square Footage 1,481,000sf
Agency Planned Activities $905,000
State of Good Repair Need $12,728,000
Percentage 7%
BROOKLYN PUBLIC LIBRARY (BPL) Number of Assets 7
Total Square Footage 517,000sf
Agency Planned Activities $1,952,000
State of Good Repair Need $7,299,000
Percentage 27%
QUEENS PUBLIC LIBRARY (QPL) Number of Assets 5
Total Square Footage 361,000sf
Agency Planned Activities $2,908,000
State of Good Repair Need $5,345,000
Percentage 54%
2015-2018 "State of Good Repair" Needs Capital Reconciliation
4
DEPARTMENT OF EDUCATION (DOE)
Number of Assets 1,199
Total Square Footage 124,968,000sf
Linear Footage of Piers/Bulkheads 2,700ft
Agency Planned Activities $1,484,689,000
State of Good Repair Need $1,484,689,000
Percentage 100%
* The proposed SCA/DOE Five Year Capital Plan (Fiscal Years 2015 - 2019) identifies rehabilitation work at the facility component level for all five years of their Five Year Plan. The reconciliation percentage (%) above represents the work defined for FY2015 – 2019. In addition to reconciling line-item state of good repair needs, selected SCA capital programmatic elements address AIMS state of good repair needs in general and are included in the overall reconciliation. These programs include: boiler conversion, climate control, auditorium upgrade, gymnasium upgrade, cafeteria/multipurpose room upgrade, room conversions, accessibility, school improvement and restructuring, science lab upgrades, library upgrades, code compliance, administrative support, and emergency stabilization projects.
CITY UNIVERSITY OF NEW YORK (CUNY)
Number of Assets 84
Total Square Footage 5,974,000sf
Linear Footage of Piers/Bulkheads 4,600ft
Agency Planned Activities $28,401,000
State of Good Repair Need $85,480,000
Percentage 33%
NEW YORK POLICE DEPARTMENT (NYPD)
Number of Assets 154
Total Square Footage 5,185,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 5,000ft
Agency Planned Activities $25,647,000
State of Good Repair Need $62,067,000
Percentage 41%
NEW YORK FIRE DEPARTMENT (FDNY)
Number of Assets 36
Total Square Footage 724,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 1,400ft
Agency Planned Activities $848,000
State of Good Repair Need $15,866,000
Percentage 5%
5
ADMINISTRATION FOR CHILDREN’S SERVICES (ACS)
Number of Assets 9
Total Square Footage 251,000sf
Agency Planned Activities $320,000
State of Good Repair Need $1,281,000
Percentage 25%
DEPARTMENT OF HOMELESS SERVICES (DHS)
Number of Assets 55
Total Square Footage 4,239,000sf
Agency Planned Activities $7,372,000
State of Good Repair Need $54,789,000
Percentage 13%
DEPARTMENT OF CORRECTION (DOC)
Number of Assets 47
Total Square Footage 5,187,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 21,300ft
Agency Planned Activities $43,737,000
State of Good Repair Need $295,930,000
Percentage 15%
Rikers Island Utilities
Agency Planned Activities $1,400,000
State of Good Repair Need $5,200,000
Percentage 27%
HUMAN RESOURCES ADMINISTRATION (HRA)
Number of Assets 16
Total Square Footage 787,000sf
Agency Planned Activities $1,463,000
State of Good Repair Need $13,296,000
Percentage 11%
DEPARTMENT FOR THE AGING (DFTA)
Number of Assets 13
Total Square Footage 209,000sf
Agency Planned Activities $0
State of Good Repair Need $1,492,000
Percentage 0%
6
DEPARTMENT OF CULTURAL AFFAIRS (DCA)
Number of Assets 289
Total Square Footage 11,180,000sf
Agency Planned Activities $25,693,000
State of Good Repair Need $88,874,000
Percentage 29%
DIVISION OF YOUTH & FAMILY JUSTICE (DYFJ)
Number of Assets 4
Total Square Footage 233,000sf
Agency Planned Activities $188,000
State of Good Repair Need $816,000
Percentage 23%
TAXI & LIMOUSINE COMMISSION (TLC)
Number of Assets 1
Total Square Footage 54,000sf
Agency Planned Activities $1,413,000
State of Good Repair Need $1,413,000
Percentage 100%
DEPARTMENT OF SMALL BUSINESS SERVICES (DSBS)
Number of Assets 250
Total Square Footage 12,328,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 161,900ft
Agency Planned Activities $12,184,000
State of Good Repair Need $196,614,000
Percentage 6%
* Most DSBS buildings are leased facilities and tenants could be responsible for capital improvement.
DEPARTMENT OF HEALTH & MENTAL HYGIENE (DOHMH)
Number of Assets 32
Total Square Footage 1,669,000sf
Agency Planned Activities $12,273,000
State of Good Repair Need $18,800,000
Percentage 65%
7
HEALTH & HOSPITALS CORPORATION (HHC)
Number of Assets 103
Total Square Footage 17,873,000sf
Agency Planned Activities $99,265,000
State of Good Repair Need $281,195,000
Percentage 35%
DEPARTMENT OF SANITATION (DSNY)
Number of Assets 94
Total Square Footage 4,754,000sf
Linear Footage of Piers/Bulkheads 36,100ft
Agency Planned Activities $19,737,000
State of Good Repair Need $118,060,000
Percentage 17%
DEPARTMENT OF TRANSPORTATION (DOT)
Bridge & Tunnels
Number of Assets 125
Total Deck Area 6,146,000sf
Agency Planned Activities $514,797,000
State of Good Repair Need $514,797,000
Percentage 100%
Streets & Highways
Miles 6,500
Agency Planned Activities $1,288,907,000
State of Good Repair Need $2,184,920,000
Percentage 59%
Street Lighting & Traffic Signal Systems
Agency Planned Activities $32,195,000
State of Good Repair Need $43,445,000
Percentage 74%
* The agency planned total represents estimates based on average cost per lane mile for reconstruction and resurfacing projects.
8
DEPARTMENT OF TRANSPORTATION (DOT) --- Continued
Facilities, Piers, Bulkheads & Marinas/Docks
Number of Assets 101
Total Square Footage 2,968,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 24,600ft
Agency Planned Activities $31,249,000
State of Good Repair Need $44,998,000
Percentage 69%
Ferries
Number of Assets 8
Agency Planned Activities $30,600,000
State of Good Repair Need $30,600,000
Percentage 100%
DEPARTMENT OF PARKS & RECREATION (DPR)
Number of Assets 1,258
Total Square Footage 10,605,000sf
Linear Footage of Piers, Bulkheads & Marinas/Docks 249,500ft
Agency Planned Activities $76,646,000
State of Good Repair Need $488,108,000
Percentage 16%
DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES (DCAS)
Number of Assets 65
Total Square Footage 14,606,000sf
Linear Footage of Piers/Bulkheads 8,300ft
Agency Planned Activities $42,720,000
State of Good Repair Need $143,876,000
Percentage 30%
FY
2015
-201
8 City
wide
"Sta
te o
f Goo
d Re
pair"
Nee
ds C
apita
l Rec
oncil
iatio
n Su
mm
ary (
Base
d on
FY
2014
Exe
cutiv
e Sum
mar
y)
# o
fTo
tal S
quar
e Li
near
"Sta
te o
f Ag
ency
Rec
oncil
iatio
nAg
ency
Asse
tsFo
otag
eFo
otag
eGo
od R
epair
"re
cent
ly pe
rform
ed &
%Bu
ildin
gsPi
ers,
Bulkh
eads
Need
spl
anne
d (F
Y 20
15 -
2018
) &
Marin
as/D
ocks
activ
ities
New
Yor
k Pub
lic L
ibra
ry (N
YPL)
16
1,481
,000
12,72
8,000
90
5,000
7% B
rook
lyn P
ublic
Lib
rary
(BPL
)7
517,0
00
7,299
,000
1,952
,000
27
% Q
ueen
s Pub
lic L
ibra
r y (Q
PL)
5
36
1,000
5,3
45,00
0
2,9
08,00
0
54%
1 D
epar
tmen
t of E
duca
tion
(DOE
)1,1
99
12
4,968
,000
2,7
00
1,4
84,68
9,000
1,484
,689,0
00
10
0% C
it y U
nive
rsity
of N
ew Y
ork (
CUNY
)84
5,9
74,00
0
4,6
00
85
,480,0
00
28,40
1,000
33
% P
olice
De p
artm
ent (
NYPD
)15
4
5,185
,000
5,000
62,06
7,000
25
,647,0
00
41%
Fire
De p
artm
ent (
FDNY
)36
72
4,000
1,4
00
15
,866,0
00
848,0
00
5%
Adm
in. f
or C
hild
ren's
Ser
vices
(ACS
)9
251,0
00
1,281
,000
320,0
00
25
% D
e par
tmen
t of H
omele
ss S
ervic
es (D
HS)
55
4,239
,000
54,78
9,000
7,3
72,00
0
13%
De p
artm
ent o
f Cor
rect
ion
(DOC
)47
5,1
87,00
0
21
,300
30
1,130
,000
45
,137,0
00
15%
Hum
an R
esou
rces
Adm
inist
ratio
n (H
RA)
16
787,0
00
13,29
6,000
1,4
63,00
0
11%
De p
artm
ent f
or th
e Agi
ng (D
FTA)
13
209,0
00
1,492
,000
0
0% D
e par
tmen
t of C
ultu
ral A
ffairs
(DCA
)28
9
11,18
0,000
88,87
4,000
25
,693,0
00
29%
Divi
sion
of Y
outh
& F
amil y
Just
ice (D
YFJ)
4
23
3,000
81
6,000
18
8,000
23%
Tax
i & L
imou
sine C
omm
issio
n (T
LC)
1
54
,000
1,4
13,00
0
1,4
13,00
0
100%
De p
t. of
Sm
all B
usin
ess S
ervic
es (D
SBS)
250
12
,328,0
00
16
1,900
19
6,614
,000
12
,184,0
00
6% D
e pt.
of H
ealth
& M
enta
l Hyg
iene (
DOHM
H)32
1,6
69,00
0
18
,800,0
00
12,27
3,000
65
% H
ealth
and
Hos p
itals
Corp
orat
ion
(HHC
)10
3
17,87
3,000
281,1
95,00
0
99,26
5,000
35
% D
e par
tmen
t of S
anita
tion
(DSN
Y)94
4,7
54,00
0
36
,100
11
8,060
,000
19
,737,0
00
17%
De p
artm
ent o
f Tra
nspo
rtatio
n (D
OT)
B
ridge
s & T
unne
ls12
5
6,146
,000
(dec
k are
a)51
4,797
,000
51
4,797
,000
100%
2
Stre
ets &
Hig
hway
s (6,5
00 m
iles)
2,184
,920,0
00
1,2
88,90
7,000
59%
S
treet
Li g
htin
g &
Traf
fic S
igna
l Sys
tem
s43
,445,0
00
32,19
5,000
74
%
Fac
ilities
, Pier
s, Bu
lkhea
ds &
Mar
inas
/Doc
ks10
1
2,968
,000
24,60
0
44,99
8,000
31
,249,0
00
69%
F
errie
s8
30,60
0,000
30
,600,0
00
100%
De p
t. of
Par
ks an
d Re
crea
tion
(DPR
)1,2
58
10
,605,0
00
24
9,500
48
8,108
,000
76
,646,0
00
16%
Dep
t. of
City
wide
Adm
in. S
ervic
es (D
CAS)
65
14,60
6,000
8,300
143,8
76,00
0
42,72
0,000
30
%3
TOTA
L3,9
71
23
2,299
,000
51
5,400
$ 6
,201,9
80,00
0$ 3
,787,5
09,00
061
%
1. D
OE's
facil
ity sp
ecific
stat
e of
goo
d re
pair
proje
cts w
ill co
ntinu
e to
be
ident
ified
in th
e 5-
year
Plan
bas
ed o
n an
nuall
y res
urve
yed
cond
itions
.2.
DOT
plan
ned
tota
l rep
rese
nts e
stim
ates
bas
ed o
n av
era g
e co
st pe
r lan
e m
ile fo
r rec
onstr
uctio
n an
d re
surfa
cing
proje
cts.
3. A
ctivit
ies re
com
men
ded
by th
e su
rvey
but
not
plan
ned
due
to a
sset
repla
cem
ent/a
band
onm
ent t
otal
$31.
64 m
illion
, whic
h eq
uals
appr
oxim
ately
0.51
% o
f the
tota
l rec
omm
ende
d.
9
This page left intentionally blank.
11
In addition to capital reconciliation agencies also participate in Citywide response to major
maintenance activities in the expense budget. Unlike repair needs which are readily identifiable
during surveys, maintenance activities can only be an estimated projection influenced by the
components’ current condition, standard lives, and scheduling of corrective work. In general, the
recommended amount represents a basic minimum to maintain the assets in a “State of Good
Repair” and assumes that the Capital work identified is carried out forthwith.
The methodology for major maintenance is documented in the Executive Summary. In
general, major maintenance is defined as those activities that should be performed at intervals of
at least one year or greater to maintain the useful life and integrity of the component (i.e.
repointing of brick in buildings). The majority of expense projects are periodic inspections and
minor repairs that are done in-house or subcontracted out. Major maintenance activities for
bridges, such as cleaning and debris removal, are exceptions which include large-scale
identifiable items that should not only occur regularly, but would also have a direct impact on the
structural integrity of the bridge over time.
As maintenance information may not be available or documented, agencies have been asked
to report on broad categories (%) closest to their experience.
NEW YORK PUBLIC LIBRARY (NYPL)
Recommended Maintenance Need $1,968,000
Percentage Reported 10%
BROOKLYN PUBLIC LIBRARY (BPL)
Recommended Maintenance Need $1,053,000
Percentage Reported 100%
QUEENS PUBLIC LIBRARY (QPL)
Recommended Maintenance Need $501,000
Percentage Reported 100%
2015 Maintenance Needs Expense Reconciliation
12
DEPARTMENT OF EDUCATION (DOE)
Recommended Maintenance Need $138,538,000
Percentage Reported 59% * DOE will spend approximately $20.02 million on preventive maintenance
through service contracts, facility management contracts, custodial operations and $61.13 million on minor repairs and comprehensive surveys.
CITY UNIVERSITY OF NEW YORK (CUNY)
Recommended Maintenance Need $10,723,000
Percentage Reported 23%
NEW YORK POLICE DEPARTMENT (NYPD)
Recommended Maintenance Need $12,395,000
Percentage Reported 80%
NEW YORK FIRE DEPARTMENT (FDNY)
Recommended Maintenance Need $2,941,000
Percentage Reported 47%
ADMINISTRATION FOR CHILDREN’S SERVICES (ACS)
Recommended Maintenance Need $673,000
Percentage Reported 81%
DEPARTMENT OF HOMELESS SERVICES (DHS)
Recommended Maintenance Need $4,989,000
Percentage Reported 100%
DEPARTMENT OF CORRECTION (DOC)
Facilities, Piers & Bulkheads
Recommended Maintenance Need $3,771,000
Percentage Reported 100%
Rikers Island Utilities
Recommended Maintenance Need $1,750,000
Percentage Reported 100%
13
HUMAN RESOURCES ADMINISTRATION (HRA)
Recommended Maintenance Need $1,947,000
Percentage Reported 2%
DEPARTMENT FOR THE AGING (DFTA)
Recommended Maintenance Need $661,000
Percentage Reported 0%
DEPARTMENT OF CULTURAL AFFAIRS (DCA)
Recommended Maintenance Need $16,028,000
Percentage Reported 0%* DCA’s maintenance items are usually undertaken by individual cultural
institutions. No City funds are spent on major maintenance.
DIVISION OF YOUTH & FAMILY JUSTICE (DYFJ)
Recommended Maintenance Need $358,000
Percentage Reported 100%
TAXI & LIMOUSINE COMMISSION (TLC)
Recommended Maintenance Need $73,000
Percentage Reported 100%
DEPARTMENT OF SMALL BUSINESS SERVICES (DSBS)
Recommended Maintenance Need $9,998,000
Percentage Reported 100%* DSBS assets are currently maintained by EDC. Maintenance activities can
be paid for through revenues gained from rental stream or through rent concessions given to tenants.
DEPARTMENT OF HEALTH & MENTAL HYGIENE (DOHMH)
Recommended Maintenance Need $3,628,000
Percentage Reported 95%
HEALTH & HOSPITALS CORPORATION (HHC)
Recommended Maintenance Need $17,310,000
Percentage Reported 88%
14
DEPARTMENT OF SANITATION (DSNY)
Recommended Maintenance Need $7,178,000
Percentage Reported 10% * DSNY maintenance work is mostly in response to safety concerns.
DEPARTMENT OF TRANSPORTATION (DOT)
Bridges & Tunnels
Recommended Maintenance Need $27,402,000
Percentage Reported 78% * The reconciliation above does not reflect flag repairs on bridges included
in the inventory.
Street Lighting & Traffic Signal Systems
Recommended Maintenance Need $57,269,000
Percentage Reported 100%
Facilities, Piers, Bulkheads & Marinas/Docks
Recommended Maintenance Need $3,690,000
Percentage Reported 30%
Ferries
Recommended Maintenance Need $5,365,000
Percentage Reported 100%
DEPARTMENT OF PARKS & RECREATION (DPR)
Recommended Maintenance Need $31,325,000
Percentage Reported 12%
DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES (DCAS)
Recommended Maintenance Need $16,570,000
Percentage Reported 83%
FY 20
15 C
itywi
de M
ainte
nanc
e Nee
ds E
xpen
se R
econ
ciliat
ion
Sum
mar
y (Ba
sed
on F
Y 20
14 E
xecu
tive S
umm
ary)
F
ACIL
ITIE
S RE
CONC
ILIA
TION
OTHE
R SY
STEM
S RE
CONC
ILIA
TION
Arch
.Ar
ch.
Elev
ator
s/Mi
sc.
Marin
as/
Spec
ialAg
ency
Agen
cyEx
terio
rIn
terio
rEl
ectri
cal
Mech
anica
lEs
calat
ors
Build
ings
Pier
sBu
lkhea
ds D
ocks
Brid
ges
Ferri
esSy
stem
sFu
nded
% N
ew Y
ork P
ublic
Lib
rary
(NYP
L)39
2,000
80
7,000
14
2,000
43
2,000
19
6,000
19
7,000
10
% B
rook
lyn P
ublic
Lib
rary
(BPL
)38
3,000
32
7,000
73
,000
20
0,000
69
,000
1,0
53,00
0
10
0% Q
ueen
s Pub
lic L
ibra
ry (Q
PL)
132,0
00
147,0
00
32,00
0
154,0
00
36,00
0
501,0
00
100%
Dep
artm
ent o
f Edu
catio
n (D
OE)
25,12
4,000
48
,568,0
00
17,12
1,000
42
,840,0
00
4,881
,000
4,000
81
,154,0
00
59
% C
ity U
nive
rsity
of N
ew Y
ork (
CUNY
)2,7
79,00
0
3,4
38,00
0
1,0
44,00
0
2,8
03,00
0
56
8,000
45
,000
47
,000
2,4
66,00
0
23
% P
olice
Dep
artm
ent (
NYPD
)3,6
24,00
0
4,6
18,00
0
1,3
12,00
0
2,2
08,00
0
32
6,000
17
2,000
40,00
0
94,00
0
9,916
,000
80%
Fire
Dep
artm
ent (
FDNY
)45
6,000
70
1,000
17
1,000
17
7,000
16
,000
25
,000
35
,000
50
,000
1,3
10,00
0
1,3
84,00
0
47
% A
dmin
. for
Chi
ldre
n's S
ervic
es (A
CS)
206,0
00
290,0
00
23,00
0
105,0
00
49,00
0
546,0
00
81%
Dep
artm
ent o
f Hom
eless
Ser
vices
(DHS
)1,1
75,00
0
1,5
73,00
0
49
5,000
1,3
94,00
0
35
3,000
4,9
89,00
0
10
0% D
epar
tmen
t of C
orre
ctio
n (D
OC)
438,0
00
826,0
00
768,0
00
1,013
,000
494,0
00
115,0
00
79
,000
37
,000
1,7
50,00
0
5,5
21,00
0
10
0% H
uman
Res
ourc
es A
dmin
istra
tion
(HRA
)75
2,000
73
1,000
99
,000
32
4,000
41
,000
41
,000
2% D
epar
tmen
t For
The
Agi
ng (D
FTA)
97,00
0
297,0
00
94,00
0
112,0
00
42,00
0
19,00
0
0
0%
Dep
artm
ent o
f Cul
tura
l Affa
irs (D
CA)
4,088
,000
4,760
,000
1,700
,000
3,841
,000
1,093
,000
546,0
00
0
0% D
ivisio
n of
You
th &
Fam
ily Ju
stice
(DYF
J)15
2,000
86
,000
25
,000
79
,000
16
,000
35
8,000
10
0%Ta
xi &
Lim
ousin
e Com
miss
ion
(TLC
)41
,000
3,0
00
4,0
00
25
,000
73
,000
100%
Dep
t. of
Sm
all B
usin
ess S
ervic
es (D
SBS)
1,566
,000
1,577
,000
871,0
00
1,323
,000
405,0
00
16,00
0
1,035
,000
3,0
89,00
0
117,0
00
9,9
98,00
0
10
0% D
ept.
of H
ealth
& M
enta
l Hyg
iene (
DOHM
H)96
1,000
1,0
26,00
0
56
8,000
64
6,000
41
2,000
15
,000
3,4
47,00
0
95
% H
ealth
and
Hosp
itals
Corp
orat
ion
(HHC
)2,2
43,00
0
3,4
83,00
0
2,9
55,00
0
5,2
73,00
0
3,3
14,00
0
42
,000
15
,170,0
00
88
% D
epar
tmen
t of S
anita
tion
(DSN
Y)1,5
08,00
0
2,0
39,00
0
62
2,000
1,5
75,00
0
11
8,000
49
,000
96
2,000
304,0
00
71
8,000
10
% D
epar
tmen
t of T
rans
porta
tion
(DOT
)75
5,000
58
6,000
24
4,000
44
9,000
15
0,000
20
4,000
809,0
00
38
5,000
190,0
00
27
,402,0
00
5,365
,000
57,26
9,000
85
,057,0
00
91
% D
ept.
of P
arks
and
Recr
eatio
n (D
PR)
5,486
,000
5,044
,000
1,574
,000
1,981
,000
222,0
00
2,076
,000
89
6,000
2,321
,000
84
4,000
4,085
,000
6,795
,000
3,848
,000
12%
Dep
t. of
City
wide
Adm
in. S
ervic
es (D
CAS)
1,273
,000
3,849
,000
1,716
,000
4,444
,000
5,104
,000
21,00
0
27,00
0
136,0
00
13
,689,0
00
83
%
City
wide
Rec
oncil
iatio
n To
tal
240,1
26,00
0$
64%
City
wide
Nee
ds53
,631,0
00$
84,77
6,000
$ 31
,653,0
00$
71,39
8,000
$ 17
,905,0
00$
3,230
,000
$ 3,9
19,00
0$
6,415
,000
$ 1,2
82,00
0$
31,48
7,000
$ 5,3
65,00
0$
67
,124,0
00$
378,1
04,00
0$
NOTE
S:- D
OC w
ill ha
ve m
ajor R
ikers
Islan
d Ut
ility w
ork d
one u
sing
capi
tal f
unds
whe
re el
igib
le- D
CA's
main
tena
nce i
tem
s are
usu
ally u
nder
take
n by
indi
vidua
l cul
tura
l inst
itutio
ns. N
o Ci
ty fu
nds a
re sp
ent o
n m
ajor m
ainte
nanc
e.- D
SBS
rece
ives s
ome m
ainte
nanc
e fun
ds in
the f
orm
of r
ent c
redi
ts fr
om th
e age
ncy's
tena
nts.
- DOT
's $2
7,402
,000 B
ridge
s rec
oncil
iatio
n is
78%
. Thi
s doe
s not
refle
ct fl
ag re
pairs
on
brid
ges i
nclu
ded
in th
e inv
ento
ry.
- DOT
's $5
7,269
,000 S
treet
Lig
htin
g &
Traf
fic S
igna
l Sys
tem
s rec
oncil
iatio
n is
100%
.- D
OT's
$5,36
5,000
Fer
ries r
econ
ciliat
ion
is 10
0%.
- DOC
Spe
cial S
yste
m is
Rike
rs Is
land
Utilit
ies an
d th
e rec
oncil
iatio
n is
100%
.
15
This page left intentionally blank.
“State of Good Repair” Activities Reconciliation
Appendices
This page left intentionally blank.
Appendix
FMS ID/ Budget Code
Agency Activity Year
NEW YORK PUBLIC LIBRARY
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
A
000NPL00037/27/2012Date of Last Survey:40 LINCOLN CENTER PLAZA
1926 - LIBRARY FOR THE PERFORMING ARTS - LINCOLN CENTER
LRCA11LPA2014Exterior WallsArchitecture Exterior 213,587
LRCA11LPA2014ParapetsArchitecture Exterior 117,980
LRCA11LPA2014FloorsArchitecture Interior 121,583
LRCA11LPA2014CeilingsArchitecture Interior 35,181
Total Planned activities for $488,331NPL0003 000
000NPL00057/30/2012Date of Last Survey:610 EAST 186TH ST.
4219 - BELMONT/ENRICO FERMI - BRANCH LIBRARY
LNCBELMLT2013RoofArchitecture Exterior 118,246
Total Planned activities for $118,246NPL0005 000
000NPL00107/15/2013Date of Last Survey:503 WEST 145TH ST.
4224 - HAMILTON GRANGE - BRANCH LIBRARY
LNCA13HAM2013Exterior WallsArchitecture Exterior 68,231
LNCA13HAM2013WindowsArchitecture Exterior 109,152
LNCA13HAM2013FloorsArchitecture Interior 73,264
Total Planned activities for $250,647NPL0010 000
000NPL0J017/8/2013Date of Last Survey:425 AVENUE OF THE AMERICAS
13343 - JEFFERSON MARKET - BRANCH LIBRARY
LNC3JMADA2014Interior WallsArchitecture Interior 48,174
Total Planned activities for $48,174NPL0J01 000
Total Planned Activities for : $905,398NEW YORK PUBLIC LIBRARY
Total Required for "State of Good Repair" for : NEW YORK PUBLIC LIBRARY $12,727,764
Page A - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
BROOKLYN PUBLIC LIBRARY
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
B
000BPL00037/8/2011Date of Last Survey:22 LINDEN BLVD.
4202 - FLATBUSH - BRANCH LIBRARY
LBCA07FBH2012ParapetsArchitecture Exterior 64,117
Total Planned activities for $64,117BPL0003 000
000BPL000610/11/2012Date of Last Survey:665 NEW LOTS AVE.
4203 - NEW LOTS - BRANCH LIBRARY
LBM13NLBR2016Exterior WallsArchitecture Exterior 200,271
LBM13NLBR2016WindowsArchitecture Exterior 351,781
LBM13NLBR2016ParapetsArchitecture Exterior 74,362
Total Planned activities for $626,414BPL0006 000
000BPL00077/1/2011Date of Last Survey:240 DIVISION AVE.
4201 - WILLIAMSBURGH - BRANCH LIBRARY
LBM08WBRF2012Exterior WallsArchitecture Exterior 1,261,866
Total Planned activities for $1,261,866BPL0007 000
Total Planned Activities for : $1,952,397BROOKLYN PUBLIC LIBRARY
Total Required for "State of Good Repair" for : BROOKLYN PUBLIC LIBRARY $7,299,226
Page B - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
QUEENS PUBLIC LIBRARY
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
C
000QPL00017/18/2012Date of Last Survey:89-11 MERRICK BOULEVARD
1867 - QUEENS CENTRAL LIBRARY -
LQD122-CL2012Exterior WallsArchitecture Exterior 413,622
LQD122-CL2012ParapetsArchitecture Exterior 37,455
LQD122-CL2012RoofArchitecture Exterior 201,590
LQD122-CL2012Interior WallsArchitecture Interior 36,143
LQD122-CL2013CeilingsArchitecture Interior 181,750
LQD122-CL2013WiringElectrical Under 600 Volts 30,748
LQD122-CL2014Interior LightingElectrical Lighting 237,092
LQD122-CL2014Exterior LightingElectrical Lighting 28,926
LQD122-CL2014Security SystemElectrical Alarm 102,484
LQD122-CL2014Fire/Smoke DetectionElectrical Alarm 409,278
LQD122-CL2014Terminal DevicesMechanical Heating 462,600
LQD122-CL2014Terminal DevicesMechanical Air Conditioning 431,614
LQD122-CL2014Heat RejectionMechanical Air Conditioning 291,685
Total Planned activities for $2,864,985QPL0001 000
000QPL00025/17/2010Date of Last Survey:41-17 MAIN STREET
4200 - FLUSHING - BRANCH LIBRARY
CAPITAL2013Interior LightingElectrical Lighting 42,917
Total Planned activities for $42,917QPL0002 000
Total Planned Activities for : $2,907,902QUEENS PUBLIC LIBRARY
Total Required for "State of Good Repair" for : QUEENS PUBLIC LIBRARY $5,344,918
Page C - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE00011/17/2013Date of Last Survey:8 HENRY STREET
456 - P. S. 1 - M -
A00309788/E23632013WiringElectrical Under 600 Volts 54,766
Total Planned activities for $54,766BOE0001 000
000BOE000312/8/2010Date of Last Survey:490 HUDSON STREET
458 - P. S. 3 - M -
A00296250/E23632013WindowsArchitecture Exterior 223,132
A00232778/E23632011FloorsArchitecture Interior 466,823
A00232785/E23632011Interior WallsArchitecture Interior 2,841,534
A00232785/E23632011CeilingsArchitecture Interior 1,803,704
ACESCA404/E23642015Interior LightingElectrical Lighting 75,627
ACESCA404/E23642015Exterior LightingElectrical Lighting 37,936
Total Planned activities for $5,448,756BOE0003 000
000BOE000512/21/2012Date of Last Survey:160 EAST 120 STREET
460 - P. S. 7 - M -
A00330850/E23632013Interior LightingElectrical Lighting 46,087
A00309572/E23632013DistributionMechanical Heating 58,233
Total Planned activities for $104,320BOE0005 000
000BOE00071/6/2012Date of Last Survey:2581 ADAM CLAYTON POWELL BLVD.
435 - I. S. 10 - M (TANDEM P.S.200-M) -
A00352828/E23642015Interior LightingElectrical Lighting 194,012
A00338187/E23642015DistributionMechanical Heating 112,666
A00338187/E23642015Terminal DevicesMechanical Heating 401,554
Total Planned activities for $708,232BOE0007 000
000BOE00091/4/2012Date of Last Survey:1573 MADISON AVENUE
437 - J. H. S. 13 - M -
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 146,250
A00317444/E23632014Interior LightingElectrical Lighting 1,192,538
Total Planned activities for $1,338,788BOE0009 000
000BOE001112/3/2012Date of Last Survey:328 WEST 48 STREET
439 - I. S. 17 - M -
PRIORCOMP/E23632012Exterior WallsArchitecture Exterior 36,140
Total Planned activities for $36,140BOE0011 000
000BOE00161/16/2013Date of Last Survey:475 WEST 155 STREET
442 - P. S. 28 - M -
A00296529/E23632013Exterior WallsArchitecture Exterior 424,496
A00296527/E23632013RoofArchitecture Exterior 291,297
Total Planned activities for $715,793BOE0016 000
Page D - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE001711/23/2011Date of Last Survey:144-176 EAST 128 STREET
2708 - P. S. 30 - M -
A00351784/E23642015Interior LightingElectrical Lighting 800,669
A00351784/E23642015Exterior LightingElectrical Lighting 47,319
Total Planned activities for $847,988BOE0017 000
000BOE001812/10/2012Date of Last Survey:281 9TH AVENUE
1688 - P. S. 33 - M -
A00296565/E23632014Interior LightingElectrical Lighting 56,061
Total Planned activities for $56,061BOE0018 000
000BOE002010/26/2012Date of Last Survey:123 MORNINGSIDE DRIVE
1661 - P. S. 36 - M -
A00233149/E23632014Exterior WallsArchitecture Exterior 42,208
A00233148/E23632014ParapetsArchitecture Exterior 46,693
A00351785/E23642015Interior LightingElectrical Lighting 38,496
Total Planned activities for $127,397BOE0020 000
000BOE00215/2/2013Date of Last Survey:319 EAST 19 STREET
1662 - P. S. 40 - M -
A00276008/E23632012Exterior WallsArchitecture Exterior 386,659
A00276006/E23632012ParapetsArchitecture Exterior 50,778
A00289086/ED0012012FloorsArchitecture Interior 233,866
A00351789/E23642015Interior LightingElectrical Lighting 51,334
Total Planned activities for $722,637BOE0021 000
000BOE002212/9/2010Date of Last Survey:116 WEST 11 STREET
692 - P. S. 41 - M -
A00296641/E23632013WiringElectrical Under 600 Volts 126,636
Total Planned activities for $126,636BOE0022 000
000BOE002412/7/2010Date of Last Survey:509 WEST 129 STREET
1664 - J. H. S. 43 - M -
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 132,857
Total Planned activities for $132,857BOE0024 000
000BOE002511/15/2012Date of Last Survey:100 WEST 77 STREET
1665 - I. S. 44 - M -
A00296689/E23642015Fire/Smoke DetectionElectrical Alarm 455,988
Total Planned activities for $455,988BOE0025 000
000BOE002612/16/2010Date of Last Survey:2351 1ST AVENUE
1666 - J. H. S. 45 - M -
A00233270/E23632011RoofArchitecture Exterior 89,671
A00338532/E23642015Interior LightingElectrical Lighting 1,474,564
A00338532/E23642015Exterior LightingElectrical Lighting 60,888
Page D - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $1,625,123BOE0026 000
000BOE002812/4/2009Date of Last Survey:223 EAST 23 STREET
1669 - J. H. S. 47 - M (SCHL FOR DEAF) -
A00128694/E23622011Exterior WallsArchitecture Exterior 291,259
A00005999/E23622011WindowsArchitecture Exterior 862,420
A00128658/E23622011RoofArchitecture Exterior 207,328
A00338569/E23642015Interior LightingElectrical Lighting 505,227
A00338569/E23642015Exterior LightingElectrical Lighting 41,056
Total Planned activities for $1,907,290BOE0028 000
000BOE002911/28/2012Date of Last Survey:433 EAST 100 STREET
1670 - P. S. 50 - M (UDC & ECF) -
A00183081/E23632013RoofArchitecture Exterior 86,664
A00338610/E23642015Interior LightingElectrical Lighting 71,291
A00182633/E23632013DistributionMechanical Heating 80,841
Total Planned activities for $238,796BOE0029 000
000BOE003111/13/2012Date of Last Survey:650 ACADEMY STREET
1672 - I. S. 52 - M -
A00338635/E23642016Interior LightingElectrical Lighting 68,642
BOIL_6TO4/E23632012DistributionMechanical Heating 101,187
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 43,398
Total Planned activities for $213,227BOE0031 000
000BOE003311/29/2010Date of Last Survey:220 HENRY STREET
1674 - J. H. S. 56 - M -
A00338676/E23642015Interior LightingElectrical Lighting 61,037
A00338676/E23642015Exterior LightingElectrical Lighting 53,234
Total Planned activities for $114,271BOE0033 000
000BOE003412/14/2009Date of Last Survey:176 EAST 115 STREET
2770 - P. S. 57 - M -
M057BP10B/EM0012011WiringElectrical Under 600 Volts 93,313
A00317932/E23632014Interior LightingElectrical Lighting 35,297
Total Planned activities for $128,610BOE0034 000
000BOE00351/27/2010Date of Last Survey:317 WEST 52 STREET
1698 - P. S. 35 - M - P35M/ MANHATTAN H.S.
A00296903/E23632014WindowsArchitecture Exterior 87,469
A00317947/E23632014RoofArchitecture Exterior 47,319
ACESCA404/E23642015Interior LightingElectrical Lighting 40,774
Total Planned activities for $175,562BOE0035 000
000BOE003710/12/2010Date of Last Survey:420 EAST 12 STREET
1700 - EAST SIDE COMMUNITY SCHOOL - M -
Page D - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00338733/E23642015ParapetsArchitecture Exterior 38,147
A00255963/E23632011FloorsArchitecture Interior 49,051
A00331103/E23632014Exterior LightingElectrical Lighting 41,752
Total Planned activities for $128,950BOE0037 000
000BOE003811/3/2008Date of Last Survey:610 EAST 12 STREET
1701 - P. S. 61 - M -
A00309758/E23632013Exterior WallsArchitecture Exterior 361,382
A00276322/E23632013WindowsArchitecture Exterior 165,690
A00276321/E23632013ParapetsArchitecture Exterior 43,788
A00167821/E23632010FloorsArchitecture Interior 175,741
A00289090/E23632012WiringElectrical Under 600 Volts 63,894
Total Planned activities for $810,495BOE0038 000
000BOE003912/3/2010Date of Last Survey:121 EAST 3 STREET
1675 - P. S. 63 - M -
A00318014/E23632014Exterior WallsArchitecture Exterior 262,262
A00296959/E23632014ParapetsArchitecture Exterior 117,008
Total Planned activities for $379,270BOE0039 000
000BOE004012/3/2010Date of Last Survey:600 EAST 6 STREET
2771 - P. S. 64 - M (OL 71) -
A00318026/E23632014Interior LightingElectrical Lighting 965,890
A00318026/E23632014Exterior LightingElectrical Lighting 46,623
Total Planned activities for $1,012,513BOE0040 000
000BOE004211/30/2012Date of Last Survey:421 EAST 88 STREET
1676 - P. S. 66 - M LANG & HEAR IMPRV -
A00289096/ED0012012FloorsArchitecture Interior 78,046
Total Planned activities for $78,046BOE0042 000
000BOE00431/31/2012Date of Last Survey:333 WEST 17 STREET
1677 - J. H. S. 70 - M -
A00351783/E23642015Interior LightingElectrical Lighting 114,715
Total Planned activities for $114,715BOE0043 000
000BOE004410/10/2012Date of Last Survey:131 EAST 104 STREET
1678 - P. S. 72 - M -
A00318092/E23642016Exterior WallsArchitecture Exterior 288,482
A00318091/E23642016ParapetsArchitecture Exterior 81,207
A00338835/E23642016Interior LightingElectrical Lighting 44,556
Total Planned activities for $414,245BOE0044 000
000BOE00459/14/2010Date of Last Survey:735 WEST END AVENUE
1679 - P. S. 75 - M -
A00167945/E23632010FloorsArchitecture Interior 729,538
Page D - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00309734/E23632013WiringElectrical Under 600 Volts 126,639
Total Planned activities for $856,177BOE0045 000
000BOE004712/16/2010Date of Last Survey:55 EAST 120 STREET
1681 - P. S. 79 - M (MULT HANDICAP) -
A00276470/E23632013Exterior WallsArchitecture Exterior 210,743
A00297081/E23632013RoofArchitecture Exterior 66,064
A00338890/E23642015Interior LightingElectrical Lighting 645,030
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 420,341
BOIL_6TO4/E23632014DistributionMechanical Heating 60,288
Total Planned activities for $1,402,466BOE0047 000
000BOE004812/6/2010Date of Last Survey:212 W. 120TH ST
1682 - MID MANHT ADULT TRNG CTR - M -
A00233666/E23632010WiringElectrical Under 600 Volts 115,974
Total Planned activities for $115,974BOE0048 000
000BOE00499/12/2012Date of Last Survey:219 EAST 109 STREET
1683 - P. S. 83 - M -
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 42,834
Total Planned activities for $42,834BOE0049 000
000BOE00501/6/2010Date of Last Survey:32 WEST 92 STREET
1684 - P. S. 84 - M -
A00331055/E23632014RoofArchitecture Exterior 37,938
Total Planned activities for $37,938BOE0050 000
000BOE005110/20/2009Date of Last Survey:160 WEST 78 STREET
1685 - P. S. 87 - M -
BOIL_6TO4/E23632012DistributionMechanical Heating 65,420
Total Planned activities for $65,420BOE0051 000
000BOE005212/6/2010Date of Last Survey:215 WEST 114TH ST.
4146 - I. S. 88 - M/WADLEIGH H.S. -
A00352830/E23642015Interior LightingElectrical Lighting 145,525
A00352830/E23642015Exterior LightingElectrical Lighting 60,540
Total Planned activities for $206,065BOE0052 000
000BOE00535/7/2012Date of Last Survey:222 WEST 134 STREET
213 - P. S. 92 - M -
A00297193/E23632013ParapetsArchitecture Exterior 51,859
A00309700/E23632013Interior LightingElectrical Lighting 615,601
A00309700/E23632013Exterior LightingElectrical Lighting 38,620
A00288964/E23632013DistributionMechanical Heating 38,022
A00288964/E23632013Terminal DevicesMechanical Heating 41,149
Total Planned activities for $785,251BOE0053 000
Page D - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE005412/21/2012Date of Last Survey:216 EAST 120 STREET
1686 - P. S. 96 - M -
A00318292/E23632014Interior LightingElectrical Lighting 41,610
Total Planned activities for $41,610BOE0054 000
000BOE00559/24/2010Date of Last Survey:525 EAST HOUSTON STREET
1687 - P. S. 97 - M - (BARD H.S. EARLY COLLEGE)
A00351984/E23642015Exterior WallsArchitecture Exterior 38,012
Total Planned activities for $38,012BOE0055 000
000BOE005612/29/2009Date of Last Survey:512 WEST 212 STREET
1712 - P. S. 98 - M -
A00318333/E23632013Exterior WallsArchitecture Exterior 97,438
A00318331/E23632013RoofArchitecture Exterior 39,847
A00339074/E23642016Interior LightingElectrical Lighting 69,545
Total Planned activities for $206,830BOE0056 000
000BOE005711/28/2012Date of Last Survey:410 EAST 100 STREET
1713 - J. H. S. 99 - M -
A00309753/E23632013Exterior WallsArchitecture Exterior 422,703
A00309752/E23632013ParapetsArchitecture Exterior 70,066
A00297271/E23632013RoofArchitecture Exterior 57,249
Total Planned activities for $550,018BOE0057 000
000BOE005812/14/2009Date of Last Survey:141 EAST 111 STREET
1714 - P. S. 101 - M -
SIRA1M101/E23632011WiringElectrical Under 600 Volts 109,411
A00318368/E23632014Interior LightingElectrical Lighting 731,289
A00318368/E23632014Exterior LightingElectrical Lighting 41,404
A00309574/E23632014DistributionMechanical Heating 40,624
Total Planned activities for $922,728BOE0058 000
000BOE005912/4/2009Date of Last Survey:330 EAST 21 STREET
1715 - J. H. S. 104 - M -
A00339156/E23642015Interior LightingElectrical Lighting 936,503
A00339156/E23642015Exterior LightingElectrical Lighting 42,448
Total Planned activities for $978,951BOE0059 000
000BOE006012/14/2009Date of Last Survey:1615 MADISON AVENUE
1702 - P. S. 108 - M -
A00318423/E23632014Interior LightingElectrical Lighting 611,926
Total Planned activities for $611,926BOE0060 000
000BOE006210/26/2012Date of Last Survey:285 DELANCEY STREET
1690 - P. S. 110 - M -
A00352001/E23632014Exterior WallsArchitecture Exterior 128,564
Page D - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00297377/E23632013FloorsArchitecture Interior 733,497
Total Planned activities for $862,061BOE0062 000
000BOE00641/21/2011Date of Last Survey:535 EAST 119 STREET
1692 - P. S. 112 - M (TANDEM M206 04) -
A00268210/E23632011Exterior WallsArchitecture Exterior 161,867
A00268211/E23632011RoofArchitecture Exterior 768,747
SANDM112A/E23642015CeilingsArchitecture Interior 254,107
SANDM112C/E23642015WiringElectrical Under 600 Volts 109,411
UNAVAILABLE/E23632012Interior LightingElectrical Lighting 49,649
Total Planned activities for $1,343,781BOE0064 000
000BOE006512/19/2011Date of Last Survey:240 WEST 113 STREET
1693 - P. S. 113 - M -
A00297410/E23632013WiringElectrical Under 600 Volts 109,411
A00352831/E23642015Interior LightingElectrical Lighting 74,072
A00352831/E23642015Exterior LightingElectrical Lighting 36,533
A00288871/E23632014Conversion EquipmentMechanical Heating 485,943
A00297405/E23632014DistributionMechanical Heating 209,091
A00297405/E23632014Terminal DevicesMechanical Heating 224,192
Total Planned activities for $1,139,242BOE0065 000
000BOE006612/13/2010Date of Last Survey:586 WEST 177 STREET
1694 - P. S. 115 - M -
A00256448/E23632011Exterior WallsArchitecture Exterior 679,584
A00276822/E23632011ParapetsArchitecture Exterior 153,795
A00276821/E23632011RoofArchitecture Exterior 37,633
SIRA3M115/E23632014WiringElectrical Under 600 Volts 140,672
Total Planned activities for $1,011,684BOE0066 000
000BOE00673/26/2010Date of Last Survey:210 EAST 33 STREET
2634 - P. S. 116 - M -
A00182199/ED0012009Interior LightingElectrical Lighting 409,134
A00331085/E23632014Terminal DevicesMechanical Heating 220,933
Total Planned activities for $630,067BOE0067 000
000BOE00689/12/2012Date of Last Survey:240 EAST 109 STREET
2772 - J. H. S. 117 - M -
A00352757/E23642015Exterior WallsArchitecture Exterior 282,685
A00318528/E23642016RoofArchitecture Exterior 69,425
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 794,466
BOIL_6TO4/E23632014DistributionMechanical Heating 113,947
Total Planned activities for $1,260,523BOE0068 000
Page D - 7
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE00691/3/2011Date of Last Survey:154 WEST 93 STREET
1695 - I. S. 118 - M - (J. H. S. 118 - M)
A00352833/E23642015Interior LightingElectrical Lighting 113,401
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 97,916
Total Planned activities for $211,317BOE0069 000
000BOE007010/10/2012Date of Last Survey:232 EAST 103 STREET
1696 - P. S. 38 - M -
A00339317/E23642016Interior LightingElectrical Lighting 42,750
Total Planned activities for $42,750BOE0070 000
000BOE007112/30/2009Date of Last Survey:301 WEST 140 STREET
694 - P. S. 123 - M -
A00318594/E23632013Exterior WallsArchitecture Exterior 51,064
A00318593/E23632013ParapetsArchitecture Exterior 88,898
A00297523/E23632013RoofArchitecture Exterior 95,369
A00297526/E23632013WiringElectrical Under 600 Volts 140,672
A00297519/E23632013Interior LightingElectrical Lighting 849,359
A00309575/E23632013DistributionMechanical Heating 40,420
Total Planned activities for $1,265,782BOE0071 000
000BOE00729/22/2009Date of Last Survey:40 DIVISION STREET
164 - P. S. 124 - M (ECF) -
A00352068/E23632014FloorsArchitecture Interior 45,661
Total Planned activities for $45,661BOE0072 000
000BOE007312/7/2010Date of Last Survey:425 WEST 123 STREET
695 - P. S. 125 - M -
SIRA1M125/E23632011WiringElectrical Under 600 Volts 54,844
Total Planned activities for $54,844BOE0073 000
000BOE00749/23/2009Date of Last Survey:80 CATHERINE STREET
1697 - P. S. 126 - M -
A00318651/E23632013Interior LightingElectrical Lighting 54,614
Total Planned activities for $54,614BOE0074 000
000BOE00759/20/2010Date of Last Survey:560 WEST 169 STREET
1721 - P. S. 128 - M -
M128BP13A/E23632013WiringElectrical Under 600 Volts 78,151
A00318667/e23632013Interior LightingElectrical Lighting 41,440
A00318667/E23632013Exterior LightingElectrical Lighting 37,229
Total Planned activities for $156,820BOE0075 000
000BOE007612/7/2010Date of Last Survey:425 WEST 130 STREET
1722 - P. S. 129 - M -
A00318688/E23632014Interior LightingElectrical Lighting 626,444
Page D - 8
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $626,444BOE0076 000
000BOE007712/23/2011Date of Last Survey:143 BAXTER STREET
1723 - P. S. 130 - M -
A00268692/E23632011WindowsArchitecture Exterior 272,301
A00352834/E23642015Interior LightingElectrical Lighting 69,204
Total Planned activities for $341,505BOE0077 000
000BOE007811/15/2011Date of Last Survey:100 HESTER STREET
1724 - J. H. S. 131 - M -
A00297660/E23632013Exterior WallsArchitecture Exterior 211,392
A00318732/E23632013ParapetsArchitecture Exterior 41,231
A00318731/E23632013RoofArchitecture Exterior 558,627
Total Planned activities for $811,250BOE0078 000
000BOE00801/28/2011Date of Last Survey:2121 5TH AVENUE
1726 - P. S. 133 - M -
A00318774/E23642015Security SystemElectrical Alarm 58,678
A00318774/E23642015Fire/Smoke DetectionElectrical Alarm 200,860
Total Planned activities for $259,538BOE0080 000
000BOE008212/30/2009Date of Last Survey:6 EDGECOMBE AVENUE
1728 - I. S. 136 - M -
A00256741/E23632011RoofArchitecture Exterior 181,852
A00352835/E23642015Interior LightingElectrical Lighting 94,361
A00352835/E23642015Exterior LightingElectrical Lighting 39,316
Total Planned activities for $315,529BOE0082 000
000BOE00839/24/2009Date of Last Survey:327 CHERRY STREET
2854 - P. S. 137 - M -
A00234324/E23632010ParapetsArchitecture Exterior 62,529
A00318833/E23632014Interior LightingElectrical Lighting 666,337
Total Planned activities for $728,866BOE0083 000
000BOE00849/21/2009Date of Last Survey:123 RIDGE STREET
1703 - P. S. 140 - M -
ACESCA404/E23642015Interior LightingElectrical Lighting 58,386
Total Planned activities for $58,386BOE0084 000
000BOE00859/22/2009Date of Last Survey:100 ATTORNEY STREET
1704 - P. S. 142 - M -
A00352836/E23642015Interior LightingElectrical Lighting 71,671
Total Planned activities for $71,671BOE0085 000
000BOE008611/13/2012Date of Last Survey:511 WEST 182 STREET
2635 - I. S. 143 - M -
A00339637/E23642015Interior LightingElectrical Lighting 114,277
Page D - 9
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
BOIL_6TO4/E23632012DistributionMechanical Heating 53,198
Total Planned activities for $167,475BOE0086 000
000BOE008710/26/2012Date of Last Survey:134 WEST 122 STREET
2773 - P. S. 242 - M - (FORMER P. S. 144 - M)
A00234404/E23632012Exterior WallsArchitecture Exterior 88,891
A00277232/E23632012ParapetsArchitecture Exterior 49,332
Total Planned activities for $138,223BOE0087 000
000BOE008812/21/2009Date of Last Survey:150 WEST 105 STREET
1705 - P. S. 145 - M -
A00318924/E23632014Interior LightingElectrical Lighting 612,275
Total Planned activities for $612,275BOE0088 000
000BOE00891/5/2011Date of Last Survey:421 EAST 106 STREET
1706 - P. S. 146 - M -
A00309578/E23632013DistributionMechanical Heating 124,686
Total Planned activities for $124,686BOE0089 000
000BOE009012/19/2011Date of Last Survey:34 WEST 118 STREET
1707 - P. S. 149 - M (TANDEM M207 03) -
A00339709/E23642015Interior LightingElectrical Lighting 1,016,433
A00339709/E23642015Exterior LightingElectrical Lighting 43,839
A00288967/E23632012Conversion EquipmentMechanical Heating 601,852
A00288967/E23632012DistributionMechanical Heating 86,321
A00288967/E23632012Terminal DevicesMechanical Heating 81,742
Total Planned activities for $1,830,187BOE0090 000
000BOE009210/14/2009Date of Last Survey:93 NAGLE AVE.
1709 - P. S. 152 - M -
A00352837/E23642015Interior LightingElectrical Lighting 98,370
Total Planned activities for $98,370BOE0092 000
000BOE009311/27/2012Date of Last Survey:1750 AMSTERDAM AVENUE
1711 - P. S. 153 - M -
A00331131/E23632014Exterior WallsArchitecture Exterior 84,976
A00319008/E23632014ParapetsArchitecture Exterior 72,187
Total Planned activities for $157,163BOE0093 000
000BOE009411/28/2012Date of Last Survey:250 WEST 127 STREET
1646 - P. S. 154 - M -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 429,893
BOIL_6TO4/E23632014DistributionMechanical Heating 61,658
Total Planned activities for $491,551BOE0094 000
000BOE00951/5/2012Date of Last Survey:319 EAST 117 STREET
1647 - P. S. 155 - M -
Page D - 10
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 41,556
Total Planned activities for $41,556BOE0095 000
000BOE009611/22/2011Date of Last Survey:1458 YORK AVENUE
1648 - P. S. 158 - M -
A00331141/E23642015WindowsArchitecture Exterior 459,740
A00310019/E23632013Interior LightingElectrical Lighting 81,826
Total Planned activities for $541,566BOE0096 000
000BOE009712/7/2010Date of Last Survey:499 WEST 133 STREET
1649 - P. S. 161 - M -
A00298015/E23632013WiringElectrical Under 600 Volts 99,978
A00319078/E23632014Interior LightingElectrical Lighting 537,147
A00339820/E23642016Fire/Smoke DetectionElectrical Alarm 935,379
Total Planned activities for $1,572,504BOE0097 000
000BOE009812/21/2009Date of Last Survey:163 WEST 97 STREET
1650 - P. S. 163 - M -
EMERG2012/E23632012Interior LightingElectrical Lighting 538,319
Total Planned activities for $538,319BOE0098 000
000BOE00999/20/2010Date of Last Survey:401 WEST 164 STREET
1651 - I. S. 164 - M -
A00277451/E23632012PanelboardsElectrical Under 600 Volts 110,453
A00277451/E23632012WiringElectrical Under 600 Volts 119,974
A00352838/E23642015Interior LightingElectrical Lighting 68,444
Total Planned activities for $298,871BOE0099 000
000BOE01001/14/2011Date of Last Survey:234 WEST 109 STREET
696 - P. S. 165 - M -
A00277468/E23632012Exterior WallsArchitecture Exterior 256,980
A00257040/E23632012RoofArchitecture Exterior 142,909
Total Planned activities for $399,889BOE0100 000
000BOE01011/6/2010Date of Last Survey:132 WEST 89 STREET
1652 - P. S. 166 - M -
A00352839/E23642015Interior LightingElectrical Lighting 53,534
Total Planned activities for $53,534BOE0101 000
000BOE01024/1/2010Date of Last Survey:220 EAST 76 STREET
1653 - J. H. S. 167 - M -
A00331104/E23632014Interior LightingElectrical Lighting 1,038,065
A00331104/E23632014Exterior LightingElectrical Lighting 54,625
Total Planned activities for $1,092,690BOE0102 000
000BOE010311/30/2012Date of Last Survey:110 EAST 88 STREET
1654 - P. S. 169 - M (ECF) (SIE VII) -
Page D - 11
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00339924/E23642015Interior LightingElectrical Lighting 44,661
Total Planned activities for $44,661BOE0103 000
000BOE010711/29/2012Date of Last Survey:370 WEST 120 STREET
1658 - P. S. 180 - M -
A00319270/E23632014Exterior WallsArchitecture Exterior 134,352
Total Planned activities for $134,352BOE0107 000
000BOE01084/1/2010Date of Last Survey:419 EAST 66 STREET
1659 - P. S. 183 - M -
A00352841/E23642015Interior LightingElectrical Lighting 39,862
A00351693/E23642015Conversion EquipmentMechanical Heating 51,752
A00351693/E23642015DistributionMechanical Heating 74,225
Total Planned activities for $165,839BOE0108 000
000BOE010912/19/2011Date of Last Survey:20 WEST 112 STREET
1660 - P. S. 185 - M TANDEM M208 03 -
A00331106/E23632014Interior LightingElectrical Lighting 1,074,364
A00331106/E23632014Exterior LightingElectrical Lighting 46,971
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 644,842
BOIL_6TO4/E23632014DistributionMechanical Heating 46,244
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 214,262
Total Planned activities for $2,026,683BOE0109 000
000BOE01101/27/2010Date of Last Survey:349 CABRINI BOULEVARD
1634 - P. S./I.S. 187 - M -
A00310083/ED0012013WiringElectrical Under 600 Volts 73,022
A00340047/E23642015Interior LightingElectrical Lighting 488,630
Total Planned activities for $561,652BOE0110 000
000BOE011111/30/2010Date of Last Survey:442 EAST HOUSTON STREET
2632 - P. S. 196 - M - FORMER (P. S. 188 - M)
A00268199/E23632011Exterior WallsArchitecture Exterior 1,116,686
A00257211/E23632011WindowsArchitecture Exterior 1,665,148
A00257210/E23632011ParapetsArchitecture Exterior 99,832
A00268200/E23632011RoofArchitecture Exterior 45,593
A00352842/E23642015Interior LightingElectrical Lighting 104,212
Total Planned activities for $3,031,471BOE0111 000
000BOE01141/14/2011Date of Last Survey:210 WEST 61 STREET
1636 - P. S. 191 - M -
A00277707/E23632013ParapetsArchitecture Exterior 65,840
Total Planned activities for $65,840BOE0114 000
000BOE011511/30/2009Date of Last Survey:500 WEST 138 STREET
1637 - P. S. 192 - M -
Page D - 12
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00330835/E23632014Exterior WallsArchitecture Exterior 49,692
A00248658/ED0012010Switchgear/ SwitchboardElectrical Under 600 Volts 106,282
A00248658/ED0012010WiringElectrical Under 600 Volts 106,643
A00340141/E23642015Interior LightingElectrical Lighting 848,017
Total Planned activities for $1,110,634BOE0115 000
000BOE011711/27/2012Date of Last Survey:625 WEST 133 STREET
1639 - I. S. 195 - M (ECF) -
A00319421/E23632014RoofArchitecture Exterior 162,696
A00248232/E23632013Terminal DevicesMechanical Heating 55,403
Total Planned activities for $218,099BOE0117 000
000BOE011811/29/2012Date of Last Survey:2230 5TH AVENUE
1640 - P. S. 197 - M -
A00277797/E23632012Exterior WallsArchitecture Exterior 60,952
A00277796/E23632012ParapetsArchitecture Exterior 75,168
A00319445/E23632014Switchgear/ SwitchboardElectrical Under 600 Volts 106,282
A00319445/E23632014WiringElectrical Under 600 Volts 106,643
Total Planned activities for $349,045BOE0118 000
000BOE011912/21/2010Date of Last Survey:1700 3RD AVENUE
1641 - P. S. 198 - M -
A00340226/E23642015WindowsArchitecture Exterior 834,211
EMERG2012/E23632012Interior LightingElectrical Lighting 35,297
A00330865/E23632014Conversion EquipmentMechanical Heating 434,669
A00319459/E23632014DistributionMechanical Heating 124,686
Total Planned activities for $1,428,863BOE0119 000
000BOE01221/5/2012Date of Last Survey:E. 116 ST. & F.D.R. DRIVE
1644 - MANHATTAN CTR. FOR MATH & SCI -M -
EMERG2012/E23632012Exterior LightingElectrical Lighting 79,676
Total Planned activities for $79,676BOE0122 000
000BOE012312/9/2010Date of Last Survey:351 W. 18 ST
1645 - BAYARD RUSTIN HS FOR THE HUMAN-M - CHARLES EVANS HUGHES HS HUMA
EMERG2008/E23632010Exterior WallsArchitecture Exterior 92,752
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 164,460
A00352844/E23642015Interior LightingElectrical Lighting 182,181
A00352844/E23642015Exterior LightingElectrical Lighting 64,541
SIRA4M440/E23632014Fire/Smoke DetectionElectrical Alarm 1,043,686
Total Planned activities for $1,547,620BOE0123 000
000BOE01249/24/2010Date of Last Survey:350 GRAND ST.
2769 - SEWARD PARK HIGH SCHOOL - M -
A00310573/E23632013Exterior WallsArchitecture Exterior 505,719
Page D - 13
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00298574/E23632013WindowsArchitecture Exterior 2,980,477
A00310574/E23632013RoofArchitecture Exterior 99,561
ACESCA404/E23642015Interior LightingElectrical Lighting 174,035
Total Planned activities for $3,759,792BOE0124 000
000BOE01253/13/2012Date of Last Survey:200 MONROE ST.
1620 - UNIVERSITY NEIGHBORHOOD H.S. - (FORMER SEWARD PARK ANNEX)
A00278013/E23632012Exterior WallsArchitecture Exterior 360,551
A00309667/E23632012RoofArchitecture Exterior 50,392
A00268285/E23632011FloorsArchitecture Interior 143,824
A00319670/E23632014Interior WallsArchitecture Interior 191,995
A00278014/E23632012Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00278014/E23632012PanelboardsElectrical Under 600 Volts 93,195
A00278014/E23632012WiringElectrical Under 600 Volts 86,713
A00319646/E23632014Interior LightingElectrical Lighting 452,155
A00298590/E23642015Security SystemElectrical Alarm 57,988
A00340427/E23642015Exhaust FansMechanical Ventilation 57,195
Total Planned activities for $1,585,106BOE0125 000
000BOE012612/1/2010Date of Last Survey:40 IRVING PLACE
698 - WASHINGTON IRVING HIGH SCHOOL -M -
A00319691/E23632013Exterior WallsArchitecture Exterior 159,175
ACESCA404/E23642015Interior LightingElectrical Lighting 253,622
ACESCA404/E23642015Exterior LightingElectrical Lighting 130,475
Total Planned activities for $543,272BOE0126 000
000BOE012712/14/2010Date of Last Survey:549 AUDUBON AVE
1621 - GEORGE WASHINGTON HIGH SCHOOL -M -
A00268778/ED0012011PanelboardsElectrical Under 600 Volts 73,635
A00268778/ED0012011WiringElectrical Under 600 Volts 370,035
Total Planned activities for $443,670BOE0127 000
000BOE012812/15/2011Date of Last Survey:145 W. 84 ST
699 - LOUIS D. BRANDEIS HIGH SCHOOL -M -
SIRA3M470/E23632012Interior WallsArchitecture Interior 318,153
SIRA3M470/E23632012WiringElectrical Under 600 Volts 287,805
EMERG2012/E23632012Interior LightingElectrical Lighting 104,862
BOIL_6TO4/E23632012Energy SourceMechanical Heating 35,363
BOIL_6TO4/E23632012DistributionMechanical Heating 185,209
Total Planned activities for $931,392BOE0128 000
000BOE012910/5/2011Date of Last Survey:345 E. 15 ST.
1622 - HEALTH PROFESSIONS HIGH SCHOOL-M -
A00278114/E23632013FloorsArchitecture Interior 1,088,596
Page D - 14
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 164,461
Total Planned activities for $1,253,057BOE0129 000
000BOE013111/16/2009Date of Last Survey:100 AMSTERDAM AVE
1624 - LA GUARDIA H.S. PERFORM. ARTS -M -
A00298762/E23632014Exterior WallsArchitecture Exterior 197,517
A00169721/E23632010WindowsArchitecture Exterior 435,944
A00235371/E23632010RoofArchitecture Exterior 1,295,213
Total Planned activities for $1,928,674BOE0131 000
000BOE01338/28/2012Date of Last Survey:122 AMSTERDAM AVE
1625 - MARTIN LUTHER KING JR H.S. - M -
ELECTPROJ/E23632012BatteriesElectrical Stand-by Power 40,778
A00352851/E23642015Interior LightingElectrical Lighting 251,595
Total Planned activities for $292,373BOE0133 000
000BOE013410/10/2012Date of Last Survey:234 EAST 105 STREET
1626 - PARK EAST HIGH SCHOOL - M -
A00340628/E23642016Interior LightingElectrical Lighting 37,811
Total Planned activities for $37,811BOE0134 000
000BOE01351/21/2011Date of Last Survey:2005 MADISON AVE, 10035
1627 - ARTHUR SCHOMBURG HS (IS201) - M - CHOIR ACADEMY OF HARLEM
A00268284/E23632011RoofArchitecture Exterior 1,961,243
A00351740/E23642015Interior LightingElectrical Lighting 74,616
A00351740/E23642015Exterior LightingElectrical Lighting 59,148
Total Planned activities for $2,095,007BOE0135 000
000BOE01379/21/2009Date of Last Survey:198 FORSYTH STREET
1629 - CASCADES HIGH SCHOOL - M -
A00340675/E23642016Interior LightingElectrical Lighting 328,966
Total Planned activities for $328,966BOE0137 000
000BOE01389/23/2009Date of Last Survey:411 PEARL ST
165 - MURRY BERGTRAUM H.S. - M -
A00018002/E23622011RoofArchitecture Exterior 1,215,810
Total Planned activities for $1,215,810BOE0138 000
000BOE013912/13/2010Date of Last Survey:180 WADSWORTH AVENUE
1630 - P. S. 528 - M - (I. S. 528 - M)
A00319960/E23632014WindowsArchitecture Exterior 41,012
Total Planned activities for $41,012BOE0139 000
000BOE014012/10/2010Date of Last Survey:525 W. 50 ST
1631 - PARK WEST HIGH SCHOOL - M -
A00330933/E23632013Exterior WallsArchitecture Exterior 39,965
M288BP11A/EM0012014RoofArchitecture Exterior 38,166
Page D - 15
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00309766/E23632013Energy SourceMechanical Heating 58,826
A00298928/E23632013Conversion EquipmentMechanical Heating 2,148,138
A00309766/E23632013DistributionMechanical Heating 924,298
A00309766/E23632013Terminal DevicesMechanical Heating 1,189,606
A00309767/E23632013Conversion EquipmentMechanical Air Conditioning 944,839
A00309767/E23632013Heat RejectionMechanical Air Conditioning 633,316
Total Planned activities for $5,977,154BOE0140 000
000BOE014111/30/2009Date of Last Survey:WEST 135 STREET & CONVENT AVENUE
4411 - A. PHILLIP RANDOLPH CAMPUS - M -
A00083154/E23622011Exterior WallsArchitecture Exterior 172,295
Total Planned activities for $172,295BOE0141 000
000BOE014212/9/2010Date of Last Survey:225 W. 24 STREET
1632 - H.S. OF FASHION INDUSTRIES - M -
A00278360/E23632013WindowsArchitecture Exterior 4,023,346
A00298968/E23642015Fire/Smoke DetectionElectrical Alarm 1,042,110
A00008008/E23632010DistributionMechanical Heating 395,433
Total Planned activities for $5,460,889BOE0142 000
000BOE014510/22/2012Date of Last Survey:439 W. 49 ST
540 - H.S. OF GRAPHIC COMMUN. ART - M -
A00309581/E23632014DistributionMechanical Heating 90,995
Total Planned activities for $90,995BOE0145 000
000BOE014612/8/2010Date of Last Survey:16 CLARKSON ST.
541 - CITY AS SCHOOL ALT. H.S. - M -
A00170028/E23632013FloorsArchitecture Interior 543,142
A00309609/E23632013WiringElectrical Under 600 Volts 109,411
A00299069/E23632013Fire/Smoke DetectionElectrical Alarm 546,458
Total Planned activities for $1,199,011BOE0146 000
000BOE014712/21/2010Date of Last Survey:320 E. 96 STREET
542 - MANHATTAN VOC/TECHNICAL HS - M - LIFE SCIENCES SECONDARY SCH - M
A00235706/E23632011Exterior WallsArchitecture Exterior 124,139
A00268077/E23632011RoofArchitecture Exterior 49,613
A00340888/E23642016Interior LightingElectrical Lighting 61,572
Total Planned activities for $235,324BOE0147 000
000BOE015112/2/2010Date of Last Survey:113 E 4 TH ST 10003
519 - CAREER DEVELOPMENT - M (M751) -
A00235768/E23632011FloorsArchitecture Interior 172,336
A00278532/E23632012Fire/Smoke DetectionElectrical Alarm 403,690
Total Planned activities for $576,026BOE0151 000
Page D - 16
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE015411/16/2011Date of Last Survey:22 E. 128 ST
521 - CONTINUING EDUCATION H.S. - M - (OLD P.S. 24 - M)
A00341134/E23642016Interior LightingElectrical Lighting 255,920
Total Planned activities for $255,920BOE0154 000
000BOE015510/18/2011Date of Last Survey:335 EAST 152 STREET
522 - P. S. 1 - BX -
A00352897/E23642015Interior LightingElectrical Lighting 74,359
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 229,277
Total Planned activities for $303,636BOE0155 000
000BOE015611/17/2011Date of Last Survey:1365 FULTON AVENUE
523 - P. S. 2 - BX - MORRISANIA EDUCATION COMPLEX
A00352000/E23642015Exterior WallsArchitecture Exterior 37,147
A00347096/E23642015RoofArchitecture Exterior 60,797
Total Planned activities for $97,944BOE0156 000
000BOE015711/30/2012Date of Last Survey:1701 FULTON AVENUE
524 - P. S. 4 - BX -
A00284538/E23632013Exterior WallsArchitecture Exterior 1,085,991
Total Planned activities for $1,085,991BOE0157 000
000BOE01582/13/2012Date of Last Survey:564 JACKSON AVENUE
525 - P. S. 5 - BX -
A00326290/E23632014Interior LightingElectrical Lighting 413,641
Total Planned activities for $413,641BOE0158 000
000BOE016011/28/2012Date of Last Survey:3201 KINGSBRIDGE AVENUE
527 - P. S. 7 - BX -
A00284593/E23632012Exterior WallsArchitecture Exterior 45,211
Total Planned activities for $45,211BOE0160 000
000BOE01625/21/2013Date of Last Survey:E. 183RD ST. & RYER AVENUE
530 - P. S. 9 - BX (OL 115) -
A00309584/E23632014Energy SourceMechanical Heating 370,692
A00309583/E23632014Conversion EquipmentMechanical Heating 732,627
A00309584/E23632014DistributionMechanical Heating 210,156
Total Planned activities for $1,313,475BOE0162 000
000BOE01641/3/2013Date of Last Survey:1450 OVERING STREET
505 - P. S. 12 - BX -
A00305383/E23632013Exterior WallsArchitecture Exterior 38,099
A00305382/E23632013WindowsArchitecture Exterior 287,758
A00284662/E23632013RoofArchitecture Exterior 50,381
Total Planned activities for $376,238BOE0164 000
Page D - 17
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE01691/4/2013Date of Last Survey:715 EAST 225 STREET
2695 - P. S. 21 - BX -
A00326517/E23632014Fire/Smoke DetectionElectrical Alarm 221,537
Total Planned activities for $221,537BOE0169 000
000BOE017010/26/2010Date of Last Survey:E. 167 STREET & COLLEGE AVENUE
500 - I. S. 22 - BX -
A00264146/E23632011Exterior WallsArchitecture Exterior 254,138
A00264145/E23632011ParapetsArchitecture Exterior 337,126
A00326538/E23642015Fire/Smoke DetectionElectrical Alarm 1,039,747
Total Planned activities for $1,631,011BOE0170 000
000BOE01719/26/2011Date of Last Survey:660 WEST 236 STREET
501 - P. S. 24 - BX -
A00309704/E23632013RoofArchitecture Exterior 781,674
A00284840/E23632012Switchgear/ SwitchboardElectrical Under 600 Volts 79,712
A00284840/E23632012WiringElectrical Under 600 Volts 106,643
A00352900/E23642015Interior LightingElectrical Lighting 71,688
A00353003/E23642016DistributionMechanical Heating 65,367
Total Planned activities for $1,105,084BOE0171 000
000BOE017210/4/2011Date of Last Survey:811 EAST 149 STREET
477 - P. S. 25 - BX -
A00347458/E23642016Interior LightingElectrical Lighting 478,338
Total Planned activities for $478,338BOE0172 000
000BOE01732/18/2010Date of Last Survey:1930 ANDREWS AVENUE
2693 - P. S. 26 - BX -
A00326622/E23632014Exterior WallsArchitecture Exterior 92,815
A00352901/E23642015Exterior LightingElectrical Lighting 43,144
A00326616/E23632014Conversion EquipmentMechanical Heating 118,057
Total Planned activities for $254,016BOE0173 000
000BOE01742/13/2013Date of Last Survey:519 ST ANNS AVENUE
478 - P. S. 277 - BX -
A00268174/E23632014Exterior WallsArchitecture Exterior 645,555
A00268158/E23632014WindowsArchitecture Exterior 156,139
A00284906/E23632013FloorsArchitecture Interior 193,768
A00347502/E23642016Interior LightingElectrical Lighting 40,573
Total Planned activities for $1,036,035BOE0174 000
000BOE017512/20/2011Date of Last Survey:1861 ANTHONY AVENUE
479 - P. S. 28 - BX -
A00352902/E23642015Interior LightingElectrical Lighting 59,609
A00305638/E23642015Fire/Smoke DetectionElectrical Alarm 261,118
Page D - 18
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $320,727BOE0175 000
000BOE017710/23/2012Date of Last Survey:510 EAST 141 STREET
481 - P. S. 30 - BX -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 399,871
BOIL_6TO4/E23632014DistributionMechanical Heating 114,704
Total Planned activities for $514,575BOE0177 000
000BOE018012/1/2009Date of Last Survey:2424 JEROME AVENUE
510 - P. S. 33 - BX -
A00242648/E23632011Exterior WallsArchitecture Exterior 798,628
A00247083/E23632010FloorsArchitecture Interior 741,730
Total Planned activities for $1,540,358BOE0180 000
000BOE018110/2/2012Date of Last Survey:261 EAST 163 STREET
511 - P. S. 35 - BX -
A00326762/E23642016Exterior WallsArchitecture Exterior 419,367
Total Planned activities for $419,367BOE0181 000
000BOE01821/28/2013Date of Last Survey:1070 CASTLE HILL AVENUE
512 - P. S. 36 - BX -
A00305755/E23632013Exterior WallsArchitecture Exterior 363,063
A00347640/E23642015ParapetsArchitecture Exterior 59,677
A00347639/E23642015RoofArchitecture Exterior 61,659
Total Planned activities for $484,399BOE0182 000
000BOE018310/23/2012Date of Last Survey:468 EAST 140 STREET
513 - P. S. 179 - BX - FORMER (P. S. 40 - BX)
A00326812/E23632014Interior LightingElectrical Lighting 62,740
A00288875/E23632012Conversion EquipmentMechanical Heating 429,893
Total Planned activities for $492,633BOE0183 000
000BOE01842/29/2012Date of Last Survey:3352 OLINVILLE AVENUE
514 - P. S. 41 - BX -
A00285092/E23632012PanelboardsElectrical Under 600 Volts 41,420
A00285092/E23632012WiringElectrical Under 600 Volts 73,022
A00309588/E23632014Terminal DevicesMechanical Heating 98,367
Total Planned activities for $212,809BOE0184 000
000BOE018510/25/2012Date of Last Survey:WASHINGTON AVE & CLAREMONT PKY
203 - P. S. 42 - BX -
A00285113/E23632013WiringElectrical Under 600 Volts 45,639
Total Planned activities for $45,639BOE0185 000
000BOE01865/6/2011Date of Last Survey:165 BROWN PLACE
515 - P. S. 43 - BX -
A00309735/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 106,282
Page D - 19
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00309735/E23632013WiringElectrical Under 600 Volts 119,974
Total Planned activities for $226,256BOE0186 000
000BOE018711/30/2012Date of Last Survey:1825 PROSPECT AVENUE
516 - P. S. 44 - BX -
A00285150/E23632013WiringElectrical Under 600 Volts 45,639
Total Planned activities for $45,639BOE0187 000
000BOE01888/23/2011Date of Last Survey:2502 LORILLARD PLACE
517 - I. S. 45 - BX - (J. H. S. 45 - BX)
A00347776/E23642016Interior LightingElectrical Lighting 1,063,697
A00347776/E23642016Exterior LightingElectrical Lighting 41,752
Total Planned activities for $1,105,449BOE0188 000
000BOE01901/10/2012Date of Last Survey:1794 EAST 172 STREET
490 - P. S. 47 - BX -
A00326958/E23632014Exterior WallsArchitecture Exterior 1,018,139
A00326957/E23632014ParapetsArchitecture Exterior 81,736
Total Planned activities for $1,099,875BOE0190 000
000BOE01929/22/2010Date of Last Survey:383 EAST 139 STREET
492 - P. S. 49 - BX -
A00305962/E23632013ParapetsArchitecture Exterior 71,017
A00326993/E23632014Interior LightingElectrical Lighting 934,662
A00326993/E23632014Exterior LightingElectrical Lighting 39,664
Total Planned activities for $1,045,343BOE0192 000
000BOE019412/29/2011Date of Last Survey:681 KELLY STREET
702 - M. S. 52 - BX -
A00285283/E23632014Fire/Smoke DetectionElectrical Alarm 404,674
A00248100/E23632011Conversion EquipmentMechanical Heating 35,275
A00248100/E23632011DistributionMechanical Heating 50,593
Total Planned activities for $490,542BOE0194 000
000BOE01982/8/2011Date of Last Survey:2111 CROTONA AVENUE
476 - P. S. 57 - BX -
A00309727/E23632014Fire/Smoke DetectionElectrical Alarm 37,415
Total Planned activities for $37,415BOE0198 000
000BOE01991/6/2010Date of Last Survey:E. 176 ST. & WASHINGTON AVENUE
463 - P. S. 58 - BX -
A00352904/E23642015Interior LightingElectrical Lighting 45,946
Total Planned activities for $45,946BOE0199 000
000BOE02019/22/2010Date of Last Survey:888 REVEREND JAMES A. POLITE AVE
464 - P. S. 60 - BX -
A00288826/E23632012RoofArchitecture Exterior 49,481
Page D - 20
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00285438/E23632012FloorsArchitecture Interior 159,594
A00327173/E23632013Interior LightingElectrical Lighting 131,047
Total Planned activities for $340,122BOE0201 000
000BOE02032/13/2013Date of Last Survey:660 FOX STREET
465 - P. S. 62 - BX -
A00306182/E23632014Interior LightingElectrical Lighting 54,885
Total Planned activities for $54,885BOE0203 000
000BOE02041/5/2010Date of Last Survey:1260 FRANKLIN AVENUE
466 - P. S. 63 - BX -
A00177757/E23632010WiringElectrical Under 600 Volts 59,330
A00309730/E23632014Interior LightingElectrical Lighting 513,076
Total Planned activities for $572,406BOE0204 000
000BOE02051/4/2011Date of Last Survey:1425 WALTON AVENUE
467 - P. S. 64 - BX -
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 41,125
Total Planned activities for $41,125BOE0205 000
000BOE02069/22/2010Date of Last Survey:677 EAST 141 STREET
468 - P. S. 65 - BX -
A00248236/E23632010Interior LightingElectrical Lighting 233,183
Total Planned activities for $233,183BOE0206 000
000BOE02075/5/2011Date of Last Survey:1001 JENNINGS STREET
678 - P. S. 66 - BX -
A00327300/E23632014Interior LightingElectrical Lighting 834,172
A00327300/E23632014Exterior LightingElectrical Lighting 37,925
Total Planned activities for $872,097BOE0207 000
000BOE02083/28/2012Date of Last Survey:2024 MOHEGAN AVENUE
679 - P. S. 67 - BX -
A00306274/E23632014Interior LightingElectrical Lighting 832,360
A00306274/E23632014Exterior LightingElectrical Lighting 37,577
Total Planned activities for $869,937BOE0208 000
000BOE020912/19/2012Date of Last Survey:4011 MONTICELLO AVENUE
2608 - P. S. 68 - BX -
A00352731/E23642015Exterior WallsArchitecture Exterior 51,289
Total Planned activities for $51,289BOE0209 000
000BOE021010/24/2012Date of Last Survey:560 THIERIOT AVENUE
469 - P. S. 69 - BX -
A00309668/E23632014Exterior WallsArchitecture Exterior 256,242
Total Planned activities for $256,242BOE0210 000
Page D - 21
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE021110/19/2011Date of Last Survey:1691 WEEKS AVENUE
470 - P. S. 70 - BX -
A00327376/E23632014Interior LightingElectrical Lighting 1,099,850
Total Planned activities for $1,099,850BOE0211 000
000BOE02141/5/2010Date of Last Survey:1020 ANDERSON AVENUE
474 - P. S. 73 - BX -
A00288981/E23632014Exterior WallsArchitecture Exterior 103,390
Total Planned activities for $103,390BOE0214 000
000BOE021510/24/2011Date of Last Survey:730 BRYANT AVENUE
475 - I. S. 74 - BX -
A00352907/E23642015Interior LightingElectrical Lighting 107,410
Total Planned activities for $107,410BOE0215 000
000BOE02162/22/2010Date of Last Survey:984 FAILE STREET
462 - P. S. 75 - BX -
A00268270/E23632012RoofArchitecture Exterior 45,342
A00348331/E23642015Interior LightingElectrical Lighting 75,727
Total Planned activities for $121,069BOE0216 000
000BOE022011/29/2011Date of Last Survey:125 EAST 181 STREET
449 - P. S. 79 - BX -
A00351890/E23642015Interior LightingElectrical Lighting 1,035,893
Total Planned activities for $1,035,893BOE0220 000
000BOE022111/3/2011Date of Last Survey:149 EAST MOSHOLU PKWY NORTH
450 - J. H. S. 80 - BX - P. S. 280 - BX
A00352908/E23642015Interior LightingElectrical Lighting 79,819
A00352908/E23642015Exterior LightingElectrical Lighting 38,273
Total Planned activities for $118,092BOE0221 000
000BOE02253/10/2011Date of Last Survey:1434 LONGFELLOW AVENUE
444 - I. S. 84 - BX -
A00348503/E23642015Exterior LightingElectrical Lighting 28,530
A00182623/E23632011DistributionMechanical Heating 57,778
Total Planned activities for $86,308BOE0225 000
000BOE022711/2/2011Date of Last Survey:2756 RESERVOIR AVENUE
1093 - P. S. 86 - BX -
A00285941/E23632013Exterior WallsArchitecture Exterior 584,286
A00288963/E23632013ParapetsArchitecture Exterior 152,905
Total Planned activities for $737,191BOE0227 000
000BOE02282/25/2010Date of Last Survey:1935 BUSSING AVENUE
434 - P. S. 87 - BX -
A00289126/ED0012012Switchgear/ SwitchboardElectrical Under 600 Volts 75,916
Page D - 22
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00289126/ED0012012WiringElectrical Under 600 Volts 43,474
Total Planned activities for $119,390BOE0228 000
000BOE022910/26/2010Date of Last Survey:1340 SHERIDAN AVENUE
2689 - P. S. 88 - BX -
A00285979/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 60,732
A00306675/E23632014Fire/Smoke DetectionElectrical Alarm 226,460
Total Planned activities for $287,192BOE0229 000
000BOE023110/27/2010Date of Last Survey:1116 SHERIDAN AVENUE
421 - P. S. 90 - BX -
A00268252/E23632011Exterior WallsArchitecture Exterior 257,110
Total Planned activities for $257,110BOE0231 000
000BOE023211/29/2012Date of Last Survey:2200 AQUEDUCT AVENUE
198 - P. S. 91 - BX -
A00286027/E23632012Fire/Smoke DetectionElectrical Alarm 129,968
Total Planned activities for $129,968BOE0232 000
000BOE02331/13/2012Date of Last Survey:700 EAST 179 STREET
423 - P. S. 92 - BX -
A00327805/E23642016Exterior WallsArchitecture Exterior 230,340
A00327804/E23642016RoofArchitecture Exterior 58,704
Total Planned activities for $289,044BOE0233 000
000BOE02359/13/2011Date of Last Survey:3530 KINGS COLLEGE PLACE
426 - P. S. 94 - BX -
A00286090/E23632012Exterior WallsArchitecture Exterior 52,130
Total Planned activities for $52,130BOE0235 000
000BOE02385/9/2011Date of Last Survey:1375 MACE AVENUE
430 - P. S. 97 - BX -
A00306845/E23632013Exterior WallsArchitecture Exterior 84,740
Total Planned activities for $84,740BOE0238 000
000BOE02394/7/2010Date of Last Survey:1619 BOSTON ROAD
2603 - I. S. 98 - BX - (J. H. S. 98 - BX)
A00351861/E23642016Interior LightingElectrical Lighting 103,889
A00351861/E23642016Exterior LightingElectrical Lighting 53,711
Total Planned activities for $157,600BOE0239 000
000BOE024010/27/2011Date of Last Survey:800 TAYLOR AVENUE
431 - P. S. 100 - BX -
A00327933/E23642016RoofArchitecture Exterior 435,266
Total Planned activities for $435,266BOE0240 000
000BOE02412/15/2012Date of Last Survey:2750 LAFAYETTE AVENUE
432 - J. H. S. 101 - BX -
Page D - 23
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00348813/E23642016Conversion EquipmentMechanical Heating 75,474
A00348813/E23642016DistributionMechanical Heating 54,125
Total Planned activities for $129,599BOE0241 000
000BOE024410/11/2011Date of Last Survey:1449 SHAKESPEARE AVENUE
406 - P. S. 199 - BX - (FORMER P.S. 104 - BX)
A00286246/E23632012Fire/Smoke DetectionElectrical Alarm 307,198
Total Planned activities for $307,198BOE0244 000
000BOE02469/28/2011Date of Last Survey:2120 ST. RAYMOND AVENUE
407 - P. S. 106 - BX -
EMERG2005/E23632011RoofArchitecture Exterior 68,042
A00286289/E23632013WiringElectrical Under 600 Volts 73,022
Total Planned activities for $141,064BOE0246 000
000BOE02475/28/2010Date of Last Survey:1695 SEWARD AVENUE
408 - P. S. 107 - BX -
A00352914/E23642015Interior LightingElectrical Lighting 55,259
Total Planned activities for $55,259BOE0247 000
000BOE02485/9/2011Date of Last Survey:1166 NEILL AVENUE
409 - P. S. 108 - BX -
A00265607/E23632013Exterior WallsArchitecture Exterior 36,140
Total Planned activities for $36,140BOE0248 000
000BOE025212/19/2012Date of Last Survey:1925 SCHIEFFELIN AVENUE
412 - P. S. 112 - BX -
A00286406/E23632012Exterior WallsArchitecture Exterior 43,383
A00349014/E23642015DistributionMechanical Heating 48,345
Total Planned activities for $91,728BOE0252 000
000BOE02539/20/2011Date of Last Survey:3710 BARNES AVENUE
413 - I. S. 113 - BX - (J. H. S. 113 - BX)
A00289135/E23632012WiringElectrical Under 600 Volts 349,477
A00248154/E23632012Conversion EquipmentMechanical Heating 964,699
A00248034/E23632012DistributionMechanical Heating 69,182
A00248154/E23632012Terminal DevicesMechanical Heating 712,186
Total Planned activities for $2,095,544BOE0253 000
000BOE02554/28/2011Date of Last Survey:120 EAST 184 STREET
414 - M.S. 319 - BX - (FORMER I.S.115-BX,OLD BX HS SCI
A00268034/E23632011Exterior WallsArchitecture Exterior 144,497
A00265753/E23632011ParapetsArchitecture Exterior 88,349
A00268232/E23632011RoofArchitecture Exterior 146,164
Total Planned activities for $379,010BOE0255 000
Page D - 24
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE02566/24/2013Date of Last Survey:977 FOX STREET
415 - I. S. 116 - BX -
A00349092/E23642015Interior LightingElectrical Lighting 115,050
Total Planned activities for $115,050BOE0256 000
000BOE02571/13/2011Date of Last Survey:1865 MORRIS AVENUE
416 - I. S. 117 - BX - (J. H. S. 117 - BX)
A00309849/E23632013ParapetsArchitecture Exterior 84,792
Total Planned activities for $84,792BOE0257 000
000BOE026012/28/2011Date of Last Survey:890 CAULDWELL AVENUE
419 - M.S. 301 - BX -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 571,025
BOIL_6TO4/E23632014DistributionMechanical Heating 491,400
Total Planned activities for $1,062,425BOE0260 000
000BOE02631/11/2011Date of Last Survey:1025 MORRISON AVENUE
1094 - J. H. S. 123 - BX -
EMERG2010/E23632011Interior WallsArchitecture Interior 143,199
A00328361/E23632013Interior LightingElectrical Lighting 953,072
A00328361/E23632013Exterior LightingElectrical Lighting 45,579
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 67,460
BOIL_6TO4/E23632014DistributionMechanical Heating 96,755
Total Planned activities for $1,306,065BOE0263 000
000BOE02641/10/2012Date of Last Survey:1111 PUGSLEY AVENUE
394 - I. S. 125 - BX - (J. H. S. 125 - BX)
A00330834/E23632013RoofArchitecture Exterior 110,590
Total Planned activities for $110,590BOE0264 000
000BOE026511/30/2011Date of Last Survey:175 WEST 166 STREET
395 - P. S. 126 -BX (ECF) -
A00244376/E23632011ParapetsArchitecture Exterior 38,670
A00349265/E23642015Interior LightingElectrical Lighting 630,013
Total Planned activities for $668,683BOE0265 000
000BOE02669/28/2011Date of Last Survey:1560 PURDY STREET
396 - I. S. 127 - BX -
BOIL_6TO4/E23632014DistributionMechanical Heating 94,540
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 405,470
Total Planned activities for $500,010BOE0266 000
000BOE026912/27/2011Date of Last Survey:885 BOLTON AVENUE
397 - I. S. 131 - BX -
A00309702/E23632013Interior LightingElectrical Lighting 61,436
Total Planned activities for $61,436BOE0269 000
Page D - 25
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE02707/3/2013Date of Last Survey:1245 WASHINGTON AVENUE
147 - P. S. 132 - BX -
A00349364/E23642015Interior LightingElectrical Lighting 72,872
Total Planned activities for $72,872BOE0270 000
000BOE02711/11/2011Date of Last Survey:1330 BRISTOW STREET
398 - P. S. 134 - BX -
A00307473/E23632013RoofArchitecture Exterior 37,640
A00328522/E23632014Interior LightingElectrical Lighting 539,370
Total Planned activities for $577,010BOE0271 000
000BOE02722/29/2012Date of Last Survey:2441 WALLACE AVENUE
400 - I. S. 135 - BX - (J. H. S. 135 - BX)
X135BP10A/E23632011WiringElectrical Under 600 Volts 127,969
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 40,518
BOIL_6TO4/E23632014DistributionMechanical Heating 48,428
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 299,444
Total Planned activities for $516,359BOE0272 000
000BOE02733/10/2011Date of Last Survey:750 JENNINGS STREET
401 - J. H. S. 136 - BX -
A00266115/E23632011Exterior WallsArchitecture Exterior 181,241
A00349422/E23632014RoofArchitecture Exterior 1,147,346
A00349419/E23642015Interior LightingElectrical Lighting 939,526
Total Planned activities for $2,268,113BOE0273 000
000BOE02743/28/2012Date of Last Survey:2225 WEBSTER AVENUE
402 - M. S. 391 - BX -
A00182625/E23632012Conversion EquipmentMechanical Heating 93,340
A00182625/E23632012DistributionMechanical Heating 66,937
A00244575/E23632012Terminal DevicesMechanical Heating 143,543
A00309644/E23632012Terminal DevicesMechanical Air Conditioning 54,621
Total Planned activities for $358,441BOE0274 000
000BOE02759/29/2011Date of Last Survey:2060 LAFAYETTE AVENUE
403 - P. S. 138 -BX -
A00286838/E23632012Interior LightingElectrical Lighting 565,968
Total Planned activities for $565,968BOE0275 000
000BOE027612/27/2011Date of Last Survey:345 BROOK AVENUE
404 - I. S. 139 - BX -
A00244634/E23632011Exterior WallsArchitecture Exterior 462,478
A00244633/E23632011WindowsArchitecture Exterior 2,128,858
A00268076/E23632011RoofArchitecture Exterior 47,556
A00349462/E23642015Interior LightingElectrical Lighting 930,131
Page D - 26
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00349462/E23642015Exterior LightingElectrical Lighting 47,667
A00309841/E23632013DistributionMechanical Heating 48,784
Total Planned activities for $3,665,474BOE0276 000
000BOE027710/21/2011Date of Last Survey:916 EAGLE AVENUE
2602 - P. S. 140 - BX -
A00330986/E23632014Interior LightingElectrical Lighting 579,258
A00349479/E23642016Fire/Smoke DetectionElectrical Alarm 292,921
A00288870/E23632013Conversion EquipmentMechanical Heating 40,353
Total Planned activities for $912,532BOE0277 000
000BOE02789/26/2011Date of Last Survey:660 WEST 237 STREET
186 - I. S. 141 - BX - (J. H. S. 141 - BX)
A00268004/E23632013DistributionMechanical Heating 122,504
Total Planned activities for $122,504BOE0278 000
000BOE02792/25/2010Date of Last Survey:3750 BAYCHESTER AVENUE
1095 - I. S. 142 - BX - (J. H. S. 142 - BX)
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 136,052
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 301,374
Total Planned activities for $437,426BOE0279 000
000BOE02809/1/2011Date of Last Survey:120 WEST 231 STREET
2606 - I. S. 143 - BX - (J. H. S. 143 - BX )
A00351751/E23642015DistributionMechanical Heating 43,944
Total Planned activities for $43,944BOE0280 000
000BOE028210/26/2010Date of Last Survey:1000 TELLER AVENUE
380 - I. S. 145 - BX -
A00349572/E23642015Interior LightingElectrical Lighting 1,183,352
A00286975/E23632012Fire/Smoke DetectionElectrical Alarm 1,373,530
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 38,073
Total Planned activities for $2,594,955BOE0282 000
000BOE028310/21/2011Date of Last Survey:968 CAULDWELL AVENUE
381 - P. S. 146 - BX -
A00351778/E23642015Interior LightingElectrical Lighting 558,816
Total Planned activities for $558,816BOE0283 000
000BOE02843/15/2012Date of Last Survey:1600 WEBSTER AVENUE
382 - I. S. 313 / 339 - BX -
A00331062/E23632014WindowsArchitecture Exterior 91,147
A00352010/E23642015RoofArchitecture Exterior 254,334
A00349611/E23642015Interior LightingElectrical Lighting 1,364,028
A00349611/E23642015Exterior LightingElectrical Lighting 57,757
Total Planned activities for $1,767,266BOE0284 000
Page D - 27
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE028512/30/2011Date of Last Survey:3630 THIRD AVENUE
383 - I. S. 219 - BX - NEW VENTURE SCHOOL (X219)
A00328774/E23632014Exterior WallsArchitecture Exterior 243,785
A00307727/E23632014WindowsArchitecture Exterior 862,073
A00328771/E23632014Interior LightingElectrical Lighting 125,265
A00328771/E23632014Exterior LightingElectrical Lighting 54,625
BOIL_6TO4/E23632014Energy SourceMechanical Heating 78,051
BOIL_6TO4/E23632014DistributionMechanical Heating 65,268
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 42,713
Total Planned activities for $1,471,780BOE0285 000
000BOE02869/22/2010Date of Last Survey:360 EAST 145 STREET
384 - J. H. S. 149 - BX -
A00351712/E23642015Interior LightingElectrical Lighting 321,769
A00351712/E23642015Exterior LightingElectrical Lighting 46,275
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 66,040
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 48,050
Total Planned activities for $482,134BOE0286 000
000BOE02879/23/2010Date of Last Survey:920 EAST 167 STREET
385 - P. S. 150 - BX -
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 245,320
BOIL_6TO4/E23632014DistributionMechanical Heating 65,084
Total Planned activities for $310,404BOE0287 000
000BOE02889/8/2010Date of Last Survey:250 EAST 156 STREET
386 - I. S. 151 - BX / P. S. 31 - BX -
A00244887/E23632011Exterior WallsArchitecture Exterior 263,129
A00244886/E23632011WindowsArchitecture Exterior 938,880
A00349690/E23642015Interior LightingElectrical Lighting 40,930
A00349690/E23642015Exterior LightingElectrical Lighting 29,748
Total Planned activities for $1,272,687BOE0288 000
000BOE02916/7/2013Date of Last Survey:333 EAST 135 STREET
148 - P. S. 154 - BX -
A00349751/E23642015Interior LightingElectrical Lighting 64,754
Total Planned activities for $64,754BOE0291 000
000BOE029210/4/2011Date of Last Survey:470 JACKSON AVENUE
1190 - I. S. 155 - BX -
A00307876/E23632013WindowsArchitecture Exterior 43,242
A00349773/E23642015Interior LightingElectrical Lighting 1,352,293
A00349773/E23642015Exterior LightingElectrical Lighting 58,453
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 41,266
Page D - 28
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
BOIL_6TO4/E23632014DistributionMechanical Heating 118,373
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 36,564
Total Planned activities for $1,650,191BOE0292 000
000BOE02939/8/2010Date of Last Survey:750 CONCOURSE VILLAGE WE
388 - SOUTH BRONX EDUCATIONAL CAMPUS - - BX
A00349795/E23642015Interior LightingElectrical Lighting 661,699
A00015827/E23632010Security SystemElectrical Alarm 54,651
Total Planned activities for $716,350BOE0293 000
000BOE029412/28/2011Date of Last Survey:757 CAULDWELL AVENUE
389 - P. S. 157 - BX -
A00349810/E23642015Interior LightingElectrical Lighting 534,279
A00268259/E23632012Conversion EquipmentMechanical Heating 391,680
A00268259/E23632012DistributionMechanical Heating 56,177
A00268259/E23632012Terminal DevicesMechanical Heating 146,996
Total Planned activities for $1,129,132BOE0294 000
000BOE029510/21/2010Date of Last Survey:800 HOME STREET
390 - I. S. 158 - BX -
A00349829/E23642015Interior LightingElectrical Lighting 1,427,649
A00349829/E23642015Exterior LightingElectrical Lighting 65,063
A00182628/E23632011DistributionMechanical Heating 131,761
Total Planned activities for $1,624,473BOE0295 000
000BOE029710/11/2011Date of Last Survey:620 TINTON AVENUE
391 - P. S. 161 - BX -
A00307987/E23632014Exterior WallsArchitecture Exterior 208,461
A00307986/E23632014WindowsArchitecture Exterior 715,309
A00329022/E23632014RoofArchitecture Exterior 330,007
A00349874/E23642015Interior LightingElectrical Lighting 647,840
Total Planned activities for $1,901,617BOE0297 000
000BOE02999/27/2011Date of Last Survey:2075 WEBSTER AVENUE
392 - P. S. 163 - BX -
A00266603/E23632011RoofArchitecture Exterior 260,786
A00351877/E23642015Interior LightingElectrical Lighting 128,001
Total Planned activities for $388,787BOE0299 000
000BOE03004/30/2013Date of Last Survey:250 EAST 164 STREET
2605 - I. S. 166 - BX -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 771,289
Total Planned activities for $771,289BOE0300 000
000BOE030112/14/2011Date of Last Survey:1970 WEST FARMS ROAD
1098 - P. S. 214/I. S. 200 - BX - (I. S. 167 - BX)
Page D - 29
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00288968/E23632012Conversion EquipmentMechanical Heating 42,494
A00287347/E23632012DistributionMechanical Heating 54,853
Total Planned activities for $97,347BOE0301 000
000BOE030212/27/2011Date of Last Survey:456 WHITE PLAINS ROAD
378 - I. S. 174 - BX -
A00287398/E23632012Exterior WallsArchitecture Exterior 260,060
Total Planned activities for $260,060BOE0302 000
000BOE030610/27/2010Date of Last Survey:800 BAYCHESTER AVENUE
4414 - I. S. 181 - BX -
EMERG2012/E23632012Exterior LightingElectrical Lighting 47,667
Total Planned activities for $47,667BOE0306 000
000BOE030810/18/2011Date of Last Survey:339 MORRIS AVENUE
368 - I. S. 203 - BX - FORMER (I.S. 183 - BX)
A00330851/E23632013Interior LightingElectrical Lighting 38,776
A00330851/E23632013Exterior LightingElectrical Lighting 56,365
A00308226/E23632013Fire/Smoke DetectionElectrical Alarm 478,520
A00268275/E23632012DistributionMechanical Heating 57,073
A00331048/E23632014Conversion EquipmentMechanical Air Conditioning 235,267
A00331048/E23632014Heat RejectionMechanical Air Conditioning 175,784
Total Planned activities for $1,041,785BOE0308 000
000BOE03105/10/2011Date of Last Survey:650 HOLLYWOOD AVENUE
370 - I. S. 192 - BX -
A00329308/E23632014Interior LightingElectrical Lighting 1,249,754
A00329308/E23632014Exterior LightingElectrical Lighting 50,798
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 717,248
BOIL_6TO4/E23632012DistributionMechanical Heating 51,436
Total Planned activities for $2,069,236BOE0310 000
000BOE03113/15/2012Date of Last Survey:1919 PROSPECT AVENUE
371 - P. S. 211 - BX / I. S. 318 - BX -
A00352919/E23642015Interior LightingElectrical Lighting 133,834
A00352919/E23642015Exterior LightingElectrical Lighting 60,888
Total Planned activities for $194,722BOE0311 000
000BOE031210/21/2010Date of Last Survey:1180 TINTON AVENUE
1100 - P. S. 198 - BX -
EMERG2010/E23632010Interior LightingElectrical Lighting 55,390
A00350215/E23642015Exterior LightingElectrical Lighting 35,489
Total Planned activities for $90,879BOE0312 000
000BOE031511/29/2011Date of Last Survey:275 HARLEM RIVER PARK BRIDGE
373 - P. S. 230/I. S. 229 (UDC) - BX -
Page D - 30
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00352920/E23642015Interior LightingElectrical Lighting 127,060
Total Planned activities for $127,060BOE0315 000
000BOE031710/19/2011Date of Last Survey:499 EAST 175 STREET
375 - P. S. 236 - BX -
A00350295/E23642015Interior LightingElectrical Lighting 66,329
Total Planned activities for $66,329BOE0317 000
000BOE031810/21/2010Date of Last Survey:E 166 TH ST. & BOSTON ROAD
376 - MORRIS HIGH SCHOOL - BX -
PRIORCOMP/E23632012Exterior WallsArchitecture Exterior 337,934
A00352921/E23642015Interior LightingElectrical Lighting 465,081
Total Planned activities for $803,015BOE0318 000
000BOE03192/22/2010Date of Last Survey:1010 REV. J.A. POLITE AVE.
377 - BRONX REGIONAL ALT. H.S. - BX -
A00288970/E23632012DistributionMechanical Heating 57,923
Total Planned activities for $57,923BOE0319 000
000BOE03209/15/2011Date of Last Survey:3000 E. TREMONT AVENUE
364 - HERBERT H. LEHMAN H.S. - BX -
A00308509/E23632013CeilingsArchitecture Interior 2,019,839
A00352922/E23642015Interior LightingElectrical Lighting 219,024
A00352922/E23642015Egress LightingElectrical Lighting 137,716
A00352922/E23642015Exterior LightingElectrical Lighting 145,540
SANDX405E/E23642015Energy SourceMechanical Heating 50,486
SANDX405E/E23642015DistributionMechanical Heating 52,883
Total Planned activities for $2,625,488BOE0320 000
000BOE03239/9/2009Date of Last Survey:1300 BOYNTON AVE.
353 - JAMES MONROE HIGH SCHOOL - BX -
A00180300/E23632010FloorsArchitecture Interior 635,595
BOIL_6TO4/E23632012Energy SourceMechanical Heating 53,519
BOIL_6TO4/E23632012DistributionMechanical Heating 151,707
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 585,756
Total Planned activities for $1,426,577BOE0323 000
000BOE03249/20/2011Date of Last Survey:800 E. GUN HILL RD.
354 - EVANDER CHILDS HIGH SCHOOL - BX -
A00248841/E23632011WiringElectrical Under 600 Volts 328,920
ACESCA404/E23642015Interior LightingElectrical Lighting 283,566
BOIL_6TO4/E23632012Energy SourceMechanical Heating 40,572
BOIL_6TO4/E23632012DistributionMechanical Heating 212,493
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 783,863
Total Planned activities for $1,649,414BOE0324 000
Page D - 31
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE03268/23/2011Date of Last Survey:500 E. FORDHAM RD.
356 - THEODORE ROOSEVELT H.S. - BX -
A00267162/E23632011Exterior WallsArchitecture Exterior 380,721
A00329660/E23642015WindowsArchitecture Exterior 189,125
A00329658/E23642015RoofArchitecture Exterior 116,904
A00267166/E23632011FloorsArchitecture Interior 431,324
A00309737/E23632014WiringElectrical Under 600 Volts 287,805
A00351867/E23642016Interior LightingElectrical Lighting 731,820
A00351867/E23642016Exterior LightingElectrical Lighting 110,990
A00329652/E23632014Energy SourceMechanical Heating 39,823
A00329652/E23632014DistributionMechanical Heating 41,714
A00329652/E23632014Terminal DevicesMechanical Heating 1,073,556
Total Planned activities for $3,403,782BOE0326 000
000BOE03278/19/2011Date of Last Survey:100 WEST MOSHOLU PARKWAY SOUTH
357 - DEWITT CLINTON HIGH SCHOOL - BX -
A00248101/E23632012WindowsArchitecture Exterior 865,492
A00248241/E23632012RoofArchitecture Exterior 280,244
SIRA4X440/E23642015WiringElectrical Under 600 Volts 82,230
A00352924/E23642015Egress LightingElectrical Lighting 125,316
Total Planned activities for $1,353,282BOE0327 000
000BOE03281/19/2011Date of Last Survey:75 W. 205TH STREET
358 - BRONX H.S. OF SCIENCE - BX -
A00308668/E23632013Exterior WallsArchitecture Exterior 274,008
A00308666/E23632013RoofArchitecture Exterior 1,735,110
A00352972/E23642015Interior LightingElectrical Lighting 139,815
A00352972/E23642015Exterior LightingElectrical Lighting 100,204
Total Planned activities for $2,249,137BOE0328 000
000BOE03329/1/2011Date of Last Survey:WEST 230 STREET & TIBBETT AVE.
1101 - JOHN F. KENNEDY HIGH SCHOOL - BX -
SIRA4X475/E23632014BatteriesElectrical Stand-by Power 43,562
ACESCA404/E23642015Interior LightingElectrical Lighting 3,987,188
ACESCA404/E23642015Exterior LightingElectrical Lighting 166,144
BOIL_6TO4/E23632012Energy SourceMechanical Heating 65,198
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 119,040
Total Planned activities for $4,381,132BOE0332 000
000BOE03335/6/2011Date of Last Survey:333 E. 151ST STREET
2684 - ALFRED E. SMITH HIGH SCHOOL - BX -
A00351869/E23642016Exterior LightingElectrical Lighting 98,280
A00288079/E23632012DistributionMechanical Heating 184,685
Page D - 32
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $282,965BOE0333 000
000BOE03379/15/2011Date of Last Survey:2697 WESTCHESTER AVENUE
327 - P. S. 721 AX (O T C) -BX -
A00331050/E23632014RoofArchitecture Exterior 41,953
Total Planned activities for $41,953BOE0337 000
000BOE03383/14/2012Date of Last Survey:501 COURTLANDT AVE.
328 - DISTRICT OFF # 7 - BX -
A00350803/E23642016Interior LightingElectrical Lighting 65,544
A00350802/E23642015Fire/Smoke DetectionElectrical Alarm 59,077
Total Planned activities for $124,621BOE0338 000
000BOE03394/7/2010Date of Last Survey:1680 HOE AVENUE
4415 - P. S. 817 - BX -
A00350815/E23642015Interior LightingElectrical Lighting 68,423
Total Planned activities for $68,423BOE0339 000
000BOE034011/2/2011Date of Last Survey:2641 GRAND CONCOURSE
329 - P. S. 246 - BX (POE CENTER) -
A00353035/E23632014Exterior WallsArchitecture Exterior 482,274
A00350863/E23642015RoofArchitecture Exterior 96,240
Total Planned activities for $578,514BOE0340 000
000BOE03429/14/2011Date of Last Survey:309 47 STREET
2682 - P. S. 1 - BK -
A00310683/E23632013Exterior WallsArchitecture Exterior 38,796
A00289773/E23632013WindowsArchitecture Exterior 693,673
A00269052/E23632013WiringElectrical Under 600 Volts 93,313
A00310679/E23632014Interior LightingElectrical Lighting 694,598
A00331059/E23632014Conversion EquipmentMechanical Air Conditioning 36,310
Total Planned activities for $1,556,690BOE0342 000
000BOE034311/23/2010Date of Last Survey:50 JEFFERSON AVE.
2521 - P. S. 3 - BK -
A00248934/E23632011Exterior WallsArchitecture Exterior 104,353
Total Planned activities for $104,353BOE0343 000
000BOE034411/16/2012Date of Last Survey:820 HANCOCK STREET
332 - P. S. 5 - BK -
A00269105/E23632012Exterior WallsArchitecture Exterior 66,478
A00269104/E23632012WindowsArchitecture Exterior 369,975
A00269103/E23632012ParapetsArchitecture Exterior 43,312
A00289642/E23632012RoofArchitecture Exterior 369,836
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 429,893
BOIL_6TO4/E23632014DistributionMechanical Heating 123,316
Page D - 33
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $1,402,810BOE0344 000
000BOE03452/14/2011Date of Last Survey:37 HICKS STREET
333 - P. S. 8 - BK -
A00289870/E23632014WindowsArchitecture Exterior 60,921
A00351814/E23642015Interior LightingElectrical Lighting 578,819
Total Planned activities for $639,740BOE0345 000
000BOE03479/27/2011Date of Last Survey:511 7TH AVE.
2522 - P. S. 10 - BK -
EMERG2012/E23632012Interior LightingElectrical Lighting 59,370
A00289906/E23632013Fire/Smoke DetectionElectrical Alarm 265,352
Total Planned activities for $324,722BOE0347 000
000BOE03491/12/2012Date of Last Survey:557 PENNSYLVANIA AVENUE
334 - P. S. 13 - BK -
A00352930/E23642015Interior LightingElectrical Lighting 41,891
BOIL_6TO4/E23632014DistributionMechanical Heating 73,989
Total Planned activities for $115,880BOE0349 000
000BOE03503/9/2012Date of Last Survey:AVE X & BATCHELDER STREET
360 - I. S. 14 - BK -
A00289993/E23632012Exterior WallsArchitecture Exterior 339,930
A00269264/E23632012ParapetsArchitecture Exterior 158,074
A00309694/E23632012RoofArchitecture Exterior 136,902
A00310885/E23632014Interior LightingElectrical Lighting 1,135,123
A00310885/E23632014Exterior LightingElectrical Lighting 48,363
A00289986/E23632013Fire/Smoke DetectionElectrical Alarm 410,582
A00331488/E23642016DistributionMechanical Heating 58,630
Total Planned activities for $2,287,604BOE0350 000
000BOE03516/2/2011Date of Last Survey:71 SULLIVAN STREET
361 - P. S. 15 - BK -
SANDK015D/E23642015Interior WallsArchitecture Interior 50,163
SANDK015B/E23642015WiringElectrical Under 600 Volts 73,022
Total Planned activities for $123,185BOE0351 000
000BOE03539/21/2011Date of Last Survey:208 NORTH 5 STREET
362 - P. S. 17 - BK -
A00249168/E23632011WindowsArchitecture Exterior 238,243
A00288830/E23632011RoofArchitecture Exterior 37,023
A00331553/E23642015Switchgear/ SwitchboardElectrical Under 600 Volts 100,968
A00331553/E23642015WiringElectrical Under 600 Volts 119,974
A00352785/E23642015Interior LightingElectrical Lighting 64,580
A00310956/E23632014Exhaust FansMechanical Ventilation 96,213
Page D - 34
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $657,001BOE0353 000
000BOE035412/14/2012Date of Last Survey:101 MAUJER STREET
363 - P. S. 18 - BK -
A00290066/E23632013WindowsArchitecture Exterior 246,523
Total Planned activities for $246,523BOE0354 000
000BOE03569/28/2010Date of Last Survey:225 ADELPHI STREET
2519 - P. S. 20 - BK -
A00269384/E23632012ParapetsArchitecture Exterior 92,636
A00268935/E23632012RoofArchitecture Exterior 77,598
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 47,150
BOIL_6TO4/E23632014DistributionMechanical Heating 135,251
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 68,612
Total Planned activities for $421,247BOE0356 000
000BOE03573/7/2012Date of Last Survey:180 CHAUNCEY STREET
338 - P. S. 21 - BK -
A00269412/E23632012Exterior WallsArchitecture Exterior 147,104
A00269411/E23632012ParapetsArchitecture Exterior 143,048
A00269410/E23632012RoofArchitecture Exterior 44,511
A00290123/E23632014Interior LightingElectrical Lighting 675,591
Total Planned activities for $1,010,254BOE0357 000
000BOE03582/11/2013Date of Last Survey:545 WILLOUGHBY AVENUE
339 - P. S. 23 - BK -
A00309698/E23632013Interior LightingElectrical Lighting 68,317
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 468,107
Total Planned activities for $536,424BOE0358 000
000BOE035911/12/2012Date of Last Survey:787 LAFAYETTE AVENUE
340 - P. S. 25 - BK -
A00311082/E23632014Exterior WallsArchitecture Exterior 74,011
A00311081/E23632014ParapetsArchitecture Exterior 57,648
A00351815/E23642015Interior LightingElectrical Lighting 47,114
Total Planned activities for $178,773BOE0359 000
000BOE036011/16/2012Date of Last Survey:1014 LAFAYETTE AVENUE
341 - P. S. 26 - BK -
A00269491/E23632012Exterior WallsArchitecture Exterior 129,721
A00290201/E23632012RoofArchitecture Exterior 88,754
A00309696/E23632013Interior LightingElectrical Lighting 258,038
Total Planned activities for $476,513BOE0360 000
000BOE036110/7/2011Date of Last Survey:NELSON & HICKS STREETS
342 - P. S. 27 - BK -
Page D - 35
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00311125/E23632014Exterior WallsArchitecture Exterior 399,917
A00351817/E23642015Interior LightingElectrical Lighting 35,564
Total Planned activities for $435,481BOE0361 000
000BOE03632/2/2012Date of Last Survey:425 HENRY STREET
343 - P. S. 29 - BK -
A00269532/E23632012Exterior WallsArchitecture Exterior 254,049
Total Planned activities for $254,049BOE0363 000
000BOE036410/23/2012Date of Last Survey:75 MESEROLE AVENUE
344 - P. S. 31 - BK (OL126) -
A00331774/E23642015Exterior WallsArchitecture Exterior 155,296
A00290257/E23632014Fire/Smoke DetectionElectrical Alarm 167,384
Total Planned activities for $322,680BOE0364 000
000BOE03654/27/2012Date of Last Survey:317 HOYT STREET
345 - P. S. 32 - BK -
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 448,746
Total Planned activities for $448,746BOE0365 000
000BOE03683/7/2012Date of Last Survey:272 MACDONOUGH STREET
347 - I. S. 35 - BK - (J.H.S. 35 & P.S. 141 - BK)
A00331852/E23632014Exterior WallsArchitecture Exterior 182,905
A00311242/E23632014ParapetsArchitecture Exterior 66,398
A00352786/E23642015Interior LightingElectrical Lighting 105,301
A00352786/E23642015Exterior LightingElectrical Lighting 48,828
A00290341/E23632013Fire/Smoke DetectionElectrical Alarm 414,534
A00288962/E23632013DistributionMechanical Heating 103,652
A00290340/E23632013Terminal DevicesMechanical Heating 382,361
Total Planned activities for $1,303,979BOE0368 000
000BOE03692/21/2013Date of Last Survey:450 PACIFIC STREET
1424 - P. S. 38 - BK -
A00290368/E23632014ParapetsArchitecture Exterior 66,826
A00290368/E23632014RoofArchitecture Exterior 37,938
A00290366/E23632014Interior LightingElectrical Lighting 61,997
Total Planned activities for $166,761BOE0369 000
000BOE03713/14/2012Date of Last Survey:265 RALPH AVENUE
1425 - P. S. 40 - BK -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 48,244
Total Planned activities for $48,244BOE0371 000
000BOE037211/24/2010Date of Last Survey:411 THATFORD AVENUE
1411 - P. S. 41 - BK -
A00330970/E23632014ParapetsArchitecture Exterior 57,129
Page D - 36
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00290417/E23632014RoofArchitecture Exterior 35,956
BOIL_6TO4/E23632012DistributionMechanical Heating 62,343
Total Planned activities for $155,428BOE0372 000
000BOE037310/19/2012Date of Last Survey:1401 EMMONS AVENUE
2625 - I. S. 43 - BK - (I. S. 98 - BK)
SandK043A/E23642015Interior WallsArchitecture Interior 657,212
SandK043A/E23642015CeilingsArchitecture Interior 186,532
SANDK043D/E23642015DistributionMechanical Heating 50,027
SANDK043D/E23642015Terminal DevicesMechanical Heating 94,745
Total Planned activities for $988,516BOE0373 000
000BOE03741/25/2011Date of Last Survey:432 MONROE STREET
2518 - P. S. 44 - BK -
A00311351/E23632014WiringElectrical Under 600 Volts 119,974
Total Planned activities for $119,974BOE0374 000
000BOE03759/14/2012Date of Last Survey:84 SCHAEFER STREET
1400 - P. S. 45 - BK -
BOIL_6TO4/E23632013Conversion EquipmentMechanical Heating 563,639
Total Planned activities for $563,639BOE0375 000
000BOE03761/22/2013Date of Last Survey:100 CLERMONT AVENUE
1401 - P. S. 46 - BK -
A00290499/E23632014Interior LightingElectrical Lighting 51,431
BOIL_6TO4/E23632014Energy SourceMechanical Heating 200,597
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 396,456
BOIL_6TO4/E23632014DistributionMechanical Heating 113,724
Total Planned activities for $762,208BOE0376 000
000BOE03782/8/2011Date of Last Survey:223 GRAHAM AVENUE
1402 - I. S. 49 - BK -
A00311428/E23632014Exterior WallsArchitecture Exterior 202,778
A00290536/E23632014ParapetsArchitecture Exterior 223,563
A00311426/E23632014RoofArchitecture Exterior 211,021
Total Planned activities for $637,362BOE0378 000
000BOE03795/2/2013Date of Last Survey:183 SOUTH 3RD STREET
1403 - J. H. S. 50 - BK -
A00290558/E23632014Exterior WallsArchitecture Exterior 221,111
A00290557/E23632014ParapetsArchitecture Exterior 54,415
SIRA3K050/E23632013WiringElectrical Under 600 Volts 125,042
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 592,207
BOIL_6TO4/E23632012DistributionMechanical Heating 42,469
Total Planned activities for $1,035,244BOE0379 000
Page D - 37
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE038110/4/2012Date of Last Survey:2675 EAST 29TH ST.
2515 - P. S. 52 - BK -
A00311490/E23632014Exterior WallsArchitecture Exterior 47,599
A00331132/E23632014ParapetsArchitecture Exterior 44,936
A00310035/ED0012013Switchgear/ SwitchboardElectrical Under 600 Volts 53,141
A00310035/ED0012013WiringElectrical Under 600 Volts 93,313
Total Planned activities for $238,989BOE0381 000
000BOE03823/4/2011Date of Last Survey:195 SANDFORD STREET
1404 - P. S. 54 - BK -
A00269900/E23632013FloorsArchitecture Interior 190,833
A00269896/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00269896/E23632013WiringElectrical Under 600 Volts 82,150
A00311506/E23632014Interior LightingElectrical Lighting 58,667
Total Planned activities for $422,748BOE0382 000
000BOE03833/14/2012Date of Last Survey:2021 BERGEN STREET
1405 - I. S. 55 - BK -
A00249720/E23632011WindowsArchitecture Exterior 900,537
A00289009/ED0012013WiringElectrical Under 600 Volts 127,969
A00311528/E23632013Exterior LightingElectrical Lighting 57,061
Total Planned activities for $1,085,567BOE0383 000
000BOE03856/21/2011Date of Last Survey:125 STUYVESANT AVENUE
1407 - J. H. S. 57 - BK -
K688BP10A/E23632012FloorsArchitecture Interior 569,487
A00289002/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 109,319
A00289002/E23632013WiringElectrical Under 600 Volts 137,110
A00352787/E23642015Interior LightingElectrical Lighting 101,736
A00352787/E23642015Exterior LightingElectrical Lighting 46,275
Total Planned activities for $963,927BOE0385 000
000BOE038610/7/2011Date of Last Survey:330 SMITH STREET
1408 - P. S. 58 - BK -
A00351820/E23642015DistributionMechanical Heating 37,790
Total Planned activities for $37,790BOE0386 000
000BOE03872/11/2013Date of Last Survey:211 THROOP AVENUE
1104 - P. S. 59 - BK -
A00309699/E23632013Interior LightingElectrical Lighting 71,688
BOIL_6TO4/E23632014Energy SourceMechanical Heating 46,120
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 455,755
Total Planned activities for $573,563BOE0387 000
Page D - 38
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE03885/10/2013Date of Last Survey:400 EMPIRE BOULEVARD
2626 - I. S. 61 - BK -
A00311622/E23632014Interior LightingElectrical Lighting 73,272
Total Planned activities for $73,272BOE0388 000
000BOE03901/27/2012Date of Last Survey:158 RICHMOND STREET
1387 - P. S. 65 - BK -
A00311665/E23632014Interior LightingElectrical Lighting 149,732
Total Planned activities for $149,732BOE0390 000
000BOE03911/13/2010Date of Last Survey:51 SAINT EDWARDS STREET
1388 - P. S. 67 - BK -
EMERG2012/E23632012Exterior LightingElectrical Lighting 40,012
Total Planned activities for $40,012BOE0391 000
000BOE039210/25/2011Date of Last Survey:956 EAST 82 STREET
2624 - I. S. 68 - BK - (J. H. S. 68 - BK)
A00311697/E23632014Interior LightingElectrical Lighting 1,339,126
A00311697/E23632014Exterior LightingElectrical Lighting 53,582
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 756,549
BOIL_6TO4/E23632014DistributionMechanical Heating 54,255
Total Planned activities for $2,203,512BOE0392 000
000BOE03932/7/2013Date of Last Survey:215 HEYWARD STREET
2752 - I. S. 71 - BK -
A00290833/E23632013WindowsArchitecture Exterior 869,886
A00351807/E23642015Interior LightingElectrical Lighting 115,782
Total Planned activities for $985,668BOE0393 000
000BOE039410/19/2010Date of Last Survey:605 SHEPHERD AVENUE
187 - P. S. 72 - BK - ANNETTE P. GOLDMAN
A00290850/E23632013Fire/Smoke DetectionElectrical Alarm 610,458
Total Planned activities for $610,458BOE0394 000
000BOE03955/6/2011Date of Last Survey:241 MAC DOUGAL STREET
1389 - P. S. 73 - BK -
A00268215/E23632011RoofArchitecture Exterior 55,420
SIRA9K073/E23642015WiringElectrical Under 600 Volts 73,902
A00311763/E23632014Interior LightingElectrical Lighting 256,468
A00290869/E23632014Fire/Smoke DetectionElectrical Alarm 199,295
Total Planned activities for $585,085BOE0395 000
000BOE03962/10/2011Date of Last Survey:95 GROVE STREET
1081 - P. S. 75 - BK -
A00290898/E23632014Exterior WallsArchitecture Exterior 122,532
A00290897/E23632014ParapetsArchitecture Exterior 90,801
Page D - 39
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $213,333BOE0396 000
000BOE03973/3/2011Date of Last Survey:1420 EAST 68 STREET
1391 - I. S. 78 - BK -
A00330859/E23632013Interior LightingElectrical Lighting 49,787
Total Planned activities for $49,787BOE0397 000
000BOE039810/3/2012Date of Last Survey:990 DEKALB AVENUE
1392 - P. S. 81 - BK -
A00290929/E23632013WindowsArchitecture Exterior 896,209
A00290931/E23632013WiringElectrical Under 600 Volts 93,781
Total Planned activities for $989,990BOE0398 000
000BOE039911/17/2009Date of Last Survey:250 BERRY STREET
1393 - P. S. 84 - BK -
A00309879/E23632014RoofArchitecture Exterior 79,156
Total Planned activities for $79,156BOE0399 000
000BOE040012/11/2009Date of Last Survey:510 CLERMONT AVE.
1082 - STERLING ALTERNATIVE H. S. - BK - (P.S. 85 - BK)
A00332463/E23642015Interior LightingElectrical Lighting 400,333
Total Planned activities for $400,333BOE0400 000
000BOE040212/9/2009Date of Last Survey:544 7TH AVENUE
1395 - I. S. 88 - BK - (J. H. S. 88 - BK)
A00291001/E23632013ParapetsArchitecture Exterior 56,017
A00311891/E23632013RoofArchitecture Exterior 96,755
A00311889/E23632014Interior LightingElectrical Lighting 919,810
A00311889/E23632014Exterior LightingElectrical Lighting 49,406
A00330872/E23632014Conversion EquipmentMechanical Heating 69,760
A00330873/E23632014DistributionMechanical Heating 100,054
Total Planned activities for $1,291,802BOE0402 000
010BOE040212/8/2009Date of Last Survey:330 18 STREET
1396 - P. S. 295 / M.S. 443 - BK - (K845)
A00337752/E23642015Interior LightingElectrical Lighting 177,725
Total Planned activities for $177,725BOE0402 010
000BOE04032/11/2011Date of Last Survey:2840 WEST 12 STREET
1397 - P. S. 90 - BK -
SANDK090H/E23642015RoofArchitecture Exterior 41,928
SANDK090E/E23642015Conversion EquipmentMechanical Heating 35,347
SANDK090E/E23642015Terminal DevicesMechanical Heating 187,013
Total Planned activities for $264,288BOE0403 000
000BOE04052/24/2011Date of Last Survey:601 PARKSIDE AVENUE
1386 - P. S. 92 - BK -
Page D - 40
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00352788/E23642015Interior LightingElectrical Lighting 81,270
A00352788/E23642015Exterior LightingElectrical Lighting 38,968
A00311950/E23632014Fire/Smoke DetectionElectrical Alarm 220,552
Total Planned activities for $340,790BOE0405 000
000BOE040612/7/2010Date of Last Survey:31 NEW YORK AVENUE
1371 - P. S. 93 - BK -
A00227149/E23632010FloorsArchitecture Interior 395,610
ENGR0K093?e23632010Interior LightingElectrical Lighting 615,468
Total Planned activities for $1,011,078BOE0406 000
000BOE04079/14/2011Date of Last Survey:5010 6TH AVENUE
1372 - P. S. 94 - BK -
A00311998/E23642015Exterior WallsArchitecture Exterior 191,615
A00332604/E23642016Interior LightingElectrical Lighting 759,345
Total Planned activities for $950,960BOE0407 000
000BOE04091/13/2011Date of Last Survey:99 AVENUE P
1 - I. S. 96 - BK -
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 54,844
A00270425/E23632013Interior LightingElectrical Lighting 1,255,971
A00270425/E23632013Exterior LightingElectrical Lighting 47,507
Total Planned activities for $1,358,322BOE0409 000
000BOE04105/17/2011Date of Last Survey:1855 STILLWELL AVE.
15 - P. S. 97 - BK -
A00288942/E23632013Exterior WallsArchitecture Exterior 212,438
A00309836/E23632013RoofArchitecture Exterior 36,896
A00289013/ED0012012WiringElectrical Under 600 Volts 63,894
A00291166/E23632013Exhaust FansMechanical Ventilation 75,906
Total Planned activities for $389,134BOE0410 000
000BOE041110/12/2011Date of Last Survey:1120 EAST 10 STREET
1373 - P. S. 99 - BK -
A00312078/E23632014Exterior WallsArchitecture Exterior 487,498
A00332690/E23632014ParapetsArchitecture Exterior 66,416
A00312074/E23632014Interior LightingElectrical Lighting 645,508
Total Planned activities for $1,199,422BOE0411 000
000BOE041212/16/2011Date of Last Survey:2951 WEST 3 STREET
1374 - P. S. 100 - BK -
BOIL_6TO4/E23632014DistributionMechanical Heating 106,512
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 54,032
Total Planned activities for $160,544BOE0412 000
Page D - 41
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE04139/11/2012Date of Last Survey:2360 BENSON AVE.
14 - P. S. 101 - BK -
A00331145/E23632014ParapetsArchitecture Exterior 42,919
Total Planned activities for $42,919BOE0413 000
000BOE04149/15/2010Date of Last Survey:211 72 STREET
1375 - P. S. 102 - BK -
A00248640/E23632011WiringElectrical Under 600 Volts 106,643
A00312128/E23632013Interior LightingElectrical Lighting 700,337
Total Planned activities for $806,980BOE0414 000
000BOE04159/27/2012Date of Last Survey:9115 5TH AVENUE
1376 - P. S. 104 - BK -
A00270544/E23632012Exterior WallsArchitecture Exterior 464,669
Total Planned activities for $464,669BOE0415 000
000BOE041610/24/2011Date of Last Survey:1031 59 STREET
2850 - P. S. 105 - BK -
A00310075/ED0012013Interior LightingElectrical Lighting 700,791
A00310075/E23632013Exterior LightingElectrical Lighting 37,925
Total Planned activities for $738,716BOE0416 000
000BOE04174/5/2011Date of Last Survey:1314 PUTNAM AVENUE
1377 - P. S. 106 - BK -
A00291294/E23632013WindowsArchitecture Exterior 172,799
Total Planned activities for $172,799BOE0417 000
000BOE04191/27/2012Date of Last Survey:200 LINWOOD STREET
1379 - P. S. 108 - BK -
A00268713/ED0012012WiringElectrical Under 600 Volts 68,975
A00330889/E23632014Interior LightingElectrical Lighting 484,178
Total Planned activities for $553,153BOE0419 000
000BOE042010/23/2012Date of Last Survey:124 MONITOR STREET
1380 - P. S. 110 - BK -
A00351832/E23642016Interior LightingElectrical Lighting 45,854
Total Planned activities for $45,854BOE0420 000
000BOE042110/3/2012Date of Last Survey:35 STARR STREET
1381 - I. S. 111 - BK -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 790,940
Total Planned activities for $790,940BOE0421 000
000BOE04239/28/2010Date of Last Survey:300 ADELPHI STREET
1383 - I. S. 113 - BK -
A00330840/E23632014WiringElectrical Under 600 Volts 157,881
Total Planned activities for $157,881BOE0423 000
Page D - 42
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE04249/20/2012Date of Last Survey:1077 REMSEN AVENUE
1384 - P. S. 114 - BK -
A00270688/E23632013Exterior WallsArchitecture Exterior 280,329
ENERG2012/E23632012Interior LightingElectrical Lighting 44,155
Total Planned activities for $324,484BOE0424 000
000BOE04271/13/2010Date of Last Survey:300 WILLOUGHBY AVENUE
1358 - I. S. 117 - BK -
A00312359/E23642015Exterior WallsArchitecture Exterior 48,271
A00332988/E23642015RoofArchitecture Exterior 1,195,415
A00250550/E23632011Switchgear/ SwitchboardElectrical Under 600 Volts 109,319
A00250550/E23632011WiringElectrical Under 600 Volts 146,250
Total Planned activities for $1,499,255BOE0427 000
000BOE042811/23/2010Date of Last Survey:3829 AVENUE K
1359 - P. S. 119 - BK -
EMERG2012/E23632012Interior LightingElectrical Lighting 397,954
A00312375/E23642015Fire/Smoke DetectionElectrical Alarm 511,997
Total Planned activities for $909,951BOE0428 000
000BOE042912/15/2009Date of Last Survey:18 BEAVER STREET
1360 - P. S. 120 - BK -
A00312391/E23632014Interior LightingElectrical Lighting 516,888
Total Planned activities for $516,888BOE0429 000
000BOE043112/3/2009Date of Last Survey:100 IRVING AVENUE
1362 - P. S. 123 - BK -
A00312427/E23642015Exterior WallsArchitecture Exterior 160,687
A00312431/E23632014FloorsArchitecture Interior 1,226,883
Total Planned activities for $1,387,570BOE0431 000
000BOE04329/27/2011Date of Last Survey:515 4TH AVENUE
1363 - P. S. 124 - BK -
A00250646/E23632012FloorsArchitecture Interior 391,577
A00312448/E23632014Interior LightingElectrical Lighting 38,271
Total Planned activities for $429,848BOE0432 000
000BOE043310/8/2009Date of Last Survey:424 LEONARD STREET
2623 - J. H. S. 126 - BK -
A00270848/E23632012WindowsArchitecture Exterior 735,743
Total Planned activities for $735,743BOE0433 000
000BOE04349/15/2010Date of Last Survey:7805 7 AVENUE
2750 - P. S. 127 - BK -
A00312486/E23632014Interior LightingElectrical Lighting 248,950
Total Planned activities for $248,950BOE0434 000
Page D - 43
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE043512/12/2011Date of Last Survey:2075 84 STREET
1364 - P. S. 128 - BK / P.S. 721 (OTC) -
A00330890/E23632014Interior LightingElectrical Lighting 753,615
A00330890/E23632014Exterior LightingElectrical Lighting 40,524
Total Planned activities for $794,139BOE0435 000
000BOE043712/22/2010Date of Last Survey:4305 FT HAMILTON PKWY
1365 - P. S. 131 - BK -
A00270898/E23632013Exterior WallsArchitecture Exterior 195,148
A00351689/E23642016Terminal DevicesMechanical Heating 314,794
Total Planned activities for $509,942BOE0437 000
000BOE04382/8/2011Date of Last Survey:320 MANHATTAN AVENUE
1366 - P. S. 132 - BK -
A00227732/E23632011WindowsArchitecture Exterior 117,095
Total Planned activities for $117,095BOE0438 000
000BOE04408/31/2011Date of Last Survey:684 LINDEN BLVD
1368 - P. S. 135 - BK -
A00227764/E23632012RoofArchitecture Exterior 111,936
A00310061/ED0012013WiringElectrical Under 600 Volts 63,894
Total Planned activities for $175,830BOE0440 000
000BOE044110/12/2011Date of Last Survey:4004 4TH AVENUE
1369 - I. S. 136 - BK - (J. H. S. 136 - BK)
A00333216/E23642015PanelboardsElectrical Under 600 Volts 69,033
A00333216/E23642015WiringElectrical Under 600 Volts 125,042
A00312568/E23632014Security SystemElectrical Alarm 96,647
A00312568/E23632014Fire/Smoke DetectionElectrical Alarm 330,829
Total Planned activities for $621,551BOE0441 000
000BOE044312/8/2010Date of Last Survey:801 PARK PLACE
1344 - P. S. 138 - BK -
A00268198/E23632011Exterior WallsArchitecture Exterior 309,499
A00268196/E23632011RoofArchitecture Exterior 71,646
A00333259/E23632014Exhaust FansMechanical Ventilation 106,530
Total Planned activities for $487,675BOE0443 000
000BOE04449/12/2012Date of Last Survey:315 EAST 113 STREET
1345 - P. S. 102 - M -
A00351790/E23642015Interior LightingElectrical Lighting 39,415
Total Planned activities for $39,415BOE0444 000
000BOE044512/13/2011Date of Last Survey:330 RUGBY RD.
1346 - P. S. 139 - BK -
A00291728/E23632014Exterior WallsArchitecture Exterior 494,015
Page D - 44
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00333266/E23642016Interior LightingElectrical Lighting 69,582
BOIL_6TO4/E23632014Energy SourceMechanical Heating 43,356
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 428,435
BOIL_6TO4/E23632014DistributionMechanical Heating 61,449
Total Planned activities for $1,096,837BOE0445 000
010BOE044510/12/2011Date of Last Survey:4001 18 AVE.
1347 - P. S. 134 - BK -
A00352825/E23642015Interior LightingElectrical Lighting 248,950
Total Planned activities for $248,950BOE0445 010
000BOE044610/7/2011Date of Last Survey:610 HENRY STREET
2622 - J. H. S. 142 - BK -
A00248023/E23632013RoofArchitecture Exterior 69,686
A00312654/E23632014Interior LightingElectrical Lighting 69,250
A00312654/E23632014Exterior LightingElectrical Lighting 48,015
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 710,648
Total Planned activities for $897,599BOE0446 000
000BOE04472/28/2011Date of Last Survey:100 NOLL STREET
2749 - P. S. 145 - BK -
A00250888/E23632011Exterior WallsArchitecture Exterior 279,452
A00250887/E23632011ParapetsArchitecture Exterior 39,696
A00291776/E23632013WiringElectrical Under 600 Volts 106,643
ACESCA404/E23642015Interior LightingElectrical Lighting 76,422
Total Planned activities for $502,213BOE0447 000
000BOE044910/12/2012Date of Last Survey:700 SUTTER AVENUE
1349 - P. S. 149 - BK - THE DANNY KAYE SCHOOL
EMERG2010/E23632012Exterior WallsArchitecture Exterior 263,215
Total Planned activities for $263,215BOE0449 000
000BOE04501/5/2012Date of Last Survey:364 SACKMAN STREET
1350 - P. S. 150 - BK -
A00291844/E23632014Interior LightingElectrical Lighting 36,724
Total Planned activities for $36,724BOE0450 000
000BOE045211/23/2010Date of Last Survey:725 EAST 23 STREET
1351 - P. S. 152 - BK -
A00309786/E23632013WindowsArchitecture Exterior 48,317
A00288911/E23632013RoofArchitecture Exterior 47,882
ACESCA404/E23642015Exterior LightingElectrical Lighting 56,365
A00352031/E23632014Conversion EquipmentMechanical Air Conditioning 97,704
Total Planned activities for $250,268BOE0452 000
Page D - 45
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE045310/12/2012Date of Last Survey:1970 HOMECREST AVENUE
1352 - P. S. 153 - BK -
A00271185/E23632013Exterior WallsArchitecture Exterior 565,581
A00291898/E23632013ParapetsArchitecture Exterior 38,972
Total Planned activities for $604,553BOE0453 000
000BOE045412/9/2009Date of Last Survey:11 AVENUE & WINDSOR PLACE
1353 - P. S. 154 - BK -
A00331024/E23632013Exterior WallsArchitecture Exterior 171,134
A00351834/E23642016Interior LightingElectrical Lighting 306,160
Total Planned activities for $477,294BOE0454 000
000BOE045511/30/2012Date of Last Survey:1355 HERKIMER STREET
1354 - P. S. 155 - BK -
A00312841/E23632013Interior LightingElectrical Lighting 35,695
Total Planned activities for $35,695BOE0455 000
000BOE045810/20/2010Date of Last Survey:400 ASHFORD STREET
1356 - P. S. 158 - BK -
A00248156/E23632010Exterior WallsArchitecture Exterior 179,885
A00312873/E23632014Fire/Smoke DetectionElectrical Alarm 248,121
Total Planned activities for $428,006BOE0458 000
000BOE04629/20/2012Date of Last Survey:1390 WILLOUGHBY AVENUE
1331 - I. S. 162 - BK - (J. H. S. 162 - BK)
A00333586/E23642016Interior LightingElectrical Lighting 59,941
Total Planned activities for $59,941BOE0462 000
000BOE04633/1/2011Date of Last Survey:1664 BENSON AVENUE
1332 - P. S. 748 - BK - SCHOOL FOR GLOBAL SCHOLARS
A00271344/E23632013Exterior WallsArchitecture Exterior 355,483
A00309673/E23632013ParapetsArchitecture Exterior 49,380
A00312969/E23632014Interior LightingElectrical Lighting 53,073
Total Planned activities for $457,936BOE0463 000
000BOE046412/23/2010Date of Last Survey:14 AVENUE & 42 STREET
1333 - P. S. 164 - BK -
A00268719/ED0012011FloorsArchitecture Interior 64,223
A00351818/E23642015Interior LightingElectrical Lighting 549,033
Total Planned activities for $613,256BOE0464 000
000BOE046511/24/2010Date of Last Survey:76 LOTT AVENUE
1334 - P. S. 165 - BK -
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 77,586
A00313001/E23632013Interior LightingElectrical Lighting 463,939
Total Planned activities for $541,525BOE0465 000
Page D - 46
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE04661/12/2012Date of Last Survey:800 VAN SICKLEN AVENUE
1335 - I. S. 166 - BK - (J. H. S. 166 - BK)
A00313019/E23632014Interior LightingElectrical Lighting 965,112
A00313019/E23632014Exterior LightingElectrical Lighting 49,754
Total Planned activities for $1,014,866BOE0466 000
000BOE046710/1/2009Date of Last Survey:1025 EASTERN PKWY
1336 - P. S. 167 - BK -
A00248059/E23632010Interior WallsArchitecture Interior 116,713
A00313039/E23632014Interior LightingElectrical Lighting 567,596
Total Planned activities for $684,309BOE0467 000
000BOE04699/15/2010Date of Last Survey:7109 6TH AVE.
8 - P. S. 170 - BK -
A00313079/E23632014Interior LightingElectrical Lighting 410,534
Total Planned activities for $410,534BOE0469 000
000BOE047210/4/2010Date of Last Survey:574 DUMONT AVENUE
1338 - P. S. 174 - BK -
ACESCA404/E23642015Interior LightingElectrical Lighting 61,755
Total Planned activities for $61,755BOE0472 000
000BOE04731/5/2012Date of Last Survey:226 BRISTOL ST.
681 - TEACHERS PREPARATORY H. S. - BK -
A00333787/E23642016Interior LightingElectrical Lighting 58,898
Total Planned activities for $58,898BOE0473 000
000BOE04741/13/2011Date of Last Survey:346 AVENUE P
7 - P. S. 177 - BK -
A00268722/E23632011PanelboardsElectrical Under 600 Volts 41,420
A00268722/E23632011WiringElectrical Under 600 Volts 46,891
Total Planned activities for $88,311BOE0474 000
000BOE04753/19/2010Date of Last Survey:2163 DEAN STREET
1339 - P. S. 178 - BK -
A00251381/E23632011FloorsArchitecture Interior 247,717
A00333839/E23642015Interior LightingElectrical Lighting 584,821
Total Planned activities for $832,538BOE0475 000
000BOE04772/24/2010Date of Last Survey:16 AVENUE & 57 STREET
1342 - P. S. 180 - BK -
ACESCA404/E23642015Interior LightingElectrical Lighting 81,617
Total Planned activities for $81,617BOE0477 000
000BOE04781/4/2012Date of Last Survey:1023 NEW YORK AVENUE
2598 - P. S. 181 - BK -
A00292316/E23632014WindowsArchitecture Exterior 1,054,794
Page D - 47
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00292315/E23632014RoofArchitecture Exterior 39,235
Total Planned activities for $1,094,029BOE0478 000
000BOE047911/26/2010Date of Last Survey:76 RIVERDALE AVE.
29 - P. S. 183 - BK -
A00313277/E23632014Interior LightingElectrical Lighting 596,934
Total Planned activities for $596,934BOE0479 000
000BOE048011/26/2010Date of Last Survey:273 NEWPORT STREET
1343 - P. S. 184 - BK -
A00309798/E23632013Exterior WallsArchitecture Exterior 58,598
A00313296/E23632014Interior LightingElectrical Lighting 570,375
Total Planned activities for $628,973BOE0480 000
000BOE04812/1/2011Date of Last Survey:8601 RIDGE BLVD
2621 - P. S. 185 - BK -
A00292369/E23632013Exterior WallsArchitecture Exterior 274,645
A00292368/E23632013WindowsArchitecture Exterior 351,332
A00182442/ED0012012WiringElectrical Under 600 Volts 63,894
A00228523/E23632011Fire/Smoke DetectionElectrical Alarm 531,689
Total Planned activities for $1,221,560BOE0481 000
000BOE04821/13/2011Date of Last Survey:7601 19 AVENUE
2620 - P. S. 186 - BK -
A00268724/ED0012011FloorsArchitecture Interior 382,764
A00313337/E23632014Fire/Smoke DetectionElectrical Alarm 40,168
Total Planned activities for $422,932BOE0482 000
000BOE048311/10/2011Date of Last Survey:3314 NEPTUNE AVENUE
2747 - P. S. 188 - BK -
SANDK188A/E23642015Interior WallsArchitecture Interior 208,448
SANDK188A/E23642015CeilingsArchitecture Interior 148,113
SANDK188D/E23642015WiringElectrical Under 600 Volts 82,150
A00352766/E23642015Exhaust FansMechanical Ventilation 85,402
Total Planned activities for $524,113BOE0483 000
000BOE04863/18/2010Date of Last Survey:1600 PARK PLACE
2 - P. S. 191 - BK -
A00292471/E23632013Interior WallsArchitecture Interior 45,289
Total Planned activities for $45,289BOE0486 000
000BOE048712/23/2010Date of Last Survey:4715 18 AVENUE
1320 - P. S. 192 - BK -
A00248013/E23632010Exterior WallsArchitecture Exterior 192,513
A00351821/E23642015Interior LightingElectrical Lighting 548,721
Total Planned activities for $741,234BOE0487 000
Page D - 48
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE048911/4/2010Date of Last Survey:AVENUE W & KNAPP STREET
1321 - P. S. 194 - BK -
A00271822/E23632012RoofArchitecture Exterior 59,042
A00352157/E23632014PanelboardsElectrical Under 600 Volts 51,775
A00352157/E23632014WiringElectrical Under 600 Volts 73,022
Total Planned activities for $183,839BOE0489 000
000BOE04902/15/2011Date of Last Survey:131 IRWIN STREET
4 - P. S. 195 - BK -
A00334152/E23642016Interior LightingElectrical Lighting 423,555
Total Planned activities for $423,555BOE0490 000
000BOE049112/15/2009Date of Last Survey:207 BUSHWICK AVENUE
1322 - P. S. 196 - BK -
A00292548/E23632013Exterior WallsArchitecture Exterior 57,285
A00289019/ED0012013FloorsArchitecture Interior 508,091
A00289666/ED0012012Interior LightingElectrical Lighting 878,428
A00289666/ED0012012Exterior LightingElectrical Lighting 37,229
Total Planned activities for $1,481,033BOE0491 000
000BOE049211/29/2011Date of Last Survey:1599 EAST 22 STREET
682 - P. S. 197 - BK -
A00309856/E23632013ParapetsArchitecture Exterior 141,584
A00292570/E23632013RoofArchitecture Exterior 77,437
A00352793/E23642015Interior LightingElectrical Lighting 57,818
A00352793/E23642015Exterior LightingElectrical Lighting 37,229
Total Planned activities for $314,068BOE0492 000
000BOE049311/23/2010Date of Last Survey:4105 FARRAGUT ROAD
1311 - P. S. 198 - BK -
A00313554/E23632014WindowsArchitecture Exterior 84,843
A00334216/E23642015RoofArchitecture Exterior 43,114
A00313549/E23632014Interior LightingElectrical Lighting 615,960
Total Planned activities for $743,917BOE0493 000
000BOE049510/14/2011Date of Last Survey:1940 BENSON AVENUE
1312 - P. S. 200 - BK -
A00292630/E23632014Exterior WallsArchitecture Exterior 135,027
EMERG2010/E23632014ParapetsArchitecture Exterior 76,114
A00334260/E23642015Interior LightingElectrical Lighting 39,323
A00334260/E23642015Exterior LightingElectrical Lighting 35,489
Total Planned activities for $285,953BOE0495 000
000BOE04962/1/2011Date of Last Survey:8010 12TH AVE.
6 - I. S. 201 - BK - (J. H. S. 201 - BK)
Page D - 49
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00292650/E23632014Exterior WallsArchitecture Exterior 71,286
A00292649/E23632014ParapetsArchitecture Exterior 67,505
A00334284/E23642016Interior LightingElectrical Lighting 746,213
A00334284/E23642016Exterior LightingElectrical Lighting 37,229
Total Planned activities for $922,233BOE0496 000
000BOE049710/5/2010Date of Last Survey:982 HEGEMAN AVE.
2667 - P. S. 202 - BK - ERNEST S. JENKYNS
ACESCA404/E23642015Exterior LightingElectrical Lighting 37,925
Total Planned activities for $37,925BOE0497 000
000BOE04985/18/2011Date of Last Survey:5101 AVENUE M
28 - P. S. 203 - BK -
A00352033/E23632014Fire/Smoke DetectionElectrical Alarm 274,706
Total Planned activities for $274,706BOE0498 000
000BOE049910/4/2011Date of Last Survey:8101 15TH AVE.
2553 - P. S. 204 - BK -
A00313678/E23632014RoofArchitecture Exterior 46,920
Total Planned activities for $46,920BOE0499 000
000BOE05002/23/2010Date of Last Survey:6701 20 AVENUE
1313 - P. S. 205 - BK -
A00352795/E23642015Interior LightingElectrical Lighting 103,773
Total Planned activities for $103,773BOE0500 000
000BOE050112/14/2011Date of Last Survey:NECK ROAD & EAST 22 STREET
1314 - P. S. 206 - BK -
A00289654/E23632013Exterior WallsArchitecture Exterior 624,962
A00313708/E23632014Interior LightingElectrical Lighting 772,644
A00313708/E23632014Exterior LightingElectrical Lighting 37,925
A00292736/E23632014Fire/Smoke DetectionElectrical Alarm 364,896
Total Planned activities for $1,800,427BOE0501 000
000BOE05025/18/2011Date of Last Survey:4011 FILLMORE AVE.
25 - P. S. 207 - BK -
A00292761/E23632013Exterior WallsArchitecture Exterior 350,597
A00288820/E23632013ParapetsArchitecture Exterior 235,088
A00292760/E23632013RoofArchitecture Exterior 62,266
A00292765/E23632014FloorsArchitecture Interior 339,211
A00292756/E23632013Interior LightingElectrical Lighting 488,107
Total Planned activities for $1,475,269BOE0502 000
000BOE05039/30/2010Date of Last Survey:4801 AVENUE D
26 - P. S. 208 - BK -
A00351835/E23642016Interior LightingElectrical Lighting 431,918
Page D - 50
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $431,918BOE0503 000
000BOE05053/18/2010Date of Last Survey:188 ROCHESTER AVENUE
1315 - I. S. 394/210 - BK - (I. S. 210 - BK )
A00352796/E23642015Interior LightingElectrical Lighting 80,869
Total Planned activities for $80,869BOE0505 000
000BOE05062/15/2011Date of Last Survey:1001 EAST 100 STREET
2745 - I. S. 211 - BK - (J. H. S. 211 - BK)
A00272141/E23632012RoofArchitecture Exterior 483,035
SANDK211A/E23642015CeilingsArchitecture Interior 130,894
SANDK211C/E23642015WiringElectrical Under 600 Volts 164,532
A00272136/E23632012Fire/Smoke DetectionElectrical Alarm 68,923
SANDK211E/E23642015Conversion EquipmentMechanical Heating 69,516
Total Planned activities for $916,900BOE0506 000
000BOE05073/1/2011Date of Last Survey:87 BAY 49 STREET
1289 - P. S. 212 - BK -
A00310528/ED0012013WiringElectrical Under 600 Volts 73,022
EMERG2012/E23632012Interior LightingElectrical Lighting 586,307
A00272162/E23632013Fire/Smoke DetectionElectrical Alarm 265,352
Total Planned activities for $924,681BOE0507 000
000BOE05082/23/2011Date of Last Survey:580 HEGEMAN AVE.
2569 - P. S. 213 - BK -
A00313848/E23632013Interior LightingElectrical Lighting 571,732
Total Planned activities for $571,732BOE0508 000
000BOE050910/19/2010Date of Last Survey:2944 PITKIN AVE.
2572 - P. S. 214 - BK -
A00252008/E23632011Exterior WallsArchitecture Exterior 113,938
A00252007/E23632011WindowsArchitecture Exterior 295,380
A00252006/E23632011ParapetsArchitecture Exterior 68,328
A00268282/E23632011RoofArchitecture Exterior 36,414
A00352797/E23642015Interior LightingElectrical Lighting 58,251
Total Planned activities for $572,311BOE0509 000
000BOE05105/15/2013Date of Last Survey:415 AVENUE S
1291 - P. S. 215 - BK -
A00289021/ED0012013WiringElectrical Under 600 Volts 54,766
A00351822/E23642015Interior LightingElectrical Lighting 41,608
Total Planned activities for $96,374BOE0510 000
000BOE05112/10/2011Date of Last Survey:350 AVENUE X
1292 - P. S. 216 - BK -
A00334578/E23642015Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
Page D - 51
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00334578/E23642015WiringElectrical Under 600 Volts 73,022
A00292920/E23632014Interior LightingElectrical Lighting 576,183
Total Planned activities for $740,303BOE0511 000
000BOE05125/20/2011Date of Last Survey:1100 NEWKIRK AVE.
1293 - P. S. 217 - BK -
A00352798/E23642015Interior LightingElectrical Lighting 43,682
Total Planned activities for $43,682BOE0512 000
000BOE05144/1/2011Date of Last Survey:1060 CLARKSON AVE.
2546 - P. S. 219 - BK -
A00248050/E23632011Exterior WallsArchitecture Exterior 131,347
A00248051/E23632011RoofArchitecture Exterior 65,432
A00334627/E23642016Interior LightingElectrical Lighting 785,544
A00313946/E23632014Fire/Smoke DetectionElectrical Alarm 92,553
Total Planned activities for $1,074,876BOE0514 000
000BOE05154/5/2011Date of Last Survey:4812 9TH AVE.
2547 - I. S. 220 - BK - (J. H. S. 220 - BK)
A00309848/E23632014Exterior WallsArchitecture Exterior 205,390
A00313966/E23632014RoofArchitecture Exterior 55,042
Total Planned activities for $260,432BOE0515 000
000BOE05173/9/2012Date of Last Survey:3301 QUENTIN ROAD
1297 - P. S. 222 - BK -
A00310024/E23632013WiringElectrical Under 600 Volts 113,308
A00314010/E23632014Interior LightingElectrical Lighting 555,788
Total Planned activities for $669,096BOE0517 000
000BOE051812/23/2010Date of Last Survey:4200 16 AVENUE
1298 - I. S. 223 - BK -
A00314029/E23632014Interior LightingElectrical Lighting 1,046,247
A00314029/E23632014Exterior LightingElectrical Lighting 42,100
A00334713/E23642015Fire/Smoke DetectionElectrical Alarm 416,982
Total Planned activities for $1,505,329BOE0518 000
000BOE051910/19/2010Date of Last Survey:755 WORTMAN AVE.
2548 - P. S. 224 - BK -
A00352799/E23642015Interior LightingElectrical Lighting 93,596
Total Planned activities for $93,596BOE0519 000
000BOE05202/15/2011Date of Last Survey:1075 OCEAN VIEW AVENUE
1299 - P. S. 225 - BK -
A00314074/E23642015Exterior WallsArchitecture Exterior 312,744
A00314073/E23642015ParapetsArchitecture Exterior 164,697
Total Planned activities for $477,441BOE0520 000
Page D - 52
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE05212/23/2010Date of Last Survey:6006 23 AVENUE
1300 - P. S. 226 - BK -
A00314089/E23632014Interior LightingElectrical Lighting 780,458
A00314089/E23632014Exterior LightingElectrical Lighting 37,672
Total Planned activities for $818,130BOE0521 000
000BOE05221/11/2011Date of Last Survey:6500 16TH AVE.
2549 - I. S. 227 - BK -
A00334800/E23642016Exterior LightingElectrical Lighting 50,092
Total Planned activities for $50,092BOE0522 000
000BOE05232/10/2011Date of Last Survey:AVENUE S & WEST 4 STREET
2619 - I. S. 228 - BK - (J. H. S. 228 - BK)
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 109,411
A00293143/E23632014Exterior LightingElectrical Lighting 43,937
Total Planned activities for $153,348BOE0523 000
000BOE05256/2/2011Date of Last Survey:1 ALBEMARLE ROAD
2552 - P. S. 230 - BK -
A00334848/E23642016Interior LightingElectrical Lighting 584,805
Total Planned activities for $584,805BOE0525 000
000BOE052712/3/2010Date of Last Survey:905 WINTHROP STREET
1323 - I. S. 232 - BK - (J. H. S. 232 - BK)
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 140,672
A00272516/E23632014Interior LightingElectrical Lighting 51,017
A00272516/E23632014Exterior LightingElectrical Lighting 42,448
Total Planned activities for $234,137BOE0527 000
000BOE052810/25/2011Date of Last Survey:AVENUE B & EAST 93 STREET
683 - P. S. 233 - BK -
A00334904/E23642016Interior LightingElectrical Lighting 116,370
A00293217/E23632013Conversion EquipmentMechanical Heating 36,991
Total Planned activities for $153,361BOE0528 000
000BOE052911/5/2010Date of Last Survey:1875 EAST 17 STREET
1324 - I. S. 234 - BK -
A00309619/E23632012WindowsArchitecture Exterior 183,540
A00314225/E23632014Interior LightingElectrical Lighting 766,238
A00314225/E23632014Exterior LightingElectrical Lighting 42,796
Total Planned activities for $992,574BOE0529 000
000BOE05308/26/2010Date of Last Survey:525 LENOX ROAD
2550 - P. S. 235 - BK -
A00293257/E23632012Exterior WallsArchitecture Exterior 87,370
A00314241/E23632014Interior LightingElectrical Lighting 464,029
Page D - 53
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $551,399BOE0530 000
000BOE05315/18/2011Date of Last Survey:6302 AVENUE U
2551 - P. S. 236 - BK -
A00268121/E23632011Exterior WallsArchitecture Exterior 100,688
EMERG2012/E23632012Interior LightingElectrical Lighting 560,957
A00289026/E23632014Fire/Smoke DetectionElectrical Alarm 227,445
Total Planned activities for $889,090BOE0531 000
000BOE053311/10/2011Date of Last Survey:2401 NEPTUNE AVENUE
1326 - I. S. 239 - BK - (J. H. S. 239 - BK)
SCASANDY/E23632013Exterior WallsArchitecture Exterior 144,604
SANDK239A/E23642015Interior WallsArchitecture Interior 517,826
SANDK239D/E23642015WiringElectrical Under 600 Volts 164,532
SANDK239F/E23642015Terminal DevicesMechanical Heating 422,311
Total Planned activities for $1,249,273BOE0533 000
000BOE05342/6/2012Date of Last Survey:2500 NOSTRAND AVENUE
1327 - I. S. 240 - BK -
A00335022/E23642015Interior LightingElectrical Lighting 1,156,328
A00335022/E23642015Exterior LightingElectrical Lighting 48,015
A00293337/E23632014Fire/Smoke DetectionElectrical Alarm 407,628
BOIL_6TO4/E23632014DistributionMechanical Heating 101,926
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 55,153
Total Planned activities for $1,769,050BOE0534 000
000BOE053511/24/2010Date of Last Survey:976 PRESIDENT STREET
2545 - P. S. 241 - BK -
A00352803/E23642015Interior LightingElectrical Lighting 50,810
Total Planned activities for $50,810BOE0535 000
000BOE05364/12/2011Date of Last Survey:100-01 FLATLANDS AVENUE
1328 - P. S. 242 - BK - P.S. 279 - BK ANNEX
A00293378/E23632013Fire/Smoke DetectionElectrical Alarm 196,922
Total Planned activities for $196,922BOE0536 000
000BOE053810/1/2010Date of Last Survey:5404 TILDEN AVENUE
2544 - P. S. 244 - BK -
A00353044/E23642015WindowsArchitecture Exterior 47,835
A00335113/E23642015RoofArchitecture Exterior 51,341
A00352939/E23642015Interior LightingElectrical Lighting 115,137
Total Planned activities for $214,313BOE0538 000
000BOE05392/25/2011Date of Last Survey:72 VERONICA PLACE
1316 - I. S. 246 - BK -
A00252543/E23632011Exterior WallsArchitecture Exterior 45,052
Page D - 54
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00252542/E23632011WindowsArchitecture Exterior 63,157
A00335131/E23642016Interior LightingElectrical Lighting 649,044
A00335131/E23642016Exterior LightingElectrical Lighting 45,054
A00353045/E23642015Conversion EquipmentMechanical Air Conditioning 75,925
Total Planned activities for $878,232BOE0539 000
000BOE05402/23/2010Date of Last Survey:7000 21 AVENUE
2746 - P. S. 247 - BK -
A00335152/E23642016Interior LightingElectrical Lighting 570,628
Total Planned activities for $570,628BOE0540 000
000BOE054112/13/2011Date of Last Survey:18 MARLBOROUGH ROAD
1302 - P. S. 249 - BK -
A00314472/E23632014Interior LightingElectrical Lighting 59,370
A00335167/E23642016Conversion EquipmentMechanical Heating 36,555
A00335167/E23642016DistributionMechanical Heating 52,430
A00335167/E23642016Terminal DevicesMechanical Heating 80,975
Total Planned activities for $229,330BOE0541 000
010BOE05418/30/2011Date of Last Survey:227 STERLING PLACE
1303 - P. S. 340 - BK -
A00317126/E23642015Exterior WallsArchitecture Exterior 78,761
Total Planned activities for $78,761BOE0541 010
000BOE05422/8/2011Date of Last Survey:108 MONTROSE AVENUE
1304 - P. S. 250 - BK -
A00293494/E23632013WindowsArchitecture Exterior 60,074
Total Planned activities for $60,074BOE0542 000
000BOE05439/27/2010Date of Last Survey:1037 EAST 54TH ST.
2543 - P. S. 251 - BK -
A00314512/E23632014RoofArchitecture Exterior 64,103
A00229662/E23632011FloorsArchitecture Interior 278,151
A00268741/ED0012013WiringElectrical Under 600 Volts 63,894
Total Planned activities for $406,148BOE0543 000
000BOE05446/18/2010Date of Last Survey:LENOX ROAD & EAST 94 STREET
1305 - I. S. 252 - BK - (J. H. S. 252 - BK)
A00293544/E23632014FloorsArchitecture Interior 51,741
A00335225/E23642016Interior LightingElectrical Lighting 38,472
A00335223/E23642015Conversion EquipmentMechanical Heating 473,762
A00335223/E23642015DistributionMechanical Heating 135,900
A00335223/E23642015Terminal DevicesMechanical Heating 495,468
Total Planned activities for $1,195,343BOE0544 000
Page D - 55
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE05453/12/2010Date of Last Survey:601 OCEAN VIEW AVENUE
1306 - P. S. 253 - BK -
A00293557/E23632014Interior LightingElectrical Lighting 521,600
A00248094/E23632010Terminal DevicesMechanical Heating 198,582
Total Planned activities for $720,182BOE0545 000
000BOE05462/16/2011Date of Last Survey:1801 AVENUE Y
2664 - P. S. 254 - BK -
A00330860/E23632013Interior LightingElectrical Lighting 335,792
SANDK254E/E23642015Terminal DevicesMechanical Heating 289,114
Total Planned activities for $624,906BOE0546 000
000BOE054711/5/2010Date of Last Survey:1866 EAST 17TH ST.
2542 - P. S. 255 - BK -
A00229734/E23632010Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00229734/E23632010PanelboardsElectrical Under 600 Volts 36,242
A00229734/E23632010WiringElectrical Under 600 Volts 82,150
Total Planned activities for $209,490BOE0547 000
000BOE054911/7/2011Date of Last Survey:60 COOK STREET
968 - P. S. 257 - BK -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 425,117
BOIL_6TO4/E23632014DistributionMechanical Heating 60,973
Total Planned activities for $486,090BOE0549 000
000BOE055011/23/2010Date of Last Survey:141 MACON STREET
1308 - I. S. 258 - BK -
PCB_LIGHT/E23632013Exterior LightingElectrical Lighting 49,406
Total Planned activities for $49,406BOE0550 000
000BOE05512/1/2011Date of Last Survey:7305 FT HAMILTON PKWY
1309 - I. S. 259 - BK - (J. H. S. 259 - BK)
A00351839/E23642016Interior LightingElectrical Lighting 37,482
Total Planned activities for $37,482BOE0551 000
000BOE05522/23/2011Date of Last Survey:875 WILLIAMS AVENUE
2541 - P. S. 260 - BK -
A00335382/E23642015Interior LightingElectrical Lighting 578,564
A00229837/E23632011Fire/Smoke DetectionElectrical Alarm 139,814
Total Planned activities for $718,378BOE0552 000
000BOE055311/14/2012Date of Last Survey:314 PACIFIC STREET
1310 - P. S. 261 - BK -
A00314695/E23632014Interior LightingElectrical Lighting 54,812
Total Planned activities for $54,812BOE0553 000
Page D - 56
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE055511/29/2010Date of Last Survey:210 CHESTER STREET
2618 - P.S./I.S. 323 - BK - (FORMER I.S. 263 - BK)
A00314740/E23632014Interior LightingElectrical Lighting 1,049,938
A00314740/E23632014Exterior LightingElectrical Lighting 45,579
Total Planned activities for $1,095,517BOE0555 000
000BOE05569/28/2010Date of Last Survey:101 PARK AVENUE
1276 - I. S. 265 - BK -
A00314763/E23632013Exterior LightingElectrical Lighting 43,526
A00335463/E23642015DistributionMechanical Heating 98,992
Total Planned activities for $142,518BOE0556 000
000BOE05589/30/2009Date of Last Survey:1957 NOSTRAND AVENUE
2617 - P. S. 269 - BK -
A00335517/E23642015RoofArchitecture Exterior 52,861
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 384,543
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 59,688
Total Planned activities for $497,092BOE0558 000
000BOE05593/4/2011Date of Last Survey:241 EMERSON PLACE
2744 - P. S. 270 - BK -
A00289034/ED0012012WiringElectrical Under 600 Volts 82,150
A00352805/E23642015Interior LightingElectrical Lighting 104,931
Total Planned activities for $187,081BOE0559 000
000BOE05612/15/2011Date of Last Survey:101-24 SEAVIEW AVENUE
1279 - P. S. 272 - BK -
A00314869/E23632014RoofArchitecture Exterior 68,897
Total Planned activities for $68,897BOE0561 000
000BOE056210/5/2010Date of Last Survey:923 JEROME ST.
2540 - P. S. 273 - BK -
BOIL_6TO4/E23632014DistributionMechanical Heating 117,116
Total Planned activities for $117,116BOE0562 000
020BOE05639/23/2011Date of Last Survey:797 BUSHWICK AVENUE
1282 - DISTRICT OFICE 32 - SECOND OPPORTUNITY SCHOOL
A00309695/E23632013ParapetsArchitecture Exterior 44,121
Total Planned activities for $44,121BOE0563 020
000BOE056411/24/2010Date of Last Survey:985 ROCKAWAY AVENUE
1283 - I. S. 275 - BK -
SIRA3K275/E23632013WiringElectrical Under 600 Volts 109,688
Total Planned activities for $109,688BOE0564 000
000BOE05656/6/2013Date of Last Survey:1070 EAST 83 STREET
1284 - P. S. 276 - BK -
Page D - 57
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00335643/E23642016RoofArchitecture Exterior 254,396
SANDK276D/E23642015Interior WallsArchitecture Interior 40,463
SANDK276D/E23642015CeilingsArchitecture Interior 204,343
Total Planned activities for $499,202BOE0565 000
000BOE056611/4/2010Date of Last Survey:2529 GERRITSEN AVE.
2539 - P. S. 277 - BK -
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 436,969
Total Planned activities for $436,969BOE0566 000
000BOE056712/14/2011Date of Last Survey:1925 STUART STREET
1285 - I. S. 278 - BK -
A00230145/E23632011Exterior WallsArchitecture Exterior 50,555
A00314980/E23632014Interior LightingElectrical Lighting 1,069,670
A00314980/E23632014Exterior LightingElectrical Lighting 46,623
A00248079/E23632011Conversion EquipmentMechanical Heating 665,367
A00248079/E23632011DistributionMechanical Heating 47,716
A00248079/E23632011Terminal DevicesMechanical Heating 221,082
Total Planned activities for $2,101,013BOE0567 000
000BOE05684/12/2011Date of Last Survey:1070 EAST 104 STREET
1286 - P. S. 279 - BK -
SANDK279E/E23642015Interior WallsArchitecture Interior 38,041
SANDK279E/E23642015CeilingsArchitecture Interior 82,553
SANDK279B/E23642015WiringElectrical Under 600 Volts 78,151
SANDK279F/E23642015DistributionMechanical Heating 35,624
Total Planned activities for $234,369BOE0568 000
000BOE05693/1/2011Date of Last Survey:8787 24 AVENUE
1287 - I. S. 281 - BK - (J. H. S. 281 - BK)
A00352158/E23632014WiringElectrical Under 600 Volts 164,532
EMERG2012/E23632012Exterior LightingElectrical Lighting 53,234
BOIL_6TO4/E23632013Conversion EquipmentMechanical Heating 751,639
BOIL_6TO4/E23632013DistributionMechanical Heating 53,902
Total Planned activities for $1,023,307BOE0569 000
000BOE057012/7/2009Date of Last Survey:180 6TH AVENUE
1288 - P. S. 282 - BK -
A00352159/E23632014WiringElectrical Under 600 Volts 53,322
A00294023/E23632013Interior LightingElectrical Lighting 682,924
BOIL_6TO4/E23632014DistributionMechanical Heating 59,603
Total Planned activities for $795,849BOE0570 000
000BOE05713/24/2011Date of Last Survey:220 WATKINS STREET
1275 - P. S. 284 - BK -
Page D - 58
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00315042/E23632014WiringElectrical Under 600 Volts 93,313
A00351824/E23642015Interior LightingElectrical Lighting 688,427
A00335752/E23642015Fire/Smoke DetectionElectrical Alarm 90,584
Total Planned activities for $872,324BOE0571 000
000BOE05722/24/2011Date of Last Survey:5905 BEVERLY ROAD
2538 - I. S. 285 - BK - (J. H. S. 285 - BK)
A00335770/E23642015Interior LightingElectrical Lighting 1,000,483
A00335770/E23642015Exterior LightingElectrical Lighting 41,752
A00294058/E23642015Fire/Smoke DetectionElectrical Alarm 295,383
A00230237/E23632011DistributionMechanical Heating 427,303
Total Planned activities for $1,764,921BOE0572 000
000BOE05732/16/2011Date of Last Survey:2525 HARING STREET
1260 - P. S. 286 - BK(CMHC-P811K/SIE I) -
A00294082/E23632014Exterior WallsArchitecture Exterior 173,502
A00294081/E23632014WindowsArchitecture Exterior 111,788
Total Planned activities for $285,290BOE0573 000
000BOE05752/11/2011Date of Last Survey:2950 WEST 25 STREET
1262 - P. S. 288 - BK -
SANDK288A/E23642015Interior WallsArchitecture Interior 101,045
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 119,506
SANDK288B/E23642015Conversion EquipmentMechanical Heating 78,336
SANDK288B/E23642015Terminal DevicesMechanical Heating 86,762
Total Planned activities for $385,649BOE0575 000
000BOE05791/12/2012Date of Last Survey:300 WYONA STREET
1266 - I. S. 292 - BK -
A00352807/E23642015Interior LightingElectrical Lighting 122,060
A00352807/E23642015Exterior LightingElectrical Lighting 56,713
Total Planned activities for $178,773BOE0579 000
000BOE05804/4/2013Date of Last Survey:284 BALTIC STREET
1267 - BROOKLYN SCHOOL FOR - GLOBAL STUDIES
A00315207/E23642015Exterior WallsArchitecture Exterior 151,290
Total Planned activities for $151,290BOE0580 000
000BOE05819/28/2012Date of Last Survey:125 COVERT STREET
1268 - I. S. 296 - BK - (J. H. S. 296 - BK)
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 779,569
BOIL_6TO4/E23632014DistributionMechanical Heating 55,905
Total Planned activities for $835,474BOE0581 000
000BOE058212/16/2009Date of Last Survey:700 PARK AVENUE
1269 - P. S. 297 - BK -
Page D - 59
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00330853/E23632013Interior LightingElectrical Lighting 452,832
Total Planned activities for $452,832BOE0582 000
000BOE058311/26/2010Date of Last Survey:85 WATKINS STREET
1270 - P. S. 298 - BK -
A00335977/E23642016Fire/Smoke DetectionElectrical Alarm 797,533
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 386,903
BOIL_6TO4/E23632012DistributionMechanical Heating 55,492
Total Planned activities for $1,239,928BOE0583 000
000BOE05844/5/2011Date of Last Survey:88 WOODBINE STREET
1271 - P. S. 299 - BK -
A00330867/E23632014Interior LightingElectrical Lighting 607,220
Total Planned activities for $607,220BOE0584 000
000BOE05862/11/2011Date of Last Survey:501 WEST AVENUE
1273 - J. H. S. 303 - BK -
A00309885/E23632014RoofArchitecture Exterior 48,112
SANDK303D/E23642015Interior WallsArchitecture Interior 503,543
SANDK303D/E23642015CeilingsArchitecture Interior 182,841
A00268748/ED0012011WiringElectrical Under 600 Volts 146,250
EMERG2012/E23632012Exterior LightingElectrical Lighting 52,886
SANDK303E/E23642015Terminal DevicesMechanical Heating 395,080
SANDK303F/E23642015Exhaust FansMechanical Ventilation 97,580
Total Planned activities for $1,426,292BOE0586 000
000BOE058712/17/2009Date of Last Survey:280 HART STREET
684 - P. S. 304 - BK -
EMERG2010/E23632010RoofArchitecture Exterior 64,449
A00315334/E23632014Interior LightingElectrical Lighting 714,318
Total Planned activities for $778,767BOE0587 000
000BOE05892/23/2011Date of Last Survey:970 VERMONT STREET
1259 - P. S. 306 - BK -
A00352945/E23642015Interior LightingElectrical Lighting 39,564
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 53,962
Total Planned activities for $93,526BOE0589 000
000BOE05903/4/2011Date of Last Survey:209 YORK STREET
2742 - P. S. 307 - BK -
A00331169/E23642015Exterior WallsArchitecture Exterior 174,743
A00331092/E23632014Interior WallsArchitecture Interior 38,789
Total Planned activities for $213,532BOE0590 000
000BOE05919/21/2011Date of Last Survey:616 QUINCY STREET
1246 - P. S. 308 - BK -
Page D - 60
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00315409/E23632014Interior LightingElectrical Lighting 960,963
A00315409/E23632014Exterior LightingElectrical Lighting 40,360
Total Planned activities for $1,001,323BOE0591 000
000BOE05929/21/2011Date of Last Survey:794 MONROE STREET
1247 - P. S. 309 - BK -
A00268006/E23632011FloorsArchitecture Interior 109,243
EMERG2011/E23632011Interior LightingElectrical Lighting 69,043
BOIL_6TO4/E23632014DistributionMechanical Heating 60,973
Total Planned activities for $239,259BOE0592 000
000BOE05939/27/2010Date of Last Survey:7103 AVENUE T
1248 - P. S. 312 - BK -
A00230668/E23632010WindowsArchitecture Exterior 124,805
BOIL_6TO4/E23632014DistributionMechanical Heating 60,288
Total Planned activities for $185,093BOE0593 000
000BOE05941/19/2011Date of Last Survey:330 59 STREET
1249 - P. S. 314 - BK -
ACESCA404/E23642015Interior LightingElectrical Lighting 159,390
Total Planned activities for $159,390BOE0594 000
000BOE059612/16/2009Date of Last Survey:101 WALTON STREET
1251 - I. S. 318 - BK -
A00253645/E23632011Exterior WallsArchitecture Exterior 39,719
Total Planned activities for $39,719BOE0596 000
000BOE059811/24/2010Date of Last Survey:46 MCKEEVER PLACE
1252 - I. S. 320 - BK -
A00230759/E23632011Exterior WallsArchitecture Exterior 121,200
A00230758/E23632011ParapetsArchitecture Exterior 83,124
A00315527/E23632014Interior LightingElectrical Lighting 61,286
A00351686/E23642015Conversion EquipmentMechanical Heating 75,470
A00351686/E23642015Terminal DevicesMechanical Heating 117,144
Total Planned activities for $458,224BOE0598 000
000BOE06021/13/2012Date of Last Survey:330 ALABAMA AVENUE
1256 - P. S. 328 - BK -
A00315611/E23632013Interior LightingElectrical Lighting 683,433
BOIL_6TO4/E23632014DistributionMechanical Heating 92,487
Total Planned activities for $775,920BOE0602 000
000BOE06034/22/2011Date of Last Survey:2929 WEST 30 STREET
1257 - P. S. 329 - BK -
A00253787/E23632011WindowsArchitecture Exterior 74,023
sandk329a/E23642015Interior WallsArchitecture Interior 120,038
Page D - 61
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
sandk329a/E23642015CeilingsArchitecture Interior 120,595
Total Planned activities for $314,656BOE0603 000
000BOE06051/4/2012Date of Last Survey:130 ROCHESTER AVENUE
2616 - P. S. 335 - BK -
A00294657/E23632013RoofArchitecture Exterior 35,584
A00315663/E23632013Interior LightingElectrical Lighting 39,564
A00315663/E23632013Exterior LightingElectrical Lighting 35,489
Total Planned activities for $110,637BOE0605 000
000BOE060710/12/2012Date of Last Survey:1400 PENNSYLVANIA AVENUE
1233 - P. S. 346 - BK -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 587,519
BOIL_6TO4/E23632014DistributionMechanical Heating 42,133
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 96,894
Total Planned activities for $726,546BOE0607 000
000BOE06081/31/2011Date of Last Survey:383-387 STATE STREET
1234 - P. S. 369 - BK -
A00330882/E23632013Fire/Smoke DetectionElectrical Alarm 97,476
Total Planned activities for $97,476BOE0608 000
000BOE061012/20/2010Date of Last Survey:355 37 STREET
1236 - P. S. 371 - BK (ALSO P.S. 231) -
A00315755/E23632014Fire/Smoke DetectionElectrical Alarm 164,922
Total Planned activities for $164,922BOE0610 000
010BOE061012/20/2010Date of Last Survey:360 36 STREET
4230 - BROOKLYN REGIONAL OFFICES - P.S. 231
A00334868/E23642015Fire/Smoke DetectionElectrical Alarm 43,323
Total Planned activities for $43,323BOE0610 010
000BOE06114/5/2011Date of Last Survey:200 WOODBINE STREET
1237 - P. S. 377 - BK -
ACESCA404/E23642015Interior LightingElectrical Lighting 79,703
ACESCA404/E23642015Exterior LightingElectrical Lighting 36,533
Total Planned activities for $116,236BOE0611 000
000BOE061212/28/2011Date of Last Survey:370 MARCY AVENUE
1238 - P. S. 380 - BK -
A00274178/E23632013RoofArchitecture Exterior 790,738
A00274172/E23632013Security SystemElectrical Alarm 134,101
A00274172/E23632013Fire/Smoke DetectionElectrical Alarm 459,037
Total Planned activities for $1,383,876BOE0612 000
000BOE06142/10/2011Date of Last Survey:242 COOPER STREET
1239 - P. S. 384 - BK -
Page D - 62
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00336582/E23642015Interior LightingElectrical Lighting 852,490
A00336582/E23642015Exterior LightingElectrical Lighting 38,620
Total Planned activities for $891,110BOE0614 000
000BOE061511/15/2010Date of Last Survey:1224 PARK PLACE
1240 - I. S. 390 - BK -
A00248060/E23632010CeilingsArchitecture Interior 332,292
ACESCA404/E23642015Interior LightingElectrical Lighting 167,675
A00336601/E23642016Conversion EquipmentMechanical Heating 52,223
A00336601/E23642016DistributionMechanical Heating 149,803
Total Planned activities for $701,993BOE0615 000
000BOE06169/9/2010Date of Last Survey:790 EAST NEW YORK AVENUE
1241 - I. S. 391 - BK - MAHALIA JACKSON
ACESCA404/E23642015Interior LightingElectrical Lighting 65,425
ACESCA404/E23642015Exterior LightingElectrical Lighting 57,061
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 40,284
BOIL_6TO4/E23632012DistributionMechanical Heating 57,778
Total Planned activities for $220,548BOE0616 000
000BOE06173/24/2011Date of Last Survey:110 CHESTER STREET
1242 - P. S. 396 - BK - (TANDEM P.S. 327 - BK)
A00289055/ED0012013WiringElectrical Under 600 Volts 123,345
A00289055/E23632013GeneratorsElectrical Stand-by Power 116,731
A00330847/E23632013Interior LightingElectrical Lighting 56,553
A00289059/E23632013Fire/Smoke DetectionElectrical Alarm 239,260
Total Planned activities for $535,889BOE0617 000
000BOE06219/11/2012Date of Last Survey:2630 BENSON AVE.
1232 - LAFAYETTE HIGH SCHOOL - BK -
SANDK400A/E23642015Interior WallsArchitecture Interior 208,344
SANDK400A/E23642015CeilingsArchitecture Interior 306,436
A00310071/E23632013WiringElectrical Under 600 Volts 287,805
A00351842/E23642016Interior LightingElectrical Lighting 130,103
Total Planned activities for $932,688BOE0621 000
000BOE06229/3/2010Date of Last Survey:2839 BEDFORD AVENUE
1220 - MIDWOOD HIGH SCHOOL - BK -
A00331041/E23632014Interior WallsArchitecture Interior 1,116,880
A00331041/E23632014CeilingsArchitecture Interior 245,365
A00248161/E23632011WiringElectrical Under 600 Volts 82,230
A00352810/E23642015Interior LightingElectrical Lighting 62,625
A00352810/E23642015Exterior LightingElectrical Lighting 96,630
A00336713/E23642015Exhaust FansMechanical Ventilation 291,889
Page D - 63
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $1,895,619BOE0622 000
010BOE06229/3/2010Date of Last Survey:E. 17 STREET & AVENUE L
13395 - MIDWOOD HIGH SCHOOL - BK - STADIUM / FIELDHOUSE
K406BP11A/EK0012012Exterior WallsArchitecture Exterior 91,956
K406BP11A/EK0012012WindowsArchitecture Exterior 43,164
K406BP11A/EK0012012RoofArchitecture Exterior 35,722
K406BP11A/EK0012012Exhaust FansMechanical Ventilation 41,237
Total Planned activities for $212,079BOE0622 010
000BOE06238/31/2012Date of Last Survey:2800 OCEAN PARKWAY
1221 - ABRAHAM LINCOLN HIGH SCHOOL - BK -
A00294984/E23632013WindowsArchitecture Exterior 1,444,724
SANDK410A/E23642015Interior WallsArchitecture Interior 1,001,380
SANDK410A/E23642015CeilingsArchitecture Interior 222,061
SANDK410B/E23642015DistributionMechanical Ventilation 49,763
Total Planned activities for $2,717,928BOE0623 000
010BOE06238/31/2012Date of Last Survey:2800 OCEAN PARKWAY
13432 - ABRAHAM LINCOLN HIGH SCHOOL - BK - FIELDHOUSE
A00294984/E23632013WindowsArchitecture Exterior 241,387
SANDK410A/E23642015Interior WallsArchitecture Interior 218,881
SANDK410A/E23642015CeilingsArchitecture Interior 53,800
Total Planned activities for $514,068BOE0623 010
000BOE06249/30/2010Date of Last Survey:5800 TILDEN AVE.
686 - SAMUEL J. TILDEN HIGH SCHOOL -BK -
A00351838/E23642016Interior LightingElectrical Lighting 172,053
Total Planned activities for $172,053BOE0624 000
000BOE062511/4/2010Date of Last Survey:3787 BEDFORD AVE.
1222 - JAMES MADISON HIGH SCHOOL - BK -
A00165524/E23632010FloorsArchitecture Interior 165,886
A00165535/E23632010Interior WallsArchitecture Interior 602,246
A00309733/E23632013PanelboardsElectrical Under 600 Volts 73,635
A00309733/E23632013WiringElectrical Under 600 Volts 287,805
A00352813/E23642015Interior LightingElectrical Lighting 128,703
BOIL6TO4/E23632012DistributionMechanical Heating 304,608
BOIL6TO4/E23632012Terminal DevicesMechanical Heating 235,225
Total Planned activities for $1,798,108BOE0625 000
000BOE06268/25/2009Date of Last Survey:29 FORT GREENE PL.
1223 - BROOKLYN TECHNICAL H.S. - BK -
A00004303/E23622011Exterior WallsArchitecture Exterior 650,315
A00288996/E23632012RoofArchitecture Exterior 113,665
Page D - 64
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00352947/E23642015Interior LightingElectrical Lighting 1,196,798
A00352947/E23642015Egress LightingElectrical Lighting 9,362
BOIL_6TO4/E23632014Energy SourceMechanical Heating 85,802
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 3,276,763
Total Planned activities for $5,332,705BOE0626 000
000BOE062812/7/2010Date of Last Survey:883 CLASSON AVE.
1225 - PROSPECT HEIGHTS HIGH SCHOOL -BK -
A00351843/E23642016Interior LightingElectrical Lighting 161,135
Total Planned activities for $161,135BOE0628 000
000BOE06299/16/2009Date of Last Survey:1601 80TH STREET
1226 - NEW UTRECHT HIGH SCHOOL - BK -
A00254318/E23632012Exterior WallsArchitecture Exterior 51,622
A00274534/E23632012RoofArchitecture Exterior 104,172
A00352814/E23642015Interior LightingElectrical Lighting 135,187
Total Planned activities for $290,981BOE0629 000
000BOE06319/3/2009Date of Last Survey:1700 FULTON STREET
1228 - BOYS & GIRLS HIGH SCHOOL - BK -
A00309570/E23632014Energy SourceMechanical Heating 57,129
Total Planned activities for $57,129BOE0631 000
000BOE06321/24/2011Date of Last Survey:832 MARCY AVE
2707 - VARIABLE ALTERNATIVE H.S. - BK -
A00352815/E23642015Interior LightingElectrical Lighting 122,428
Total Planned activities for $122,428BOE0632 000
000BOE06331/24/2011Date of Last Survey:237 SEVENTH AVE
1229 - JOHN JAY CAMPUS HIGH SCHOOLS- BK -
SIR4K460A/E23632014FloorsArchitecture Interior 530,541
SIRA2K460/E23632012Switchgear/ SwitchboardElectrical Under 600 Volts 98,343
SIRA2K460/E23632012PanelboardsElectrical Under 600 Volts 158,982
SIRA2K460/E23632012WiringElectrical Under 600 Volts 399,461
A00352816/E23642015Interior LightingElectrical Lighting 173,581
A00352816/E23642015Exterior LightingElectrical Lighting 214,998
Total Planned activities for $1,575,906BOE0633 000
000BOE06348/22/2011Date of Last Survey:911 FLATBUSH AVENUE
141 - ERASMUS HALL EDUCATIONAL CAMPUS - - BK
A00289266/E23632012BatteriesElectrical Stand-by Power 35,031
A00337017/E23642016Interior LightingElectrical Lighting 256,714
Total Planned activities for $291,745BOE0634 000
010BOE06348/22/2011Date of Last Survey:911 FLATBUSH AVENUE
14343 - ERASMUS HALL EDUCATIONAL CAMPUS - ERASMUS HALL ACADEMY - BK
Page D - 65
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00337017/E23642016Interior LightingElectrical Lighting 25,965
Total Planned activities for $25,965BOE0634 010
000BOE063512/3/2010Date of Last Survey:600 KINGSTON AVE.
2523 - GEORGE W. WINGATE HIGH SCHOOL-BK -
A00330855/E23632013Interior LightingElectrical Lighting 156,789
Total Planned activities for $156,789BOE0635 000
000BOE06361/31/2011Date of Last Survey:400 IRVING AVE.
2524 - BUSHWICK HIGH SCHOOL - BK -
A00316296/E23632014Interior LightingElectrical Lighting 1,529,243
Total Planned activities for $1,529,243BOE0636 000
000BOE06372/10/2012Date of Last Survey:350 67TH STREET
687 - TELECOMMUN. ARTS & TECH H.S. -BK -
A00337087/E23632014WindowsArchitecture Exterior 132,391
A00352948/E23642015Interior LightingElectrical Lighting 66,933
Total Planned activities for $199,324BOE0637 000
000BOE063812/22/2010Date of Last Survey:1171 65TH STREET
1230 - CHRISTA MCAULIFFE SCHOOL - BK - (I.S. 187 - BK)
A00182459/E23632010Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00182459/E23632010WiringElectrical Under 600 Volts 73,022
A00337099/E23642016Interior LightingElectrical Lighting 510,578
A00254490/E23632011Fire/Smoke DetectionElectrical Alarm 767,995
Total Planned activities for $1,442,693BOE0638 000
000BOE06409/26/2011Date of Last Survey:3000 AVENUE X
2817 - SHEEPSHEAD BAY HIGH SCHOOL - BK -
A00309769/E23632013ParapetsArchitecture Exterior 165,802
A00295343/E23632013RoofArchitecture Exterior 83,047
Total Planned activities for $248,849BOE0640 000
000BOE06419/20/2012Date of Last Survey:1600 ROCKAWAY PKWY
2741 - CANARSIE HIGH SCHOOL - BK -
A00351732/E23642016Conversion EquipmentMechanical Heating 1,493,239
Total Planned activities for $1,493,239BOE0641 000
000BOE06421/11/2011Date of Last Survey:5800 20TH AVE
1219 - FRANKLIN D. ROOSEVELT H.S - BK -
A00352819/E23642015Interior LightingElectrical Lighting 71,925
A00352819/E23642015Exterior LightingElectrical Lighting 103,016
BOIL_6TO4/E23632014Energy SourceMechanical Heating 40,425
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 1,476,189
BOIL_6TO4/E23632012DistributionMechanical Heating 42,345
Total Planned activities for $1,733,900BOE0642 000
Page D - 66
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE064310/3/2011Date of Last Survey:6565 FLATLANDS AVE
1206 - SOUTH SHORE HIGH SCHOOL - BK -
A00231714/E23632011RoofArchitecture Exterior 197,249
A00274836/E23632012BatteriesElectrical Stand-by Power 39,775
A00352820/E23642015Interior LightingElectrical Lighting 355,250
BOIL_6TO4/E23632012Energy SourceMechanical Heating 59,993
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 43,815
BOIL_6TO4/E23632012DistributionMechanical Heating 62,842
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 68,009
Total Planned activities for $826,933BOE0643 000
010BOE064310/3/2011Date of Last Survey:6565 FLATLANDS AVE
14641 - SOUTH SHORE HIGH SCHOOL - BK - FIELDHOUSE
A00352820/E23642015Interior LightingElectrical Lighting 132,003
Total Planned activities for $132,003BOE0643 010
000BOE06449/29/2010Date of Last Survey:1600 AVENUE L
1207 - EDWARD R. MURROW HIGH SCHOOL -BK -
A00316476/E23632014ParapetsArchitecture Exterior 41,400
A00330965/E23632014RoofArchitecture Exterior 320,097
A00231767/E23632010Interior WallsArchitecture Interior 45,853
A00231767/E23632010CeilingsArchitecture Interior 148,743
A00352821/E23642015Interior LightingElectrical Lighting 166,240
A00352821/E23642015Egress LightingElectrical Lighting 97,872
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 102,358
BOIL_6TO4/E23632012DistributionMechanical Heating 146,808
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 45,347
A00331094/E23632014Conversion EquipmentMechanical Air Conditioning 172,907
Total Planned activities for $1,287,625BOE0644 000
000BOE06451/31/2011Date of Last Survey:50 AVENUE X @STILLWELL AVE.
1208 - JOHN DEWEY HIGH SCHOOL - BK -
SANDK540A/E23642015Interior WallsArchitecture Interior 88,324
SANDK540A/E23642015CeilingsArchitecture Interior 228,899
SANDK540B/E23642015WiringElectrical Under 600 Volts 267,247
SANDK540B/E23642015GeneratorsElectrical Stand-by Power 116,731
A00352822/E23642015Interior LightingElectrical Lighting 235,025
BOIL_6TO4/E23632012Energy SourceMechanical Heating 41,779
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 152,563
BOIL_6TO4/E23632012DistributionMechanical Heating 109,407
Total Planned activities for $1,239,975BOE0645 000
Page D - 67
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE06469/19/2012Date of Last Survey:105 JOHNSON ST.
1209 - GEORGE WESTINGHOUSE H.S. - BK -
A00316529/E23632014Interior LightingElectrical Lighting 161,473
Total Planned activities for $161,473BOE0646 000
000BOE06478/31/2011Date of Last Survey:901 CLASSON AVE
1210 - CLARA BARTON HIGH SCHOOL - BK -
A00337305/E23642016Interior LightingElectrical Lighting 1,214,040
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 911,722
Total Planned activities for $2,125,762BOE0647 000
000BOE06489/21/2011Date of Last Survey:50 BEDFORD AVE
688 - AUTOMOTIVE HIGH SCHOOL - BK -
A00337333/E23642016Interior LightingElectrical Lighting 995,607
A00337333/E23642016Exterior LightingElectrical Lighting 50,102
Total Planned activities for $1,045,709BOE0648 000
000BOE06499/15/2009Date of Last Survey:1 WELLS STREET
1211 - EAST N.Y. TRANSIT TECH. H.S.-BK -
A00337357/E23642016Interior LightingElectrical Lighting 958,257
Total Planned activities for $958,257BOE0649 000
000BOE06502/15/2011Date of Last Survey:25 BRIGHTON 4 RD.
1212 - WILLIAM E. GRADY HIGH SCHOOL -BK -
SandK620B/E23642015Interior WallsArchitecture Interior 357,307
SandK620B/E23642015CeilingsArchitecture Interior 378,813
SANDK620C/E23642015WiringElectrical Under 600 Volts 164,461
A00337381/E23642015Interior LightingElectrical Lighting 313,944
SandK620F/E23642015Conversion EquipmentMechanical Heating 49,858
SandK620F/E23642015DistributionMechanical Heating 71,509
Total Planned activities for $1,335,892BOE0650 000
000BOE06527/1/2011Date of Last Survey:257 NORTH 6TH ST.
1213 - VAN ARSDALE HIGH SCHOOL - BK -
SandK620B/E23642015CeilingsArchitecture Interior 316,455
SANDK620C/E23642015Switchgear/ SwitchboardElectrical Under 600 Volts 151,831
SANDK620C/E23642015PanelboardsElectrical Under 600 Volts 39,119
SANDK620C/E23642015WiringElectrical Under 600 Volts 143,904
A00337381/E23642015Interior LightingElectrical Lighting 1,135,538
Total Planned activities for $1,786,847BOE0652 000
000BOE06531/25/2011Date of Last Survey:345 DEAN STREET
677 - BROOKLYN HIGH SCHOOL OF ARTS - - MAIN BUILDING
A00331173/E23642015Exterior WallsArchitecture Exterior 425,714
Total Planned activities for $425,714BOE0653 000
Page D - 68
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE06541/25/2011Date of Last Survey:500 PACIFIC STREET
1214 - BROOKLYN H.S. OF ARTS, ANNEX -
A00337471/E23642016Interior LightingElectrical Lighting 115,029
A00337469/E23642015Energy SourceMechanical Heating 77,539
A00337469/E23642015Conversion EquipmentMechanical Heating 383,118
A00337469/E23642015DistributionMechanical Heating 54,949
A00337489/E23642015SprinklerMechanical Fire Suppression 43,646
Total Planned activities for $674,281BOE0654 000
000BOE065510/4/2010Date of Last Survey:145 PENNSYLVANIA AVE.
2740 - WILLIAM H. MAXWELL CTE H.S. - BK -
A00316730/E23632014Exterior WallsArchitecture Exterior 262,681
A00295684/E23632014RoofArchitecture Exterior 90,389
A00352824/E23642015Exterior LightingElectrical Lighting 52,190
Total Planned activities for $405,260BOE0655 000
000BOE06571/24/2011Date of Last Survey:475 NOSTRAND AVE
1215 - ADULT TRAINING CENTER - BK -
A00275141/E23632014Interior LightingElectrical Lighting 42,055
Total Planned activities for $42,055BOE0657 000
000BOE06595/1/2013Date of Last Survey:65 COURT ST
1217 - ADMINISTRATION BLDG - BK -
A00337583/E23642015DistributionMechanical Ventilation 51,896
Total Planned activities for $51,896BOE0659 000
000BOE06602/14/2011Date of Last Survey:131 LIVINGSTON STREET
335 - REGIONAL OPERATIONS CENTER - BK -
A00351847/E23642016Interior LightingElectrical Lighting 391,541
A00351847/E23642016Exterior LightingElectrical Lighting 42,796
Total Planned activities for $434,337BOE0660 000
000BOE066412/7/2009Date of Last Survey:362 SCHERMERHORN ST.
311 - P. S. 806 - BK - PUPIL PERSONNEL & SERVICES
A00295824/E23632014Exterior WallsArchitecture Exterior 204,946
Total Planned activities for $204,946BOE0664 000
000BOE066512/11/2009Date of Last Survey:355 PARK PLACE
4418 - DISTRICT OFFICE #13 - BK -
A00337656/E23642016Interior LightingElectrical Lighting 91,000
Total Planned activities for $91,000BOE0665 000
000BOE06692/22/2011Date of Last Survey:999 JAMAICA AVE.
312 - FRANKLIN K. LANE HIGH SCHOOL -BK -
A00352812/E23642015Interior LightingElectrical Lighting 51,826
A00352812/E23642015Exterior LightingElectrical Lighting 121,776
Page D - 69
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
BOIL_6TO4/E23632012Energy SourceMechanical Heating 43,693
BOIL_6TO4/E23632012DistributionMechanical Heating 45,768
Total Planned activities for $263,063BOE0669 000
000BOE06721/5/2011Date of Last Survey:108-35 167 STREET
314 - J. H. S. 8 - Q -
A00310324/E23632014WiringElectrical Under 600 Volts 109,688
A00309703/E23632013Interior LightingElectrical Lighting 1,348,434
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 77,460
Total Planned activities for $1,535,582BOE0672 000
000BOE067312/17/2012Date of Last Survey:58-74 57 STREET
315 - P. S. 9 - Q (W REED SCHOOL) -
A00278783/E23632014Exterior WallsArchitecture Exterior 397,017
Total Planned activities for $397,017BOE0673 000
000BOE067412/7/2012Date of Last Survey:31 AVE & 45 STREET
316 - J. H. S. 10 - Q -
A00330934/E23632014Exterior WallsArchitecture Exterior 162,520
A00320508/E23632014ParapetsArchitecture Exterior 74,811
A00320507/E23632014RoofArchitecture Exterior 62,093
A00341251/E23642016Interior LightingElectrical Lighting 59,022
Total Planned activities for $358,446BOE0674 000
000BOE067611/10/2011Date of Last Survey:42-00 72 STREET
318 - P. S. 12 - Q -
A00353032/E23642015Switchgear/ SwitchboardElectrical Under 600 Volts 42,513
A00353032/E23642015WiringElectrical Under 600 Volts 79,982
A00341272/E23642015Terminal DevicesMechanical Heating 192,992
Total Planned activities for $315,487BOE0676 000
000BOE067710/14/2011Date of Last Survey:55-01 94 STREET
319 - P. S. 13 - Q -
A00330891/E23632014Interior LightingElectrical Lighting 591,999
Total Planned activities for $591,999BOE0677 000
000BOE067811/20/2012Date of Last Survey:107-01 OTIS AVENUE
321 - P. S. 14 - Q -
A00320565/E23642016Exterior WallsArchitecture Exterior 133,267
A00320563/E23642016RoofArchitecture Exterior 57,396
A00320562/E23632013Interior LightingElectrical Lighting 65,297
Total Planned activities for $255,960BOE0678 000
000BOE068011/16/2012Date of Last Survey:28-37 29 STREET
323 - P. S. 17 - Q -
A00320599/E23632014Interior LightingElectrical Lighting 61,346
Page D - 70
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $61,346BOE0680 000
000BOE06816/16/2011Date of Last Survey:86-35 235 COURT
665 - P. S. 18 - Q -
A00289112/ED0012012WiringElectrical Under 600 Volts 73,022
Total Planned activities for $73,022BOE0681 000
000BOE068211/25/2009Date of Last Survey:99 ST & ROOSEVELT AVENUE
1218 - P. S. 19 - Q -
A00258423/E23632011Exterior WallsArchitecture Exterior 53,002
A00320631/E23632014Interior LightingElectrical Lighting 589,277
Total Planned activities for $642,279BOE0682 000
000BOE06848/29/2012Date of Last Survey:147-36 26 AVENUE
1195 - P. S. 21 - Q -
A00299618/E23632014Exterior WallsArchitecture Exterior 207,309
A00299617/E23632014ParapetsArchitecture Exterior 56,842
A00330950/E23632014RoofArchitecture Exterior 535,737
A00309936/ED0012013WiringElectrical Under 600 Volts 109,411
Total Planned activities for $909,299BOE0684 000
000BOE068511/19/2009Date of Last Survey:153-33 SANFORD AVENUE
1196 - P. S. 22 - Q -
A00320676/E23632014Interior LightingElectrical Lighting 39,719
BOIL_6TO4/E23632014DistributionMechanical Heating 43,845
Total Planned activities for $83,564BOE0685 000
000BOE06861/26/2010Date of Last Survey:138-11 35 AVENUE
4421 - QUEENS OUTREACH CENTER - Q -
A00341441/E23642016Interior LightingElectrical Lighting 114,037
Total Planned activities for $114,037BOE0686 000
000BOE068711/19/2009Date of Last Survey:141-11 HOLLY AVENUE
1197 - P. S. 24 - Q -
A00279015/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 54,659
A00279015/E23632013WiringElectrical Under 600 Volts 63,894
Total Planned activities for $118,553BOE0687 000
000BOE06882/1/2013Date of Last Survey:34-65 192 STREET
1198 - J. H. S. 25 - Q -
BOIL_6TO4/E23632014DistributionMechanical Heating 56,721
A00331155/E23632014Conversion EquipmentMechanical Air Conditioning 44,116
Total Planned activities for $100,837BOE0688 000
000BOE068911/13/2012Date of Last Survey:195-02 69 AVENUE
2260 - P. S. 26 - Q -
A00341495/E23642015Interior LightingElectrical Lighting 52,965
Page D - 71
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $52,965BOE0689 000
000BOE06907/27/2010Date of Last Survey:125-10 23 AVENUE
2261 - P. S. 29 - Q -
A00351905/E23642016Interior LightingElectrical Lighting 40,393
Total Planned activities for $40,393BOE0690 000
000BOE069211/9/2011Date of Last Survey:211-45 46 ROAD
2651 - P. S. 31 - Q -
A00331108/E23632014Exterior LightingElectrical Lighting 42,838
A00320796/E23632014Security SystemElectrical Alarm 49,186
A00320796/E23632014Fire/Smoke DetectionElectrical Alarm 168,368
Total Planned activities for $260,392BOE0692 000
000BOE06973/25/2010Date of Last Survey:187-01 FOCH BLVD
2267 - P. S. 36 - Q -
A00341651/E23642016Interior LightingElectrical Lighting 251,656
Total Planned activities for $251,656BOE0697 000
000BOE06985/20/2011Date of Last Survey:179-37 137 AVENUE
2269 - P. S. 37 - Q -
A00279215/E23632013Interior LightingElectrical Lighting 731,327
A00341674/E23642015Fire/Smoke DetectionElectrical Alarm 259,937
A00341673/E23642016Terminal DevicesMechanical Heating 390,642
Total Planned activities for $1,381,906BOE0698 000
000BOE07006/14/2010Date of Last Survey:109-20 UNION HALL STREET
2271 - P. S. 40 - Q -
A00330936/E23632013ParapetsArchitecture Exterior 79,395
A00279256/E23632012Switchgear/ SwitchboardElectrical Under 600 Volts 97,172
A00279256/E23632012WiringElectrical Under 600 Volts 140,672
Total Planned activities for $317,239BOE0700 000
000BOE07013/4/2010Date of Last Survey:214-43 35 AVENUE
2272 - P. S. 41 - Q -
A00351907/E23642016Interior LightingElectrical Lighting 41,068
Total Planned activities for $41,068BOE0701 000
000BOE070212/7/2011Date of Last Survey:488 BEACH 66 STREET
2803 - P. S. 42 - Q -
SANDQ042A/E23642015Interior WallsArchitecture Interior 212,846
SANDQ042A/E23642015CeilingsArchitecture Interior 59,873
Total Planned activities for $272,719BOE0702 000
000BOE07053/16/2010Date of Last Survey:9 POWER ROAD
4422 - P. S. 47 - Q -
A00288982/E23632012RoofArchitecture Exterior 44,459
Page D - 72
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $44,459BOE0705 000
000BOE070711/13/2009Date of Last Survey:79-15 PENELOPE AVENUE
2296 - P. S. 49 - Q -
A00248659/ED0012010WiringElectrical Under 600 Volts 39,991
Total Planned activities for $39,991BOE0707 000
000BOE07081/5/2011Date of Last Survey:143-26 101 AVENUE
2652 - P. S. 50 - Q -
A00268150/E23632011Exterior WallsArchitecture Exterior 260,190
Total Planned activities for $260,190BOE0708 000
000BOE07093/15/2013Date of Last Survey:GUY R. BREWER BLVD & 146 TERRACE
969 - P. S. 52 - Q -
A00341873/E23642016Interior LightingElectrical Lighting 43,650
Total Planned activities for $43,650BOE0709 000
000BOE07112/6/2013Date of Last Survey:86-02 127 STREET
2274 - P. S. 54 - Q -
A00279457/E23632013Exterior WallsArchitecture Exterior 46,183
Total Planned activities for $46,183BOE0711 000
010BOE07123/24/2010Date of Last Survey:131-10 97 AVENUE
4143 - P. S. 55 - Q - ANNEX
A00240599/E23632010RoofArchitecture Exterior 37,840
Total Planned activities for $37,840BOE0712 010
000BOE07163/19/2010Date of Last Survey:98-50 50 AVENUE
2259 - I. S. 61 - Q -
A00300190/E23632013Interior LightingElectrical Lighting 67,793
Total Planned activities for $67,793BOE0716 000
000BOE07192/18/2011Date of Last Survey:82-01 101 AVENUE
556 - P. S. 64 - Q -
BOIL_6TO4/E23632012DistributionMechanical Heating 45,687
Total Planned activities for $45,687BOE0719 000
000BOE07209/22/2011Date of Last Survey:85-11 102 STREET
557 - P. S. 66 - Q -
A00321295/E23632014Interior LightingElectrical Lighting 245,799
Total Planned activities for $245,799BOE0720 000
000BOE072111/23/2011Date of Last Survey:51-60 MARATHON PKWY
558 - J. H. S. 67 - Q -
A00321310/E23632014Interior LightingElectrical Lighting 36,048
Total Planned activities for $36,048BOE0721 000
000BOE07225/19/2010Date of Last Survey:59-09 SAINT FELIX AVENUE
559 - P. S. 68 - Q -
Page D - 73
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00268179/E23632012RoofArchitecture Exterior 37,833
A00342112/E23642016Interior LightingElectrical Lighting 477,545
Total Planned activities for $515,378BOE0722 000
000BOE072310/18/2010Date of Last Survey:30-45 42 STREET
666 - P. S. 70 - Q -
A00309914/E23632013WiringElectrical Under 600 Volts 45,639
A00342141/E23642016Interior LightingElectrical Lighting 57,494
Total Planned activities for $103,133BOE0723 000
000BOE072411/20/2012Date of Last Survey:77-02 37 AVENUE
544 - P. S. 69 - Q -
A00259108/E23632012ParapetsArchitecture Exterior 80,483
Total Planned activities for $80,483BOE0724 000
000BOE07255/18/2010Date of Last Survey:62-85 FOREST AVENUE
531 - P. S. 71 - Q -
A00321387/E23642016ParapetsArchitecture Exterior 72,758
Total Planned activities for $72,758BOE0725 000
000BOE072612/13/2011Date of Last Survey:133-25 GUY R. BREWER BLVD.
970 - J. H. S. 72 - Q -
A00321402/E23632014Exterior LightingElectrical Lighting 51,494
A00279711/E23632012Fire/Smoke DetectionElectrical Alarm 437,166
Total Planned activities for $488,660BOE0726 000
000BOE07273/26/2012Date of Last Survey:70-02 54 AVE.
532 - I. S. 73 - Q -
A00279739/E23632013Fire/Smoke DetectionElectrical Alarm 455,838
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 542,671
Total Planned activities for $998,509BOE0727 000
000BOE07283/5/2010Date of Last Survey:61-15 OCEANIA STREET
2697 - I. S. 74 - Q -
A00352164/E23632014Switchgear/ SwitchboardElectrical Under 600 Volts 97,172
A00352164/E23632014PanelboardsElectrical Under 600 Volts 60,404
A00352164/E23632014WiringElectrical Under 600 Volts 140,672
A00342225/E23642015Interior LightingElectrical Lighting 956,178
A00342225/E23642015Exterior LightingElectrical Lighting 42,100
Total Planned activities for $1,296,526BOE0728 000
000BOE07295/18/2010Date of Last Survey:16-66 HANCOCK STREET
533 - P. S. 75 - Q (R PERRY SCHOOL) -
A00342248/E23642015Interior LightingElectrical Lighting 460,382
A00342247/E23642015Conversion EquipmentMechanical Heating 281,819
A00342247/E23642015DistributionMechanical Heating 40,420
Page D - 74
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00342247/E23642015Terminal DevicesMechanical Heating 62,427
Total Planned activities for $845,048BOE0729 000
000BOE073010/15/2009Date of Last Survey:36-36 10 STREET
534 - P. S. 76 - Q -
A00268141/E23632011Exterior WallsArchitecture Exterior 593,996
A00352165/E23632014WiringElectrical Under 600 Volts 119,974
Total Planned activities for $713,970BOE0730 000
000BOE07311/28/2010Date of Last Survey:15-28 149 STREET
535 - P. S. 79 - Q -
A00300459/E23632013RoofArchitecture Exterior 51,840
Total Planned activities for $51,840BOE0731 000
000BOE07329/1/2011Date of Last Survey:171-05 137 AVENUE
971 - P. S. 80 - Q -
A00279836/E23632014Security SystemElectrical Alarm 72,485
A00279836/E23632014Fire/Smoke DetectionElectrical Alarm 248,121
Total Planned activities for $320,606BOE0732 000
000BOE07369/16/2010Date of Last Survey:23-70 31 STREET
1619 - P. S. 85 - Q -
A00259351/E23632011Exterior WallsArchitecture Exterior 131,424
A00309716/E23642015Fire/Smoke DetectionElectrical Alarm 174,276
Total Planned activities for $305,700BOE0736 000
000BOE073811/13/2009Date of Last Survey:67-54 80 STREET
1605 - P. S. 87 - Q -
A00268792/ED0012011FloorsArchitecture Interior 332,459
A00248697/ED0012010WiringElectrical Under 600 Volts 63,894
A00342431/E23642015Interior LightingElectrical Lighting 489,788
Total Planned activities for $886,141BOE0738 000
000BOE073912/17/2012Date of Last Survey:60-85 CATALPA AVENUE
1606 - P. S. 88 - Q -
A00300623/E23632014Exterior WallsArchitecture Exterior 246,612
A00321659/E23632014ParapetsArchitecture Exterior 56,480
Total Planned activities for $303,092BOE0739 000
000BOE074011/10/2011Date of Last Survey:85-28 BRITTON AVENUE
1607 - P. S. 89 - Q -
A00259417/E23632012Exterior WallsArchitecture Exterior 150,302
A00279975/E23632012RoofArchitecture Exterior 63,875
Total Planned activities for $214,177BOE0740 000
000BOE07412/6/2013Date of Last Survey:86-50 109 STREET
1609 - P. S. 90 - Q -
Page D - 75
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00321693/E23632014Interior LightingElectrical Lighting 55,580
Total Planned activities for $55,580BOE0741 000
000BOE07449/20/2011Date of Last Survey:66-56 FOREST AVENUE
1613 - I. S. 93 - Q -
A00268794/E23632011WindowsArchitecture Exterior 781,202
Total Planned activities for $781,202BOE0744 000
000BOE074510/3/2012Date of Last Survey:41-77 LITTLE NECK PKWY
1614 - P. S. 94 - Q -
A00280047/E23632013Exterior WallsArchitecture Exterior 81,511
Total Planned activities for $81,511BOE0745 000
000BOE074611/22/2011Date of Last Survey:179-01 90 AVENUE
2767 - P. S. 95 - Q -
A00280061/E23632012Interior LightingElectrical Lighting 731,135
Total Planned activities for $731,135BOE0746 000
000BOE074810/26/2011Date of Last Survey:85-52 85 STREET
1616 - P. S. 97 - Q -
A00280097/E23632013Exterior WallsArchitecture Exterior 64,103
A00280096/E23632013ParapetsArchitecture Exterior 126,857
A00342594/E23642016Interior LightingElectrical Lighting 537,795
Total Planned activities for $728,755BOE0748 000
000BOE07516/7/2010Date of Last Survey:111-11 118 STREET
1618 - P. S. 100 - Q -
A00259594/E23632011Exterior WallsArchitecture Exterior 140,098
A00330887/E23632014Interior LightingElectrical Lighting 690,127
Total Planned activities for $830,225BOE0751 000
000BOE075212/27/2012Date of Last Survey:2 RUSSELL PLACE
1592 - P. S. 101 - Q -
A00342658/E23642015Interior LightingElectrical Lighting 35,990
Total Planned activities for $35,990BOE0752 000
000BOE075410/28/2011Date of Last Survey:26-01 MOTT AVENUE
1585 - P. S. 104 - Q -
A00280183/E23632012WindowsArchitecture Exterior 192,584
A00280182/E23632012ParapetsArchitecture Exterior 64,359
A00280185/E23632012Switchgear/ SwitchboardElectrical Under 600 Volts 81,989
A00280185/E23632012WiringElectrical Under 600 Volts 82,150
Total Planned activities for $421,082BOE0754 000
000BOE07553/23/2010Date of Last Survey:420 BEACH 51 STREET
1586 - P. S. 105 - Q -
A00268214/E23632012Exterior WallsArchitecture Exterior 336,417
Page D - 76
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00171996/E23632010WindowsArchitecture Exterior 360,058
A00321908/E23632014Interior LightingElectrical Lighting 501,197
SANDQ105D/E23642015Terminal DevicesMechanical Heating 180,880
Total Planned activities for $1,378,552BOE0755 000
000BOE07581/6/2012Date of Last Survey:108-10 109 AVENUE
1588 - P. S. 108 - Q -
EMERG2012/E23632012Interior LightingElectrical Lighting 104,698
Total Planned activities for $104,698BOE0758 000
000BOE076010/15/2009Date of Last Survey:37-15 13 STREET
1590 - P. S. 111 - Q -
A00237683/E23632010Conversion EquipmentMechanical Heating 123,909
A00237676/E23632010Terminal DevicesMechanical Heating 112,192
Total Planned activities for $236,101BOE0760 000
000BOE076112/17/2012Date of Last Survey:25-05 37 AVENUE
1591 - P. S. 112 - Q -
A00280313/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00280313/E23632013WiringElectrical Under 600 Volts 82,150
Total Planned activities for $173,248BOE0761 000
000BOE07631/25/2012Date of Last Survey:CRONSTON AVE & BEACH 135
190 - P. S. 114 - Q -
SANDQ114C/E23642015WiringElectrical Under 600 Volts 54,766
SANDQ114E/E23642015Terminal DevicesMechanical Heating 97,832
Total Planned activities for $152,598BOE0763 000
000BOE076412/2/2009Date of Last Survey:80-51 261 STREET
1567 - P. S. 115 - Q -
A00301021/E23632013Exterior WallsArchitecture Exterior 35,280
A00237747/E23632010Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00237747/E23632010WiringElectrical Under 600 Volts 73,022
Total Planned activities for $199,400BOE0764 000
000BOE07655/20/2011Date of Last Survey:107-25 WREN PLACE
1568 - P. S. 116 - Q -
A00322061/E23632014Interior LightingElectrical Lighting 89,297
Total Planned activities for $89,297BOE0765 000
000BOE076712/14/2010Date of Last Survey:190-20 109TH RD.
2531 - P. S. 118 - Q -
A00342907/E23642016Interior LightingElectrical Lighting 538,319
Total Planned activities for $538,319BOE0767 000
000BOE07695/19/2010Date of Last Survey:74-01 78 AVENUE
1557 - I. S. 119 - Q -
Page D - 77
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00342922/E23642015Interior LightingElectrical Lighting 82,654
Total Planned activities for $82,654BOE0769 000
000BOE07706/7/2010Date of Last Survey:126-10 109 AVENUE
1558 - P. S. 121 - Q -
A00172266/E23632010FloorsArchitecture Interior 221,353
A00322139/E23632014Interior LightingElectrical Lighting 542,842
A00172263/E23632011Conversion EquipmentMechanical Heating 366,549
A00172256/E23632011Terminal DevicesMechanical Heating 40,598
Total Planned activities for $1,171,342BOE0770 000
000BOE077112/23/2009Date of Last Survey:21-21 DITMARS BLVD.
2532 - P. S. 122 - Q -
A00342974/E23642015Exterior LightingElectrical Lighting 37,925
Total Planned activities for $37,925BOE0771 000
000BOE07749/17/2010Date of Last Survey:31-51 21 STREET
1560 - I. S. 126 - Q -
A00352862/E23642015Exterior LightingElectrical Lighting 40,360
Total Planned activities for $40,360BOE0774 000
000BOE07777/27/2010Date of Last Survey:128-02 7TH AVENUE
1561 - P. S. 129 - Q -
A00351915/E23642016Interior LightingElectrical Lighting 37,337
Total Planned activities for $37,337BOE0777 000
000BOE07783/4/2010Date of Last Survey:200-01 42 AVENUE
1562 - P. S. 130 - Q -
A00322285/E23632014Exterior WallsArchitecture Exterior 207,094
Total Planned activities for $207,094BOE0778 000
000BOE07804/7/2010Date of Last Survey:218TH ST. & 132ND AVE.
2535 - P. S. 132 - Q -
A00280630/E23632012WiringElectrical Under 600 Volts 43,474
Total Planned activities for $43,474BOE0780 000
000BOE078111/1/2010Date of Last Survey:248-05 86 AVENUE
1564 - P. S. 133 - Q -
A00289150/E23632012Fire/Smoke DetectionElectrical Alarm 461,796
Total Planned activities for $461,796BOE0781 000
000BOE078211/24/2009Date of Last Survey:109TH AVE. & 203RD ST.
2536 - P. S. 134 - Q -
A00343188/E23642016Interior LightingElectrical Lighting 531,929
Total Planned activities for $531,929BOE0782 000
010BOE078211/24/2009Date of Last Survey:109 AVE & 203 STREET
1538 - P. S. 134 - Q - MINISCHOOL (TRK 4)
Page D - 78
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00343188/E23642016Interior LightingElectrical Lighting 76,449
Total Planned activities for $76,449BOE0782 010
000BOE078311/1/2010Date of Last Survey:207-11 89 AVENUE
2537 - P. S. 135 - Q -
A00301355/E23632014Exterior WallsArchitecture Exterior 263,481
A00301354/E23632014ParapetsArchitecture Exterior 98,760
A00322380/E23632014RoofArchitecture Exterior 195,650
A00322376/E23632013Interior LightingElectrical Lighting 612,858
Total Planned activities for $1,170,749BOE0783 000
000BOE078411/24/2009Date of Last Survey:201-15 115 AVENUE
1539 - P. S. 136 - Q -
A00280695/E23632013Exterior WallsArchitecture Exterior 326,808
A00352169/E23632014WiringElectrical Under 600 Volts 63,894
A00343227/E23642015Interior LightingElectrical Lighting 492,607
Total Planned activities for $883,309BOE0784 000
010BOE078411/24/2009Date of Last Survey:201-15 115TH AVE.
32 - P. S. 136 - Q - MINISCHOOL
A00343231/E23642015RoofArchitecture Exterior 70,886
A00343227/E23642015Interior LightingElectrical Lighting 73,143
Total Planned activities for $144,029BOE0784 010
000BOE07852/20/2013Date of Last Survey:253 ST & WELLER AVENUE
972 - P. S. 138 - Q -
A00322416/E23632014Interior LightingElectrical Lighting 48,614
Total Planned activities for $48,614BOE0785 000
000BOE07861/19/2010Date of Last Survey:93-06 63 DRIVE
1540 - P. S. 139 - Q -
A00280732/E23632012Exterior WallsArchitecture Exterior 78,853
A00301403/E23632012RoofArchitecture Exterior 163,858
Total Planned activities for $242,711BOE0786 000
000BOE078811/10/2009Date of Last Survey:37-11 21ST AVE.
2530 - J. H. S. 141 - Q -
A00309905/ED0012013WiringElectrical Under 600 Volts 93,781
A00352863/E23642015Interior LightingElectrical Lighting 143,948
Total Planned activities for $237,729BOE0788 000
010BOE078912/21/2011Date of Last Survey:114-43 142 STREET
2939 - P.S. 233 - Q -
A00309617/E23632014RoofArchitecture Exterior 136,129
Total Planned activities for $136,129BOE0789 010
Page D - 79
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE079011/25/2009Date of Last Survey:34-74 113 STREET
1542 - P. S. 143 - Q -
A00343353/E23642016Interior LightingElectrical Lighting 805,616
Total Planned activities for $805,616BOE0790 000
000BOE079111/16/2011Date of Last Survey:93-02 69 AVENUE
1544 - P. S. 144 - Q -
A00322539/E23632014Interior LightingElectrical Lighting 430,765
Total Planned activities for $430,765BOE0791 000
000BOE07934/1/2010Date of Last Survey:98-01 159 AVENUE
1547 - P. S. 146 - Q -
SANDQ146A/E23642015CeilingsArchitecture Interior 99,180
A00351977/E23642015Fire/Smoke DetectionElectrical Alarm 557,584
Total Planned activities for $656,764BOE0793 000
000BOE07944/1/2010Date of Last Survey:218-01 116 AVENUE
1548 - P. S. 147 - Q -
A00260322/E23632011FloorsArchitecture Interior 430,938
Total Planned activities for $430,938BOE0794 000
000BOE079611/10/2010Date of Last Survey:93-11 34 AVNEUE
1550 - P. S. 149 - Q -
A00289153/ED0012012WiringElectrical Under 600 Volts 66,652
A00352865/E23642015Interior LightingElectrical Lighting 70,194
Total Planned activities for $136,846BOE0796 000
000BOE080012/6/2011Date of Last Survey:60-02 60 LANE
1525 - P. S. 153 - Q -
A00268806/ED0012012WiringElectrical Under 600 Volts 91,406
A00352867/E23642015Interior LightingElectrical Lighting 101,406
Total Planned activities for $192,812BOE0800 000
000BOE080111/15/2012Date of Last Survey:75-02 162 STREET
1526 - P. S. 154 - Q -
A00288829/E23632012Exterior WallsArchitecture Exterior 52,245
A00280974/E23632012ParapetsArchitecture Exterior 68,010
A00280973/E23632012RoofArchitecture Exterior 52,043
A00260411/E23632012WiringElectrical Under 600 Volts 77,586
Total Planned activities for $249,884BOE0801 000
000BOE08034/8/2010Date of Last Survey:229-02 137 AVENUE
191 - P. S. 156 - Q -
A00248247/E23632010Exterior WallsArchitecture Exterior 198,764
A00238441/E23632010WindowsArchitecture Exterior 72,698
A00248248/E23632010ParapetsArchitecture Exterior 65,840
Page D - 80
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00343597/E23642015Interior LightingElectrical Lighting 58,508
A00281006/E23632012Fire/Smoke DetectionElectrical Alarm 630,150
Total Planned activities for $1,025,960BOE0803 000
000BOE080410/19/2012Date of Last Survey:64 AVE & 102 STREET
1527 - J. H. S. 157 - Q -
A00322771/E23632014Interior LightingElectrical Lighting 120,248
Total Planned activities for $120,248BOE0804 000
000BOE08053/3/2010Date of Last Survey:46-35 OCEANIA STREET
1528 - J. H. S. 158 - Q -
A00322791/E23632013Interior LightingElectrical Lighting 1,154,368
A00322791/E23632013Exterior LightingElectrical Lighting 47,667
Total Planned activities for $1,202,035BOE0805 000
000BOE080710/26/2011Date of Last Survey:109-59 INWOOD STREET
1530 - P. S. 160 - Q -
A00322837/E23632014RoofArchitecture Exterior 53,216
Total Planned activities for $53,216BOE0807 000
000BOE080810/5/2011Date of Last Survey:201-02 53 AVENUE
1531 - P. S. 162 - Q -
A00322858/E23632014Interior LightingElectrical Lighting 1,328,835
A00322858/E23632014Exterior LightingElectrical Lighting 56,365
A00351794/E23642016DistributionMechanical Heating 55,154
Total Planned activities for $1,440,354BOE0808 000
000BOE08101/21/2010Date of Last Survey:138-01 77 AVENUE
1533 - P. S. 164 - Q -
A00343746/E23642015Interior LightingElectrical Lighting 46,262
Total Planned activities for $46,262BOE0810 000
000BOE08111/20/2010Date of Last Survey:70-35 150 STREET
2738 - P. S. 165 - Q -
A00322909/E23632014Interior LightingElectrical Lighting 639,747
Total Planned activities for $639,747BOE0811 000
000BOE08131/21/2010Date of Last Survey:158-40 76 ROAD
2853 - J. H. S. 168 - Q -
A00330984/E23632014Exterior LightingElectrical Lighting 42,100
A00268243/E23632011Conversion EquipmentMechanical Heating 623,104
Total Planned activities for $665,204BOE0813 000
000BOE081511/17/2011Date of Last Survey:14-14 29 AVENUE
1535 - P. S. 171 - Q -
A00330896/E23632013Exterior WallsArchitecture Exterior 453,401
Total Planned activities for $453,401BOE0815 000
Page D - 81
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE081612/2/2009Date of Last Survey:81-14 257 STREET
1536 - J. H. S. 172 - Q -
A00289003/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 136,649
A00289003/E23632013WiringElectrical Under 600 Volts 127,969
A00322990/E23632014Interior LightingElectrical Lighting 108,063
A00322990/E23632014Exterior LightingElectrical Lighting 46,623
BOIL_6TO4/E23632014DistributionMechanical Heating 47,716
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 51,639
Total Planned activities for $518,659BOE0816 000
000BOE08181/19/2010Date of Last Survey:65-10 DIETERLE CRESCENT
1510 - P. S. 174 - Q -
A00352870/E23642015Interior LightingElectrical Lighting 53,566
A00323027/E23632013Security SystemElectrical Alarm 204,223
A00323027/E23632013Fire/Smoke DetectionElectrical Alarm 559,258
Total Planned activities for $817,047BOE0818 000
000BOE081910/19/2012Date of Last Survey:64-35 102 STREET
1511 - P. S. 175 - Q -
A00343908/E23642015Exterior WallsArchitecture Exterior 203,735
A00323046/E23642016ParapetsArchitecture Exterior 40,492
A00343903/E23642015Interior LightingElectrical Lighting 50,502
Total Planned activities for $294,729BOE0819 000
000BOE082111/18/2009Date of Last Survey:56-37 188 STREET
1512 - P. S. 177 - Q -
A00343942/E23642015Terminal DevicesMechanical Heating 76,242
Total Planned activities for $76,242BOE0821 000
000BOE082210/4/2012Date of Last Survey:189-10 RADNOR ROAD
1513 - P. S. 178 - Q -
A00323102/E23632014Interior LightingElectrical Lighting 37,506
Total Planned activities for $37,506BOE0822 000
000BOE082312/20/2011Date of Last Survey:320 BEACH 104 STREET
2851 - J. H. S. 180 - Q - SCHOLARS ACADEMY
SANDQ180D/E23642015CeilingsArchitecture Interior 267,462
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 125,042
SANDQ180E/E23642015DistributionMechanical Heating 43,443
Total Planned activities for $435,947BOE0823 000
000BOE08244/8/2010Date of Last Survey:148-15 230 STREET
1514 - P. S. 181 - Q -
A00351749/E23642015Interior LightingElectrical Lighting 332,256
Total Planned activities for $332,256BOE0824 000
Page D - 82
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE08253/16/2010Date of Last Survey:2-45 BEACH 79 STREET
1515 - P. S. 183 - Q -
A00238873/E23632011WindowsArchitecture Exterior 157,176
A00248844/E23632011RoofArchitecture Exterior 630,620
SANDQ183C/E23642015WiringElectrical Under 600 Volts 119,974
A00238869/E23632011Fire/Smoke DetectionElectrical Alarm 165,414
Total Planned activities for $1,073,184BOE0825 000
000BOE08261/27/2010Date of Last Survey:163-15 21 ROAD
1516 - P. S. 184 - Q -
A00302147/E23632013Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00302147/E23632013WiringElectrical Under 600 Volts 82,150
Total Planned activities for $173,248BOE0826 000
000BOE082712/12/2011Date of Last Survey:147-26 25 DRIVE
2761 - J. H. S. 185 - Q -
A00302164/E23632013WindowsArchitecture Exterior 394,712
A00323196/E23632013RoofArchitecture Exterior 46,482
A00323194/E23632014Exterior LightingElectrical Lighting 44,187
A00323193/E23632013Fire/Smoke DetectionElectrical Alarm 375,136
Total Planned activities for $860,517BOE0827 000
000BOE08283/28/2011Date of Last Survey:252-12 72 AVENUE
1517 - P. S. 186 - Q -
A00260925/E23632011Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00260925/E23632011WiringElectrical Under 600 Volts 63,894
A00330988/E23632014Interior LightingElectrical Lighting 526,549
A00268208/E23632011Fire/Smoke DetectionElectrical Alarm 265,352
Total Planned activities for $946,893BOE0828 000
000BOE082910/13/2010Date of Last Survey:218-12 HARTLAND AVENUE
1518 - P. S. 188 - Q -
A00238956/E23632010WiringElectrical Under 600 Volts 82,150
Total Planned activities for $82,150BOE0829 000
000BOE083012/12/2011Date of Last Survey:144-80 BARCLAY AVENUE
1519 - J. H. S. 189 - Q -
A00281516/E23632012Security SystemElectrical Alarm 120,808
A00281516/E23632012Fire/Smoke DetectionElectrical Alarm 413,536
Total Planned activities for $534,344BOE0830 000
000BOE08314/9/2010Date of Last Survey:68-17 AUSTIN STREET
1520 - J. H. S. 190 - Q -
A00323260/E23632013Interior LightingElectrical Lighting 49,596
A00323260/E23632013Exterior LightingElectrical Lighting 42,796
Page D - 83
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $92,392BOE0831 000
000BOE083312/14/2010Date of Last Survey:109-89 204 STREET
1522 - I. S. 192 - Q -
A00261015/E23632011Interior LightingElectrical Lighting 1,220,373
A00261015/E23632011Exterior LightingElectrical Lighting 52,190
Total Planned activities for $1,272,563BOE0833 000
000BOE08341/28/2010Date of Last Survey:152-20 11 AVENUE
1494 - P. S. 193 - Q -
A00281587/E23632012Security SystemElectrical Alarm 37,968
A00281587/W23632012Fire/Smoke DetectionElectrical Alarm 129,968
Total Planned activities for $167,936BOE0834 000
000BOE08351/28/2010Date of Last Survey:154-60 17 AVENUE
1495 - J. H. S. 194 - Q -
PCB_LIGHT/E23632013Exterior LightingElectrical Lighting 44,535
A00344209/E23642015DistributionMechanical Heating 91,158
Total Planned activities for $135,693BOE0835 000
000BOE08363/17/2010Date of Last Survey:253-50 149 AVENUE
1496 - P. S. 195 - Q -
SANDQ195B/E23642015WiringElectrical Under 600 Volts 109,411
Total Planned activities for $109,411BOE0836 000
000BOE08375/12/2010Date of Last Survey:71-25 113 STREET
1497 - P. S. 196 - Q -
A00302347/E23632013RoofArchitecture Exterior 714,078
A00351760/E23642015Exterior LightingElectrical Lighting 36,881
Total Planned activities for $750,959BOE0837 000
000BOE08383/23/2010Date of Last Survey:825 HICKSVILLE ROAD
1498 - P. S. 197 - Q -
A00323374/E23632013Interior LightingElectrical Lighting 604,427
Total Planned activities for $604,427BOE0838 000
000BOE083912/7/2011Date of Last Survey:365 BEACH 56 STREET
1499 - P. S. 333 - Q - (FORMER JHS 198-Q)
SANDQ198C/E23642015Switchgear/ SwitchboardElectrical Under 600 Volts 60,732
SANDQ198C/E23642015WiringElectrical Under 600 Volts 140,672
A00352871/E23642015Interior LightingElectrical Lighting 91,533
Total Planned activities for $292,937BOE0839 000
000BOE084111/18/2009Date of Last Survey:70-10 164 STREET
1501 - P. S. 200 - Q -
A00128004/E23622011WindowsArchitecture Exterior 1,423,978
A00182401/E23622011RoofArchitecture Exterior 80,813
Page D - 84
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
KITAREA09/E23632011Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
KITAREA09/E23632011PanelboardsElectrical Under 600 Volts 82,840
KITAREA09/E23632011WiringElectrical Under 600 Volts 82,150
Total Planned activities for $1,760,879BOE0841 000
000BOE08421/20/2010Date of Last Survey:65-11 155 STREET
1502 - P. S. 201 - Q -
A00344329/E23642015Interior LightingElectrical Lighting 532,382
Total Planned activities for $532,382BOE0842 000
000BOE08434/1/2010Date of Last Survey:138-30 LAFAYETTE STREET
973 - I. S. 202 - Q - (J. H. S. 202 - Q)
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 146,250
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 73,690
Total Planned activities for $219,940BOE0843 000
000BOE08443/5/2010Date of Last Survey:53-11 SPRINGFIELD BLVD
2760 - P. S. 203 - Q -
A00183131/ED0012010WiringElectrical Under 600 Volts 82,150
A00323488/E23632014Interior LightingElectrical Lighting 663,025
A00239250/E23632010Fire/Smoke DetectionElectrical Alarm 622,273
Total Planned activities for $1,367,448BOE0844 000
000BOE08459/16/2010Date of Last Survey:36-41 28 STREET
1503 - J. H. S. 204 - Q -
A00302498/E23632013Interior LightingElectrical Lighting 37,015
A00302498/E23632013Exterior LightingElectrical Lighting 53,234
Total Planned activities for $90,249BOE0845 000
000BOE084610/5/2011Date of Last Survey:75-25 BELL BLVD
1504 - P. S. 205 - Q -
A00344408/E23642016Fire/Smoke DetectionElectrical Alarm 395,395
Total Planned activities for $395,395BOE0846 000
000BOE08471/19/2010Date of Last Survey:61-21 97 PLACE
1505 - P. S. 206 - Q -
A00010913/E23632010Switchgear/ SwitchboardElectrical Under 600 Volts 45,549
A00010913/E23632010WiringElectrical Under 600 Volts 82,150
A00344431/E23642015Interior LightingElectrical Lighting 47,530
A00010906/E23632010Security SystemElectrical Alarm 36,242
A00010906/E23632010Fire/Smoke DetectionElectrical Alarm 124,061
Total Planned activities for $335,532BOE0847 000
000BOE08482/22/2011Date of Last Survey:159-15 88 STREET
1506 - P. S. 207 - Q -
SANDQ207A/E23632014Fire/Smoke DetectionElectrical Alarm 43,064
Page D - 85
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $43,064BOE0848 000
000BOE08491/27/2010Date of Last Survey:16-10 UTOPIA PKWY
1507 - P. S. 209 - Q -
A00288999/ED0012013Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00288999/ED0012013WiringElectrical Under 600 Volts 82,150
Total Planned activities for $173,248BOE0849 000
000BOE08502/18/2011Date of Last Survey:93-11 101 AVENUE
1508 - I. S. 210 - Q -
A00323597/E23632014RoofArchitecture Exterior 60,740
A00351900/E23642015Interior LightingElectrical Lighting 927,097
A00351900/E23642015Exterior LightingElectrical Lighting 54,277
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 212,203
Total Planned activities for $1,254,317BOE0850 000
000BOE085110/13/2010Date of Last Survey:231-02 67 AVENUE
166 - P. S. 213 - Q -
A00302606/E23632014Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00302606/E23632014WiringElectrical Under 600 Volts 82,150
Total Planned activities for $173,248BOE0851 000
000BOE08524/11/2011Date of Last Survey:31-15 140 STREET
1481 - P. S. 214 - Q -
A00352171/E23632014Switchgear/ SwitchboardElectrical Under 600 Volts 91,098
A00352171/E23632014WiringElectrical Under 600 Volts 77,586
Total Planned activities for $168,684BOE0852 000
000BOE08534/4/2011Date of Last Survey:535 BRIAR PLACE
2528 - P. S. 215 - Q -
A00302644/E23632013RoofArchitecture Exterior 262,081
A00344541/E23642015Interior LightingElectrical Lighting 641,120
A00302638/E23642015Fire/Smoke DetectionElectrical Alarm 265,352
Total Planned activities for $1,168,553BOE0853 000
000BOE085411/19/2010Date of Last Survey:64-20 175 STREET
1482 - J. H. S. 216 - Q -
A00352872/E23642015Exterior LightingElectrical Lighting 43,839
Total Planned activities for $43,839BOE0854 000
000BOE08552/12/2013Date of Last Survey:85-05 144 STREET
1483 - J. H. S. 217 - Q -
A00302687/E23632014Interior LightingElectrical Lighting 88,965
A00344581/E23642016DistributionMechanical Heating 90,446
Total Planned activities for $179,411BOE0855 000
Page D - 86
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE085711/16/2011Date of Last Survey:62-10 108 STREET
193 - P. S. 220 - Q -
A00323731/E23632013Interior LightingElectrical Lighting 499,311
Total Planned activities for $499,311BOE0857 000
000BOE08625/24/2011Date of Last Survey:67-25 51 ROAD
1487 - P. S. 229 - Q -
EMERG2006/E23632011WindowsArchitecture Exterior 560,186
A00282137/E23632012RoofArchitecture Exterior 65,640
A00344737/E23642015Interior LightingElectrical Lighting 38,341
Total Planned activities for $664,167BOE0862 000
000BOE08632/8/2013Date of Last Survey:145-00 SPRINGFIELD BLVD
2629 - J. H. S. 231 - Q(TANDEM Q251-29) -
A00302858/E23632014Fire/Smoke DetectionElectrical Alarm 472,612
Total Planned activities for $472,612BOE0863 000
000BOE08642/13/2013Date of Last Survey:153-23 83 STREET
195 - P. S. 232 - Q -
BOIL_6to4/E23632014Conversion EquipmentMechanical Heating 39,696
Total Planned activities for $39,696BOE0864 000
000BOE08651/18/2013Date of Last Survey:46-21 COLDEN STREET
1488 - J. H. S. 237 - Q -
A00331025/E23632014ParapetsArchitecture Exterior 260,649
A00302899/E23632014RoofArchitecture Exterior 179,321
Total Planned activities for $439,970BOE0865 000
000BOE08661/14/2013Date of Last Survey:88-15 182 STREET
1489 - I. S. 238 - Q -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 98,204
BOIL_6TO4/E23632014DistributionMechanical Heating 140,850
Total Planned activities for $239,054BOE0866 000
000BOE08689/1/2011Date of Last Survey:156-10 BAISLEY BLVD-JAMAICA
974 - AUGUST MARTIN HIGH SCHOOL - Q -
A00302957/E23632014RoofArchitecture Exterior 184,346
A00351729/E23642015DistributionMechanical Heating 76,057
A00351729/E23642015Terminal DevicesMechanical Heating 234,931
Total Planned activities for $495,334BOE0868 000
000BOE08698/30/2012Date of Last Survey:32-24 CORPORAL KENNEDY STREET
1491 - BAYSIDE HIGH SCHOOL - Q -
A00323989/E23632014Exterior WallsArchitecture Exterior 358,822
A00302983/E23632014ParapetsArchitecture Exterior 280,269
Total Planned activities for $639,091BOE0869 000
Page D - 87
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE08708/29/2012Date of Last Survey:100-00 BEACH CHANNEL DRIVE
1492 - BEACH CHANNEL HIGH SCHOOL - Q -
SandQ410C/E23642015BatteriesElectrical Stand-by Power 37,403
SandQ410E/E23642015Conversion EquipmentMechanical Heating 102,208
SandQ410E/E23642015DistributionMechanical Heating 146,594
SANDQ410E/E23642015DistributionMechanical Ventilation 89,580
Total Planned activities for $375,785BOE0870 000
000BOE087110/15/2010Date of Last Survey:57-00 223 STREET, BAYSIDE
196 - BENJAMIN CARDOZO HIGH SCHOOL - Q -
A00310137/E23632013WiringElectrical Under 600 Volts 164,460
A00310137/E23632013GeneratorsElectrical Stand-by Power 116,731
BOIL_6TO4/E23632014Energy SourceMechanical Heating 40,018
BOIL_6TO4/E23632014DistributionMechanical Heating 104,797
BOIL_6TO4/E23632014Terminal DevicesMechanical Heating 39,695
Total Planned activities for $465,701BOE0871 000
000BOE08729/8/2009Date of Last Survey:143-10 SPRINGFIELD BLVD.
2759 - SPRINGFIELD GARDENS H.S. - Q -
A00352878/E23642015Interior LightingElectrical Lighting 110,125
BOIL_6TO4/E23632012Energy SourceMechanical Heating 37,137
Total Planned activities for $147,262BOE0872 000
000BOE08739/2/2009Date of Last Survey:63-25 MAIN ST. FLUSHING
1493 - JOHN BOWNE HIGH SCHOOL - Q -
A00352879/E23642015Interior LightingElectrical Lighting 311,292
Total Planned activities for $311,292BOE0873 000
000BOE087411/19/2010Date of Last Survey:58-20 UTOPIA PKWY.-FLUSHING
2628 - FRANCIS LEWIS HIGH SCHOOL - Q -
ELECTPROJ/E23632012Service EquipmentElectrical Under 600 Volts 66,374
ELECTPROJ/E23632012WiringElectrical Under 600 Volts 287,805
A00352880/E23642015Interior LightingElectrical Lighting 48,503
A00352880/E23642015Egress LightingElectrical Lighting 55,773
A00352880/E23642015Exterior LightingElectrical Lighting 104,206
A00344994/E23642015Fire/Smoke DetectionElectrical Alarm 884,671
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 74,662
BOIL_6TO4/E23632012DistributionMechanical Heating 107,085
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 217,293
Total Planned activities for $1,846,372BOE0874 000
000BOE08758/29/2011Date of Last Survey:HILLSIDE AVE. & 232 ST.
197 - MARTIN VAN BUREN HIGH SCHOOL - Q -
EMERG2012/E23632012Exterior LightingElectrical Lighting 107,793
Page D - 88
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $107,793BOE0875 000
000BOE08761/4/2011Date of Last Survey:67-01 110 ST.
1469 - FOREST HILLS HIGH SCHOOL - Q -
A00331078/E23632013Exterior WallsArchitecture Exterior 724,562
Total Planned activities for $724,562BOE0876 000
000BOE08779/17/2010Date of Last Survey:48-10 31 AVE.
1470 - WILLIAM C. BRYANT HIGH SCHOOL -Q -
A00303176/E23632012Exterior WallsArchitecture Exterior 822,028
A00282459/E23632012ParapetsArchitecture Exterior 55,047
A00303174/E23632012RoofArchitecture Exterior 265,378
A00352957/E23642015Egress LightingElectrical Lighting 40,984
A00352957/E23642015Exterior LightingElectrical Lighting 95,716
Total Planned activities for $1,279,153BOE0877 000
000BOE087912/10/2010Date of Last Survey:48-01 90TH STREET
1472 - NEWTOWN HIGH SCHOOL - Q -
A00303176/E23632012Exterior WallsArchitecture Exterior 39,261
A00303174/E23632012RoofArchitecture Exterior 46,044
A00240042/E23632011FloorsArchitecture Interior 1,780,867
A00352957/E23642015Interior LightingElectrical Lighting 74,734
Total Planned activities for $1,940,906BOE0879 000
000BOE08803/12/2012Date of Last Survey:105-25 HORACE HARDING EXP.
1473 - H. S. OF ARTS & BUSINESS - Q -
A00330927/E23632013Interior LightingElectrical Lighting 418,932
Total Planned activities for $418,932BOE0880 000
000BOE08818/29/2012Date of Last Survey:35-01 UNION STREET
2758 - FLUSHING HIGH SCHOOL - Q -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 51,698
BOIL_6TO4/E23632014DistributionMechanical Heating 296,593
Total Planned activities for $348,291BOE0881 000
000BOE08823/25/2011Date of Last Survey:821 BAY 25TH STREET
1474 - FAR ROCKAWAY HIGH SCHOOL - Q -
A00353037/E23632014Exterior WallsArchitecture Exterior 169,971
A00345204/E23642015WindowsArchitecture Exterior 101,094
A00345203/E23642015ParapetsArchitecture Exterior 49,012
A00345202/E23642015RoofArchitecture Exterior 174,524
A00352882/E23642015Interior LightingElectrical Lighting 164,447
Total Planned activities for $659,048BOE0882 000
000BOE08838/24/2009Date of Last Survey:167-01 GOTHIC DR.
1475 - JAMAICA HIGH SCHOOL - Q -
Page D - 89
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00303325/E23632014WindowsArchitecture Exterior 441,308
A00011509/E23622010WiringElectrical Under 600 Volts 308,362
A00174539/E23632011Terminal DevicesMechanical Heating 1,216,421
Total Planned activities for $1,966,091BOE0883 000
000BOE08848/30/2012Date of Last Survey:89-30 114TH STREET
1476 - RICHMOND HILL HIGH SCHOOL - Q -
A00268143/E23632013Exterior WallsArchitecture Exterior 132,637
A00268144/E23632013RoofArchitecture Exterior 93,821
Total Planned activities for $226,458BOE0884 000
000BOE088512/23/2011Date of Last Survey:101-01 ROCKAWAY BLVD.
1477 - JOHN ADAMS HIGH SCHOOL - Q -
A00248030/E23632012Exterior WallsArchitecture Exterior 490,146
Total Planned activities for $490,146BOE0885 000
000BOE08869/20/2011Date of Last Survey:21-27 HIMROD STREET
1478 - GROVER CLEVELAND HIGH SCHOOL - Q -
A00352885/E23642015Interior LightingElectrical Lighting 156,527
A00352885/E23642015Egress LightingElectrical Lighting 41,140
A00352885/E23642015Exterior LightingElectrical Lighting 96,081
Total Planned activities for $293,748BOE0886 000
000BOE088712/14/2010Date of Last Survey:207-01 116TH AVE.
1479 - ANDREW JACKSON HIGH SCHOOL - Q -
A00330969/E23632014Exterior WallsArchitecture Exterior 278,555
A00324423/E23632014RoofArchitecture Exterior 318,090
Total Planned activities for $596,645BOE0887 000
000BOE08888/30/2011Date of Last Survey:160-05 HIGHLAND AVE.
1480 - HILLCREST HIGH SCHOOL - Q -
BOIL_6TO4/E23632012Energy SourceMechanical Heating 57,208
BOIL_6TO4/E23632012DistributionMechanical Heating 149,812
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 52,692
Total Planned activities for $259,712BOE0888 000
000BOE089012/19/2012Date of Last Survey:37-02 47TH AVE.
1456 - QUEENS VOCATIONAL TECH. H.S. - Q -
A00288913/E23632013Exterior WallsArchitecture Exterior 69,312
Total Planned activities for $69,312BOE0890 000
000BOE089112/22/2010Date of Last Survey:36TH ST & QUEENS BLVD.
1457 - AVIATION H.S. - Q -
A00345428/E23642015WindowsArchitecture Exterior 703,781
A00324508/E23642016RoofArchitecture Exterior 115,251
A00352173/E23632014PanelboardsElectrical Under 600 Volts 36,818
Page D - 90
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00352173/E23632014WiringElectrical Under 600 Volts 328,920
A00345422/E23642015Interior LightingElectrical Lighting 180,428
A00345422/E23642015Exterior LightingElectrical Lighting 90,923
Total Planned activities for $1,456,121BOE0891 000
000BOE089211/4/2011Date of Last Survey:165-65 84TH AVE.
1458 - THOMAS A. EDISON HIGH SCHOOL - Q -
A00345447/E23642015RoofArchitecture Exterior 186,950
A00352886/E23642015Interior LightingElectrical Lighting 177,967
BOIL_6to4/E23632014Conversion EquipmentMechanical Heating 1,192,514
BOIL_6TO4/E23632012DistributionMechanical Heating 85,519
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 36,678
Total Planned activities for $1,679,628BOE0892 000
000BOE089311/18/2011Date of Last Survey:41-15 104 STREET
1459 - P. S. 721 - Q (OTC-OL 16) -
A00352887/E23642015Interior LightingElectrical Lighting 97,265
Total Planned activities for $97,265BOE0893 000
000BOE089412/11/2012Date of Last Survey:28-11 QUEENS PLAZA NORTH
1460 - DIVISION OF SCHOOL FACILITIES -Q -
A00345530/E23642016Interior LightingElectrical Lighting 72,789
Total Planned activities for $72,789BOE0894 000
000BOE08959/2/2011Date of Last Survey:44-36 VERNON BLVD
1461 - BUREAU OF SUPPLIES -
EMERG2005/E23632011WindowsArchitecture Exterior 973,102
A00288991/E23632013RoofArchitecture Exterior 1,233,503
SANDQ801D/E23642015CeilingsArchitecture Interior 217,056
SANDK801E/E23642015Energy SourceMechanical Heating 69,411
SANDK801E/E23642015Conversion EquipmentMechanical Heating 50,693
SANDK801E/E23642015Terminal DevicesMechanical Heating 1,023,198
Total Planned activities for $3,566,963BOE0895 000
000BOE089711/3/2011Date of Last Survey:976 SENECA AVENUE
1463 - I. S. 77 - Q (WITH I. S. 93 -Q) -
A00351854/E23642016Interior LightingElectrical Lighting 69,468
Total Planned activities for $69,468BOE0897 000
000BOE08981/18/2013Date of Last Survey:58 SUMMIT STREET
1464 - P. S. 1 - SI -
A00345713/E23642015Exterior WallsArchitecture Exterior 207,089
Total Planned activities for $207,089BOE0898 000
000BOE089911/12/2010Date of Last Survey:333 MIDLAND AVENUE
1465 - I. S. 2 - SI -
Page D - 91
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00268912/E23632012Exterior WallsArchitecture Exterior 377,868
SANDR002A/E23642015Interior WallsArchitecture Interior 141,605
ACESCA404/E23642015Interior LightingElectrical Lighting 119,941
Total Planned activities for $639,414BOE0899 000
000BOE09004/18/2013Date of Last Survey:80 SOUTH GOFF AVENUE
1466 - P. S. 3 - SI -
A00351735/E23642015Conversion EquipmentMechanical Heating 66,689
Total Planned activities for $66,689BOE0900 000
000BOE09035/6/2013Date of Last Survey:1270 HUGUENOT AVENUE
1454 - I. S. 7 - SI -
A00303898/E23632013RoofArchitecture Exterior 1,086,314
Total Planned activities for $1,086,314BOE0903 000
000BOE090710/28/2010Date of Last Survey:100 TOMPKINS AVENUE
1442 - P. S. 14 - SI -
A00240864/E23632011RoofArchitecture Exterior 102,878
A00240869/E23632011FloorsArchitecture Interior 1,040,945
Total Planned activities for $1,143,823BOE0907 000
000BOE090810/10/2012Date of Last Survey:80 MONROE AVENUE
1443 - P. S. 16 - SI -
A00303991/E23632013Interior LightingElectrical Lighting 66,985
Total Planned activities for $66,985BOE0908 000
000BOE09096/22/2010Date of Last Survey:221 BROADWAY
1444 - P. S. 18 - SI -
A00310248/ED0012014WiringElectrical Under 600 Volts 66,652
A00268291/E23632011Conversion EquipmentMechanical Heating 415,565
Total Planned activities for $482,217BOE0909 000
000BOE091012/8/2011Date of Last Survey:780 POST AVENUE
1445 - P. S. 19 - SI -
A00325072/E23632014WindowsArchitecture Exterior 216,949
A00304033/E23632014ParapetsArchitecture Exterior 61,042
A00325065/E23632014Fire/Smoke DetectionElectrical Alarm 222,618
Total Planned activities for $500,609BOE0910 000
000BOE091112/5/2011Date of Last Survey:161 PARK AVENUE
1446 - P. S. 20 - SI -
A00240943/E23632011RoofArchitecture Exterior 49,018
Total Planned activities for $49,018BOE0911 000
000BOE091212/5/2011Date of Last Survey:168 HOOKER PLACE
1447 - P. S. 21 - SI -
A00345963/E23642016Interior LightingElectrical Lighting 231,320
Page D - 92
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $231,320BOE0912 000
000BOE09131/7/2011Date of Last Survey:1860 FOREST AVENUE
2526 - P. S. 22 - SI -
A00175554/E23632010FloorsArchitecture Interior 434,007
PCB_LIGHT/E23632012Interior LightingElectrical Lighting 75,658
Total Planned activities for $509,665BOE0913 000
000BOE09143/13/2012Date of Last Survey:30 NATICK STREET
1448 - P. S. 23 - SI -
A00325144/E23632014Interior LightingElectrical Lighting 348,166
Total Planned activities for $348,166BOE0914 000
000BOE09153/11/2011Date of Last Survey:225 CLEVELAND AVENUE
2757 - I. S. 24 - SI -
A00283410/E23632013Fire/Smoke DetectionElectrical Alarm 508,800
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 846,208
BOIL_6TO4/E23632012DistributionMechanical Heating 60,684
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 281,170
Total Planned activities for $1,696,862BOE0915 000
000BOE09166/3/2011Date of Last Survey:4210 ARTHUR KILL ROAD
4428 - P. S. 25 - SI - OLD P.S. 4 - SI
A00346037/E23642016Interior LightingElectrical Lighting 112,675
Total Planned activities for $112,675BOE0916 000
000BOE091812/8/2011Date of Last Survey:11 CLOVE LAKE PLACE
1451 - I. S. 27 - SI -
A00304171/E23632013DistributionMechanical Heating 56,974
Total Planned activities for $56,974BOE0918 000
000BOE09192/18/2011Date of Last Survey:1581 VICTORY BLVD
1452 - P. S. 29 - SI -
A00262877/E23632011Exterior WallsArchitecture Exterior 253,436
A00262876/E23632011ParapetsArchitecture Exterior 63,705
A00268290/E23632011RoofArchitecture Exterior 96,559
A00289091/ED0012012WiringElectrical Under 600 Volts 54,766
A00325232/E23632014DistributionMechanical Heating 42,331
Total Planned activities for $510,797BOE0919 000
000BOE092012/6/2011Date of Last Survey:FISKE & LEONARD AVENUES
1453 - P. S. 30 - SI -
A00346106/E23642015Interior LightingElectrical Lighting 474,305
Total Planned activities for $474,305BOE0920 000
000BOE092110/16/2012Date of Last Survey:55 LAYTON AVENUE
1426 - P. S. 31 - SI -
Page D - 93
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 367,799
BOIL_6TO4/E23632014DistributionMechanical Heating 105,504
Total Planned activities for $473,303BOE0921 000
000BOE09234/26/2012Date of Last Survey:ACADEMY & YETMAN AVENUES
1429 - I. S. 34 - SI (OL TOTTENVILLE) -
A00346164/E23632014Fire/Smoke DetectionElectrical Alarm 358,113
A00346163/E23642016Terminal DevicesMechanical Heating 148,431
Total Planned activities for $506,544BOE0923 000
000BOE09242/18/2011Date of Last Survey:60 FOOTE AVE.
2527 - P. S. 35 - SI -
A00183153/ED0012012Switchgear/ SwitchboardElectrical Under 600 Volts 60,732
Total Planned activities for $60,732BOE0924 000
000BOE09254/24/2013Date of Last Survey:255 IONIA AVENUE
1430 - P. S. 36 - SI -
A00325359/E23632014Exterior WallsArchitecture Exterior 44,878
A00325358/E23632014WindowsArchitecture Exterior 568,665
A00325356/E23632014RoofArchitecture Exterior 92,209
A00346200/E23642015Conversion EquipmentMechanical Heating 396,456
Total Planned activities for $1,102,208BOE0925 000
000BOE092810/18/2012Date of Last Survey:91 HENDERSON AVENUE
1435 - P. S. 373 - SI - (FORMER P. S. 40)
A00309864/E23632014Exterior WallsArchitecture Exterior 84,740
Total Planned activities for $84,740BOE0928 000
000BOE09293/13/2012Date of Last Survey:CLAWSON ST & LOCUST AVENUE
1436 - P. S. 41 - SI -
A00309857/ED0012013FloorsArchitecture Interior 194,063
A00248722/E23632014WiringElectrical Under 600 Volts 73,022
A00310566/E23632013Interior LightingElectrical Lighting 496,090
Total Planned activities for $763,175BOE0929 000
000BOE09312/18/2011Date of Last Survey:58 LAWRENCE AVE.
2525 - P. S. 45 - SI -
A00325484/E23642016RoofArchitecture Exterior 63,517
Total Planned activities for $63,517BOE0931 000
000BOE09353/13/2012Date of Last Survey:200 ADELAIDE AVENUE
1412 - P. S. 50 - SI -
A00248729/ED0012012WiringElectrical Under 600 Volts 86,648
A00304514/E23632013Interior LightingElectrical Lighting 63,995
Total Planned activities for $150,643BOE0935 000
Page D - 94
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE09372/14/2013Date of Last Survey:450 BUEL AVENUE
1413 - P. S. 52 - SI -
SANDR052A/E23642015CeilingsArchitecture Interior 107,281
SANDR052E/E23642015Energy SourceMechanical Heating 87,847
SANDR052E/E23642015Conversion EquipmentMechanical Heating 289,364
SANDR052E/E23642015DistributionMechanical Heating 207,512
Total Planned activities for $692,004BOE0937 000
000BOE09391/8/2010Date of Last Survey:1060 WILLOWBROOK ROAD
1415 - P. S. 54 - SI -
A00241503/E23632011WindowsArchitecture Exterior 570,348
A00241501/E23632011RoofArchitecture Exterior 555,548
A00346474/E23642015Interior LightingElectrical Lighting 613,024
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 353,466
BOIL_6TO4/E23632014DistributionMechanical Heating 506,963
Total Planned activities for $2,599,349BOE0939 000
000BOE09402/15/2013Date of Last Survey:54 OSBORNE STREET
1416 - P. S. 55 - SI -
BOIL_6TO4/E23632014Conversion EquipmentMechanical Heating 373,690
BOIL_6TO4/E23632014DistributionMechanical Heating 214,388
Total Planned activities for $588,078BOE0940 000
000BOE094110/28/2010Date of Last Survey:140 PALMA DRIVE
1417 - P. S. 57 - SI -
A00268884/E23632011Motor ControllersElectrical Under 600 Volts 395,415
A00325683/E23632014Interior LightingElectrical Lighting 125,675
Total Planned activities for $521,090BOE0941 000
000BOE09429/16/2011Date of Last Survey:55 MERRILL AVENUE
1418 - P. S. 60 - SI -
A00309853/E23632013Interior LightingElectrical Lighting 721,828
Total Planned activities for $721,828BOE0942 000
000BOE09456/13/2011Date of Last Survey:33 FERNDALE AVENUE
1421 - I. S. 72 - SI -
A00288984/E23632012RoofArchitecture Exterior 87,104
ACESCA404/E23642015Interior LightingElectrical Lighting 69,414
Total Planned activities for $156,518BOE0945 000
000BOE094812/7/2011Date of Last Survey:458 CLAWSON ST.
1199 - STATEN ISLAND TECH H.S. - SI -
A00351775/E23642016Interior LightingElectrical Lighting 1,049,637
A00351775/E23642016Exterior LightingElectrical Lighting 58,453
Total Planned activities for $1,108,090BOE0948 000
Page D - 95
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE09499/2/2011Date of Last Survey:30 INNIS ST.
1200 - PORT RICHMOND HIGH SCHOOL - SI -
A00304856/E23632013Exterior WallsArchitecture Exterior 63,875
PRIORCOMP/E23632012RoofArchitecture Exterior 94,878
A00352894/E23642015Exterior LightingElectrical Lighting 83,714
Total Planned activities for $242,467BOE0949 000
000BOE09508/26/2011Date of Last Survey:105 HAMILTON AVE.
1201 - CURTIS HIGH SCHOOL - SI -
A00330895/E23632013WindowsArchitecture Exterior 201,846
A00325906/E23632013RoofArchitecture Exterior 203,441
A00352895/E23642015Interior LightingElectrical Lighting 1,315,331
Total Planned activities for $1,720,618BOE0950 000
010BOE09508/26/2011Date of Last Survey:105 HAMILTON AVE.
2945 - CURTIS HIGH SCHOOL - SI - FIELD HOUSE
A00330895/E23632013WindowsArchitecture Exterior 38,572
Total Planned activities for $38,572BOE0950 010
000BOE09513/11/2011Date of Last Survey:100 LUTEN AVE
2739 - TOTTENVILLE HIGH SCHOOL - SI -
A00284206/E23632012Exterior WallsArchitecture Exterior 413,787
A00263565/E23632011WindowsArchitecture Exterior 652,877
BOIL_6to4/E23632014Energy SourceMechanical Heating 58,300
Total Planned activities for $1,124,964BOE0951 000
000BOE09521/20/2010Date of Last Survey:1200 MANOR RD
1202 - SUSAN E. WAGNER HIGH SCHOOL - SI -
A00352005/E23642015Exterior WallsArchitecture Exterior 117,685
A00346801/E23642015RoofArchitecture Exterior 167,460
A00352965/E23642015Interior LightingElectrical Lighting 100,772
A00352965/E23642015Exterior LightingElectrical Lighting 105,771
BOIL_6TO4/E23632012Energy SourceMechanical Heating 43,691
BOIL_6TO4/E23632012Conversion EquipmentMechanical Heating 159,545
BOIL_6TO4/E23632012DistributionMechanical Heating 915,317
BOIL_6TO4/E23632012Terminal DevicesMechanical Heating 123,695
Total Planned activities for $1,733,936BOE0952 000
000BOE095312/13/2012Date of Last Survey:109 RHINE AVE.
1203 - CONCORD ALTERNATIVE H.S. - SI - (OLD P. S. 12)
A00304960/E23632014Exterior WallsArchitecture Exterior 67,132
A00304959/E23632014WindowsArchitecture Exterior 76,987
Total Planned activities for $144,119BOE0953 000
Page D - 96
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE095510/28/2010Date of Last Survey:155 TOMPKINS AVENUE
1205 - P. S. 722 - SI (OCC TRAIN CTR) - HUNGERFORD SCHOOL
A00284298/E23632014Exterior WallsArchitecture Exterior 138,181
A00326026/E23632014WindowsArchitecture Exterior 44,474
A00284297/E23632014ParapetsArchitecture Exterior 121,301
Total Planned activities for $303,956BOE0955 000
000BOE09611/20/2011Date of Last Survey:500 WEST 160 STREET
4467 - P. S. 4 - M -
A00338091/E23642015RoofArchitecture Exterior 290,712
Total Planned activities for $290,712BOE0961 000
000BOE09653/2/2011Date of Last Survey:129-15 150 AVENUE
1182 - P. S. 124 - Q -
A00268273/E23632012Exterior WallsArchitecture Exterior 53,876
Total Planned activities for $53,876BOE0965 000
000BOE096612/21/2011Date of Last Survey:125-20 SUTPHIN BLVD
1183 - P. S. 223 - Q -
A00302766/E23632014WindowsArchitecture Exterior 786,227
A00323768/E23632014Interior LightingElectrical Lighting 844,179
A00323768/E23632014Exterior LightingElectrical Lighting 35,489
Total Planned activities for $1,665,895BOE0966 000
000BOE09691/31/2011Date of Last Survey:62 PARK PLACE
4481 - P. S. 77 - BK -
A00275530/E23632014Exterior WallsArchitecture Exterior 330,036
A00296137/E23632014RoofArchitecture Exterior 85,009
A00352826/E23642015Interior LightingElectrical Lighting 53,495
UNAVAILABLE/E23632011Conversion EquipmentMechanical Heating 65,979
UNAVAILABLE/E23632011Terminal DevicesMechanical Heating 180,383
Total Planned activities for $714,902BOE0969 000
000BOE097010/24/2011Date of Last Survey:1225 BAY RIDGE AVE.
1186 - P. S. 176 - BK -
ACESCA404/E23642015Interior LightingElectrical Lighting 68,888
Total Planned activities for $68,888BOE0970 000
000BOE09711/7/2011Date of Last Survey:20 HOUSTON ST.
1187 - I. S. 51 - SI -
A00283838/E23632013Fire/Smoke DetectionElectrical Alarm 80,379
Total Planned activities for $80,379BOE0971 000
000BOE09722/11/2013Date of Last Survey:185 ELLERY ST.
2888 - P. S. 148 - BK -
A00312720/E23632014Exterior WallsArchitecture Exterior 242,339
Page D - 97
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00312719/E23632014ParapetsArchitecture Exterior 163,649
Total Planned activities for $405,988BOE0972 000
000BOE097311/13/2012Date of Last Survey:196-25 PECK AVE.
2882 - P. S. 179 - Q -
A00330987/E23632014Interior LightingElectrical Lighting 41,709
Total Planned activities for $41,709BOE0973 000
000BOE097410/16/2012Date of Last Survey:BROADWAY & 196TH ST.
2889 - I. S. 218 - M -
A00268195/E23632013RoofArchitecture Exterior 146,174
Total Planned activities for $146,174BOE0974 000
000BOE097612/15/2010Date of Last Survey:3703 10TH AVE.
4139 - P. S. 5 - MANHATTAN -
A00296283/E23632013RoofArchitecture Exterior 397,364
Total Planned activities for $397,364BOE0976 000
000BOE09782/25/2011Date of Last Survey:43 SNYDER AVE.
4141 - P. S. 6 - BK -
A00268202/E23632011Exterior WallsArchitecture Exterior 65,658
A00268203/E23632011RoofArchitecture Exterior 70,123
Total Planned activities for $135,781BOE0978 000
000BOE098010/22/2010Date of Last Survey:34TH AVE. & 100TH ST.
4144 - P. S. 92 - Q -
A00302941/E23632013WindowsArchitecture Exterior 166,626
ACESCA404/E23642015Interior LightingElectrical Lighting 52,628
Total Planned activities for $219,254BOE0980 000
000BOE09821/8/2010Date of Last Survey:345 CHAMBERS ST.
4147 - STUYVESANT HIGH SCHOOL - M -
A00235331/E23632011Exterior WallsArchitecture Exterior 100,127
A00235329/E23632011RoofArchitecture Exterior 59,076
Total Planned activities for $159,203BOE0982 000
000BOE09855/17/2011Date of Last Survey:645 MAIN ST.,
4150 - P. S./I. S. 217 - M -
A00235117/E23632011Exterior WallsArchitecture Exterior 86,515
Total Planned activities for $86,515BOE0985 000
000BOE09874/4/2011Date of Last Survey:160 BEACH 29 STREET
4470 - P. S. 43 - Q - (TANDEM P. S. 256 - Q)
SANDQ043F/E23642015RoofArchitecture Exterior 57,506
Total Planned activities for $57,506BOE0987 000
000BOE09902/17/2011Date of Last Survey:14-30 BROADWAY
4473 - LONG ISLAND CITY HIGH SCHOOL - Q -
Page D - 98
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00309799/E23632013Exterior WallsArchitecture Exterior 55,557
Total Planned activities for $55,557BOE0990 000
000BOE09956/7/2011Date of Last Survey:3050 WEBSTER AVENUE
4489 - P. S./M. S. 20 - BX -
A00264105/E23632011RoofArchitecture Exterior 35,399
Total Planned activities for $35,399BOE0995 000
000BOE10139/13/2012Date of Last Survey:101-33 124TH STREET
13406 - P. S. 161 - Q -
A00289668/E23632012Exterior WallsArchitecture Exterior 119,494
A00288387/E23632012WindowsArchitecture Exterior 138,272
A00289669/E23632012ParapetsArchitecture Exterior 76,147
Total Planned activities for $333,913BOE1013 000
000BOE10272/22/2011Date of Last Survey:109-15 98TH STREET
13469 - I. S. 137 - Q -
A00331157/E23632014Exterior WallsArchitecture Exterior 81,682
A00331159/E23632014RoofArchitecture Exterior 52,626
Total Planned activities for $134,308BOE1027 000
000BOE10321/10/2013Date of Last Survey:1001 EAST 45TH STREET
13585 - P. S. 109 - BK -
A00350986/E23642015Exterior WallsArchitecture Exterior 125,026
Total Planned activities for $125,026BOE1032 000
000BOE10421/11/2010Date of Last Survey:77 MARSH AVENUE
13596 - P. S. 58 - SI -
ACESCA404/E23642015Interior LightingElectrical Lighting 95,803
Total Planned activities for $95,803BOE1042 000
000BOE10512/1/2013Date of Last Survey:3441 STEENWICK AVENUE
14264 - P.S./I.S. 189 - BX -
SANDX189A/E23642015Exterior WallsArchitecture Exterior 68,088
Total Planned activities for $68,088BOE1051 000
000BOE107611/1/2011Date of Last Survey:100 TRINITY PLACE
14422 - H.S. OF ECONOMICS AND FINANCE -M -
A00340979/E23642015Interior LightingElectrical Lighting 345,036
Total Planned activities for $345,036BOE1076 000
000BOE107912/16/2011Date of Last Survey:2865 W. 19TH STREET
14425 - H.S. FOR SPORTS MANAGEMENT - BK -
A00330531/E23632014Interior LightingElectrical Lighting 137,731
Total Planned activities for $137,731BOE1079 000
000BOE10811/25/2010Date of Last Survey:402 EASTERN PKWY.
14427 - WEB DUBOIS ACADEMIC H.S. - BK -
Page D - 99
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00337689/E23642016Interior LightingElectrical Lighting 451,499
Total Planned activities for $451,499BOE1081 000
000BOE10982/22/2010Date of Last Survey:1180 REVEREND JAMES A POLITE AVE
14449 - REV. JAMES A. POLITE AVENUE - SCHOOL CAMPUS - BX
PRIORCOMP/E23632012Exterior WallsArchitecture Exterior 128,322
PRIORCOMP/E23632012ParapetsArchitecture Exterior 67,389
PRIORCOMP/E23632012RoofArchitecture Exterior 243,348
Total Planned activities for $439,059BOE1098 000
000HRA00486/7/2011Date of Last Survey:1180 JAMES A. POLITE AVE.
1946 - THE METROPOLITAN HIGH SCHOOL -BX -
PRIORCOMP/E23632012Exterior WallsArchitecture Exterior 36,818
PRIORCOMP/E23632012RoofArchitecture Exterior 186,042
Total Planned activities for $222,860HRA0048 000
Total Planned Activities for : $426,305,795DEPARTMENT OF EDUCATION
Total Required for "State of Good Repair" for : DEPARTMENT OF EDUCATION $1,484,689,000
Page D - 100
Note: The proposed SCA/DOE Five Year Capital Plan (Fiscal Years 2015 - 2019) identifies rehabilitation work at the facility component level forall five years of their Five Year Plan. The reconciliation percentage (%) above represents the work defined for FY2015 – 2019. In addition toreconciling line-item state of good repair needs, selected SCA capital programmatic elements address AIMS state of good repair needs in generaland are included in the overall reconciliation. These programs include: boiler conversion, climate control, auditorium upgrade, gymnasiumupgrade, cafeteria/multipurpose room upgrade, room conversions, accessibility, school improvement and restructuring, science lab upgrades,l i b r a r y u p g r a d e s , c o d e c o m p l i a n c e , a d m i n i s t r a t i v e s u p p o r t , a n d e m e r g e n c y s t a b i l i z a t i o n p r o j e c t s .
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
020CUN00024/11/2013Date of Last Survey:500 GRAND CONCOURSE
2121 - HOSTOS COMMUNITY COLLEGE - B BUILDING (22001)
HS045-0112013Exterior WallsArchitecture Exterior 309,070
HS045-0122015Interior WallsArchitecture Interior 37,301
Total Planned activities for $346,371CUN0002 020
050CUN00024/10/2013Date of Last Survey:120 EAST 149TH ST.
13556 - HOSTOS COMMUNITY COLLEGE - SAVOY BLDG. - D
HS047-013 / HS049-02015RoofArchitecture Exterior 268,733
Total Planned activities for $268,733CUN0002 050
020CUN00031/7/2013Date of Last Survey:EAST SIDE (JAMAICA BAY)
13550 - KINGSBOROUGH COMMUNITY COLLEGE - BULKHEAD
SAND-KG022014Sheet PilesBulkheads Structural 9,955
Total Planned activities for $9,955CUN0003 020
0G0CUN00036/6/2012Date of Last Survey:1925 ORIENTAL BLVD.
2126 - KINGSBOROUGH COMMUNITY COLLEGE - HEALTH & PHYSICAL EDUCATION C
KG203-0062012Exhaust FansMechanical Ventilation 49,556
Total Planned activities for $49,556CUN0003 0G0
0P0CUN00036/4/2012Date of Last Survey:1813 ORIENTAL BLVD.
2105 - KINGSBOROUGH COMMUNITY COLLEGE - CENTRAL SERVICES - P
KG201-0062011RoofArchitecture Exterior 134,380
KG201-0062011RoofArchitecture Exterior 69,820
KG202-0062011Fire/Smoke DetectionElectrical Alarm 227,692
KG024-0082012DistributionMechanical Heating 40,125
KG030-0122012Heat RejectionMechanical Air Conditioning 238,580
Total Planned activities for $710,597CUN0003 0P0
0S0CUN00036/6/2012Date of Last Survey:2120 ORIENTAL BLVD.
2106 - KINGSBOROUGH COMMUNITY COLLEGE - ART & SCIENCE BLDG - S
CA201KG012009Exterior WallsArchitecture Exterior 11,415
CA201KG012009Exterior WallsArchitecture Exterior 127,405
Total Planned activities for $138,820CUN0003 0S0
0T0CUN00036/4/2012Date of Last Survey:2001 ORIENTAL BLVD.
2107 - KINGSBOROUGH COMMUNITY COLLEGE - LEON M. GOLDSTEIN PERF. ARTS CT
KG028-0112011Interior LightingElectrical Lighting 28,396
KG028-0112011Terminal DevicesMechanical Heating 46,476
KG205-0062006Terminal DevicesMechanical Air Conditioning 45,766
Total Planned activities for $120,638CUN0003 0T0
0U0CUN00036/4/2012Date of Last Survey:1824 ORIENTAL BLVD.
2108 - KINGSBOROUGH COMMUNITY COLLEGE - COLLEGE CENTER - U
KG030-0122012RoofArchitecture Exterior 514,253
Page E - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
KG202-0062006Fire/Smoke DetectionElectrical Alarm 284,321
Total Planned activities for $798,574CUN0003 0U0
2T0CUN00036/8/2012Date of Last Survey:2065 ORIENTAL BLVD.
2110 - KINGSBOROUGH COMMUNITY COLLEGE - TEMPORARY BLDG. T2
KG029-0112011Exterior WallsArchitecture Exterior 8,444
KG029-0112011RoofArchitecture Exterior 64,259
KG029-0112011Conversion EquipmentMechanical Heating 10,035
ACECUN4222014Terminal DevicesMechanical Air Conditioning 310,930
Total Planned activities for $393,667CUN0003 2T0
4T0CUN00036/8/2012Date of Last Survey:2111 ORIENTAL BLVD.
2112 - KINGSBOROUGH COMMUNITY COLLEGE - TEMPORARY BLDG. T4
ACECUN4232014Conversion EquipmentMechanical Air Conditioning 55,870
ACECUN4232014Heat RejectionMechanical Air Conditioning 23,881
Total Planned activities for $79,751CUN0003 4T0
5T0CUN00036/8/2012Date of Last Survey:2100 ORIENTAL BLVD.
2113 - KINGSBOROUGH COMMUNITY COLLEGE - TEMPORARY BLDG. T5
KG200-0062012RoofArchitecture Exterior 119,803
Total Planned activities for $119,803CUN0003 5T0
7T0CUN00036/8/2012Date of Last Survey:2131 ORIENTAL BLVD.
2115 - KINGSBOROUGH COMMUNITY COLLEGE - TEMPORARY BLDG. T7
KG025-0092012Conversion EquipmentMechanical Air Conditioning 160,771
Total Planned activities for $160,771CUN0003 7T0
010CUN00044/23/2013Date of Last Survey:31-10 THOMSON AVE.
2096 - LAGUARDIA COMMUNITY COLLEGE - M - JOSEPH SHENKER HALL
LG031-0122015RoofArchitecture Exterior 435,591
CA200LG132015Conversion EquipmentMechanical Air Conditioning 51,527
CA200LG132015Heat RejectionMechanical Air Conditioning 548,638
Total Planned activities for $1,035,756CUN0004 010
020CUN00044/23/2013Date of Last Survey:31-40 THOMSON AVENUE
2823 - LAGUARDIA COMMUNITY COLLEGE - E - E BUILDING
LG024-0092015RoofArchitecture Exterior 2,544,518
LG020-0092015FloorsArchitecture Interior 355,446
LG020-0092015CeilingsArchitecture Interior 213,937
Total Planned activities for $3,113,901CUN0004 020
030CUN00044/23/2013Date of Last Survey:29-10 THOMSON AVENUE
4434 - LAGUARDIA COMMUNITY COLLEGE - C - CENTER 3 BUILDING
LG035-0102015Exterior WallsArchitecture Exterior 2,476,025
LG035-010/CA200LG022015WindowsArchitecture Exterior 371,528
LG035-0102015ParapetsArchitecture Exterior 62,401
Page E - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
LG070-010/CA019LG122014Energy SourceMechanical Heating 407,851
LG030-0122014Conversion EquipmentMechanical Heating 4,030,336
CA200LG132015Conversion EquipmentMechanical Air Conditioning 1,649,066
CA200LG132015Heat RejectionMechanical Air Conditioning 142,588
Total Planned activities for $9,139,795CUN0004 030
010CUN00054/11/2013Date of Last Survey:199 CHAMBERS STREET
2097 - BOR. OF MANHATTAN COMM. COLLEGE - CHAMBERS ST BLDG. (MAIN CAMPUS
CA200MC042013Exterior WallsArchitecture Exterior 826,324
CA200MC042013WindowsArchitecture Exterior 191,702
MC141-0092011RoofArchitecture Exterior 1,986,957
CA202MC012011FloorsArchitecture Interior 130,303
MC030-0122012CeilingsArchitecture Interior 1,674,746
MC028-0102011Motor ControllersElectrical Under 600 Volts 297,516
MC028-0102011Terminal DevicesMechanical Air Conditioning 252,440
MC028-0102011Heat RejectionMechanical Air Conditioning 76,769
MC028-0102011DistributionMechanical Ventilation 129,884
Total Planned activities for $5,566,641CUN0005 010
020CUN00054/11/2013Date of Last Survey:199 CHAMBERS STREET
2098 - BOR. OF MANHATTAN COMM. COLLEGE - BMCC AUDITORIUM
CA200MC042012Exterior WallsArchitecture Exterior 58,880
MC141-0092011RoofArchitecture Exterior 133,278
Total Planned activities for $192,158CUN0005 020
030CUN00064/16/2013Date of Last Survey:222-05 56TH AVENUE
2100 - QUEENSBOROUGH COMMUNITY COLLEGE - KURT SCHMELLER LIBRARY
QB040-0112014HW Heat ExchangerMechanical Plumbing 117,294
Total Planned activities for $117,294CUN0006 030
040CUN00064/16/2013Date of Last Survey:222-15 56TH AVENUE
2101 - QUEENSBOROUGH COMMUNITY COLLEGE - SCIENCE BLDG
QB031-0072014WindowsArchitecture Exterior 6,394
QB043-0122014RoofArchitecture Exterior 178,921
QB039-0112014WiringElectrical Under 600 Volts 16,556
QB040-0112014DistributionMechanical Heating 53,609
Total Planned activities for $255,480CUN0006 040
050CUN00064/18/2013Date of Last Survey:221-05 56TH AVENUE
2102 - QUEENSBOROUGH COMMUNITY COLLEGE - KENNEDY HALL GYMNASIUM
QB039-0112014WiringElectrical Under 600 Volts 6,683
Total Planned activities for $6,683CUN0006 050
110CUN00064/18/2013Date of Last Survey:222-11 56TH AVENUE
2085 - QUEENSBOROUGH COMMUNITY COLLEGE - ADMIN & BUSINESS BLDG
Page E - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
QB045-0132014RoofArchitecture Exterior 35,826
QB039-0112014WiringElectrical Under 600 Volts 6,683
Total Planned activities for $42,509CUN0006 110
120CUN00064/16/2013Date of Last Survey:222-01 56TH AVENUE
2086 - QUEENSBOROUGH COMMUNITY COLLEGE - MEDICAL ARTS BLDG
QB043-0122014RoofArchitecture Exterior 391,853
QB039-0102014Heat RejectionMechanical Air Conditioning 196,483
Total Planned activities for $588,336CUN0006 120
300CUN00064/18/2013Date of Last Survey:222-25 56TH AVENUE
1570 - QUEENSBOROUGH COMMUNITY COLLEGE - HUMANITIES BLDG
QB042-0122014CeilingsArchitecture Interior 161,056
Total Planned activities for $161,056CUN0006 300
050CUN00073/16/2011Date of Last Survey:2020 SEDGWICK AVENUE
2090 - BRONX COMMUNITY COLLEGE - COLSTON HALL
CA200BX042009Exterior WallsArchitecture Exterior 458,456
Total Planned activities for $458,456CUN0007 050
100CUN00073/16/2011Date of Last Survey:2018 SEDGEWICK AVE
2073 - BRONX COMMUNITY COLLEGE - BUTLER HALL
BX200-0062012DistributionMechanical Heating 10,586
Total Planned activities for $10,586CUN0007 100
110CUN00073/15/2011Date of Last Survey:2050 SEDGWICK AVENUE
2074 - BRONX COMMUNITY COLLEGE - LANGUAGE HALL
BX200-0062012DistributionMechanical Heating 12,429
Total Planned activities for $12,429CUN0007 110
120CUN00073/15/2011Date of Last Survey:2060 SEDGEWICK AVE
1571 - BRONX COMMUNITY COLLEGE - GOULD MEMORIAL LIBRARY
BX024-0112011Exterior WallsArchitecture Exterior 22,836
BX024-0112011WindowsArchitecture Exterior 86,366
BX024-0112011RoofArchitecture Exterior 18,785
BX024-0112011RoofArchitecture Exterior 52,662
BX200-0062011DistributionMechanical Heating 7,776
Total Planned activities for $188,424CUN0007 120
170CUN00073/23/2011Date of Last Survey:160 HALL OF FAME TERRACE
2077 - BRONX COMMUNITY COLLEGE - ROSCOE C. BROWN STUDENT CENTER
BX024-0112012Exterior WallsArchitecture Exterior 225,102
BX024-0112012RoofArchitecture Exterior 349,460
BX200-0062012DistributionMechanical Heating 7,364
Total Planned activities for $581,926CUN0007 170
Page E - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
190CUN00073/18/2011Date of Last Survey:2151 UNIVERSITY AVENUE
2794 - BRONX COMMUNITY COLLEGE - GOULD RESIDENCE HALL
BX200-0062012DistributionMechanical Heating 6,177
Total Planned activities for $6,177CUN0007 190
230CUN00073/18/2011Date of Last Survey:2053 UNIVERSITY AVENUE
2080 - BRONX COMMUNITY COLLEGE - ALUMNI GYMNASIUM
BX200-0062012DistributionMechanical Heating 11,336
Total Planned activities for $11,336CUN0007 230
240CUN00073/17/2011Date of Last Survey:125 WEST 180th ST
2081 - BRONX COMMUNITY COLLEGE - NICHOLS HALL
BX200-0062012DistributionMechanical Heating 18,373
Total Planned activities for $18,373CUN0007 240
260CUN00073/17/2011Date of Last Survey:121 WEST 180th STREET
2083 - BRONX COMMUNITY COLLEGE - ENERGY PLANT
BX200-0062012TransformersElectrical Over 600 Volts 31,225
BX200-0062011GeneratorsElectrical Stand-by Power 72,244
BX200-0062013Terminal DevicesMechanical Heating 46,630
Total Planned activities for $150,099CUN0007 260
280CUN00073/21/2011Date of Last Survey:155 WEST 180th ST
2646 - BRONX COMMUNITY COLLEGE - GUGGENHEIM HALL
BX200-0062012HW Heat ExchangerMechanical Plumbing 46,899
Total Planned activities for $46,899CUN0007 280
290CUN00073/14/2011Date of Last Survey:161 WEST 180th STREET
2063 - BRONX COMMUNITY COLLEGE - MEISTER HALL (TECH II)
CA200BX042011Exterior WallsArchitecture Exterior 1,201,692
BX024-0112011RoofArchitecture Exterior 200,991
BX200-0062011Conversion EquipmentMechanical Heating 43,803
CA025BX132013DistributionMechanical Heating 165,018
CA025BX132013Terminal DevicesMechanical Heating 332,108
CA025BX132013DistributionMechanical Air Conditioning 50,175
CA025BX132013Terminal DevicesMechanical Air Conditioning 436,041
BX200-0062012Heat RejectionMechanical Air Conditioning 589,352
Total Planned activities for $3,019,179CUN0007 290
310CUN00073/15/2011Date of Last Survey:187 WEST 180th STREET
2065 - BRONX COMMUNITY COLLEGE - SOUTH HALL
CA201BX042012Exterior WallsArchitecture Exterior 145,327
CA201BX042012ParapetsArchitecture Exterior 62,154
Total Planned activities for $207,481CUN0007 310
Page E - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
CITY UNIVERSITY OF NEW YORK
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
E
320CUN00073/16/2011Date of Last Survey:185 WEST 180th STREET
2066 - BRONX COMMUNITY COLLEGE - HAVEMEYER LABORATORY
BX024-0112012ParapetsArchitecture Exterior 53,224
BX024-0112012RoofArchitecture Exterior 71,925
Total Planned activities for $125,149CUN0007 320
500CUN00073/22/2011Date of Last Survey:181 HALL OF FAME TERRACE
2069 - BRONX COMMUNITY COLLEGE - MACCRAKEN HALL
CA201BX05/BX024-0112012Exterior WallsArchitecture Exterior 136,513
CA201BX05/BX024-0112012RoofArchitecture Exterior 11,048
Total Planned activities for $147,561CUN0007 500
Total Planned Activities for : $28,400,916CITY UNIVERSITY OF NEW YORK
Total Required for "State of Good Repair" for : CITY UNIVERSITY OF NEW YORK $85,480,412
Page E - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
010DBS00147/23/2008Date of Last Survey:738-744 THIRD AVENUE
2506 - 23RD ST. TERMINAL - WAREHOUSE - BLDG #7
PO792011RoofArchitecture Exterior 164,681
Total Planned activities for $164,681DBS0014 010
010DGSP00511/29/2010Date of Last Survey:PIERS 35 & 36, EAST RIVER
2402 - POLICE OFFICES -
FEMA2013FloorsArchitecture Interior 36,078
Total Planned activities for $36,078DGSP005 010
000DOT00881/14/2013Date of Last Survey:103-109 PARK ROW
2411 - MANHATTAN CIVIC CENTER-GARAGE -
PO792014Exterior WallsArchitecture Exterior 167,080
PO792014Interior WallsArchitecture Interior 54,477
PO792014CeilingsArchitecture Interior 772,536
PO792014DistributionMechanical Ventilation 32,874
Total Planned activities for $1,026,967DOT0088 000
010DOT00986/15/2011Date of Last Survey:W 34TH TO W 37TH STS
1806 - PIER 76 - NYPD TOW POUND
PO792015DeckPiers Structural 72,506
801C52322014Piles and BracingPiers Structural 61,186
801C52322014Wales and ChocksPiers Fender 89,362
801C52322014PilesPiers Fender 212,455
Total Planned activities for $435,508DOT0098 010
000NYP00011/30/2012Date of Last Survey:16-20 ERICSSON PLACE
1927 - 1 PRECINCT/TROOP A -
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 10,250
Total Planned activities for $10,250NYP0001 000
000NYP000411/29/2010Date of Last Survey:132 BROOME STREET
1554 - 7 PRECINCT / LAD. 18 / BATT. 4 - CO-LOCATE
EXPENSE2012Exterior WallsArchitecture Exterior 95,384
PO792014Conversion EquipmentMechanical Air Conditioning 210,118
PO792014Heat RejectionMechanical Air Conditioning 116,851
Total Planned activities for $422,353NYP0004 000
000NYP00061/31/2012Date of Last Survey:230 WEST 20TH STREET
1930 - 10 PRECINCT -
EXPENSE2014Exterior WallsArchitecture Exterior 76,157
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 8,963
Total Planned activities for $85,120NYP0006 000
000NYP00082/3/2012Date of Last Survey:357 WEST 35TH STREET
1931 - MIDTOWN SOUTH PRECINCT -
Page F - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
EXPENSE2014FloorsArchitecture Interior 21,856
EXPENSE2014CeilingsArchitecture Interior 10,717
Total Planned activities for $32,573NYP0008 000
000NYP00092/17/2012Date of Last Survey:306 WEST 54TH STREET
1932 - MIDTOWN NORTH PCT & GARAGE ANNEX - (FORMER 18 PCT)
PO792015Exterior WallsArchitecture Exterior 73,634
Total Planned activities for $73,634NYP0009 000
000NYP00123/1/2012Date of Last Survey:162 EAST 102ND STREET
1935 - 23 PRECINCT / FD ENG CO. 53 - COMBINED FACILITY
EXPENSE2014FloorsArchitecture Interior 15,718
EXPENSE2014CeilingsArchitecture Interior 17,663
PO792014Heat RejectionMechanical Air Conditioning 37,871
Total Planned activities for $71,253NYP0012 000
000NYP00131/3/2011Date of Last Survey:151 WEST 100TH STREET
1936 - 24 PRECINCT/PBMN/FD - CO-LOCATE
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 10,767
PO792012Heat RejectionMechanical Air Conditioning 83,701
Total Planned activities for $94,468NYP0013 000
000NYP00155/13/2010Date of Last Survey:520 WEST 126TH STREET
1910 - 26 PRECINCT -
PO792014Exterior WallsArchitecture Exterior 47,598
PO792014FloorsArchitecture Interior 54,338
Total Planned activities for $101,936NYP0015 000
000NYP001610/19/2009Date of Last Survey:2271-89 FREDERICK DOUGLASS BLVD
1912 - 28 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 156,237
PO792017WindowsArchitecture Exterior 71,318
PO792007RoofArchitecture Exterior 62,456
Total Planned activities for $290,011NYP0016 000
000NYP00173/1/2012Date of Last Survey:451 WEST 151ST STREET
1913 - 30 PRECINCT -
PO792017Exterior WallsArchitecture Exterior 134,554
PO792017WindowsArchitecture Exterior 158,235
PO792017CeilingsArchitecture Interior 127,260
Total Planned activities for $420,049NYP0017 000
000NYP00182/21/2012Date of Last Survey:250 WEST 135TH STREET
1914 - 32 PRECINCT -
EXPENSE2013Exterior WallsArchitecture Exterior 33,578
Total Planned activities for $33,578NYP0018 000
Page F - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
000NYP001912/13/2010Date of Last Survey:4295 BROADWAY
1915 - 34 PRECINCT -
PO792018Exterior WallsArchitecture Exterior 81,097
Total Planned activities for $81,097NYP0019 000
000NYP00202/13/2012Date of Last Survey:257 ALEXANDER AVENUE
1916 - 40 PRECINCT -
PO792007Exterior WallsArchitecture Exterior 258,086
Total Planned activities for $258,086NYP0020 000
000NYP002112/10/2009Date of Last Survey:1086 SIMPSON STREET
1917 - DETECTIVE BUREAU BRONX - OLD 41 PRECINCT
PO792015WindowsArchitecture Exterior 78,007
Total Planned activities for $78,007NYP0021 000
000NYP00223/8/2012Date of Last Survey:830 WASHINGTON AVENUE
1918 - 42 PRECINCT -
PO792018FloorsArchitecture Interior 271,690
Total Planned activities for $271,690NYP0022 000
000NYP00233/9/2011Date of Last Survey:900 FTELEY AVENUE
1919 - 43 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 47,364
PO792015ParapetsArchitecture Exterior 43,575
Total Planned activities for $90,939NYP0023 000
000NYP00243/8/2012Date of Last Survey:1278 SEDGWICK AVENUE
2644 - BRONX TASK FORCE (OLD 44 PCT.) -
PO792015FloorsArchitecture Interior 585,994
Total Planned activities for $585,994NYP0024 000
000NYP00252/15/2012Date of Last Survey:2877 BARKLEY AVENUE
1920 - 45 PRECINCT -
PO792015FloorsArchitecture Interior 158,486
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 10,147
Total Planned activities for $168,633NYP0025 000
000NYP002611/27/2009Date of Last Survey:2120 RYER AVENUE
2784 - 46 PRECINCT -
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 8,907
Total Planned activities for $8,907NYP0026 000
000NYP00272/16/2012Date of Last Survey:4111 LACONIA AVENUE
1921 - 47 PRECINCT -
PO792013Exterior WallsArchitecture Exterior 42,445
Total Planned activities for $42,445NYP0027 000
Page F - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
000NYP00296/15/2010Date of Last Survey:2121 EASTCHESTER ROAD
1923 - 49 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 40,115
RESO A2014WindowsArchitecture Exterior 425,649
PO792015Interior WallsArchitecture Interior 59,194
Total Planned activities for $524,958NYP0029 000
000NYP00301/14/2010Date of Last Survey:3450 KINGSBRIDGE AVENUE
1897 - 50 PRECINCT -
RESO A2014GeneratorsElectrical Stand-by Power 74,077
Total Planned activities for $74,077NYP0030 000
000NYP003112/15/2009Date of Last Survey:3016 WEBSTER AVENUE
1898 - 52 PRECINCT -
PO792011Exterior WallsArchitecture Exterior 147,136
PO792011RoofArchitecture Exterior 43,858
PO792015Interior WallsArchitecture Interior 54,684
PO792015CeilingsArchitecture Interior 61,703
Total Planned activities for $307,381NYP0031 000
000NYP00321/7/2010Date of Last Survey:2 UNIONPORT ROAD
1900 - HWY PATROL #1/SS #2 -
PO792015Exterior WallsArchitecture Exterior 87,873
Total Planned activities for $87,873NYP0032 000
000NYP00332/8/2012Date of Last Survey:2951 W 8TH STREET
1901 - 60 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 309,451
PO792015WindowsArchitecture Exterior 149,989
PO792015CeilingsArchitecture Interior 107,023
Total Planned activities for $566,463NYP0033 000
000NYP00342/16/2011Date of Last Survey:2575 CONEY ISLAND AVENUE
1902 - 61 PRECINCT -
PO792018WindowsArchitecture Exterior 88,368
Total Planned activities for $88,368NYP0034 000
000NYP00352/17/2010Date of Last Survey:1925 BATH AVENUE
1903 - 62 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 102,518
PO792015FloorsArchitecture Interior 229,638
Total Planned activities for $332,156NYP0035 000
000NYP00384/14/2010Date of Last Survey:2820 SNYDER AVENUE
1906 - 67 PRECINCT - CO-LOCATE
PO792016Exterior WallsArchitecture Exterior 77,623
Page F - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
PO792016CeilingsArchitecture Interior 50,766
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 9,115
Total Planned activities for $137,504NYP0038 000
000NYP00402/8/2012Date of Last Survey:9720 FOSTER AVENUE
2643 - 69 PRECINCT -
PO792007RoofArchitecture Exterior 73,367
Total Planned activities for $73,367NYP0040 000
000NYP00414/14/2010Date of Last Survey:154 LAWRENCE AVENUE
2783 - 70 PRECINCT -
PO792018Exterior WallsArchitecture Exterior 54,921
PO792018FloorsArchitecture Interior 249,049
PO792018Interior WallsArchitecture Interior 59,057
PO792018CeilingsArchitecture Interior 53,178
Total Planned activities for $416,205NYP0041 000
000NYP004411/20/2009Date of Last Survey:1470 E NEW YORK AVENUE
1884 - 73 PRECINCT -
PO792016WindowsArchitecture Exterior 138,664
Total Planned activities for $138,664NYP0044 000
010NYP004411/20/2009Date of Last Survey:1470 E NEW YORK AVENUE
4377 - 73 PRECINCT - SERVICE SHOP #3
PO792014Exterior WallsArchitecture Exterior 148,229
PO792014RoofArchitecture Exterior 67,913
PO792014CeilingsArchitecture Interior 90,756
Total Planned activities for $306,898NYP0044 010
000NYP00462/7/2012Date of Last Survey:191 UNION STREET
1886 - 76 PRECINCT -
PO792015WindowsArchitecture Exterior 226,978
PO792014Terminal DevicesMechanical Heating 37,787
Total Planned activities for $264,765NYP0046 000
000NYP00473/18/2010Date of Last Survey:127 UTICA AVENUE
1887 - 77 PRECINCT -
PO792014Exterior WallsArchitecture Exterior 109,841
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 8,984
Total Planned activities for $118,825NYP0047 000
000NYP00493/19/2010Date of Last Survey:263 TOMPKINS AVENUE
1889 - 79TH PRECINCT -
EXPENSE2014GeneratorsElectrical Stand-by Power 37,039
Total Planned activities for $37,039NYP0049 000
Page F - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
000NYP00503/19/2010Date of Last Survey:30 RALPH AVENUE
1890 - 81 PRECINCT/FD - CO-LOCATE
PO792016Exterior WallsArchitecture Exterior 106,883
PO792016WindowsArchitecture Exterior 36,786
Total Planned activities for $143,669NYP0050 000
000NYP00512/2/2012Date of Last Survey:301 GOLD STREET
1891 - 84 PRECINCT/ENG CO207/LAD CO110 - CO-LOCATE
PO792015Exterior WallsArchitecture Exterior 472,977
PO792018WindowsArchitecture Exterior 116,716
PO792015ParapetsArchitecture Exterior 126,791
PO792017Heat RejectionMechanical Air Conditioning 141,765
Total Planned activities for $858,249NYP0051 000
000NYP00541/23/2013Date of Last Survey:211 UNION AVENUE
2642 - 90 PRECINCT/PBBN/FD - CO-LOCATE
PO792015Exterior WallsArchitecture Exterior 68,402
PO792015FloorsArchitecture Interior 129,535
EXPENSE2014CeilingsArchitecture Interior 31,450
PO792015Terminal DevicesMechanical Heating 151,907
Total Planned activities for $381,294NYP0054 000
000NYP00552/28/2011Date of Last Survey:100 MESEROLE AVENUE
1894 - 94 PRECINCT -
PO792015Exterior WallsArchitecture Exterior 109,841
PO792015CeilingsArchitecture Interior 53,945
Total Planned activities for $163,786NYP0055 000
000NYP00571/25/2012Date of Last Survey:92-94 ROCKAWAY BEACH BLV
1895 - 100 PRECINCT/SS #9A -
FEMA2013Terminal DevicesMechanical Heating 29,012
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 10,030
Total Planned activities for $39,043NYP0057 000
000NYP00582/6/2013Date of Last Survey:16-12 MOTT AVENUE
1896 - 101 PRECINCT -
PO792015Interior WallsArchitecture Interior 103,487
Total Planned activities for $103,487NYP0058 000
000NYP00592/13/2013Date of Last Survey:87-34 118TH ST.
1871 - 102 PRECINCT/TROOP G -
PO792014Terminal DevicesMechanical Heating 46,515
Total Planned activities for $46,515NYP0059 000
000NYP00601/24/2012Date of Last Survey:168-02 91ST AVE,
1872 - 103 PRECINCT/CBBU -
Page F - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
PO792017Exterior WallsArchitecture Exterior 105,866
Total Planned activities for $105,866NYP0060 000
000NYP006211/1/2010Date of Last Survey:92-08 222ND STREET
1874 - 105 PRECINCT/PBBS/FD - CO-LOCATE
PO792012Exterior WallsArchitecture Exterior 82,243
EXPENSE2014CeilingsArchitecture Interior 22,459
Total Planned activities for $104,702NYP0062 000
000NYP00631/23/2012Date of Last Survey:103-51 101ST STREET
1875 - 106 PRECINCT -
PO792017Exterior WallsArchitecture Exterior 269,086
Total Planned activities for $269,086NYP0063 000
000NYP00641/28/2013Date of Last Survey:5-47 50TH AVENUE L.I.C.
2641 - 108 PRECINCT -
PO792014Exterior WallsArchitecture Exterior 460,821
Total Planned activities for $460,821NYP0064 000
000NYP00651/30/2013Date of Last Survey:37-05 UNION STREET
1876 - 109 PRECINCT -
EXPENSE2014Exterior WallsArchitecture Exterior 26,967
Total Planned activities for $26,967NYP0065 000
000NYP00661/31/2013Date of Last Survey:94-41 43RD AVENUE
2781 - 110 PRECINCT -
PO792016Exterior WallsArchitecture Exterior 89,107
PO792016ParapetsArchitecture Exterior 45,634
Total Planned activities for $134,741NYP0066 000
000NYP00681/31/2013Date of Last Survey:68-40 AUSTIN STREET
1878 - 112 PRECINCT -
EXPENSE2014FloorsArchitecture Interior 19,913
Total Planned activities for $19,913NYP0068 000
000NYP00692/5/2013Date of Last Survey:167-02 BAISLEY BLVD
1879 - 113 PRECINCT -
EXPENSE2014Exterior WallsArchitecture Exterior 40,826
Total Planned activities for $40,826NYP0069 000
000NYP00712/19/2010Date of Last Survey:92-15 NORTHERN BLVD
1881 - 115 PRECINCT -
EXPENSE2014Exterior WallsArchitecture Exterior 18,718
Total Planned activities for $18,718NYP0071 000
000NYP00725/24/2011Date of Last Survey:53-15 58TH STREET
1882 - CENTRAL MOTOR REPAIR -
PO792014Exterior WallsArchitecture Exterior 36,176
Page F - 7
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
PO792014WindowsArchitecture Exterior 879,916
PO792014RoofArchitecture Exterior 578,838
PO792014CeilingsArchitecture Interior 159,908
PO792012Interior LightingElectrical Lighting 160,284
Total Planned activities for $1,815,122NYP0072 000
000NYP00731/17/2013Date of Last Survey:78 RICHMOND TERRACE
1883 - 120 PRECINCT -
PO792014Exterior WallsArchitecture Exterior 420,862
EXPENSE2014WindowsArchitecture Exterior 21,400
PO792014ParapetsArchitecture Exterior 55,736
Total Planned activities for $497,998NYP0073 000
010NYP00731/17/2013Date of Last Survey:78 RICHMOND TERRACE
4369 - 120 PRECINCT - ANNEX BUILDING
PO792014Exterior WallsArchitecture Exterior 311,854
Total Planned activities for $311,854NYP0073 010
000NYP00761/28/2013Date of Last Survey:59-06 LAUREL HILL BLVD.
1861 - COMBINED FACILITY - ADMINISTRATION BUILDING
PO792017Exterior WallsArchitecture Exterior 208,429
PO792017WindowsArchitecture Exterior 282,787
PO792017ParapetsArchitecture Exterior 74,316
PO792017RoofArchitecture Exterior 121,731
Total Planned activities for $687,263NYP0076 000
000NYP007712/22/2010Date of Last Survey:47-07 PEARSON PLACE
1862 - PROPERTY CLERK WAREHOUSE -
PO792014FloorsArchitecture Interior 83,623
Total Planned activities for $83,623NYP0077 000
000NYP00781/14/2013Date of Last Survey:1 POLICE PLAZA
1863 - POLICE HEADQUARTERS -
PO792014Exterior WallsArchitecture Exterior 1,965,198
PO792014ParapetsArchitecture Exterior 47,014
PO792014Interior WallsArchitecture Interior 364,842
PO792015Interior LightingElectrical Lighting 175,078
PO792014Terminal DevicesMechanical Heating 1,184,005
PO792014DistributionMechanical Air Conditioning 495,657
PO792011Terminal DevicesMechanical Air Conditioning 86,150
Total Planned activities for $4,317,944NYP0078 000
000NYP007912/1/2010Date of Last Survey:34 1/2 E 12TH STREET
1864 - COMMUNITY AFFAIRS -
PO792014Exterior WallsArchitecture Exterior 465,928
Page F - 8
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
PO792014WindowsArchitecture Exterior 384,505
PO792014ParapetsArchitecture Exterior 170,836
PO792014RoofArchitecture Exterior 101,294
PO792017FloorsArchitecture Interior 118,768
PO792017Interior WallsArchitecture Interior 185,778
PO792017CeilingsArchitecture Interior 157,646
Total Planned activities for $1,584,755NYP0079 000
000NYP00801/15/2013Date of Last Survey:138 W 30TH STREET
1865 - TRAFFIC OPERATIONS DISTRICT -
EXPENSE2013FloorsArchitecture Interior 26,383
Total Planned activities for $26,383NYP0080 000
000NYP008112/1/2010Date of Last Survey:235 EAST 20TH STREET
1866 - POLICE ACADEMY BUILDING - 13 PRECINCT/PBMS
PO792014WindowsArchitecture Exterior 343,598
PO792014RoofArchitecture Exterior 39,584
EXPENSE2014StandpipeMechanical Fire Suppression 9,608
Total Planned activities for $392,790NYP0081 000
000NYP00854/22/2010Date of Last Survey:4201 FOURTH AVENUE
4357 - SUNSET PARK COURTHOUSE - RECRUITMENT SECTION
PO792017WindowsArchitecture Exterior 630,938
Total Planned activities for $630,938NYP0085 000
000NYP008612/3/2009Date of Last Survey:179 WILSON AVENUE
4358 - SATCOMM BROOKLYN NORTH - OLD 83 PRECINCT
PO792014FloorsArchitecture Interior 78,266
Total Planned activities for $78,266NYP0086 000
000NYP00891/16/2013Date of Last Survey:2207 AMSTERDAM AVENUE
13443 - 33 PRECINCT -
EXPENSE2014Exterior WallsArchitecture Exterior 7,532
Total Planned activities for $7,532NYP0089 000
000NYP00914/22/2010Date of Last Survey:237 42ND STREET
13448 - NYPD QUARTERMASTER SECTION -
EXPENSE2014FloorsArchitecture Interior 8,021
PO792016CeilingsArchitecture Interior 58,931
Total Planned activities for $66,952NYP0091 000
000NYP00942/10/2012Date of Last Survey:140 58TH STREET
13521 - HARBOR CHARLIE - BLDG.
EXPENSE2014Interior WallsArchitecture Interior 21,104
Total Planned activities for $21,104NYP0094 000
Page F - 9
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
000NYP00983/2/2011Date of Last Survey:PIER 76 - HUDSON RIVER
2408 - VIOLATION TOW SERVICE - PIER 76 WAREHOUSE
PO792011Exterior WallsArchitecture Exterior 200,447
PO792018WindowsArchitecture Exterior 329,780
PO792018ParapetsArchitecture Exterior 234,718
FEMA2013RoofArchitecture Exterior 391,479
FEMA2013FloorsArchitecture Interior 41,769
FEMA2014Terminal DevicesMechanical Heating 113,731
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 9,760
Total Planned activities for $1,321,683NYP0098 000
000NYP00992/5/2013Date of Last Survey:150-14 JAMAICA AVENUE
13400 - FORENSIC INVESTIGATIONS DIVISION - LABORATORY
PO792016Exterior WallsArchitecture Exterior 459,164
PO792016ParapetsArchitecture Exterior 38,349
EXPENSE2014CeilingsArchitecture Interior 15,621
Total Planned activities for $513,134NYP0099 000
000NYP01006/22/2011Date of Last Survey:140 58TH STREET
13604 - HARBOR CHARLIE -
PO792014DeckMarinas/Docks Floating Docks 108,536
FEMA2013Lighting FixtureMarinas/Docks Electrical 28,925
FEMA2013Water SupplyMarinas/Docks Mech./Plumbing 28,461
Total Planned activities for $165,922NYP0100 000
000NYP01012/27/2012Date of Last Survey:FOOT OF 14TH AVE @ FLUSHING BAY
13605 - HARBOR GEORGE -
FEMA2013Wave AttenuatorMarinas/Docks Protective Structure 37,465
Total Planned activities for $37,465NYP0101 000
020NYP010311/4/2009Date of Last Survey:CROSS BAY BLVD & FOOT OF 159 AVE
13650 - NORTH PIER AT HARBOR ADAM -
F1752013DeckPiers Structural 66,969
F1752013Pile CapsPiers Structural 37,345
F1752013Piles and BracingPiers Structural 58,776
Total Planned activities for $163,090NYP0103 020
030NYP010311/4/2009Date of Last Survey:CROSS BAY BLVD & FOOT OF 159 AVE
13651 - SOUTH PIER AT HARBOR ADAM -
F1752013DeckPiers Structural 41,212
PO792013Piles and BracingPiers Structural 36,170
Total Planned activities for $77,382NYP0103 030
000NYP01061/30/2013Date of Last Survey:137-58 NORTHERN BLVD.
14213 - FLUSHING ARMORY - QUEENS NORTH TASK FORCE
Page F - 10
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
PO792011Exterior WallsArchitecture Exterior 45,966
Total Planned activities for $45,966NYP0106 000
000NYP01075/26/2011Date of Last Survey:127 PENNSYLVANIA AVENUE
14437 - PAL BUILDING -
RESO A2014Exterior WallsArchitecture Exterior 284,269
RESO A2014WindowsArchitecture Exterior 492,279
RESO A2013RoofArchitecture Exterior 58,965
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 9,385
Total Planned activities for $844,898NYP0107 000
001NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14513 - RODMANS NECK COMPLEX - TACTICAL VILLAGE HOUSE 1A
EXPENSE2014Average Cost Method
19,894
Total Planned activities for $19,894NYP0109 001
002NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14514 - RODMANS NECK COMPLEX - TACTICAL VILLAGE HOUSE 1B
EXPENSE2014Average Cost Method
19,894
Total Planned activities for $19,894NYP0109 002
003NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14515 - RODMANS NECK COMPLEX - TACTIACL VILLAGE HOUSE 1C
EXPENSE2014Average Cost Method
19,894
Total Planned activities for $19,894NYP0109 003
004NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14516 - RODMANS NECK COMPLEX - TACTICAL VILLAGE HOUSE 1D
EXPENSE2014Average Cost Method
19,894
Total Planned activities for $19,894NYP0109 004
005NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14517 - RODMANS NECK COMPLEX - TACTICAL VILLAGE CLASSROOM
EXPENSE2014Average Cost Method
3,376
Total Planned activities for $3,376NYP0109 005
006NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14518 - RODMANS NECK COMPLEX - TACTICAL VILLAGE CHECK IN BLDG.
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 006
007NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14519 - RODMANS NECK COMPLEX - BOMB SQUAD OFFICE
Page F - 11
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
EXPENSE2013Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 007
008NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14520 - RODMANS NECK COMPLEX - BOMB SQUAD DOG HOUSE 2
EXPENSE2013Average Cost Method
27,770
Total Planned activities for $27,770NYP0109 008
009NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14521 - RODMANS NECK COMPLEX - BOMB SQUAD DOG HOUSE 2B
EXPENSE2013Average Cost Method
27,770
Total Planned activities for $27,770NYP0109 009
010NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14522 - RODMANS NECK COMPLEX - BOMB SQUAD DOG HOUSE 2A
EXPENSE2013Average Cost Method
27,770
Total Planned activities for $27,770NYP0109 010
011NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14523 - RODMANS NECK COMPLEX - CLASSROOM BLDG 1
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 011
012NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14524 - RODMANS NECK COMPLEX - CLASSROOM BLDG 2
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 012
013NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14525 - RODMANS NECK COMPLEX - CLASSROOM BLDG 3
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 013
014NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14526 - RODMANS NECK COMPLEX - CLASSROOM BLDG 4
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 014
015NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14527 - RODMANS NECK COMPLEX - CLASSROOM BLDG 5
Page F - 12
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 015
016NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14528 - RODMANS NECK COMPLEX - CLASSROOM BLDG 7
EXPENSE2014Average Cost Method
20,348
Total Planned activities for $20,348NYP0109 016
017NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14529 - RODMANS NECK COMPLEX - CLASSROOM BLDG 9
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 017
018NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PRAK
14530 - RODMANS NECK COMPLEX - LOCKER & OFFICE BLDG 8
EXPENSE2014Average Cost Method
35,646
Total Planned activities for $35,646NYP0109 018
019NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14531 - RODMANS NECK COMPLEX - GUN CLEANING BLDG 10
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 019
020NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14532 - RODMANS NECK COMPLEX - LOCKER BLDG 11
EXPENSE2014Average Cost Method
4,500
Total Planned activities for $4,500NYP0109 020
021NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14533 - RODMANS NECK COMPLEX - LOUNGE ROOM BLDG 12
EXPENSE2014Average Cost Method
4,500
Total Planned activities for $4,500NYP0109 021
022NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14534 - RODMANS NECK COMPLEX - OFFICE BLDG 13
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 022
023NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14535 - RODMANS NECK COMPLEX - OFFICE BLDG 13A
Page F - 13
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 023
024NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14536 - RODMANS NECK COMPLEX - GARAGE BLDG 15
EXPENSE2014Average Cost Method
35,646
Total Planned activities for $35,646NYP0109 024
025NYP01091/1/2013Date of Last Survey:PELHAM DRIVE - PELHAM PARK
14537 - RODMANS NECK COMPLEX - GENERATOR BLDG 14
EXPENSE2014Average Cost Method
15,450
Total Planned activities for $15,450NYP0109 025
026NYP01091/1/2013Date of Last Survey:PARK DR SOUTH END OF PELHAM PARK
14541 - RODMANS NECK COMPLEX - LOCKER ROOM BLDG 17
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 026
027NYP01091/1/2013Date of Last Survey:PELHAM DR. - PELHAM PARK
14542 - RODMANS NECK COMPLEX - MESS HALL BLDG 18
PO792014Average Cost Method
50,895
Total Planned activities for $50,895NYP0109 027
028NYP01091/1/2013Date of Last Survey:PELHAM DR. - PELHAM PARK
14543 - RODMANS NECK COMPLEX - REST ROOM BLDG 19
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 028
029NYP01091/1/2013Date of Last Survey:PELHAM DR. - PELHAM PARK
14544 - RODMANS NECK COMPLEX - ARMORY BLDG 20
EXPENSE2014Average Cost Method
14,541
Total Planned activities for $14,541NYP0109 029
412NYP01101/1/2013Date of Last Survey:FORT TOTTEN
14547 - FORT TOTTEN BLDG # 412 - CANINE TEAM
EXPENSE2014Average Cost Method
10,728
Total Planned activities for $10,728NYP0110 412
610NYP01101/1/2013Date of Last Survey:610 CIRCLE DRIVE
14549 - FORT TOTTEN BLDG # 610 - T.A.R.U. MAIN OFFICE
Page F - 14
Appendix
FMS ID/ Budget Code
Agency Activity Year
POLICE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
F
EXPENSE2014Average Cost Method
10,361
Total Planned activities for $10,361NYP0110 610
615NYP01101/1/2013Date of Last Survey:615 CIRCLE DRIVE
14551 - FORT TOTTEN BLDG # 615 - T.A.R.U. VEHICLE REPAIR
EXPENSE2014Average Cost Method
84,239
Total Planned activities for $84,239NYP0110 615
601PAR01711/1/2013Date of Last Survey:601 TOTTEN AVENUE
13781 - FT. TOTTEN BLDG. # 601 - NYPD ESU & TARU OFFICES
EXPENSE2014Average Cost Method
36,353
Total Planned activities for $36,353PAR0171 601
Total Planned Activities for : $25,647,033POLICE DEPARTMENT
Total Required for "State of Good Repair" for : POLICE DEPARTMENT $62,067,356
Page F - 15
Appendix
FMS ID/ Budget Code
Agency Activity Year
FIRE DEPARTMENT
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
G
100FIR000311/5/2009Date of Last Survey:RANDALLS ISLAND
13857 - PLATFORM - PILE SUPPORTED PLATFORM
CAPITAL2014Piles and BracingPiers Structural 129,744
CAPITAL2014FacingPiers Fender 132,082
CAPITAL2014Wales and ChocksPiers Fender 131,578
CAPITAL2014PilesPiers Fender 73,276
Total Planned activities for $466,680FIR0003 100
010FIR00062/6/2012Date of Last Survey:83-98 WOODHAVEN BOULEVARD
1995 - COMMUNICATIONS CENTER-QUEENS -
F175CO992012RoofArchitecture Exterior 146,182
Total Planned activities for $146,182FIR0006 010
010NYP010311/4/2009Date of Last Survey:158-67 CROSS BAY BLVD.
13649 - WHARF UNDER EC 331/LC 173 - BY HARBOR ADAM
F175GOLD2014Piles and BracingPiers Structural 108,116
F175GOLD2014FacingPiers Fender 126,548
Total Planned activities for $234,664NYP0103 010
Total Planned Activities for : $847,526FIRE DEPARTMENT
Total Required for "State of Good Repair" for : FIRE DEPARTMENT $15,865,870
Page G - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
ADMIN. FOR CHILDREN'S SERVICES
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
H
000ACS00026/21/2011Date of Last Survey:333 SECOND STREET
13412 - ALONZO DAUGHTRY DAY CARE CENTER -
DCSTRUC2015RoofArchitecture Exterior 22,471
Total Planned activities for $22,471ACS0002 000
000ACS00037/9/2012Date of Last Survey:1375 BUSHWICK AVENUE
13413 - JOHN COKER DAY CARE CENTER -
DCSTRUC2016Exterior WallsArchitecture Exterior 12,220
DCSTRUC2016RoofArchitecture Exterior 43,435
DCSTRUC2016Terminal DevicesMechanical Air Conditioning 23,804
Total Planned activities for $79,459ACS0003 000
090HHC00016/17/2011Date of Last Survey:492 FIRST AVENUE
4372 - NEW ACS CHILDREN'S CENTER - BELLEVUE HOSPITAL BLDG R-S
CCGEN2015RoofArchitecture Exterior 13,945
CCGEN2015FloorsArchitecture Interior 138,980
CCGEN2015CeilingsArchitecture Interior 12,827
Total Planned activities for $165,752HHC0001 090
000HRA00492/7/2013Date of Last Survey:1250 EAST 229TH STREET
1947 - CROSSROADS SHELTER - MAIN BUILDING
CAPITAL2018Exterior WallsArchitecture Exterior 27,941
CAPITAL2018ParapetsArchitecture Exterior 14,367
CAPITAL2018Interior WallsArchitecture Interior 10,319
Total Planned activities for $52,627HRA0049 000
Total Planned Activities for : $320,307ADMIN. FOR CHILDREN'S SERVICES
Total Required for "State of Good Repair" for : ADMIN. FOR CHILDREN'S SERVICES $1,281,229
Page H - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF HOMELESS SERVICES
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
I
000DHS00277/19/2012Date of Last Survey:78 CATHERINE STREET
1954 - METROPOLITAN FAMILY SHELTER - A.K.A. CATHERINE ST SHELTER
H115CSWR2014WindowsArchitecture Exterior 799,601
Total Planned activities for $799,601DHS0027 000
000DHS00307/19/2012Date of Last Survey:8 EAST 3RD STREET
1956 - MEN'S SHELTER-EAST 3RD STREET -
HH112NHPR2013DistributionMechanical Heating 44,439
Total Planned activities for $44,439DHS0030 000
000DHS003512/20/2012Date of Last Survey:64 SUNKEN GARDEN LOOP
1960 - CHARLES GAY SHELTER - KEENER BUILDING
HH112CGKF2013FloorsArchitecture Interior 112,204
HH112WBLR2013DistributionMechanical Heating 95,423
Total Planned activities for $207,627DHS0035 000
000DHS004212/19/2012Date of Last Survey:21-10 BORDEN AVENUE
1941 - BORDEN AVENUE MEN'S SHELTER -
FEMA2013FloorsArchitecture Interior 331,387
Total Planned activities for $331,387DHS0042 000
000DHS005212/28/2012Date of Last Survey:346 POWERS AVENUE
1948 - PATH - POWERS FAMILY RESIDENCE -
OMB-CPSD2012ParapetsArchitecture Exterior 72,435
OMB-CPSD2012RoofArchitecture Exterior 321,781
Total Planned activities for $394,216DHS0052 000
000DHS005412/21/2012Date of Last Survey:50 WEST MOUNT EDEN AVE.
50 - MOUNT EDEN SRO -
HH112MEBU2013RoofArchitecture Exterior 275,772
Total Planned activities for $275,772DHS0054 000
000DHS00629/22/2009Date of Last Survey:1605 NELSON AVENUE
3011 - NELSON AVE FAMILY RESIDENCE -
HH115NELX2013WindowsArchitecture Exterior 90,973
Total Planned activities for $90,973DHS0062 000
000DHS00675/26/2010Date of Last Survey:216 FORT WASHINGTON AVENUE
4439 - FORT WASHINGTON ARMORY - SHELTER
HH115FTXU2012WindowsArchitecture Exterior 1,114,954
HHCN0042013FloorsArchitecture Interior 729,925
Total Planned activities for $1,844,879DHS0067 000
000DHS00709/16/2009Date of Last Survey:215 EAST 45TH STREET
4442 - NEW PROVIDENCE -
HH115PRXU2012ParapetsArchitecture Exterior 121,407
HH115PRXU2012RoofArchitecture Exterior 99,281
Page I - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF HOMELESS SERVICES
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
I
Total Planned activities for $220,688DHS0070 000
000DHS00728/26/2009Date of Last Survey:2720 BROADWAY
4444 - REGENT FAMILY RESIDENCE -
HH115REX-C2011Exterior WallsArchitecture Exterior 406,965
Total Planned activities for $406,965DHS0072 000
000DHS00759/30/2009Date of Last Survey:781 EAST 135TH STREET
4447 - WILLOW SHELTER -
HH112WLOW2013Exterior WallsArchitecture Exterior 492,566
HH112WLOW2013FloorsArchitecture Interior 480,001
HH112WLOW2013Interior WallsArchitecture Interior 98,632
HH112WLOW2013CeilingsArchitecture Interior 1,320,791
Total Planned activities for $2,391,990DHS0075 000
000DHS007810/13/2009Date of Last Survey:1150 COMMONWEALTH AVENUE
4450 - COMMONWEALTH -
HH112CWRR2012RoofArchitecture Exterior 225,343
Total Planned activities for $225,343DHS0078 000
000DHS007910/6/2009Date of Last Survey:1075 WEBSTER AVENUE
4451 - WEBSTER HOUSING -
HH112WEBU2014Interior LightingElectrical Lighting 41,848
Total Planned activities for $41,848DHS0079 000
000DHS008111/19/2009Date of Last Survey:1402 8TH AVENUE
4453 - PARK SLOPE ARMORY - WOMENS' SHELTER
ROOF WARRANTY2012RoofArchitecture Exterior 37,952
Total Planned activities for $37,952DHS0081 000
000DHS008212/1/2009Date of Last Survey:357 SARATOGA AVENUE
4454 - BROWNSVILLE WOMENS SHELTER -
HH112BRXU2012Exterior WallsArchitecture Exterior 57,930
Total Planned activities for $57,930DHS0082 000
Total Planned Activities for : $7,371,610DEPT. OF HOMELESS SERVICES
Total Required for "State of Good Repair" for : DEPT. OF HOMELESS SERVICES $54,789,388
Page I - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CORRECTION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
J
010DOC00013/9/2011Date of Last Survey:18-18 HAZEN ST., RIKERS ISLAND
2045 - RIKERS ISLAND FACILITIES - ANNA M. KROSS CENTER (AMKC)
072 C75AMKCSW2014Switchgear/ SwitchboardElectrical Under 600 Volts 53,909
072 C75AMKCSW2014WiringElectrical Under 600 Volts 165,293
Total Planned activities for $219,202DOC0001 010
020DOC00013/2/2011Date of Last Survey:11-11 HAZEN ST., RIKERS ISLAND
2046 - RIKERS ISLAND FACILITIES - ROBERT N. DAVOREN CENTER
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 9,890,000
072C75RNDCDT2014Exhaust FansMechanical Ventilation 47,614
Total Planned activities for $9,937,614DOC0001 020
030DOC00013/16/2011Date of Last Survey:15-15 HAZEN ST., RIKERS ISLAND
2025 - RIKERS ISLAND FACILITIES - GEORGE MOTCHAN DETENTION CENTER
072 C75EXTR2014Exterior WallsArchitecture Exterior 380,174
Total Planned activities for $380,174DOC0001 030
040DOC00013/16/2011Date of Last Survey:10-10 HAZEN ST., RIKERS ISLAND
2026 - RIKERS ISLAND FACILITIES - ERIC M. TAYLOR CENTER (EMTC)
850 C75-FCAD2014Exterior WallsArchitecture Exterior 455,742
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 3,172,397
Total Planned activities for $3,628,139DOC0001 040
060DOC00013/8/2011Date of Last Survey:16-16 HAZEN ST., RIKERS ISLAND
2028 - RIKERS ISLAND FACILITIES - OTIS BANTUM CORRECT CENTER -OBCC
072 C75EXTR2014Exterior WallsArchitecture Exterior 332,542
072 C75OBCCRF2014RoofArchitecture Exterior 6,236,891
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 4,633,012
Total Planned activities for $11,202,445DOC0001 060
063DOC00013/8/2011Date of Last Survey:16-16 HAZEN ST., RIKERS ISLAND
4248 - RIKERS ISLAND FACILITIES - NORTH FACILITY,OBCC 300 CELL ANX
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 692,175
Total Planned activities for $692,175DOC0001 063
070DOC00013/1/2011Date of Last Survey:19-19 HAZEN ST., RIKERS ISLAND
2792 - RIKERS ISLAND FACILITIES - ROSE M. SINGER CENTER RMSC
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 5,256,972
Total Planned activities for $5,256,972DOC0001 070
080DOC00013/15/2011Date of Last Survey:15-00 HAZEN ST., RIKERS ISLAND
2029 - RIKERS ISLAND FACILITIES - NORTH INFIRMARY CENTER (NIC)
072 C138FSNIC2014Fire/Smoke DetectionElectrical Alarm 1,523,699
Total Planned activities for $1,523,699DOC0001 080
150DOC00013/15/2011Date of Last Survey:16-06 HAZEN ST., RIKERS ISLAND
2865 - RIKERS ISLAND FACILITIES - WEST FACILITY
Page J - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CORRECTION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
J
072 C138ALARM2014Fire/Smoke DetectionElectrical Alarm 3,542,043
Total Planned activities for $3,542,043DOC0001 150
500DOC00013/15/2011Date of Last Survey:HAZEN ST., RIKERS ISLAND
14636 - RIKERS ISLAND FACILITIES - NORTH INFIRMARY CENTER ANNEX
072 C138FSNIC2014Fire/Smoke DetectionElectrical Alarm 682,587
Total Planned activities for $682,587DOC0001 500
ELECTDOC00011/1/2013Date of Last Survey:RIKERS ISLAND
4278 - RIKERS ISLAND - ELECTRICAL
072 C75TRANF2013Rikers Island Utilities
1,400,000
Total Planned activities for $1,400,000DOC0001 ELECT
000DOC00037/25/2012Date of Last Survey:275 ATLANTIC AVENUE
129 - BROOKLYN HOUSE OF DETENTION -
850 C75-FCAD2014WindowsArchitecture Exterior 3,456,860
Total Planned activities for $3,456,860DOC0003 000
000DOC00057/24/2012Date of Last Survey:125 WHITE STREET
2033 - MANHATTAN HOUSE OF DETENTION - SOUTH TOWER
850 C75-FCAD2014Exterior WallsArchitecture Exterior 378,246
Total Planned activities for $378,246DOC0005 000
000DOC00067/23/2012Date of Last Survey:126-02 82ND AVENUE
2034 - QUEENS HOUSE OF DETENTION -
850 C75-FCAD2014Exterior WallsArchitecture Exterior 107,450
Total Planned activities for $107,450DOC0006 000
000DOC00097/24/2012Date of Last Survey:138-40 CENTRE STREET
2013 - MANHATTAN HOUSE OF DETENTION - NORTH TOWER
850 C75-FCAD2014Exterior WallsArchitecture Exterior 205,186
072 C75MDWTR2014H/C Water PipingMechanical Plumbing 39,656
Total Planned activities for $244,842DOC0009 000
000DOC00107/27/2012Date of Last Survey:#1 HALLECK STREET
2866 - VERNON C. BAIN CNTR, MARITIME #3 - 800 BED FLOATING DETEN FACILITY
072 C75VCBC22014RoofArchitecture Exterior 120,254
072 C75-CHILL2014Conversion EquipmentMechanical Air Conditioning 856,651
072 C75-CHILL2014Heat RejectionMechanical Air Conditioning 1,507,706
Total Planned activities for $2,484,611DOC0010 000
Total Planned Activities for : $45,137,059DEPARTMENT OF CORRECTION
Total Required for "State of Good Repair" for : DEPARTMENT OF CORRECTION $301,129,797
Page J - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
HUMAN RESOURCES ADMINISTRATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
K
000HRA00677/25/2011Date of Last Survey:217 HART STREET
4137 - HART FAMILY RESIDENCE -
850HR25FACA2015Exterior WallsArchitecture Exterior 114,358
850HR25FACA2015Interior WallsArchitecture Interior 48,632
850HR25FACA2015CeilingsArchitecture Interior 44,581
Total Planned activities for $207,571HRA0067 000
000HRA00697/19/2011Date of Last Survey:970 DEKALB AVENUE
4346 - TRANSITIONAL HOUSING - HORIZONS -
850HR25FACA2015Exterior WallsArchitecture Exterior 158,254
Total Planned activities for $158,254HRA0069 000
000HRA00707/20/2011Date of Last Survey:1275 WESTCHESTER AVENUE
4347 - TRANSITIONAL HOUSING-NEW DAY ONE -
850HR25FACA2015Exterior WallsArchitecture Exterior 204,998
850HR25FACA2015RoofArchitecture Exterior 238,140
Total Planned activities for $443,138HRA0070 000
000HRA00717/20/2011Date of Last Survey:1138 LONGFELLOW AVENUE
4348 - TRANSITIONAL HOUSING-NEW DAY TWO -
850HR25FACA2015Exterior WallsArchitecture Exterior 57,319
850HR25FACA2015RoofArchitecture Exterior 111,731
Total Planned activities for $169,050HRA0071 000
000HRA00727/21/2011Date of Last Survey:11 & 13 WEST 137TH STREET
4349 - TRANSITIONAL HOUSING-HELP HAVEN -
850HR25FACA2015Exterior WallsArchitecture Exterior 89,486
Total Planned activities for $89,486HRA0072 000
030HRA00737/28/2011Date of Last Survey:122-124-126-126A W. 127 STREET
4352 - TRANSITIONAL HOUSING - / W.127 STREET
850HR25FACA2015Exterior WallsArchitecture Exterior 96,141
850HR25FACA2015Interior WallsArchitecture Interior 217,171
850HR25FACA2015CeilingsArchitecture Interior 82,026
Total Planned activities for $395,338HRA0073 030
Total Planned Activities for : $1,462,837HUMAN RESOURCES ADMINISTRATION
Total Required for "State of Good Repair" for : HUMAN RESOURCES ADMINISTRATION $13,295,864
Page K - 1
FMS ID/ Budget Code
Agency Activity YearType of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
Appendix
DEPARTMENT FOR THE AGING
L
Date of Last Survey:
$ 0
Total Required for "State of Good Repair" for :
$ 0Total Planned Activities for :
DEPARTMENT FOR THE AGING
DEPARTMENT FOR THE AGING
$1,492,326
Page - 1L
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
ELEDCA00016/12/2012Date of Last Survey:5TH AVE & 82ND STREET
4163 - METROPOLITAN MUSEUM OF ART - ELECTRICAL SYSTEM
850 PV022ELEC2011WiringElectrical Under 600 Volts 117,703
Total Planned activities for $117,703DCA0001 ELE
001DCA00026/6/2011Date of Last Survey:W. 77TH ST. & CPW
2327 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 1
850 PV034EXTR2013RoofArchitecture Exterior 208,272
Total Planned activities for $208,272DCA0002 001
002DCA00025/31/2011Date of Last Survey:W. 77TH ST. & CPW
2328 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 2
850 PV034-MOD2013WindowsArchitecture Exterior 83,667
850 PV034-MOD2013RoofArchitecture Exterior 742,430
Total Planned activities for $826,097DCA0002 002
003DCA00026/1/2011Date of Last Survey:W. 77TH ST. & CPW
2808 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 3
850 PV034RFCP2014RoofArchitecture Exterior 1,188,363
850 PV034RFCP2013Storm Drain PipingMechanical Plumbing 95,192
Total Planned activities for $1,283,555DCA0002 003
004DCA00025/31/2011Date of Last Survey:W. 77TH ST. & CPW
2329 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 4
850 PV034-MOD2013Exterior WallsArchitecture Exterior 216,984
850 PV034-MOD2013WindowsArchitecture Exterior 617,563
850 PV034-MOD2013RoofArchitecture Exterior 1,114,090
Total Planned activities for $1,948,637DCA0002 004
005DCA00026/1/2011Date of Last Survey:W. 77TH ST. & CPW
2309 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 5
850 PV034-MOD2013Exterior WallsArchitecture Exterior 241,110
850 PV034-MOD2013WindowsArchitecture Exterior 361,615
850 PV034-MOD2013RoofArchitecture Exterior 558,988
850 PV034-MOD2013Interior WallsArchitecture Interior 45,178
Total Planned activities for $1,206,891DCA0002 005
006DCA00025/31/2011Date of Last Survey:W. 77TH ST. & CPW
2310 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 6
850 PV034-MOD2013Exterior WallsArchitecture Exterior 264,086
850 PV034-MOD2013WindowsArchitecture Exterior 361,426
850 PV034-MOD2013RoofArchitecture Exterior 619,804
Total Planned activities for $1,245,316DCA0002 006
008DCA00026/1/2011Date of Last Survey:W. 77TH ST. & CPW
2312 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 8 & 8A
Page M - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
850 PV034-IT22013Storm Drain PipingMechanical Plumbing 125,523
Total Planned activities for $125,523DCA0002 008
009DCA00026/1/2011Date of Last Survey:W. 77TH ST. & CPW
2313 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 9
850 PV034CPWR2013Exterior WallsArchitecture Exterior 438,863
850 PV034CPWR2013WindowsArchitecture Exterior 1,620,854
850 PV034CPWR2013RoofArchitecture Exterior 1,412,738
Total Planned activities for $3,472,455DCA0002 009
012DCA00026/2/2011Date of Last Survey:W. 77TH ST. & CPW
2315 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 12
850 PV034CPWR2013WindowsArchitecture Exterior 99,255
850 PV034CPWR2013RoofArchitecture Exterior 89,112
850 PV034CPWR2013Interior WallsArchitecture Interior 234,568
850 PV034CPWR2013CeilingsArchitecture Interior 85,964
850 PV034-IT22013DistributionMechanical Heating 45,236
850 PV034CPWR2013Conversion EquipmentMechanical Air Conditioning 105,551
850 PV034CPWR2013Terminal DevicesMechanical Air Conditioning 63,863
Total Planned activities for $723,549DCA0002 012
013DCA00026/2/2011Date of Last Survey:W. 77TH ST. & CPW
2316 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 13 & 13A
850 PV034-IT22013DistributionMechanical Heating 57,012
Total Planned activities for $57,012DCA0002 013
015DCA00026/8/2011Date of Last Survey:W. 77TH ST. & CPW
2317 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 15 & 15A
850 PV034-IT22013DistributionMechanical Heating 91,947
Total Planned activities for $91,947DCA0002 015
019DCA00026/6/2011Date of Last Survey:W. 77TH ST. & CPW
2337 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 19
850 PV034CPWR2013Exterior WallsArchitecture Exterior 610,664
850 PV034CPWR2013WindowsArchitecture Exterior 87,486
850 PV034CPWR2013RoofArchitecture Exterior 116,760
Total Planned activities for $814,910DCA0002 019
01ADCA00026/6/2011Date of Last Survey:W. 77TH ST. & CPW
2338 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 1A
850 PV034EXTR2013RoofArchitecture Exterior 71,431
Total Planned activities for $71,431DCA0002 01A
02ADCA00025/31/2011Date of Last Survey:W. 77TH ST. & CPW
2339 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 2A
850 PV034-MOD2013WindowsArchitecture Exterior 147,707
Page M - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
850 PV034-MOD2013RoofArchitecture Exterior 534,763
Total Planned activities for $682,470DCA0002 02A
02BDCA00025/31/2011Date of Last Survey:W. 77TH ST. & CPW
2340 - AMERICAN MUSEUM OF NATL HISTORY - SECTION 2B
850 PV034-MOD2013WindowsArchitecture Exterior 97,380
850 PV034-MOD2013RoofArchitecture Exterior 508,025
Total Planned activities for $605,405DCA0002 02B
900DCA00054/11/2012Date of Last Survey:BRONX RIVER PKWY & FORDHAM RD
2362 - BRONX ZOO - WORLD OF BIRDS
850 PV176ROOF2013RoofArchitecture Exterior 381,240
Total Planned activities for $381,240DCA0005 900
020DCA00094/6/2009Date of Last Survey:BOARDWALK & W.8TH ST.
2356 - NY AQUARIUM - MAIN AQUARIUM
801 PV230-SHA2013Exterior WallsArchitecture Exterior 73,177
801 PV230-SHA2013GeneratorsElectrical Stand-by Power 72,988
Total Planned activities for $146,165DCA0009 020
150DCA00091/1/2013Date of Last Survey:BOARDWALK & W.8TH ST.
2222 - NY AQUARIUM - RESTROOM
PV230-SHA2014Average Cost Method
6,192
Total Planned activities for $6,192DCA0009 150
160DCA00091/1/2013Date of Last Survey:BOARDWALK & W.8TH ST.
2223 - NY AQUARIUM - SHARK BUILDING
PV230-SHA2014Average Cost Method
9,492
Total Planned activities for $9,492DCA0009 160
170DCA00091/1/2013Date of Last Survey:BOARDWALK & W.8TH ST.
2224 - NY AQUARIUM - EXHIBIT
PV230-SHA2014Average Cost Method
62,136
Total Planned activities for $62,136DCA0009 170
000DCA00104/13/2011Date of Last Survey:SOUTHERN BLVD. @200TH STREET
2345 - NEW YORK BOTANICAL GARDEN - PRATT BUILDING
Private funding2013Conversion EquipmentMechanical Air Conditioning 72,125
Private funding2013Terminal DevicesMechanical Air Conditioning 90,259
Private funding2013Heat RejectionMechanical Air Conditioning 42,451
Total Planned activities for $204,835DCA0010 000
000DCA00131/29/2013Date of Last Survey:1220 FIFTH AVE.
2376 - MUSEUM OF THE CITY OF NEW YORK -
PV241MOD32014Exterior WallsArchitecture Exterior 215,740
Page M - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
PV241MOD32014WindowsArchitecture Exterior 65,712
PV241MOD22011FloorsArchitecture Interior 679,606
PV241MOD32014Interior WallsArchitecture Interior 269,958
PV241MOD22011CeilingsArchitecture Interior 264,923
Total Planned activities for $1,495,939DCA0013 000
000DCA00143/11/2009Date of Last Survey:145 BROOKLYN AVE
2601 - BROOKLYN CHILDREN'S MUSEUM -
850 PV262-RT2014RoofArchitecture Exterior 236,930
Total Planned activities for $236,930DCA0014 000
000DCA001511/14/2012Date of Last Survey:30 LAFAYETTE AVE.
2377 - BROOKLYN ACADEMY OF MUSIC -
PV264-FAC2013Exterior WallsArchitecture Exterior 277,227
PV264-FAC2013ParapetsArchitecture Exterior 82,875
PV264-FAC2013RoofArchitecture Exterior 596,490
Total Planned activities for $956,592DCA0015 000
010DCA001511/14/2012Date of Last Survey:651 FULTON STREET
3002 - BROOKLYN ACADEMY OF MUSIC - H. LICHTENSTEIN THEATRE
801PV264REC22013Exterior WallsArchitecture Exterior 672,206
Total Planned activities for $672,206DCA0015 010
000DCA00175/24/2010Date of Last Survey:47-01 111TH STREET
2366 - NEW YORK HALL OF SCIENCE -
850 PV274-SP12013Exterior WallsArchitecture Exterior 78,962
850 PV274-SP12013RoofArchitecture Exterior 154,049
850 PV274-AHU2013Terminal DevicesMechanical Heating 442,092
850 PV274-AHU2013Conversion EquipmentMechanical Air Conditioning 408,167
850 PV274-AHU2013Terminal DevicesMechanical Air Conditioning 464,356
850 PV274-AHU2013Heat RejectionMechanical Air Conditioning 52,302
850 PV274-AHU2013Exhaust FansMechanical Ventilation 181,290
Total Planned activities for $1,781,218DCA0017 000
000DCA00181/15/2013Date of Last Survey:130 W 56TH ST.
2354 - NEW YORK CITY CENTER -
850 PV279-CC32013RoofArchitecture Exterior 18,960
Total Planned activities for $18,960DCA0018 000
200DCA00211/1/2013Date of Last Survey:441 CLARKE AVENUE
1599 - HISTORIC RICHMOND TOWN - BRITTON COTTAGE
PV341BRIT2013Average Cost Method
55,570
Total Planned activities for $55,570DCA0021 200
Page M - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
250DCA00211/1/2013Date of Last Survey:441 CLARKE AVENUE
2631 - HISTORIC RICHMOND TOWN - CARRIAGE & WAGON MANUFACTORY
126PV341-CAR2014Average Cost Method
9,544
Total Planned activities for $9,544DCA0021 250
320DCA00211/1/2013Date of Last Survey:441 CLARKE AVENUE
1579 - HISTORIC RICHMOND TOWN - STORAGE BLDG/CARRIAGE HOUSE
850 PV341-CAR2013Average Cost Method
29,240
Total Planned activities for $29,240DCA0021 320
340DCA00215/16/2013Date of Last Survey:441 CLARKE AVENUE
2386 - HISTORIC RICHMOND TOWN - OLD PUBLIC SCHOOL 28
850PV341PS282014Exterior WallsArchitecture Exterior 72,717
850PV341PS282014WindowsArchitecture Exterior 152,454
Total Planned activities for $225,171DCA0021 340
010DCA00223/11/2010Date of Last Survey:675 WEST 252 STREET
2388 - WAVE HILL - WAVE HILL HOUSE GALLERY & CAFE
850 PV464-ADA2013RoofArchitecture Exterior 94,169
850 PV464-ADA2013Interior LightingElectrical Lighting 51,658
850 PV464-ADA2013Conversion EquipmentMechanical Heating 49,640
Total Planned activities for $195,467DCA0022 010
060DCA00245/16/2013Date of Last Survey:1000 RICHMOND TERRACE
2392 - SNUG HARBOR CULT CNTR & BOTN GDN - BLDG F
850 PV490-FH2013Exterior WallsArchitecture Exterior 113,957
850 PV490-FH2013WindowsArchitecture Exterior 196,272
850 PV490-FH2013RoofArchitecture Exterior 45,134
850 PV490-FH2013FloorsArchitecture Interior 128,422
850 PV490-FH2013Interior WallsArchitecture Interior 136,676
850 PV490-FH2013CeilingsArchitecture Interior 281,625
Total Planned activities for $902,086DCA0024 060
000DCA002512/1/2011Date of Last Survey:37 W 65TH STREET
2811 - LINCOLN CTR. FOR PERFORMING ARTS - DAVID H. KOCH THEATRE
126 PV475CONC2014FloorsArchitecture Interior 14,679
126 PV475CONC2014DistributionMechanical Ventilation 6,691
Total Planned activities for $21,369DCA0025 000
000DCA00265/17/2012Date of Last Survey:46-01 21ST ST. L.I. CITY
1552 - P.S.1/INST. FOR CONTEMPORARY ART -
850 PV501HVAC2014Conversion EquipmentMechanical Air Conditioning 84,935
Total Planned activities for $84,935DCA0026 000
Page M - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
000DCA00273/9/2009Date of Last Survey:881 7TH AVE
2399 - CARNEGIE HALL -
850 PV503MSTP2013WindowsArchitecture Exterior 151,204
850 PV503MST32013FloorsArchitecture Interior 41,052
850 PV503MST32013CeilingsArchitecture Interior 36,505
850 PV503MSTP2013Egress LightingElectrical Lighting 54,381
850 PV503MSTP2013Conversion EquipmentMechanical Air Conditioning 770,332
850 PV503MSTP2013H/C Water PipingMechanical Plumbing 178,661
Total Planned activities for $1,232,135DCA0027 000
000DCA00284/20/2010Date of Last Survey:75 STUYVESANT PLACE
4371 - STATEN IS. INST. ARTS & SCIENCES - STATEN ISLAND MUSEUM
850 PV302RFDR2014ParapetsArchitecture Exterior 59,390
Total Planned activities for $59,390DCA0028 000
010DCA00284/20/2010Date of Last Survey:1000 RICHMOND TERRACE
2400 - STATEN IS. INST. ARTS & SCIENCES - BUILDING A
850 PV302-AB2013Exterior WallsArchitecture Exterior 210,575
850 PV302-AB2013WindowsArchitecture Exterior 242,958
850 PV302-AB2013RoofArchitecture Exterior 56,044
850 PV302-AB2013FloorsArchitecture Interior 746,148
850 PV302-AB2013Interior WallsArchitecture Interior 474,777
850 PV302-AB2013CeilingsArchitecture Interior 569,147
850 PV302-AB2013Interior LightingElectrical Lighting 93,099
Total Planned activities for $2,392,748DCA0028 010
000DCA00324/27/2009Date of Last Survey:FLUSHING MEADOWS CORONA PARK
3008 - QUEENS THEATRE IN THE PARK -
850 PVQ460-F2013Heat RejectionMechanical Air Conditioning 101,952
Total Planned activities for $101,952DCA0032 000
000DCA00336/2/2010Date of Last Survey:1230 FIFTH AVENUE
3009 - EL MUSEO DEL BARRIO - HECKSCHER BUILDING TENANT
PV467HECK2013Exterior WallsArchitecture Exterior 53,075
PV467HECK2013WindowsArchitecture Exterior 31,929
Total Planned activities for $85,004DCA0033 000
000DCA00404/23/2010Date of Last Survey:36-01 35TH AVE
14458 - AMERICAN MUSEUM OF THE MOVING - IMAGE
801AMMI20042012Terminal DevicesMechanical Heating 278,321
801AMMI20042012Heat RejectionMechanical Air Conditioning 246,952
Total Planned activities for $525,273DCA0040 000
000DGS00366/3/2010Date of Last Survey:100 OLD SLIP
4126 - POLICE MUSEUM - (OLD 1ST PRECINCT)
Page M - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF CULTURAL AFFAIRS
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
M
850 PV467-POL2011Exterior WallsArchitecture Exterior 210,664
850 PV467-POL2011WindowsArchitecture Exterior 109,147
Total Planned activities for $319,811DGS0036 000
Total Planned Activities for : $25,692,772DEPARTMENT OF CULTURAL AFFAIRS
Total Required for "State of Good Repair" for : DEPARTMENT OF CULTURAL AFFAIRS $88,874,382
Page M - 7
Appendix
FMS ID/ Budget Code
Agency Activity Year
DIVISION OF YOUTH & FAMILY JUSTICE
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
N
000DJJ00027/10/2012Date of Last Survey:17 BRISTOL ST.
4382 - CROSSROADS JUVENILE DETENTION - CENTER
JJ1FACREN2015Exterior WallsArchitecture Exterior 7,963
JJ1FACREN2016RoofArchitecture Exterior 8,816
JJ1FACREN2016FloorsArchitecture Interior 6,279
JJ1FACREN2015FloorsArchitecture Interior 14,169
JJ1FACREN2016CeilingsArchitecture Interior 5,000
JJ1FACREN2016Interior LightingElectrical Lighting 8,443
JJ1FACREN2015DistributionMechanical Ventilation 25,030
Total Planned activities for $75,700DJJ0002 000
000DJJ00037/13/2012Date of Last Survey:560 BROOK AVENUE
4383 - HORIZON JUVENILE DETENTION - CENTER
JJ1FACREN2016RoofArchitecture Exterior 9,607
JJ1FACREN2015FloorsArchitecture Interior 16,897
JJ1FACREN2017Interior WallsArchitecture Interior 53,974
JJ1FACREN2016Interior LightingElectrical Lighting 7,505
JJ1FACREN2015DistributionMechanical Air Conditioning 24,614
Total Planned activities for $112,597DJJ0003 000
Total Planned Activities for : $188,297DIVISION OF YOUTH & FAMILY JUSTICE
Total Required for "State of Good Repair" for : DIVISION OF YOUTH & FAMILY JUSTICE $815,898
Page N - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
TAXI AND LIMOUSINE COMMISSION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
O
000TLC00017/24/2012Date of Last Survey:24-55 BQE WEST
14462 - WOODSIDE INSPECTION FACILITY - TLC ENFORCE. SAFETY & EMISSIONS
850 PW77TLCWD2014Exterior WallsArchitecture Exterior 464,659
850 PW77TLCWD2014RoofArchitecture Exterior 74,926
850 PW77TLCWD2014FloorsArchitecture Interior 184,375
850 PW77TLCWD2014Interior WallsArchitecture Interior 273,458
850 PW77TLCWD2014CeilingsArchitecture Interior 195,298
850 TLC10SEC2014Security SystemElectrical Alarm 45,678
850 PW77WDUP2014DistributionMechanical Heating 37,577
850 PW77WDUP2014Conversion EquipmentMechanical Air Conditioning 99,554
850 PW77WDUP2014DistributionMechanical Air Conditioning 37,372
Total Planned activities for $1,412,897TLC0001 000
Total Planned Activities for : $1,412,897TAXI AND LIMOUSINE COMMISSION
Total Required for "State of Good Repair" for : TAXI AND LIMOUSINE COMMISSION $1,412,897
Page O - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF SMALL BUSINESS SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
P
000DBS00116/28/2011Date of Last Survey:5600 1ST AVENUE
2431 - BROOKLYN WHSLE MEAT MARKET - BLDG A
801NRELUMP2014Interior LightingElectrical Lighting 271,224
Total Planned activities for $271,224DBS0011 000
010DBS00116/28/2011Date of Last Survey:5600 1ST AVENUE
2432 - BROOKLYN WHSLE MEAT MARKET - BLDG B
801NRELUMP2014Interior LightingElectrical Lighting 139,856
Total Planned activities for $139,856DBS0011 010
000DBS00325/31/2011Date of Last Survey:1680 LEXINGTON AVENUE
4338 - JULIA DEBURGOS LATINO - CULTURAL CENTER
801 1680LEXCI2014WindowsArchitecture Exterior 85,506
801 1680LEXSP2014Interior LightingElectrical Lighting 165,721
Total Planned activities for $251,227DBS0032 000
000DBS00348/6/2012Date of Last Survey:140 58TH STREET
13424 - BROOKLYN ARMY TERMINAL - BUILDING A
801 BATCI2014WindowsArchitecture Exterior 1,423,666
801 BATCI2014Interior WallsArchitecture Interior 66,905
801 BATCI2014CeilingsArchitecture Interior 188,008
801 BATCI2014Terminal DevicesMechanical Heating 70,116
Total Planned activities for $1,748,695DBS0034 000
010DBS00348/1/2012Date of Last Survey:140 58TH STREET
13425 - BROOKLYN ARMY TERMINAL - BUILDING B
801 BATCI2014WindowsArchitecture Exterior 585,416
801 BATCI2013RoofArchitecture Exterior 548,860
801 BATCI2013CeilingsArchitecture Interior 395,092
Total Planned activities for $1,529,368DBS0034 010
000DBS005010/14/2010Date of Last Survey:72 BOWNE ST.
13963 - PIER 12 -
801 BKCRUISE2014DeckPiers Structural 51,313
801 BKCRUISE2014Wales and ChocksPiers Fender 326,106
801 BKCRUISE2014PilesPiers Fender 387,654
Total Planned activities for $765,073DBS0050 000
066DBSR02612/21/2011Date of Last Survey:FLATBUSH AVE.
20 - TIMBER BULKHEAD - YANKEE SKIPPER
801 WATERLUMP2014Piles and BracingBulkheads Structural 62,372
801 WATERLUMP2014Sheet PilesBulkheads Structural 123,762
Total Planned activities for $186,134DBSR026 066
000DBSR0404/2/2009Date of Last Survey:W 48TH ST AND HUDSON RIVER
13486 - PIER 88 - PASSENGER SHIP TERM.
Page P - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF SMALL BUSINESS SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
P
801 PIER88-892014Deck SurfacePiers Structural 149,530
801 PIER88-892014Pile CapsPiers Structural 38,340
801 PIER88-892014PilesPiers Fender 22,723
Total Planned activities for $210,592DBSR040 000
000DBSR0414/2/2009Date of Last Survey:W 50TH ST AND HUDSON RIVER
13487 - PIER 90 - PASSENGER SHIP TERM.
801 PIER88-892014DeckPiers Structural 85,783
801 PIER88-892014Deck SurfacePiers Structural 45,452
801 PIER88-892014Pile CapsPiers Structural 92,877
801 PIER88-892014FacingPiers Fender 121,804
801 PIER88-892014Wales and ChocksPiers Fender 110,661
801 PIER88-892014PilesPiers Fender 175,396
Total Planned activities for $631,974DBSR041 000
000DBSR0424/6/2009Date of Last Survey:W 52ND ST. AND HUDSON RIVER
13488 - PIER 92 - PASSENGER SHIP TERM.
801 PIER92RH2014DeckPiers Structural 962,402
801 PIER92RH2014Pile CapsPiers Structural 65,810
801 PIER92RH2014Piles and BracingPiers Structural 345,246
801 PIER92RH2014FacingPiers Fender 274,796
801 PIER92RH2014Wales and ChocksPiers Fender 520,118
801 PIER92RH2014PilesPiers Fender 439,668
Total Planned activities for $2,608,040DBSR042 000
000DBSR0434/16/2013Date of Last Survey:W 54TH ST AND HUDSON RIVER
13489 - PIER 94 - PIERS 92/94 LLC
801 WATERLUMP2014DeckPiers Structural 139,666
801 WATERLUMP2014Piles and BracingPiers Structural 287,376
801 WATERLUMP2014FacingPiers Fender 185,378
801 WATERLUMP2014Wales and ChocksPiers Fender 315,786
801 WATERLUMP2014PilesPiers Fender 1,001,030
Total Planned activities for $1,929,236DBSR043 000
000DGS006010/12/2010Date of Last Survey:WEST END OF FERRY TERMINAL WEST
13925 - REVETMENT - /EAST AND WEST OF BALLPARK WHARF
801 SIBULK2014RevetmentBulkheads Structural 1,395,820
801 SIBULK2014FillBulkheads Backfill 94,246
Total Planned activities for $1,490,066DGS0060 000
001DGSPR303/8/2012Date of Last Survey:23RD ST. MARINA
2666 - 23RD ST. MARINA PKG. GARAGE - BUILDING FOUNDATION
801SKYPORT2014Piles and BracingPiers Structural 40,922
Total Planned activities for $40,922DGSPR30 001
Page P - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF SMALL BUSINESS SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
P
022DGSPR303/8/2012Date of Last Survey:23RD ST. MARINA
2583 - 23RD ST. MARINA DOCK - BULKHEAD
801SKYPORT2014Wales and ChocksBulkheads Fender 90,153
Total Planned activities for $90,153DGSPR30 022
000PAR01546/23/2011Date of Last Survey:FOOT OF 23RD STREET & FDR DRIVE
13645 - SKYPORT MARINA (23RD ST MARINA) -
801SKYPORT2014DeckMarinas/Docks Access Walkways 37,995
801SKYPORT2014GangwaysMarinas/Docks Access Walkways 46,874
801SKYPORT2014Piles and BracingMarinas/Docks Access Walkways 47,425
801SKYPORT2014Floats/FramesMarinas/Docks Floating Docks 40,009
801SKYPORT2014Wave AttenuatorMarinas/Docks Protective Structure 119,097
Total Planned activities for $291,400PAR0154 000
Total Planned Activities for : $12,183,960DEPT. OF SMALL BUSINESS SERV.
Total Required for "State of Good Repair" for : DEPT. OF SMALL BUSINESS SERV. $196,613,859
Page P - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF HEALTH & MENTAL HYGIENE
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
Q
000HEA00018/6/2009Date of Last Survey:455 FIRST AVENUE
1574 - PUBLIC HEALTH LABORATORY BLDG. -
CAPITAL2015WindowsArchitecture Exterior 2,796,392
CAPITAL2015RoofArchitecture Exterior 42,784
CAPITAL2015FloorsArchitecture Interior 1,946,814
CAPITAL2015CeilingsArchitecture Interior 1,060,215
CAPITAL2015WiringElectrical Under 600 Volts 236,904
CAPITAL2015Interior LightingElectrical Lighting 411,145
CAPITAL2015Egress LightingElectrical Lighting 31,692
CAPITAL2015Terminal DevicesMechanical Heating 1,342,547
CAPITAL2015Terminal DevicesMechanical Air Conditioning 132,202
CAPITAL2015DistributionMechanical Ventilation 537,260
CAPITAL2015Exhaust FansMechanical Ventilation 55,054
Total Planned activities for $8,593,009HEA0001 000
000HEA00027/3/2012Date of Last Survey:158 EAST 115 STREET
1998 - EAST HARLEM DISTRICT HEALTH CTR. -
HL82EHRLM2013Exhaust FansMechanical Ventilation 42,739
Total Planned activities for $42,739HEA0002 000
000HEA00047/2/2012Date of Last Survey:1309 FULTON AVENUE
2645 - MORRISANIA DISTRICT HEALTH CTR. -
CAPITAL2015FloorsArchitecture Interior 78,604
CAPITAL2015Conversion EquipmentMechanical Air Conditioning 51,671
Total Planned activities for $130,275HEA0004 000
000HEA00057/2/2012Date of Last Survey:1826 ARTHUR AVENUE
1977 - TREMONT DISTRICT HEALTH CTR. -
CAPITAL2015WindowsArchitecture Exterior 65,204
Total Planned activities for $65,204HEA0005 000
000HEA00077/6/2012Date of Last Survey:90-37 PARSONS BOULEVARD
1979 - JAMAICA DISTRICT HEALTH CENTER -
CAPITAL2015Interior LightingElectrical Lighting 11,123
Total Planned activities for $11,123HEA0007 000
000HEA00087/6/2012Date of Last Survey:485 THROOP AVENUE
1980 - BEDFORD DISTRICT HEALTH CENTER -
CAPITAL2015Interior LightingElectrical Lighting 16,003
CAPITAL2015Conversion EquipmentMechanical Air Conditioning 47,425
Total Planned activities for $63,428HEA0008 000
000HEA00127/8/2009Date of Last Survey:2238 FIFTH AVENUE
2788 - CENTRAL HARLEM DIST HEALTH CTR. -
HL82DO26A2011Exterior WallsArchitecture Exterior 61,436
Page Q - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF HEALTH & MENTAL HYGIENE
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
Q
HL82DO26A2011WindowsArchitecture Exterior 386,484
HL82DO26A2011RoofArchitecture Exterior 177,207
HL82DO26A2011FloorsArchitecture Interior 31,768
HL82DO26A2011CeilingsArchitecture Interior 51,420
Total Planned activities for $708,315HEA0012 000
000HEA001312/10/2012Date of Last Survey:303 NINTH AVENUE
1575 - CHELSEA DISTRICT HEALTH CENTER -
CAPITAL-HL82CHELI2015Exterior WallsArchitecture Exterior 110,069
CAPITAL-HL82CHELI2015FloorsArchitecture Interior 76,210
CAPITAL-HL82CHELI2015Interior WallsArchitecture Interior 146,322
CAPITAL-HL82CHELI2015CeilingsArchitecture Interior 129,920
Total Planned activities for $462,521HEA0013 000
000HEA00145/7/2009Date of Last Survey:160 WEST 100TH STREET
1984 - RIVERSIDE HEALTH CENTER -
HL82RVREX2014Exterior WallsArchitecture Exterior 120,158
HL82RVREX2014WindowsArchitecture Exterior 496,098
HL82RVREX2014RoofArchitecture Exterior 207,465
HL82RVREX2014FloorsArchitecture Interior 86,601
HL82RVREX2014CeilingsArchitecture Interior 42,052
HL82RVREX2014Interior LightingElectrical Lighting 112,375
HL82RVREX2014Terminal DevicesMechanical Heating 130,774
HL82RVREX2014Conversion EquipmentMechanical Air Conditioning 54,082
Total Planned activities for $1,249,605HEA0014 000
000HEA001512/17/2012Date of Last Survey:12-26 31ST AVENUE
132 - ASTORIA DISTRICT HEALTH CENTER -
CAPITAL2015Switchgear/ SwitchboardElectrical Under 600 Volts 44,465
Total Planned activities for $44,465HEA0015 000
000HEA001612/18/2012Date of Last Survey:34-33 JUNCTION BOULEVARD
133 - CORONA DISTRICT HEALTH CENTER -
CAPITAL2015Exterior WallsArchitecture Exterior 77,667
CAPITAL2015WindowsArchitecture Exterior 57,595
Total Planned activities for $135,262HEA0016 000
000HEA001912/14/2012Date of Last Survey:151 MAUJER STREET
1987 - WILLIAMSBURG DISTRICT HEALTH CTR -
CAPITAL2015WindowsArchitecture Exterior 79,296
CAPITAL2015FloorsArchitecture Interior 49,831
CAPITAL2015CeilingsArchitecture Interior 77,601
Total Planned activities for $206,728HEA0019 000
Page Q - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF HEALTH & MENTAL HYGIENE
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
Q
000HEA00228/4/2009Date of Last Survey:1601 AVENUE S
13729 - HOMECREST DIST. HEALTH CTR. -
HL82HCRST2014Exterior WallsArchitecture Exterior 94,176
HL82HCRST2014WindowsArchitecture Exterior 224,756
HL82HCRST2014RoofArchitecture Exterior 101,374
HL82HCRST2014FloorsArchitecture Interior 19,369
HL82HCRST2014Interior LightingElectrical Lighting 48,335
Total Planned activities for $488,010HEA0022 000
000HEA00261/1/2013Date of Last Survey:3139 VETERANS ROAD WEST
13733 - STATEN ISLAND ANIMAL SHELTER -
HL82SIABE2015Average Cost Method
72,483
Total Planned activities for $72,483HEA0026 000
Total Planned Activities for : $12,273,167DEPT. OF HEALTH & MENTAL HYGIENE
Total Required for "State of Good Repair" for : DEPT. OF HEALTH & MENTAL HYGIENE $18,800,282
Page Q - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
010HHC00015/17/2010Date of Last Survey:462 FIRST AVENUE
70 - BELLEVUE HOSPITAL - BLDG C-D
CAPITAL2014Exterior WallsArchitecture Exterior 333,644
CAPITAL2015ParapetsArchitecture Exterior 79,326
EXPENSE2014RoofArchitecture Exterior 33,250
EXPENSE2014FloorsArchitecture Interior 62,073
CAPITAL2014CeilingsArchitecture Interior 40,636
CAPITAL2014Switchgear/ SwitchboardElectrical Under 600 Volts 46,594
CAPITAL2014PanelboardsElectrical Under 600 Volts 28,247
EXPENSE2014WiringElectrical Under 600 Volts 198,603
Total Planned activities for $822,373HHC0001 010
020HHC00015/17/2010Date of Last Survey:462 FIRST AVENUE
71 - BELLEVUE HOSPITAL - BLDG A
CAPITAL2014Exterior WallsArchitecture Exterior 78,191
EXPENSE2014Switchgear/ SwitchboardElectrical Under 600 Volts 21,744
EXPENSE2014WiringElectrical Under 600 Volts 22,223
Total Planned activities for $122,158HHC0001 020
030HHC00015/20/2010Date of Last Survey:462 FIRST AVENUE
72 - BELLEVUE HOSPITAL - EMERGENCY G BLDG. & F BLDG.
EXPENSE2014WiringElectrical Under 600 Volts 8,327
EXPENSE2014DistributionMechanical Heating 9,290
Total Planned activities for $17,618HHC0001 030
040HHC00015/18/2010Date of Last Survey:462 FIRST AVENUE
73 - BELLEVUE HOSPITAL - BLDG H
EXPENSE2013FloorsArchitecture Interior 36,013
EXPENSE2014Interior WallsArchitecture Interior 12,160
EXPENSE2014CeilingsArchitecture Interior 157,407
EXPENSE2014WiringElectrical Under 600 Volts 101,592
CAPITAL2014BatteriesElectrical Stand-by Power 138,701
EXPENSE2014DistributionMechanical Heating 93,406
CAPITAL2014DistributionMechanical Air Conditioning 380,261
Total Planned activities for $919,540HHC0001 040
050HHC00015/20/2010Date of Last Survey:462 FIRST AVENUE
74 - BELLEVUE HOSPITAL - BLDG I - K
EXPENSE2014CeilingsArchitecture Interior 55,695
Total Planned activities for $55,695HHC0001 050
130HHC00015/20/2010Date of Last Survey:462 FIRST AVENUE
13727 - BELLEVUE HOSPITAL - AMBULATORY CARE BUILDING
EXPENSE2014Exterior WallsArchitecture Exterior 13,709
Page R - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
Total Planned activities for $13,709HHC0001 130
010HHC00021/27/2010Date of Last Survey:1400 PELHAM PARKWAY SOUTH
55 - JACOBI MEDICAL CENTER - JACOBI HOSPITAL - BLDG 1
CAPITAL2015RoofArchitecture Exterior 119,821
212008702014CeilingsArchitecture Interior 61,862
212008702014WiringElectrical Under 600 Volts 95,243
CAPITAL2015Interior LightingElectrical Lighting 139,516
212008702014Interior LightingElectrical Lighting 134,741
CAPITAL2015DistributionMechanical Heating 14,781
Total Planned activities for $565,963HHC0002 010
030HHC00021/26/2010Date of Last Survey:2021 EASTCHESTER ROAD
56 - JACOBI MEDICAL CENTER - NURSES RESIDENCE - BLDG 4
CAPITAL2015WindowsArchitecture Exterior 774,756
02200970&212008702014Interior WallsArchitecture Interior 14,781
CAPITAL2015CeilingsArchitecture Interior 27,045
02200970&212008702014CeilingsArchitecture Interior 19,533
02200970&212008702014WiringElectrical Under 600 Volts 44,446
02200970&212008702014Interior LightingElectrical Lighting 250,843
Total Planned activities for $1,131,404HHC0002 030
090HHC00021/26/2010Date of Last Survey:1400 PELHAM PARKWAY SOUTH
82 - JACOBI MEDICAL CENTER - AUDITORIUM ROTUNDA
EXPENSE2014Exterior WallsArchitecture Exterior 6,189
EXPENSE2014Terminal DevicesMechanical Heating 4,021
Total Planned activities for $10,211HHC0002 090
100HHC00021/27/2010Date of Last Survey:1420 PELHAM PARKWAY SOUTH
14113 - JACOBI MEDICAL CENTER - PATIENT CARE - BLDG 6
212011012014Exterior WallsArchitecture Exterior 72,557
Total Planned activities for $72,557HHC0002 100
010HHC000310/18/2011Date of Last Survey:ROOSEVELT ISLAND
83 - COLER MEMORIAL HOSPITAL - BLDG A
CAPITAL2015Exterior WallsArchitecture Exterior 1,002,940
CAPITAL2015WindowsArchitecture Exterior 314,033
CAPITAL2015ParapetsArchitecture Exterior 159,016
CAPITAL2015RoofArchitecture Exterior 895,101
CAPITAL2015CeilingsArchitecture Interior 244,049
Total Planned activities for $2,615,139HHC0003 010
020HHC000310/18/2011Date of Last Survey:ROOSEVELT ISLAND
84 - COLER MEMORIAL HOSPITAL - BLDG B - CENTRAL BLDG
15553099992014ParapetsArchitecture Exterior 155,361
Page R - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
15553099992014RoofArchitecture Exterior 235,052
Total Planned activities for $390,413HHC0003 020
030HHC000310/18/2011Date of Last Survey:ROOSEVELT ISLAND
85 - COLER MEMORIAL HOSPITAL - BLDG C - NORTH BLDG
EXPENSE2014Interior LightingElectrical Lighting 498,886
Total Planned activities for $498,886HHC0003 030
050HHC000310/18/2011Date of Last Survey:ROOSEVELT ISLAND
87 - COLER MEMORIAL HOSPITAL - BLDG S - SPECIAL WING
672001722014WindowsArchitecture Exterior 953,748
672001722014FloorsArchitecture Interior 269,458
Total Planned activities for $1,223,206HHC0003 050
010HHC00044/12/2013Date of Last Survey:2601 OCEAN PARKWAY
88 - CONEY ISLAND HOSPITAL - MAIN BLDG
262006022014Exterior WallsArchitecture Exterior 1,325,661
CAPITAL2015ParapetsArchitecture Exterior 753,054
CAPITAL2014RoofArchitecture Exterior 909,131
CAPITAL2014FloorsArchitecture Interior 913,652
EXPENSE2014CeilingsArchitecture Interior 57,789
EXPENSE2014WiringElectrical Under 600 Volts 38,097
EXPENSE2013Interior LightingElectrical Lighting 5,349
CAPITAL2015Conversion EquipmentMechanical Air Conditioning 1,223,279
Total Planned activities for $5,226,011HHC0004 010
020HHC00044/9/2013Date of Last Survey:2601 OCEAN PARKWAY
89 - CONEY ISLAND HOSPITAL - HAMMETT
EXPENSE2013Exterior WallsArchitecture Exterior 34,403
EXPENSE2014Interior WallsArchitecture Interior 15,933
EXPENSE2013WiringElectrical Under 600 Volts 2,843
Total Planned activities for $53,178HHC0004 020
030HHC00044/10/2013Date of Last Survey:2601 OCEAN PARKWAY
90 - CONEY ISLAND HOSPITAL - POWER PLANT
EXPENSE2013Exterior WallsArchitecture Exterior 14,795
EXPENSE2014WindowsArchitecture Exterior 8,708
EXPENSE2014ParapetsArchitecture Exterior 10,681
EXPENSE2014RoofArchitecture Exterior 19,973
262011022014Conversion EquipmentMechanical Heating 88,075
262011022014DistributionMechanical Heating 126,323
Total Planned activities for $268,554HHC0004 030
060HHC00044/8/2013Date of Last Survey:2601 OCEAN PARKWAY
67 - CONEY ISLAND HOSPITAL - BLDG 6
Page R - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
CAPITAL2014Exterior WallsArchitecture Exterior 422,527
CAPITAL2014WindowsArchitecture Exterior 305,524
CAPITAL2014ParapetsArchitecture Exterior 42,886
Total Planned activities for $770,937HHC0004 060
070HHC00044/10/2013Date of Last Survey:2601 OCEAN PARKWAY
14325 - CONEY ISLAND HOSPITAL - TOWER BUILDING
262010022014ParapetsArchitecture Exterior 54,078
SANDY26B2014Interior WallsArchitecture Interior 114,840
SANDY26B2014CeilingsArchitecture Interior 225,531
Total Planned activities for $394,449HHC0004 070
010HHC00051/6/2011Date of Last Survey:79-01 BROADWAY
68 - ELMHURST HOSPITAL - ZONES A,B,C,D, E, F, ER, PER
CAPITAL2015WindowsArchitecture Exterior 289,348
EXPENSE2014ParapetsArchitecture Exterior 78,897
CAPITAL2015RoofArchitecture Exterior 357,586
EXPENSE2014FloorsArchitecture Interior 19,440
EXPENSE2015Interior WallsArchitecture Interior 28,266
EXPENSE2015CeilingsArchitecture Interior 121,823
CAPITAL2016WiringElectrical Under 600 Volts 238,106
332008052015Interior LightingElectrical Lighting 85,681
332008052015Conversion EquipmentMechanical Heating 721,513
332008052015DistributionMechanical Heating 459,929
EXPENSE2014Conversion EquipmentMechanical Air Conditioning 84,640
CAPITAL2015Heat RejectionMechanical Air Conditioning 354,528
EXPENSE2014StandpipeMechanical Fire Suppression 90,720
Total Planned activities for $2,930,476HHC0005 010
040HHC00051/6/2011Date of Last Survey:79-01 BROADWAY
4112 - ELMHURST HOSPITAL - STAFF HOUSE
CAPITAL2015Exterior WallsArchitecture Exterior 43,399
CAPITAL2015WindowsArchitecture Exterior 165,065
CAPITAL2015WiringElectrical Under 600 Volts 32,489
Total Planned activities for $240,953HHC0005 040
050HHC00051/6/2011Date of Last Survey:79-01 BROADWAY
4132 - ELMHURST HOSPITAL - AMBULATORY CARE - ZONE H
EXPENSE2015CeilingsArchitecture Interior 9,550
332008052015Interior LightingElectrical Lighting 49,644
Total Planned activities for $59,194HHC0005 050
010HHC00073/18/2008Date of Last Survey:227 MADISON STREET
100 - GOUVERNEUR HEALTHCARE SERVICES -
Page R - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
122005702015RoofArchitecture Exterior 549,126
122005702015Interior WallsArchitecture Interior 642,664
122005702015CeilingsArchitecture Interior 4,100,027
122005702015DistributionMechanical Heating 231,236
122005702015DistributionMechanical Air Conditioning 202,332
122005702015Water HeaterMechanical Plumbing 96,348
Total Planned activities for $5,821,733HHC0007 010
020HHC00073/18/2008Date of Last Survey:34 SPRING STREET
101 - GOUVERNEUR HEALTHCARE SERVICES - JUDSON HC - CLINIC
EXPENSE2015Exterior WallsArchitecture Exterior 22,583
682001722015ParapetsArchitecture Exterior 365,261
682001722015RoofArchitecture Exterior 149,948
Total Planned activities for $537,792HHC0007 020
010HHC00082/22/2010Date of Last Survey:506 LENOX AVENUE
102 - HARLEM HOSPITAL - MARTIN LUTHER KING, JR PAVILION
EXPENSE2015Exterior WallsArchitecture Exterior 73,667
EXPENSE2014FloorsArchitecture Interior 327,578
6400002014Interior WallsArchitecture Interior 22,586
132003702014CeilingsArchitecture Interior 238,998
EXPENSE2014WiringElectrical Under 600 Volts 61,908
EXPENSE2013Interior LightingElectrical Lighting 222,968
EXPENSE2014DistributionMechanical Heating 288,146
132003702014Terminal DevicesMechanical Heating 791,816
132003702014DistributionMechanical Air Conditioning 212,999
132003702013Heat RejectionMechanical Air Conditioning 133,434
EXPENSE2014Exhaust FansMechanical Ventilation 353,308
EXPENSE2014H/C Water PipingMechanical Plumbing 69,422
Total Planned activities for $2,796,829HHC0008 010
020HHC00081/21/2010Date of Last Survey:15 WEST 136 STREET
103 - HARLEM HOSPITAL - KOUNTZ PAVILION
132007022015Exterior WallsArchitecture Exterior 43,861
132007022015WindowsArchitecture Exterior 776,932
132007022015RoofArchitecture Exterior 273,955
EXPENSE2015CeilingsArchitecture Interior 9,547
EXPENSE2013WiringElectrical Under 600 Volts 7,598
EXPENSE2014Interior LightingElectrical Lighting 107,253
EXPENSE2015DistributionMechanical Heating 187,082
132007032015Terminal DevicesMechanical Heating 661,750
Total Planned activities for $2,067,978HHC0008 020
Page R - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
010HHC000911/15/2010Date of Last Survey:449 CLARKSON AVENUE
125 - KINGS COUNTY HOSPITAL CENTER - MAIN BLDG. A,B,C
292008022014Exterior WallsArchitecture Exterior 1,269,182
CAPITAL2017WindowsArchitecture Exterior 2,041,142
292008022014ParapetsArchitecture Exterior 183,283
292008022014RoofArchitecture Exterior 734,299
CAPITAL2017FloorsArchitecture Interior 1,241,777
CAPITAL2017CeilingsArchitecture Interior 43,679
CAPITAL2017WiringElectrical Under 600 Volts 333,349
CAPITAL2017Interior LightingElectrical Lighting 1,692,374
CAPITAL2017Terminal DevicesMechanical Heating 486,559
CAPITAL2017Conversion EquipmentMechanical Air Conditioning 1,646,952
CAPITAL2017Terminal DevicesMechanical Air Conditioning 1,916,484
CAPITAL2017Heat RejectionMechanical Air Conditioning 1,078,132
CAPITAL2017DistributionMechanical Ventilation 389,423
CAPITAL2017Exhaust FansMechanical Ventilation 149,643
CAPITAL2017StandpipeMechanical Fire Suppression 49,712
Total Planned activities for $13,255,990HHC0009 010
020HHC000911/15/2010Date of Last Survey:541 CLARKSON AVENUE
126 - KINGS COUNTY HOSPITAL CENTER - BLDG E
CAPITAL2017RoofArchitecture Exterior 44,494
CAPITAL2017FloorsArchitecture Interior 472,201
CAPITAL2017CeilingsArchitecture Interior 168,131
CAPITAL2017Interior LightingElectrical Lighting 166,454
Total Planned activities for $851,280HHC0009 020
070HHC000911/15/2010Date of Last Survey:689 NEW YORK AVENUE
106 - KINGS COUNTY HOSPITAL CENTER - BLDG T - NURSES HOME (SENIOR)
CAPITAL2017Exterior WallsArchitecture Exterior 523,283
CAPITAL2017WindowsArchitecture Exterior 799,598
CAPITAL2017ParapetsArchitecture Exterior 91,280
CAPITAL2017RoofArchitecture Exterior 300,284
CAPITAL2017FloorsArchitecture Interior 590,964
CAPITAL2017WiringElectrical Under 600 Volts 222,232
CAPITAL2017Interior LightingElectrical Lighting 418,137
CAPITAL2017Terminal DevicesMechanical Heating 188,674
CAPITAL2017Conversion EquipmentMechanical Air Conditioning 697,009
CAPITAL2017DistributionMechanical Ventilation 151,007
CAPITAL2017Exhaust FansMechanical Ventilation 193,425
Total Planned activities for $4,175,893HHC0009 070
Page R - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
080HHC00091/13/2010Date of Last Survey:410 WINTHROP STREET
107 - KINGS COUNTY HOSPITAL CENTER - BLDG R -BEHAVIORAL HEALTH CENTER
CAPITAL2017Exterior WallsArchitecture Exterior 53,101
CAPITAL2017ParapetsArchitecture Exterior 36,020
CAPITAL2017CeilingsArchitecture Interior 137,809
CAPITAL2017StandpipeMechanical Fire Suppression 32,155
Total Planned activities for $259,085HHC0009 080
090HHC000911/16/2010Date of Last Survey:444 WINTHROP STREET
108 - KINGS COUNTY HOSPITAL CENTER - BLDG P - PATHLOLOGY
CAPITAL2017Exterior WallsArchitecture Exterior 1,540,996
CAPITAL2017WindowsArchitecture Exterior 1,225,564
CAPITAL2017ParapetsArchitecture Exterior 138,961
CAPITAL2017RoofArchitecture Exterior 170,157
CAPITAL2017FloorsArchitecture Interior 343,985
CAPITAL2017Interior WallsArchitecture Interior 340,451
CAPITAL2017CeilingsArchitecture Interior 40,176
CAPITAL2017WiringElectrical Under 600 Volts 75,020
CAPITAL2017GeneratorsElectrical Stand-by Power 76,485
CAPITAL2017Interior LightingElectrical Lighting 181,553
CAPITAL2017Fire/Smoke DetectionElectrical Alarm 936,693
Total Planned activities for $5,070,041HHC0009 090
100HHC000911/16/2010Date of Last Survey:577 CLARKSON AVENUE
109 - KINGS COUNTY HOSPITAL CENTER - BLDG Z - POWER HOUSE
CAPITAL2017Exterior WallsArchitecture Exterior 423,417
CAPITAL2017WindowsArchitecture Exterior 127,593
292011052014ParapetsArchitecture Exterior 305,677
292011052014RoofArchitecture Exterior 102,326
CAPITAL2017FloorsArchitecture Interior 185,861
CAPITAL2017CeilingsArchitecture Interior 164,817
CAPITAL2017GeneratorsElectrical Stand-by Power 76,485
CAPITAL2017Interior LightingElectrical Lighting 196,392
Total Planned activities for $1,582,568HHC0009 100
190HHC000911/17/2010Date of Last Survey:648 ALBANY AVENUE
299 - KINGS COUNTY HOSPITAL CENTER - BLDG K5 - STAFF HOUSE
CAPITAL2017Exterior WallsArchitecture Exterior 570,436
CAPITAL2017WindowsArchitecture Exterior 591,211
CAPITAL2017ParapetsArchitecture Exterior 51,493
CAPITAL2017RoofArchitecture Exterior 264,134
CAPITAL2017FloorsArchitecture Interior 337,564
Page R - 7
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
CAPITAL2017Interior WallsArchitecture Interior 122,475
CAPITAL2017CeilingsArchitecture Interior 121,733
CAPITAL2017Switchgear/ SwitchboardElectrical Under 600 Volts 69,892
CAPITAL2017WiringElectrical Under 600 Volts 64,978
CAPITAL2017GeneratorsElectrical Stand-by Power 76,485
CAPITAL2017Interior LightingElectrical Lighting 468,270
CAPITAL2017Fire/Smoke DetectionElectrical Alarm 626,476
CAPITAL2017Conversion EquipmentMechanical Air Conditioning 88,761
Total Planned activities for $3,453,908HHC0009 190
250HHC000911/18/2010Date of Last Survey:547 WINTHROP STREET
277 - KINGS COUNTY HOSPITAL CENTER - K0 - LAUNDRY
CAPITAL2017Exterior WallsArchitecture Exterior 725,946
CAPITAL2017WindowsArchitecture Exterior 1,839,878
CAPITAL2017ParapetsArchitecture Exterior 259,586
CAPITAL2017RoofArchitecture Exterior 427,654
CAPITAL2017FloorsArchitecture Interior 310,585
CAPITAL2017Interior WallsArchitecture Interior 49,579
CAPITAL2017CeilingsArchitecture Interior 351,317
CAPITAL2017WiringElectrical Under 600 Volts 101,307
CAPITAL2017Interior LightingElectrical Lighting 838,346
CAPITAL2017Exterior LightingElectrical Lighting 49,817
Total Planned activities for $4,954,015HHC0009 250
260HHC000911/19/2010Date of Last Survey:591 CLARKSON AVENUE
4123 - KINGS COUNTY HOSPITAL CENTER - SUPPORT BUILDING
CAPITAL2017Exterior WallsArchitecture Exterior 129,770
Total Planned activities for $129,770HHC0009 260
270HHC000911/18/2010Date of Last Survey:599 KINGSTON AVENUE
4124 - KINGS COUNTY HOSPITAL CENTER - CENTRAL KITCHEN BUILDING
CAPITAL2017FloorsArchitecture Interior 37,316
CAPITAL2017Interior WallsArchitecture Interior 64,256
CAPITAL2017Conversion EquipmentMechanical Air Conditioning 41,159
Total Planned activities for $142,731HHC0009 270
280HHC000911/17/2010Date of Last Survey:594 ALBANY AVENUE
4433 - KINGS COUNTY HOSPITAL CENTER - SUSAN SMITH MCKINNEY CENTER
CAPITAL2017RoofArchitecture Exterior 65,665
CAPITAL2017Interior WallsArchitecture Interior 104,709
CAPITAL2017Interior LightingElectrical Lighting 131,184
Total Planned activities for $301,558HHC0009 280
Page R - 8
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
290HHC000911/16/2010Date of Last Survey:471 CLARKSON AVENUE
13439 - KINGS COUNTY HOSPITAL CENTER - INPATIENT BED TOWER - BLDG. D
CAPITAL2017RoofArchitecture Exterior 47,058
CAPITAL2017CeilingsArchitecture Interior 127,622
Total Planned activities for $174,680HHC0009 290
300HHC000911/16/2010Date of Last Survey:489 CLARKSON AVENUE
13893 - KINGS COUNTY HOSPITAL CENTER - BUILDING S
EXPENSE2015StandpipeMechanical Fire Suppression 28,650
Total Planned activities for $28,650HHC0009 300
010HHC00101/12/2012Date of Last Survey:234 EAST 149TH STREET
278 - LINCOLN HOSPITAL - MAIN HOSPITAL
252007022014Exterior WallsArchitecture Exterior 359,314
252007022012ParapetsArchitecture Exterior 55,740
EXPENSE2014RoofArchitecture Exterior 2,882,182
EXPENSE2016FloorsArchitecture Interior 414,064
EXPENSE2018Interior WallsArchitecture Interior 41,655
EXPENSE2015CeilingsArchitecture Interior 531,612
22004222014BatteriesElectrical Stand-by Power 66,053
EXPENSE2015DistributionMechanical Heating 202,118
Total Planned activities for $4,552,738HHC0010 010
010HHC001112/5/2012Date of Last Survey:1901 FIRST AVENUE
281 - METROPOLITAN HOSPITAL - MAIN BUILDING
EXPENSE2014RoofArchitecture Exterior 90,861
EXPENSE2014RoofArchitecture Exterior 17,378
EXPENSE2014FloorsArchitecture Interior 27,491
CAPITAL (NYPA)2015Energy SourceMechanical Heating 2,151,118
CAPITAL (NYPA)2015Conversion EquipmentMechanical Heating 3,826,280
Total Planned activities for $6,113,129HHC0011 010
030HHC001112/5/2012Date of Last Survey:1901 FIRST AVENUE
750 - METROPOLITAN HOSPITAL - MENTAL HEALTH
CAPITAL2015WindowsArchitecture Exterior 1,618,609
Total Planned activities for $1,618,609HHC0011 030
000HHC00132/18/2010Date of Last Survey:3424 KOSSUTH AVE. & 210 ST.
732 - NORTH CENTRAL BRONX HOSPITAL -
CAPITAL2015CeilingsArchitecture Interior 26,446
CAPITAL2015Fire/Smoke DetectionElectrical Alarm 79,231
CAPITAL2015Terminal DevicesMechanical Heating 1,017,044
Total Planned activities for $1,122,721HHC0013 000
Page R - 9
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
060HHC00141/20/2012Date of Last Survey:82-68 164TH STREET
991 - QUEENS HOSPITAL - NURSES SCHOOL - N
CAPITAL2015WindowsArchitecture Exterior 389,691
CAPITAL2015CeilingsArchitecture Interior 11,509
Total Planned activities for $401,199HHC0014 060
100HHC00141/19/2012Date of Last Survey:82-68 164TH STREET
995 - QUEENS HOSPITAL - POWER PLANT - E
342005012014WindowsArchitecture Exterior 243,187
Total Planned activities for $243,187HHC0014 100
110HHC00141/19/2012Date of Last Survey:82-68 164TH STREET
996 - QUEENS HOSPITAL - MAINTENANCE - F
342005012014ParapetsArchitecture Exterior 51,688
CAPITAL2015RoofArchitecture Exterior 11,603
Total Planned activities for $63,291HHC0014 110
130HHC00141/19/2012Date of Last Survey:82-68 164TH STREET
998 - QUEENS HOSPITAL - STORES - S
CAPITAL2015ParapetsArchitecture Exterior 16,228
Total Planned activities for $16,228HHC0014 130
280HHC00151/1/2013Date of Last Survey:460 BRIELLE AVE.
66 - SEA VIEW HOSPITAL, REHAB CTR. - BLDG 44
CAPITAL2014Average Cost Method
134,200
Total Planned activities for $134,200HHC0015 280
010HHC00165/27/2010Date of Last Survey:760 BROADWAY
2726 - WOODHULL MEDICAL CENTER - MAIN
482012032014Exterior WallsArchitecture Exterior 119,299
482012032014WindowsArchitecture Exterior 15,156,530
482012032014ParapetsArchitecture Exterior 36,069
EXPENSE2014RoofArchitecture Exterior 141,664
EXPENSE2014FloorsArchitecture Interior 79,098
EXPENSE2014Interior WallsArchitecture Interior 4,346
EXPENSE2014CeilingsArchitecture Interior 89,721
EXPENSE2015Energy SourceMechanical Heating 445,221
EXPENSE2014DistributionMechanical Heating 25,999
CAPITAL2014Terminal DevicesMechanical Heating 2,919,136
EXPENSE2014H/C Water PipingMechanical Plumbing 9,702
CAPITAL2014Sanitary PipingMechanical Plumbing 47,042
EXPENSE2014Storm Drain PipingMechanical Plumbing 75,604
EXPENSE2013StandpipeMechanical Fire Suppression 11,930
Page R - 10
Appendix
FMS ID/ Budget Code
Agency Activity Year
HEALTH AND HOSPITALS CORP.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
R
Total Planned activities for $19,161,362HHC0016 010
010HHC00173/8/2010Date of Last Survey:100 NORTH PORTLAND AVENUE
1003 - CUMBERLAND NFCC - BLDG B
EXPENSE2015ParapetsArchitecture Exterior 97,549
EXPENSE2014RoofArchitecture Exterior 39,293
Total Planned activities for $136,842HHC0017 010
020HHC00173/8/2010Date of Last Survey:100 NORTH PORTLAND AVENUE
2727 - CUMBERLAND NFCC - BLDG C
EXPENSE2013Fire/Smoke DetectionElectrical Alarm 35,625
EXPENSE2013DistributionMechanical Heating 3,568
Total Planned activities for $39,193HHC0017 020
010HHC001812/4/2012Date of Last Survey:1225 GERARD AVE.
1004 - MORRISANIA D & T CENTER - MAIN BLDG.
EXPENSE2014WindowsArchitecture Exterior 948,984
EXPENSE2014ParapetsArchitecture Exterior 69,069
EXPENSE2014RoofArchitecture Exterior 388,231
EXPENSE2014Interior WallsArchitecture Interior 248,962
Total Planned activities for $1,655,246HHC0018 010
Total Planned Activities for : $99,265,068HEALTH AND HOSPITALS CORP.
Total Required for "State of Good Repair" for : HEALTH AND HOSPITALS CORP. $281,195,201
Page R - 11
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF SANITATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
S
000DOS00037/9/2012Date of Last Survey:2 BLOOMFIELD STREET
118 - MANHATTAN 2/4 GARAGE - (FORMER GANSEVOORT MTS)
S216-404A2015Exterior WallsArchitecture Exterior 260,185
S216-404A2015WindowsArchitecture Exterior 195,100
S216-404A2015RoofArchitecture Exterior 755,446
S216-404A2015FloorsArchitecture Interior 381,730
S216-404A2015Interior WallsArchitecture Interior 68,966
S216-404A2015CeilingsArchitecture Interior 1,199,579
S216-404A2015Interior LightingElectrical Lighting 32,121
S216-404A2015Conversion EquipmentMechanical Air Conditioning 88,431
Total Planned activities for $2,981,558DOS0003 000
010DOS00034/20/2012Date of Last Survey:GANSEVOORT ST. & HUDSON RIVER
1842 - GANSEVOORT MARINE TRANSFER STA. - BARGE DOCKS
S216-404A2015DeckPiers Structural 310,545
S216-404A2015Piles and BracingPiers Structural 82,592
S216-404A2015FacingPiers Fender 654,930
S216-404A2015Wales and ChocksPiers Fender 174,817
S216-404A2015PilesPiers Fender 302,272
S216-404A2015RailingPiers Deck Elements 68,410
Total Planned activities for $1,593,566DOS0003 010
000DOS00047/9/2012Date of Last Survey:59TH ST. & HUDSON RIVER
2015 - W. 59TH ST. MARINE TRANSFER STA. -
S216-415A2015Exterior WallsArchitecture Exterior 51,082
S216-415A2015RoofArchitecture Exterior 89,087
S216-415A2015FloorsArchitecture Interior 123,421
S216-415A2015StandpipeMechanical Fire Suppression 248,070
S216-415A2015Fire PumpMechanical Fire Suppression 51,501
Total Planned activities for $563,161DOS0004 000
010DOS00043/20/2012Date of Last Survey:59TH ST. & HUDSON RIVER
1843 - W. 59TH ST. MARINE TRANSFER STA. - W. 59TH STREET, NORTH PIER
S216-415A2015DeckPiers Structural 43,880
S216-415A2015FacingPiers Fender 108,610
S216-415A2015Wales and ChocksPiers Fender 171,309
S216-415A2015PilesPiers Fender 271,521
Total Planned activities for $595,320DOS0004 010
020DOS00043/20/2012Date of Last Survey:W. 59TH ST. & HUDSON RIVER
2857 - W. 59TH ST. MTS - W. 59TH ST. SOUTH PIER
S216-415A2015Wales and ChocksPiers Fender 48,544
S216-415A2015PilesPiers Fender 76,942
Page S - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF SANITATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
S
Total Planned activities for $125,486DOS0004 020
000DOS00087/30/2010Date of Last Survey:BAY 41ST ST. AND GRAVESEND BAY
2018 - S.W.BROOKLYN MARINE TRANSFER STA -
S216-399A2014Exterior WallsArchitecture Exterior 375,248
S216-399A2014WindowsArchitecture Exterior 266,940
S216-399A2014RoofArchitecture Exterior 105,237
S216-399A2014FloorsArchitecture Interior 263,073
S216-399A2014Interior WallsArchitecture Interior 271,811
S216-399A2014CeilingsArchitecture Interior 568,586
S216-399A2014Interior LightingElectrical Lighting 52,843
S216-399A2014StandpipeMechanical Fire Suppression 153,805
Total Planned activities for $2,057,543DOS0008 000
010DOS000812/19/2011Date of Last Survey:BAY 41ST ST. AND GRAVESEND BAY
1820 - S.W.BROOKLYN MARINE TRANSFER STA - BARGE DOCKS
S216-399A2014FacingPiers Fender 539,777
Total Planned activities for $539,777DOS0008 010
010DOS00091/29/2008Date of Last Survey:HAMILTON AVE & GOWANUS BAY
2873 - HAMILTON AVENUE MTS - BARGE DOCKS
S216-4032010PilesPiers Fender 75,339
Total Planned activities for $75,339DOS0009 010
BN3DOS000B12/19/2011Date of Last Survey:BAY 41ST. ST. & GRAVESEND BAY
1823 - S.W. BROOKLYN DOS FACILITY - CONCRETE WHARF
S216-399A2014FacingBulkheads Fender 457,992
Total Planned activities for $457,992DOS000B BN3
MH3DOS000B4/20/2012Date of Last Survey:GANESVOORT ST. & HUDSON RIVER
1829 - BULKHEAD -
S216-404A2015Relieving Platform TopBulkheads Structural 311,054
S216-404A2015Coping/CurbBulkheads Structural 37,251
S216-404A2015SurfaceBulkheads Backfill 122,855
Total Planned activities for $471,160DOS000B MH3
MH4DOS000B3/20/2012Date of Last Survey:59TH ST. & HUDSON RIVER
1830 - BULKHEAD -
S216-415A2015Relieving Platform TopBulkheads Structural 58,912
S216-415A2015Wales and ChocksBulkheads Fender 77,398
Total Planned activities for $136,310DOS000B MH4
000DOS00206/10/2013Date of Last Survey:52-35 58TH STREET
120 - CENTRAL REPAIR SHOP - QUEENS 2,3,4 GARAGE
S136-385C2013WindowsArchitecture Exterior 2,029,507
S136-264D2012RoofArchitecture Exterior 326,976
Page S - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF SANITATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
S
Total Planned activities for $2,356,483DOS0020 000
000DOS00236/13/2011Date of Last Survey:92 BROOK STREET
2004 - STATEN ISLAND 1 GARAGE -
S136-264H2012ParapetsArchitecture Exterior 180,267
S136-264H2012RoofArchitecture Exterior 758,158
Total Planned activities for $938,425DOS0023 000
000DOS00257/12/2012Date of Last Survey:1000 WEST SERVICE ROAD
130 - STATEN ISLAND 3 GARAGE - BOROUGH REPAIR SHOP
S136-388A2015Exterior WallsArchitecture Exterior 920,009
S136-264B2016RoofArchitecture Exterior 449,448
Total Planned activities for $1,369,457DOS0025 000
000DOS00266/7/2013Date of Last Survey:2500 RICHMOND AVENUE
2005 - STATEN ISLAND 2 GARAGE/BORO OFFC -
S136-264K2012Exterior WallsArchitecture Exterior 280,531
S136-264K2012RoofArchitecture Exterior 446,993
Total Planned activities for $727,524DOS0026 000
000DOS00307/28/2010Date of Last Survey:5100 1ST AVENUE
2790 - BROOKLYN 7/10 GARAGE -
S136-3882015Exterior WallsArchitecture Exterior 714,575
Total Planned activities for $714,575DOS0030 000
000DOS00474/8/2011Date of Last Survey:44 BEAVER ST.
4187 - SANITATION HDQR. ANNEX -
EXPENSE2015Exterior WallsArchitecture Exterior 237,157
EXPENSE2015WindowsArchitecture Exterior 940,307
S136-383H2012DistributionMechanical Heating 43,310
S136-383H2012Terminal DevicesMechanical Air Conditioning 263,466
S136-383H2012Heat RejectionMechanical Air Conditioning 123,913
Total Planned activities for $1,608,153DOS0047 000
000DOS00496/15/2011Date of Last Survey:130-23 150TH AVE.
4189 - QUEENS 8/10/12 GARAGE - BERGENLANDING
S136-264G2015RoofArchitecture Exterior 582,495
Total Planned activities for $582,495DOS0049 000
000DOS00536/10/2011Date of Last Survey:5602 19 AVENUE
4196 - BROOKLYN 12 GARAGE - MAIN BUILDING
S136-264B2015ParapetsArchitecture Exterior 242,266
S136-264B2015RoofArchitecture Exterior 366,136
Total Planned activities for $608,402DOS0053 000
000DOS00586/3/2013Date of Last Survey:640 W. 26 ST
4517 - MANHATTAN BOROUGH REPAIR SHOP -
Page S - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF SANITATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
S
S136-264B2016RoofArchitecture Exterior 1,234,117
Total Planned activities for $1,234,117DOS0058 000
Total Planned Activities for : $19,736,843DEPARTMENT OF SANITATION
Total Required for "State of Good Repair" for : DEPARTMENT OF SANITATION $118,059,870
Page S - 4
Appendix
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
T
000DOT0090172 - QUEENS BOROUGH HALL - GARAGE - 7/16/2010Date of Last Survey:80-25 126TH STREET
850 TF-18-20122014Exterior WallsArchitecture Exterior 450,318
850 TF-18-20122014RoofArchitecture Exterior 1,540,889
850 TF-18-20122014FloorsArchitecture Interior 2,535,232
850 TF-18-20122014CeilingsArchitecture Interior 1,562,261
850 TF-18-20122014Security SystemElectrical Alarm 44,641
850 TF-18-20122014Water HeaterMechanical Plumbing 41,655
Total Planned Activities for $6,174,996DOT0090 000
000DOT00922412 - ARTERIAL & FLEET SERVICES - MAIN GARAGE9/14/2011Date of Last Survey:32-11 HARPER STREET
850 HWQF027C2015Exterior WallsArchitecture Exterior 479,169
850 HWQF027C2015ParapetsArchitecture Exterior 297,867
850 HWQF027C2015RoofArchitecture Exterior 269,587
850 HWQF027C2015FloorsArchitecture Interior 318,729
850 HWQF027C2015Interior WallsArchitecture Interior 43,021
850 HWQF027C2015CeilingsArchitecture Interior 59,284
Total Planned Activities for $1,467,657DOT0092 000
010DOT00922406 - ARTERIAL & FLEET SERVICES - OFFICE & STOREHOUSE9/14/2011Date of Last Survey:32-11 HARPER STREET
850 HWQF027C2015Exterior WallsArchitecture Exterior 235,929
850 HWQF027C2015ParapetsArchitecture Exterior 39,867
850 HWQF027C2015RoofArchitecture Exterior 39,127
841 SANDHWFAC2014FloorsArchitecture Interior 41,681
850 HWQF027C2015Interior WallsArchitecture Interior 105,889
850 HWQF027C2015CeilingsArchitecture Interior 146,846
Total Planned Activities for $609,339DOT0092 010
020DOT0092564 - ARTERIAL & FLEET SERVICES - GAS HOUSE9/14/2011Date of Last Survey:32-11 HARPER STREET
850 HWQF027C2015Exterior WallsArchitecture Exterior 55,806
850 HWQF027C2015ParapetsArchitecture Exterior 35,782
Total Planned Activities for $91,588DOT0092 020
030DOT00922812 - ARTERIAL & FLEET SERVICES - BOILER HOUSE9/14/2011Date of Last Survey:32-11 HARPER STREET
850 HWQF027C2015Exterior WallsArchitecture Exterior 152,837
850 HWQF027C2015WindowsArchitecture Exterior 216,034
850 HWQF027C2015ParapetsArchitecture Exterior 296,760
850 HWQF027C2015Switchgear/ SwitchboardElectrical Under 600 Volts 66,697
Total Planned Activities for $732,328DOT0092 030
T - 1Page
Appendix
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
T
040DOT00922407 - ARTERIAL & FLEET SERVICES - STORAGE 19/14/2011Date of Last Survey:32-11 HARPER STREET
850 HWQF027C2015Exterior WallsArchitecture Exterior 52,728
Total Planned Activities for $52,728DOT0092 040
010DOT0095552 - KENT AVENUE BRIDGE COMPLEX - GARAGE 21/1/2013Date of Last Survey:372 KENT AVENUE
842 SANDHWFAC2014Average Cost Method
45,822
Total Planned Activities for $45,822DOT0095 010
020DOT0095553 - KENT AVENUE BRIDGE COMPLEX - GARAGE 31/1/2013Date of Last Survey:372 KENT AVENUE
843 SANDHWFAC2014Average Cost Method
72,053
Total Planned Activities for $72,053DOT0095 020
030DOT00951023 - KENT AVENUE BRIDGE COMPLEX - GARAGE 41/1/2013Date of Last Survey:372 KENT AVENUE
841 SANDHWFAC2014Average Cost Method
35,577
Total Planned Activities for $35,577DOT0095 030
000DOT01062418 - WHITEHALL FERRY TERMINAL - 6/29/2011Date of Last Survey:SOUTH & WHITEHALL STREETS
801WHITEHALL2014FloorsArchitecture Interior 60,417
Total Planned Activities for $60,417DOT0106 000
000DOT01092420 - ST. GEORGE STATION - FERRY, BUS, TRAIN TERMINAL7/5/2011Date of Last Survey:1 RICHMOND TERRACE
801 C5215AB22012Exterior WallsArchitecture Exterior 116,011
801 C5215AB22012ParapetsArchitecture Exterior 123,386
801 C5215AB22012RoofArchitecture Exterior 532,920
801 C5215AB22012FloorsArchitecture Interior 87,404
801 C5215AB22012Interior WallsArchitecture Interior 35,829
Total Planned Activities for $895,550DOT0109 000
000DOT01232422 - COURT SQUARE-GARAGE - 11/2/2009Date of Last Survey:COURT SQUARE & THOMSON AVE.
841 TF18-20192017Exterior WallsArchitecture Exterior 1,518,231
841 TF18-20192017ParapetsArchitecture Exterior 58,618
841 TF18-20192017RoofArchitecture Exterior 115,309
841 TF18-20192017FloorsArchitecture Interior 420,561
841 TF18-20192017Interior WallsArchitecture Interior 576,994
841 TF18-20192017CeilingsArchitecture Interior 534,254
Total Planned Activities for $3,223,967DOT0123 000
020DOT01241025 - HAMILTON AVE. ASPHALT PLANT - STORAGE1/1/2013Date of Last Survey:448 HAMILTON AVENUE
T - 2Page
Appendix
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
T
HWKF20072014Average Cost Method
16,081
Total Planned Activities for $16,081DOT0124 020
000DOT01251000 - FLATLANDS AVENUE YARD - MAIN BUILDING3/3/2011Date of Last Survey:6080 FLATLANDS AVE.
841 HWKF0292015Exterior WallsArchitecture Exterior 116,712
841 HWKF0292015RoofArchitecture Exterior 52,108
841 HWKF0292015Interior LightingElectrical Lighting 40,546
841 HWKF0292015DistributionMechanical Heating 36,289
Total Planned Activities for $245,655DOT0125 000
000DOT01262423 - GLENDALE YARD - BLDG. 1 (SHOPS & OFFICES)10/17/2012Date of Last Survey:69-46 SYBILLA STREET
HWQF2002T2015Exterior WallsArchitecture Exterior 124,294
HWQF2002T2015WindowsArchitecture Exterior 86,528
HWQF2002T2015RoofArchitecture Exterior 76,936
HWQF2002T2015Conversion EquipmentMechanical Heating 66,497
Total Planned Activities for $354,255DOT0126 000
000DOT012813923 - CITY ISLAND FERRY DOCK - 6/10/2011Date of Last Survey:FORDHAM STREET
C5517B2014PilesMarinas/Docks Fender 510,330
C5517B2014Wales and ChocksMarinas/Docks Fender 98,376
Total Planned Activities for $608,706DOT0128 000
018DOT01281790 - COAL DOCK -TIMBER PILE SUPPORTED - CONCRETE PIER6/10/2011Date of Last Survey:HART ISLAND
C5517B2013Piles and BracingPiers Structural 44,239
C5517B2013Wales and ChocksPiers Fender 86,397
C5517B2013PilesPiers Fender 195,626
C5517B2013Coping/CurbPiers Deck Elements 59,253
Total Planned Activities for $385,515DOT0128 018
020DOT01281791 - BULKHEAD, CONNER ST. YARD - CONCRETE GRAVITY WALL5/20/2011Date of Last Survey:3200 CONNER STREET
850 HWXP20222014Gravity WallBulkheads Structural 520,572
Total Planned Activities for $520,572DOT0128 020
000DOT01291792 - DOT HARPER ST. FLEET FACILITY - TIMBER BULKHEAD6/17/2011Date of Last Survey:32-11 HARPER STREET
801 HWQ9962015Gravity WallBulkheads Structural 319,649
801 HWQ9962015Pile Supported WallBulkheads Structural 241,486
801 HWQ9962015Piles and BracingBulkheads Structural 46,516
801 HWQ9962015FillBulkheads Backfill 51,088
801 HWQ9962015PilesBulkheads Fender 114,348
801 HWQ9962015Wales and ChocksBulkheads Fender 161,979
T - 3Page
Appendix
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
T
Total Planned Activities for $935,066DOT0129 000
012DOT01301794 - DOT ASPHALT PLANT - STEEL SHEET PILE BULKHEAD12/15/2011Date of Last Survey:488 HAMILTON AVE.
850 HWKF20072015Sheet PilesBulkheads Structural 119,998
Total Planned Activities for $119,998DOT0130 012
000DOT01414379 - VESSEL MAINTENANCE FACILITY - 7/5/2011Date of Last Survey:1 BAY STREET
C5219FM2014Exterior WallsArchitecture Exterior 303,043
C5219FM2014WindowsArchitecture Exterior 140,569
C5219FM2014ParapetsArchitecture Exterior 65,477
C5219FM2014RoofArchitecture Exterior 59,729
C5219FM2013Conversion EquipmentMechanical Heating 344,304
C5219FM2013DistributionMechanical Heating 98,765
C5219FM2013Terminal DevicesMechanical Heating 721,036
Total Planned Activities for $1,732,923DOT0141 000
000DOT019013889 - WHITEHALL FERRY TERMINAL - FERRY SLIPS 1 - 35/31/2011Date of Last Survey:SOUTH STREET
C5517B2014FacingMarinas/Docks Fender 1,828,825
C5517B2014PilesMarinas/Docks Fender 1,104,080
C5517B2014Wales and ChocksMarinas/Docks Fender 485,069
Total Planned Activities for $3,417,974DOT0190 000
010DOT019213894 - ST. GEORGE FERRY TERMINAL - FERRY SLIP 16/1/2011Date of Last Survey:1 BAY STREET
C5517B2014FacingMarinas/Docks Fender 135,468
C5517B2014PilesMarinas/Docks Fender 98,140
C5517B2014Wales and ChocksMarinas/Docks Fender 80,845
Total Planned Activities for $314,453DOT0192 010
030DOT019213896 - ST. GEORGE FERRY TERMINAL - FERRY SLIPS 3 - 66/1/2011Date of Last Survey:1 BAY STREET
C5517B2014FacingMarinas/Docks Fender 2,140,404
C5517B2014PilesMarinas/Docks Fender 2,374,999
C5517B2014Wales and ChocksMarinas/Docks Fender 724,370
Total Planned Activities for $5,239,773DOT0192 030
050DOT019213898 - ST. GEORGE FERRY TERMINAL - SLIP 8 & 69TH STREET5/19/2011Date of Last Survey:1 BAY STREET
C5517B2014PilesMarinas/Docks Fender 1,143,140
C5517B2014Wales and ChocksMarinas/Docks Fender 557,574
C5517B2014Tower FramesMarinas/Docks Gallows Frames 186,689
Total Planned Activities for $1,887,403DOT0192 050
000DOT019313892 - HART ISLAND FERRY DOCK - 6/10/2011Date of Last Survey:HART ISLAND
T - 4Page
Appendix
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
T
C5517B2014FacingMarinas/Docks Fender 78,378
C5517B2014PilesMarinas/Docks Fender 870,179
C5517B2014Wales and ChocksMarinas/Docks Fender 102,120
Total Planned Activities for $1,050,677DOT0193 000
000DOT020514318 - DELANCEY - ESSEX GARAGE - 2/4/2010Date of Last Survey:107 ESSEX STREET
850 TF18-20072014RoofArchitecture Exterior 68,399
850 TF18-20072014FloorsArchitecture Interior 430,185
850 TF18-20072014Interior LightingElectrical Lighting 258,328
850 TF18-20072014Egress LightingElectrical Lighting 39,916
850 TF18-20072014Security SystemElectrical Alarm 36,502
850 TF18-20072014Fire/Smoke DetectionElectrical Alarm 124,950
Total Planned Activities for $958,280DOT0205 000
Total Planned Activities for : $31,249,353DEPARTMENT OF TRANSPORTATION Facilities
Total Required for "State of Good Repair" for : DEPARTMENT OF TRANSPORTATION Facilities $44,998,000
T - 5Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
FLUSHING BRIDGE EAST BOUND DOT0001NORTHERN BLVD. X-ING FLUSH. RIV. 1/2/2013Date of Last Survey:
HBCR03A2014Cap BeamPiers 112,100Bridge Structure
HBCR03A2014Cap BeamPiers 77,243Bridge Structure
HBCR03A2014Cap BeamPiers 184,334Bridge Structure
HBCR03A2014Cap BeamPiers 35,031Bridge Structure
HBCR03A2014Cap BeamPiers 63,453Bridge Structure
HBCR03A2014Cap BeamPiers 151,425Bridge Structure
HBCR03A2014Pier,ColumnsPiers 66,548Bridge Structure
HBCR03A2014Pier,ColumnsPiers 129,562Bridge Structure
HBCR03A2014Pier,ColumnsPiers 36,373Bridge Structure
HBCR03A2014Pier,ColumnsPiers 45,466Bridge Structure
HBCR03A2014Pier,ColumnsPiers 161,952Bridge Structure
HBCR03A2014Pier,ColumnsPiers 69,420Bridge Structure
HBCR03A2014Stem,Solid PierPiers 43,819Bridge Structure
HBCR03A2014Brngs,Ancr Blts,PadsPiers 22,673Bridge Structure
HBCR03A2014Mono Deck SurfaceDeck Elements 41,448Bridge Structure
HBCR03A2014Railings/ParapetsDeck Elements 103,433Bridge Structure
HBCR03A2014Deck,StructuralSuperstructure 64,745Bridge Structure
HBCR03A2014JointsSuperstructure 89,187Bridge Structure
HBCR03A2014Primary MemberSuperstructure 535,640Bridge Structure
HBCR03A2014Secondary MemberSuperstructure 582,217Bridge Structure
Total Planned Activities for $2,616,069DOT0001
HUTCHINSON RIVER PARKWAY BRIDGE DOT0007BARTOW AVE X-ING HUTCH RIVER 5/17/2011Date of Last Survey:
HB107003E2016Bascule SpanMovable Bridges 69,930Bridge Structure
Total Planned Activities for $69,930DOT0007
HEN HUD PKWAY VIADUCT BRIDGE DOT0009W. 72ST TO W. 79ST 7/11/2011Date of Last Survey:
HBM11722014Brngs,Ancr Blts,PadsAbutments 140,920Bridge Structure
HBM11722014Cap BeamPiers 1,590,717Bridge Structure
HBM11722014Pier,ColumnsPiers 1,767,399Bridge Structure
HBM11722014Stem,Solid PierPiers 8,943,101Bridge Structure
HBM11722014PedestalsPiers 1,070,669Bridge Structure
HBM11722014PedestalsPiers 214,724Bridge Structure
HBM11722014MedianDeck Elements 74,356Bridge Structure
HBM11722014Railings/ParapetsDeck Elements 292,003Bridge Structure
HBM11722014Wearing SurfaceDeck Elements 37,020Bridge Structure
HBM11722014Deck,StructuralSuperstructure 68,919Bridge Structure
HBM11722014JointsSuperstructure 146,219Bridge Structure
T - 6Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBM11722014Primary MemberSuperstructure 39,315,956Bridge Structure
HBM11722014Primary MemberSuperstructure 2,807,048Bridge Structure
HBM11722014Secondary MemberSuperstructure 1,489,846Bridge Structure
Total Planned Activities for $57,958,897DOT0009
HENRY HUDSON PKWY, W. 158TH ST. DOT0011HENRY HUDSON PKWY AT W. 158TH ST 12/17/2012Date of Last Survey:
HBM11652014Joint with DeckAbutments 70,260Bridge Structure
HBM11652014Stem (breastwall)Abutments 75,392Bridge Structure
HBM11652014WallsWingwalls 45,880Bridge Structure
HBM11652014Cap BeamPiers 282,313Bridge Structure
HBM11652014Pier,ColumnsPiers 244,871Bridge Structure
HBM11652014Railings/ParapetsDeck Elements 84,077Bridge Structure
HBM11652014Wearing SurfaceDeck Elements 152,057Bridge Structure
HBM11652014Deck,StructuralSuperstructure 4,070,192Bridge Structure
HBM11652014JointsSuperstructure 66,706Bridge Structure
HBM11652014Primary MemberSuperstructure 2,883,319Bridge Structure
HBM11652014Primary MemberSuperstructure 1,133,664Bridge Structure
HBM11652014Secondary MemberSuperstructure 398,001Bridge Structure
Total Planned Activities for $9,506,732DOT0011
EASTCHESTER BRIDGE DOT0015BOSTON RD X-ING HUTCH RIVER 7/19/2011Date of Last Survey:
BRX95792014WallsWingwalls 59,579Bridge Structure
BRX95792014PavementApproaches 59,246Bridge Structure
BRX95792014Cap BeamPiers 299,306Bridge Structure
BRX95792014Pier,ColumnsPiers 382,559Bridge Structure
BRX95792014Brngs,Ancr Blts,PadsPiers 304,123Bridge Structure
BRX95792014SidewalksDeck Elements 67,898Bridge Structure
BRX95792014ScupperDeck Elements 119,759Bridge Structure
BRX95792014Deck,StructuralSuperstructure 121,707Bridge Structure
BRX95792014Primary MemberSuperstructure 5,225,448Bridge Structure
BRX95792014Secondary MemberSuperstructure 215,725Bridge Structure
Total Planned Activities for $6,855,350DOT0015
GERRITSEN INLET BRIDGE DOT0021BELT SHORE PKWAY(BSP) 8/3/2011Date of Last Survey:
HBK6432014Joint with DeckAbutments 211,360Bridge Structure
HBK6432014Stem (breastwall)Abutments 903,028Bridge Structure
HBK6432014WallsWingwalls 76,576Bridge Structure
HBK6432014Pier ProtectionStream Channel 57,546Bridge Structure
HBK6432014PavementApproaches 73,152Bridge Structure
HBK6432014Cap BeamPiers 2,679,182Bridge Structure
T - 7Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBK6432014Pier,ColumnsPiers 12,264,850Bridge Structure
HBK6432014Stem,Solid PierPiers 5,407,651Bridge Structure
HBK6432014Brngs,Ancr Blts,PadsPiers 321,668Bridge Structure
HBK6432014CurbsDeck Elements 3,848,589Bridge Structure
HBK6432014Guide RailingDeck Elements 40,553Bridge Structure
HBK6432014SidewalksDeck Elements 501,467Bridge Structure
HBK6432014Deck,StructuralSuperstructure 884,212Bridge Structure
HBK6432014JointsSuperstructure 167,226Bridge Structure
HBK6432014Primary MemberSuperstructure 1,144,835Bridge Structure
HBK6432014Primary MemberSuperstructure 12,115,573Bridge Structure
HBK6432014Secondary MemberSuperstructure 418,096Bridge Structure
Total Planned Activities for $41,115,564DOT0021
MILL BASIN BRIDGE DOT0022BSP X-ING MILL BASIN 4/24/2013Date of Last Survey:
HBK10232014Stem (breastwall)Abutments 416,081Bridge Structure
HBK10232014Mat (scour & erosion)Wingwalls 244,059Bridge Structure
HBK10232014WallsWingwalls 70,336Bridge Structure
HBK10232014Mat (scour & erosion)Stream Channel 55,003Bridge Structure
HBK10232014PavementApproaches 53,914Bridge Structure
HBK10232014Cap BeamPiers 455,838Bridge Structure
HBK10232014Pier,ColumnsPiers 319,156Bridge Structure
HBK10232014Pier,ColumnsPiers 1,831,680Bridge Structure
HBK10232014Stem,Solid PierPiers 270,295Bridge Structure
HBK10232014Brngs,Ancr Blts,PadsPiers 2,107,585Bridge Structure
HBK10232014CurbsDeck Elements 3,589,281Bridge Structure
HBK10232014MedianDeck Elements 73,126Bridge Structure
HBK10232014SidewalksDeck Elements 202,680Bridge Structure
HBK10232014SidewalksDeck Elements 45,040Bridge Structure
HBK10232014Wearing SurfaceDeck Elements 148,077Bridge Structure
HBK10232014Deck,StructuralSuperstructure 55,417Bridge Structure
HBK10232014Deck,StructuralSuperstructure 2,493,749Bridge Structure
HBK10232014JointsSuperstructure 103,404Bridge Structure
HBK10232014Primary MemberSuperstructure 2,656,606Bridge Structure
HBK10232014Primary MemberSuperstructure 12,810,682Bridge Structure
HBK10232014Primary MemberSuperstructure 595,173Bridge Structure
HBK10232014Secondary MemberSuperstructure 595,376Bridge Structure
HBK10232014Secondary MemberSuperstructure 764,019Bridge Structure
HBK10232014Secondary MemberSuperstructure 43,207Bridge Structure
HBK10232014Bascule SpanMovable Bridges 10,506,880Bridge Structure
HBK10232014Bascule Span PierMovable Bridges 195,578Bridge Structure
T - 8Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBK10232014Motor BrakeDrive 58,619Bridge Electrical
HBK10232014ConduitRaceway 482,376Bridge Electrical
HBK10232014WiresRaceway 168,292Bridge Electrical
HBK10232014WiringRaceway 1,007,979Bridge Electrical
HBK10232014Counter WeightBascule 503,539Bridge Mechanical
HBK10232014Emergency DriveBascule 65,830Bridge Mechanical
HBK10232014HousesBascule 97,066Bridge Mechanical
HBK10232014HousesBascule 52,741Bridge Mechanical
HBK10232014HousesBascule 41,939Bridge Mechanical
HBK10232014Lock BarsBascule 267,848Bridge Mechanical
HBK10232014Main Drive SystemBascule 1,783,860Bridge Mechanical
HBK10232014TrunnionBascule 143,112Bridge Mechanical
Total Planned Activities for $45,375,443DOT0022
PAERDEGAT BASIN BRIDGE DOT0023BELT SHORE PKWAY 9/28/2006Date of Last Survey:
HBK10242014Pier ProtectionStream Channel 1,383,315Bridge Structure
Total Planned Activities for $1,383,315DOT0023
PROMENADE OVER FDR BRIDGE DOT003179ST TO 91ST ST. 10/26/2010Date of Last Survey:
HBPKMULTI2014Cap BeamPiers 241,510Bridge Structure
HBPKMULTI2014Pier,ColumnsPiers 74,498Bridge Structure
HBPKMULTI2014Railings/ParapetsDeck Elements 737,532Bridge Structure
HBPKMULTI2014Wearing SurfaceDeck Elements 222,174Bridge Structure
HBPKMULTI2014Wearing SurfaceDeck Elements 274,273Bridge Structure
HBPKMULTI2014Wearing SurfaceDeck Elements 51,098Bridge Structure
HBPKMULTI2014Wearing SurfaceDeck Elements 35,653Bridge Structure
HBPKMULTI2014Deck,StructuralSuperstructure 8,914,447Bridge Structure
HBPKMULTI2014Deck,StructuralSuperstructure 4,457,224Bridge Structure
HBPKMULTI2014JointsSuperstructure 140,717Bridge Structure
Total Planned Activities for $15,149,126DOT0031
HARLEM RIVER DR. VIADUCT BRIDGE DOT0034127TH ST. TO 2ND AVE. 11/11/2010Date of Last Survey:
HBM10272014Joint with DeckAbutments 129,864Bridge Structure
HBM10272014PavementApproaches 182,158Bridge Structure
HBM10272014Cap BeamPiers 45,785Bridge Structure
HBM10272014Brngs,Ancr Blts,PadsPiers 488,523Bridge Structure
HBM10272014MedianDeck Elements 77,743Bridge Structure
HBM10272014Railings/ParapetsDeck Elements 38,097Bridge Structure
HBM10272014SidewalksDeck Elements 38,355Bridge Structure
HBM10272014Wearing SurfaceDeck Elements 220,070Bridge Structure
T - 9Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBM10272014Deck,StructuralSuperstructure 995,938Bridge Structure
HBM10272014JointsSuperstructure 40,965Bridge Structure
HBM10272014Primary MemberSuperstructure 1,424,542Bridge Structure
Total Planned Activities for $3,682,040DOT0034
MADISON AVE. BRIDGE DOT0042HARLEM RIVER, HARLEM RIV DR. 7/11/2011Date of Last Survey:
HBX644S2014WallsAbutments 456,159Bridge Structure
HBX644S2014WallsWingwalls 51,233Bridge Structure
HBX644S2014Deck,StructuralSuperstructure 47,344Bridge Structure
HBX644S2014Center Pivot/Rim AssemblSwing 66,129Bridge Mechanical
Total Planned Activities for $620,865DOT0042
145TH STREET BRIDGE DOT0043HARLEM RIVER, HARLEM RIV DR. 5/6/2010Date of Last Survey:
HBX10292014Bank ProtectionStream Channel 224,161Bridge Structure
HBX10292014PavementApproaches 392,922Bridge Structure
Total Planned Activities for $617,083DOT0043
BROADWAY BRIDGE DOT0044HARLEM RIVER, B'WAY 5/7/2010Date of Last Survey:
HBM11472014WallsWingwalls 219,799Bridge Structure
HBM11472014Bank ProtectionStream Channel 109,409Bridge Structure
HBM11472014Pier ProtectionStream Channel 474,145Bridge Structure
HBM11472014GratingsDeck Elements 179,280Bridge Structure
HBM11472014Mono Deck SurfaceDeck Elements 76,079Bridge Structure
HBM11472014Railings/ParapetsDeck Elements 70,796Bridge Structure
HBM11472014Primary MemberSuperstructure 902,786Bridge Structure
HBM11472014Vertical Lift SpanMovable Bridges 1,287,079Bridge Structure
HBM11472014Vertical Lift PierMovable Bridges 1,034,786Bridge Structure
HBM11472014Dist Equip & Motor ContrElectrical Power 682,805Bridge Electrical
HBM11472014Submarine Control CablesRaceway 1,578,234Bridge Electrical
HBM11472014Traffic SignalTraffic System Electrical 161,132Bridge Electrical
HBM11472014Lighting DevicesLighting 49,077Bridge Electrical
HBM11472014CTRWT Ropes & GuidesVertical Lift 78,995Bridge Mechanical
HBM11472014Counter WeightVertical Lift 77,473Bridge Mechanical
HBM11472014ElevatorsVertical Lift 534,631Bridge Mechanical
HBM11472014End LocksVertical Lift 84,775Bridge Mechanical
HBM11472014HousesVertical Lift 74,027Bridge Mechanical
HBM11472014Main Drive SystemVertical Lift 733,479Bridge Mechanical
HBM11472014SheavesVertical Lift 419,974Bridge Mechanical
HBM11472014Traffic DevicesVertical Lift 347,149Bridge Mechanical
HBM11472014Traffic DevicesVertical Lift 1,697,687Bridge Mechanical
T - 10Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
Total Planned Activities for $10,873,597DOT0044
PELHAM BRIDGE DOT0045EASTCHESTER BAY,BX, PELHAM PKY 5/5/2010Date of Last Survey:
HBX11272014Stem,Solid PierPiers 51,153Bridge Structure
HBX11272014Stem,Solid PierPiers 183,225Bridge Structure
HBX11272014Primary MemberSuperstructure 2,017,505Bridge Structure
HBX11272014Primary MemberSuperstructure 2,341,223Bridge Structure
HBX11272014Bascule SpanMovable Bridges 2,076,841Bridge Structure
HBX11272014Bascule Span PierMovable Bridges 1,649,571Bridge Structure
HBX11272014WiringRaceway 192,596Bridge Electrical
HBX11272014Traffic SignalTraffic System Electrical 161,132Bridge Electrical
HBX11272014Counter WeightBascule 196,988Bridge Mechanical
HBX11272014Main Drive SystemBascule 343,670Bridge Mechanical
HBX11272014Traffic DevicesBascule 70,572Bridge Mechanical
HBX11272014Traffic DevicesBascule 113,770Bridge Mechanical
Total Planned Activities for $9,398,246DOT0045
CITY ISLAND BRIDGE DOT0046EASTCHESTER BAY, CITY ISL RD. 11/16/2010Date of Last Survey:
HBX11642014WallsWingwalls 106,627Bridge Structure
HBX11642014Railings/ParapetsDeck Elements 241,698Bridge Structure
HBX11642014Wearing SurfaceDeck Elements 164,628Bridge Structure
HBX11642014Wearing SurfaceDeck Elements 37,990Bridge Structure
Total Planned Activities for $550,943DOT0046
ROOSEVELT AVE. BRIDGE DOT0049VAN WYCK EXPY, FLUSHING RIV. 12/19/2012Date of Last Survey:
HBQ1203 2014Stem (breastwall)Abutments 74,672Bridge Structure
HBQ1203 2014WallsWingwalls 98,458Bridge Structure
HBQ1203 2014SidewalksApproaches 36,349Bridge Structure
HBQ1203 2014Pier,ColumnsPiers 751,803Bridge Structure
HBQ1203 2014Stem,Solid PierPiers 288,606Bridge Structure
HBQ1203 2014PedestalsPiers 55,305Bridge Structure
HBQ1203 2014SidewalksDeck Elements 54,775Bridge Structure
HBQ1203 2014Wearing SurfaceDeck Elements 1,514,072Bridge Structure
HBQ1203 2014Wearing SurfaceDeck Elements 353,283Bridge Structure
HBQ1203 2014Deck,StructuralSuperstructure 153,100Bridge Structure
HBQ1203 2014Deck,StructuralSuperstructure 76,022Bridge Structure
HBQ1203 2014JointsSuperstructure 36,869Bridge Structure
HBQ1203 2014Primary MemberSuperstructure 430,536Bridge Structure
HBQ1203 2014Primary MemberSuperstructure 683,632Bridge Structure
HBQ1203 2014Secondary MemberSuperstructure 1,487,054Bridge Structure
T - 11Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
Total Planned Activities for $6,094,536DOT0049
CONRAIL NE REG BRIDGE DOT0054MELROSE-WEBSTER,E163 TO 165 ST 11/15/2010Date of Last Survey:
HBX1632014Wearing SurfaceDeck Elements 55,380Bridge Structure
Total Planned Activities for $55,380DOT0054
AMTRAK BRIDGE DOT0055LEGGETT AVE,BRUCKNER GARRISON 7/20/2011Date of Last Survey:
HBCR01B2014Mono Deck SurfaceDeck Elements 61,515Bridge Structure
HBCR01B2014Wearing SurfaceDeck Elements 49,734Bridge Structure
HBCR01B2014Primary MemberSuperstructure 5,749,847Bridge Structure
Total Planned Activities for $5,861,096DOT0055
METRO NORTH BRIDGE DOT0058E241ST ST,BX RIV RD,CARPENTER 7/13/2011Date of Last Survey:
HBX11902014Wearing SurfaceDeck Elements 63,013Bridge Structure
HBX11902014JointsSuperstructure 93,206Bridge Structure
Total Planned Activities for $156,219DOT0058
GRAND CONCOURSE BRIDGE DOT0062167TH ST 7/19/2011Date of Last Survey:
HBX11042014Stem (breastwall)Abutments 494,221Bridge Structure
HBX11042014WallsWingwalls 133,563Bridge Structure
HBX11042014Pier,ColumnsPiers 2,409,530Bridge Structure
HBX11042014Stem,Solid PierPiers 357,173Bridge Structure
HBX11042014SidewalksDeck Elements 52,125Bridge Structure
HBX11042014Deck,StructuralSuperstructure 250,618Bridge Structure
HBX11042014Primary MemberSuperstructure 313,705Bridge Structure
Total Planned Activities for $4,010,935DOT0062
LIRR BUSHWICK DIVISION BRIDGE DOT0065ATLANTIC AVE,EASTERN-GEORGIA 7/25/2011Date of Last Survey:
HBK12012014Joint with DeckAbutments 89,971Bridge Structure
HBK12012014PavementApproaches 105,776Bridge Structure
HBK12012014Pier,ColumnsPiers 121,600Bridge Structure
HBK12012014PedestalsPiers 172,309Bridge Structure
HBK12012014MedianDeck Elements 413,583Bridge Structure
HBK12012014Railings/ParapetsDeck Elements 603,208Bridge Structure
HBK12012014Wearing SurfaceDeck Elements 1,687,345Bridge Structure
HBK12012014Deck,StructuralSuperstructure 652,406Bridge Structure
HBK12012014JointsSuperstructure 66,439Bridge Structure
Total Planned Activities for $3,912,637DOT0065
T - 12Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
11TH AVE VIADUCT (RAMP) DOT0066WEST 33 STREET 7/25/2011Date of Last Survey:
HBMC0372014Brngs,Ancr Blts,PadsAbutments 182,264Bridge Structure
HBM1120B2014Joint with DeckAbutments 64,906Bridge Structure
HBMC0372014Stem (breastwall)Abutments 99,518Bridge Structure
HBM1120B2014WallsWingwalls 36,922Bridge Structure
HBM1120B2014Wearing SurfaceDeck Elements 263,341Bridge Structure
HBM1120B2014ScupperDeck Elements 45,135Bridge Structure
HBM1120B2014JointsSuperstructure 135,573Bridge Structure
HBM1120B2014JointsSuperstructure 203,359Bridge Structure
HBMC0372014Primary MemberSuperstructure 399,546Bridge Structure
Total Planned Activities for $1,430,564DOT0066
125TH ST. VIADUCT BRIDGE DOT0068RIVERSIDE DR,ST.CLAIRES,134 ST 10/28/2010Date of Last Survey:
HB1070RV2014Stem,Solid PierPiers 226,635Bridge Structure
HB1070RV2014Wearing SurfaceDeck Elements 166,295Bridge Structure
HB1070RV2014Primary MemberSuperstructure 8,041,396Bridge Structure
Total Planned Activities for $8,434,326DOT0068
RIVERSIDE DR. VIADUCT BRIDGE DOT0069152ND ST- W161ST ST 10/28/2010Date of Last Survey:
HBM11652014Bridge Seat&pedestalsAbutments 235,107Bridge Structure
HBM11652014Brngs,Ancr Blts,PadsAbutments 260,377Bridge Structure
HBM11652014Joint with DeckAbutments 121,700Bridge Structure
HBM11652014PedestalsAbutments 430,245Bridge Structure
HBM11652014PavementApproaches 121,640Bridge Structure
HBM11652014Cap BeamPiers 1,069,116Bridge Structure
HBM11652014Stem,Solid PierPiers 860,804Bridge Structure
HBM11652014Brngs,Ancr Blts,PadsPiers 4,749,270Bridge Structure
HBM11652014SidewalksDeck Elements 165,713Bridge Structure
HBM11652014SidewalksDeck Elements 48,066Bridge Structure
HBM11652014Wearing SurfaceDeck Elements 75,635Bridge Structure
HBM11652014Wearing SurfaceDeck Elements 265,908Bridge Structure
HBM11652014Deck,StructuralSuperstructure 2,638,676Bridge Structure
HBM11652014JointsSuperstructure 106,135Bridge Structure
HBM11652014Primary MemberSuperstructure 6,425,901Bridge Structure
Total Planned Activities for $17,574,293DOT0069
HARLEM RIVER DRIVE RAMP BRIDGE DOT0079172ND ST, AMSTERDAM AVE 7/13/2011Date of Last Survey:
HBM72402014Joint with DeckAbutments 55,868Bridge Structure
HBM72402014Stem (breastwall)Abutments 188,145Bridge Structure
T - 13Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBM72402014WallsWingwalls 160,406Bridge Structure
HBM72402014PavementApproaches 35,615Bridge Structure
HBM72402014Cap BeamPiers 280,510Bridge Structure
HBM72402014Cap BeamPiers 942,646Bridge Structure
HBM72402014Pier,ColumnsPiers 12,016,488Bridge Structure
HBM72402014Mat (scour & erosion)Piers 47,561Bridge Structure
HBM72402014CurbsDeck Elements 143,391Bridge Structure
HBM72402014MedianDeck Elements 162,583Bridge Structure
HBM72402014Railings/ParapetsDeck Elements 235,098Bridge Structure
HBM72402014SidewalksDeck Elements 369,257Bridge Structure
HBM72402014Wearing SurfaceDeck Elements 77,413Bridge Structure
HBM72402014Deck,StructuralSuperstructure 11,776,672Bridge Structure
HBM72402014JointsSuperstructure 455,788Bridge Structure
HBM72402014Primary MemberSuperstructure 8,877,223Bridge Structure
HBM72402014Primary MemberSuperstructure 5,043,985Bridge Structure
HBM72402014Secondary MemberSuperstructure 5,463,052Bridge Structure
Total Planned Activities for $46,331,701DOT0079
HENRY HUDSON PKWY. BRIDGE DOT0080AMTRAK, 94TH-98TH ST 1/7/2013Date of Last Survey:
HBM11732014PavementApproaches 37,698Bridge Structure
HBM11732014CurbsDeck Elements 50,212Bridge Structure
HBM11732014Deck,StructuralSuperstructure 54,261Bridge Structure
Total Planned Activities for $142,171DOT0080
BATTERY PARK TUNNEL DOT0082BATTERY PLACE 7/20/2011Date of Last Survey:
HBM11462014WallsAbutments 12,201,871Bridge Structure
HBM11462014WallsWingwalls 24,890,632Bridge Structure
HBM11462014PavementApproaches 105,985Bridge Structure
HBM11462014Stem,Solid PierPiers 35,725Bridge Structure
HBM11462014Railings/ParapetsDeck Elements 78,793Bridge Structure
HBM11462014Railings/ParapetsDeck Elements 139,157Bridge Structure
HBM11462014SidewalksDeck Elements 44,179Bridge Structure
HBM11462014Wearing SurfaceDeck Elements 114,992Bridge Structure
HBM11462014Primary MemberSuperstructure 521,243Bridge Structure
Total Planned Activities for $38,132,577DOT0082
PARK AVE. TUNNEL DOT0083E34TH ST-39TH ST 7/20/2011Date of Last Survey:
HBM5512014BackwallAbutments 857,344Bridge Structure
HBM5512014Stem (breastwall)Abutments 760,761Bridge Structure
HBM5512014WallsWingwalls 746,719Bridge Structure
T - 14Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBM5512014Railings/ParapetsDeck Elements 172,263Bridge Structure
HBM5512014Deck,StructuralSuperstructure 2,671,986Bridge Structure
HBM5512014Primary MemberSuperstructure 16,815,516Bridge Structure
Total Planned Activities for $22,024,589DOT0083
BELTSHORE PARKWAY DOT0134BELT SHORE PKWY AT FRESH CREEK 7/16/2008Date of Last Survey:
HBK10722014Stem (breastwall)Abutments 236,588Bridge Structure
HBK10722014WallsWingwalls 84,376Bridge Structure
HBK10722014Pier ProtectionStream Channel 120,130Bridge Structure
HBK10722014Cap BeamPiers 51,639Bridge Structure
HBK10722014Primary MemberSuperstructure 6,170,878Bridge Structure
HBK10722014Secondary MemberSuperstructure 63,885Bridge Structure
Total Planned Activities for $6,727,496DOT0134
GRAND CONCOURSE OVER E.161 ST. DOT0135GRAND CONCOURSE AND E.161 ST. 7/13/2011Date of Last Survey:
HBX11042014Stem (breastwall)Abutments 337,757Bridge Structure
Total Planned Activities for $337,757DOT0135
MACOMBS DAM BRIDGE DOT0137E.155 ST. & HARLEM RIVER 5/16/2011Date of Last Survey:
BRX287S2014Joint with DeckAbutments 48,362Bridge Structure
BRX287S2014Pier ProtectionStream Channel 123,347Bridge Structure
BRX287S2014Cap BeamPiers 536,474Bridge Structure
BRX287S2014Pier,ColumnsPiers 996,683Bridge Structure
BRX287S2014Stem,Solid PierPiers 428,563Bridge Structure
BRX287S2014Brngs,Ancr Blts,PadsPiers 381,066Bridge Structure
BRX287S2014PedestalsPiers 52,923Bridge Structure
BRX287S2014SidewalksDeck Elements 43,832Bridge Structure
BRX287S2014Primary MemberSuperstructure 720,244Bridge Structure
BRX287S2014Secondary MemberSuperstructure 79,536Bridge Structure
Total Planned Activities for $3,411,030DOT0137
UNIONPORT BRIDGE DOT0140WESTCHESTER CREEK 5/5/2010Date of Last Survey:
HBX11312014Pier ProtectionStream Channel 86,295Bridge Structure
HBX11312014Cap BeamPiers 52,332Bridge Structure
HBX11312014Primary MemberSuperstructure 340,955Bridge Structure
HBX11312014Bascule SpanMovable Bridges 1,638,012Bridge Structure
HBX11312014Bascule Span PierMovable Bridges 438,703Bridge Structure
HBX11312014Control ConsoleControl System Electrical 52,238Bridge Electrical
HBX11312014Disconnect SwitchControl System Electrical 35,684Bridge Electrical
HBX11312014Limit SwitchControl System Electrical 36,187Bridge Electrical
T - 15Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
HBX11312014Dist Equip & Motor ContrElectrical Power 425,175Bridge Electrical
HBX11312014WiringRaceway 917,981Bridge Electrical
HBX11312014Traffic SignalTraffic System Electrical 38,526Bridge Electrical
HBX11312014Lighting DevicesLighting 38,304Bridge Electrical
HBX11312014HousesBascule 26,820Bridge Mechanical
HBX11312014HousesBascule 16,762Bridge Mechanical
HBX11312014Lock BarsBascule 128,956Bridge Mechanical
HBX11312014Traffic DevicesBascule 37,923Bridge Mechanical
HBX11312014TrunnionBascule 130,567Bridge Mechanical
Total Planned Activities for $4,441,420DOT0140
GRAND STREET BRIDGE DOT0150GARDNER AVENUE BROOKLYN 4/26/2013Date of Last Survey:
HBK11612014Brngs,Ancr Blts,PadsAbutments 59,875Bridge Structure
HBK11612014Stem (breastwall)Abutments 119,573Bridge Structure
HBK11612014Pier ProtectionStream Channel 148,859Bridge Structure
HBK11612014Swing Span TrussMovable Bridges 670,742Bridge Structure
HBK11612014Swing Span TrussMovable Bridges 223,581Bridge Structure
HBK11612014Submarine Control CablesRaceway 299,908Bridge Electrical
HBK11612014WiringRaceway 473,989Bridge Electrical
HBK11612014Traffic SignalTraffic System Electrical 38,526Bridge Electrical
HBK11612014Lighting DevicesLighting 61,287Bridge Electrical
HBK11612014End LiftSwing 66,889Bridge Mechanical
HBK11612014HousesSwing 74,313Bridge Mechanical
HBK11612014Main Drive SystemSwing 41,182Bridge Mechanical
HBK11612014Traffic DevicesSwing 39,207Bridge Mechanical
Total Planned Activities for $2,317,931DOT0150
E. 165TH ST. BRIDGE DOT0166E. 165TH ST 11/15/2010Date of Last Survey:
HBCR01B2014PavementApproaches 248,892Bridge Structure
HBCR01B2014Wearing SurfaceDeck Elements 119,438Bridge Structure
Total Planned Activities for $368,330DOT0166
49TH AVE. BRIDGE DOT016749TH AVE. 10/28/2010Date of Last Survey:
HBQ49AV2017Joint with DeckAbutments 129,813Bridge Structure
HBQ49AV2017WallsWingwalls 181,312Bridge Structure
HBQ49AV2017SidewalksApproaches 42,835Bridge Structure
HBQ49AV2017Pier,ColumnsPiers 78,675Bridge Structure
HBQ49AV2017Stem,Solid PierPiers 159,908Bridge Structure
HBQ49AV2017Primary MemberSuperstructure 1,006,751Bridge Structure
Total Planned Activities for $1,599,294DOT0167
T - 16Page
DEPARTMENT OF TRANSPORTATION
FMS ID/ Budget Code
Agency Activity YearType of Work
Agency Activity Funding
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Appendix T
31ST STREET BRIDGE DOT017531ST STREET OVER 8/2/2011Date of Last Survey:
HBM11712017WallsWingwalls 141,941Bridge Structure
HBM11712017Stem,Solid PierPiers 190,578Bridge Structure
HBM11712017Deck,StructuralSuperstructure 733,962Bridge Structure
HBM11712017Primary MemberSuperstructure 288,947Bridge Structure
Total Planned Activities for $1,355,428DOT0175
WARDS ISLAND PEDESTRIAN BRIDGE DOT0188FOOT OF E. 103 ST. TO SOUTH END 11/21/2006Date of Last Survey:
HBM11592014Dist Equip & Motor ContrElectrical Power 209,065Bridge Electrical
HBM11592014WiringRaceway 197,636Bridge Electrical
HBM11592014CTRWT Ropes & GuidesVertical Lift 75,164Bridge Mechanical
Total Planned Activities for $481,865DOT0188
Sub-Total $380,974,775DEPARTMENT OF TRANSPORTATION Bridges
Agency indicates that in addition to the above, the following amounts are budgeted : Bridge Component Repairs/Replacements FY 2015 - 2018 $185,048,000 and Bridge Protective Coating FY 2015 - 2018 $114,243,000. This increases the reconciled amount by $299,290,000. (Note: These estimates are based on the precentage of total numbers of spans represented by the bridges included in the study).
Total Planned Activities for:
For Streets and City owned Arterials, the Agency indicates the following actual and planned expenditures: (Note: These estimates are based on average $/lane mile for reconstruction, engineered resurfacing and resurfacing projects that the Agency reports it will undertake, and does not represent actual amounts in the budget).
Primary Streets FY 2015 - 2018
Secondary Streets FY 2015 - 2018
Local Streets FY 2015 - 2018
City Owned Arterials FY 2015 - 2018
Step Streets FY 2015 - 2018
Sub-Total
Sub-Total
Total Planned Activities for :
Total Planned Activities for Ferries
DEPARTMENT OF TRANSPORTATION
Total Required for "State of Good Repair" for :DEPARTMENT OF TRANSPORTATION
$237,443,000
$273,311,000
$748,197,000
$22,296,000
$7,660,000
$1,288,907,000
$30,600,000
$1,897,748,000
$2,818,760,000
Bridge Reconciliation Sub-Total $514,797,000
Total Planned Activities for Street Lighting and Traffic Signal Systems Sub-Total $32,195,000
Total Planned Activities for Streets and Highways
T - 17Page
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
070PAR00025/19/2011Date of Last Survey:BX PARK S., E 180 ST., GUNHIL
233 - BRONX PARK - MULTI PURPOSE SHOPS - 0007
P-6ROOF9A2014RoofArchitecture Exterior 122,284
Total Planned activities for $122,284PAR0002 070
107PAR00064/15/2013Date of Last Survey:EASTERN WALL ALONG CLAREMONT AVE
14237 - RIVERSIDE PARK RETAINING WALL - AT SAKURA PARK
P-6RETWA22012Wall/FenceRetaining Walls Wall 1,014,083
Total Planned activities for $1,014,083PAR0006 107
116PAR00064/19/2013Date of Last Survey:W 135TH ST TO W 136TH ST
14246 - RIVERSIDE PARK RETAINING WALL - ABUTMENT AND PLAZA WEST WALL
P-6RETWA22012CopingRetaining Walls Wall 43,393
Total Planned activities for $43,393PAR0006 116
300PAR00063/27/2013Date of Last Survey:WEST 79TH ST & HUDSON RIVER
4507 - RIVERSIDE PARK MARINA PIERS -
P-307R97D2015Pile CapsPiers Structural 109,009
P-307R97D2015Piles and BracingPiers Structural 490,176
Total Planned activities for $599,185PAR0006 300
010PAR000710/8/2010Date of Last Survey:W 172ND TO W 174TH STREET
221 - HIGHBRIDGE PARK - HIGHBRIDGE PLAY CENTER
P-6BLDG9A2013FloorsArchitecture Interior 56,097
Total Planned activities for $56,097PAR0007 010
060PAR000710/8/2010Date of Last Survey:WEST 155 STREET TO DYCKMAN ST.
13867 - HIGHBRIDGE PARK - AQUEDUCT TOWER
P-311HWTR2015Exterior WallsArchitecture Exterior 385,697
P-311HWTR2015WindowsArchitecture Exterior 125,599
Total Planned activities for $511,296PAR0007 060
020PAR00101/1/2013Date of Last Survey:GRAND CENTRAL PARKWAY, UNION
616 - ALLEY POND PARK - OFFICE & COMFORT STATION - 02
P-411APE22014Average Cost Method
40,718
Total Planned activities for $40,718PAR0010 020
02APAR00101/1/2013Date of Last Survey:GRAND CENTRAL PARKWAY, UNION
617 - ALLEY POND ATHLETIC PARK - TENNIS BLDG - 02
P-411APE22014Average Cost Method
71,460
Total Planned activities for $71,460PAR0010 02A
210PAR00118/31/2010Date of Last Survey:MYRTLE AVE, UNION TPKE,
211 - FOREST PARK - GREENHOUSE - 21
P-409FPGR2012Exterior WallsArchitecture Exterior 397,553
Page U - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-409FPGR2012WindowsArchitecture Exterior 37,745
P-409FPGR2012RoofArchitecture Exterior 1,362,638
P-409FPGR2012FloorsArchitecture Interior 164,777
P-409FPGR2012Interior WallsArchitecture Interior 156,972
P-409FPGR2012Interior LightingElectrical Lighting 46,054
Total Planned activities for $2,165,739PAR0011 210
020PAR00121/1/2013Date of Last Survey:CONNECTION RR, DRY HARBOR RD.,
723 - JUNIPER VALLEY PARK - OFFICE & COMFORT STATION - 02
P-6CBLDG72014Average Cost Method
135,553
Total Planned activities for $135,553PAR0012 020
S01PAR00139/6/2012Date of Last Survey:HOYT AVENUE & 21 STREET
1110 - ASTORIA PARK - DIVING POOL - 02B
P-401APPS2015Exterior WallsArchitecture Exterior 714,668
P-401APPS2015FloorsArchitecture Interior 411,253
Total Planned activities for $1,125,921PAR0013 S01
030PAR00156/1/2012Date of Last Survey:1321 VICTORY BLVD. & LABAU AVE.
4498 - CLOVE LAKES PARK - WAR MEMORIAL SKATING RINK
P-500WAR12012Heat RejectionMechanical Air Conditioning 54,673
Total Planned activities for $54,673PAR0015 030
075PAR00185/14/2012Date of Last Survey:5TH AVE. TO CENTRAL PARK W.,
1091 - CENTRAL PARK - TAVERN ON THE GREEN - 045
TAVREH2014RoofArchitecture Exterior 110,394
Total Planned activities for $110,394PAR0018 075
S18PAR00181/1/2013Date of Last Survey:5TH AVE. TO CENTRAL PARK W.,
290 - CENTRAL PARK - BRIDGE GILL (21) - 122
P-3CENTPK2010Average Cost Method
135,725
Total Planned activities for $135,725PAR0018 S18
S19PAR00181/1/2013Date of Last Survey:5TH AVE. TO CENTRAL PARK W.,
291 - CENTRAL PARK - BRIDGE GILL 22T - 123
P-3CENTPK2010Average Cost Method
135,725
Total Planned activities for $135,725PAR0018 S19
S37PAR00185/6/2010Date of Last Survey:5TH AVE. TO CENTRAL PARK W.,
860 - CENTRAL PARK - TREFOIL ARCH BIN#: 2-24617-0
CENTRAL-PARK-COB2012Mat (scour & erosion)Park Bridges Stream Channel 70,274
Total Planned activities for $70,274PAR0018 S37
029PAR00191/1/2013Date of Last Survey:GRAND CENTRAL PARKWAY
939 - FLUSHING MEADOWS CORONA PARK - ALLIED STORAGE III- 0029
Page U - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-6ROOF9A2014Average Cost Method
43,126
Total Planned activities for $43,126PAR0019 029
037PAR00191/1/2013Date of Last Survey:111TH STREET AND SAULTELL AVENUE
923 - FLUSHING MEADOWS CORONA PARK - OFFICE AND COMFORT STATION
P-6BLDG9A2013Average Cost Method
88,698
Total Planned activities for $88,698PAR0019 037
041PAR00192/23/2011Date of Last Survey:GRAND CENTRAL PARKWAY
1071 - FLUSHING MEADOWS CORONA PARK - OLMSTED CENTRE ADMINISTRATION
P-4OLMST42015WindowsArchitecture Exterior 170,891
P-4OLMST42015RoofArchitecture Exterior 81,267
P-4OLMST42015CeilingsArchitecture Interior 39,977
Total Planned activities for $292,135PAR0019 041
025PAR00202/1/2011Date of Last Survey:FLATBUSH, OCEAN & PARKSIDE AVES.
889 - PROSPECT PARK - REPAIR SHOP/TECHNICAL SERVICES
P-6ROOF9B2014RoofArchitecture Exterior 210,972
Total Planned activities for $210,972PAR0020 025
14CPAR00201/1/2013Date of Last Survey:FLATBUSH, OCEAN & PARKSIDE AVES.
623 - PROSPECT PARK - WELL HOUSE - 014C
P-200WCST2015Average Cost Method
32,064
Total Planned activities for $32,064PAR0020 14C
002PAR002711/22/2011Date of Last Survey:150-03 JAMAICA AVE,
1803 - RUFUS KING PARK - KING MANSION HISTORIC HOUSE
P-4LATRUF2015Exterior WallsArchitecture Exterior 216,524
P-4LATRUF2015RoofArchitecture Exterior 432,819
Total Planned activities for $649,343PAR0027 002
004PAR00301/1/2013Date of Last Survey:106 AVE., 173 STREET,
2776 - LIBERTY PARK - INTERMEDIATE POOL
P-6CPOOL72011Average Cost Method
152,690
Total Planned activities for $152,690PAR0030 004
N02PAR00301/1/2013Date of Last Survey:106 AVE., 173 STREET,
1781 - LIBERTY PARK - WADING POOL
P-6BPOOL72013Average Cost Method
74,784
Total Planned activities for $74,784PAR0030 N02
F91PAR00316/7/2010Date of Last Survey:OCEAN PROMENADE
262 - ROCKAWAY BEACH & BOARDWALK -
Page U - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
SANDY4-032015DeckBoardwalks Superstructure 2,369,402
SANDY4-032015GirdersBoardwalks Substructure 793,891
SANDY4-032015Underside EnclosureBoardwalks Substructure 199,445
Total Planned activities for $3,362,738PAR0031 F91
F92PAR00316/7/2010Date of Last Survey:SHORE FRONT PKWY & BEACH
263 - ROCKAWAY BEACH & BOARDWALK -
SANDY4-032015DeckBoardwalks Superstructure 17,246,970
SANDY4-032015RailingBoardwalks Superstructure 398,955
SANDY4-032015BeamsBoardwalks Substructure 4,864,322
SANDY4-032015PiersBoardwalks Substructure 4,862,828
SANDY4-032015GirdersBoardwalks Substructure 6,293,071
SANDY4-032015Underside EnclosureBoardwalks Substructure 615,505
Total Planned activities for $34,281,651PAR0031 F92
I01PAR00317/26/2011Date of Last Survey:BOARDWALK @ BEACH 17 ST.
895 - ROCKAWAY BEACH & BOARDWALK - COMFORT STATION/MAINTENANCE
P-4PNYC042013Exterior WallsArchitecture Exterior 46,071
P-4PNYC042013Terminal DevicesMechanical Heating 40,219
Total Planned activities for $86,290PAR0031 I01
001PAR003212/9/2010Date of Last Survey:93-29 QUEENS BOULEVARD
897 - LOST BATTALION HALL - RECREATION CENTER
P-6REC07D2015ParapetsArchitecture Exterior 149,138
P-6REC11B2015RoofArchitecture Exterior 243,262
Total Planned activities for $392,400PAR0032 001
001PAR00341/1/2013Date of Last Survey:32nd AVE & 99th ST
647 - VEST POCKET POOL (FISHER) - FISHER POOL, INTERMEDIATE
P-6POOL11/P-6POL11B2014Average Cost Method
157,306
Total Planned activities for $157,306PAR0034 001
001PAR003910/12/2010Date of Last Survey:W145-W155-BRADHURST-EDGECOMBE
899 - JACKIE ROBINSON PARK - JACKIE ROBINSON POOL, OLYMPIC
P-6POOL112014Exterior WallsArchitecture Exterior 140,801
P-6POOL112014FloorsArchitecture Interior 267,387
Total Planned activities for $408,188PAR0039 001
01APAR003910/12/2010Date of Last Survey:W145-W155-BRADHURST-EDGECOMBE
881 - JACKIE ROBINSON PARK - RECREATION CENTER
P-303JACK 2014Exterior WallsArchitecture Exterior 44,000
P-6BPOOL72013Pool Filter/TreatmentMechanical Plumbing 70,858
Total Planned activities for $114,858PAR0039 01A
Page U - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
005PAR00431/1/2013Date of Last Survey:E. HOUSTON,STANTON & PITT STS.
14038 - HAMILTON FISH RECREATION CENTRE - WADING POOL
P-6BPOOL72013Average Cost Method
222,792
Total Planned activities for $222,792PAR0043 005
007PAR00431/1/2013Date of Last Survey:E. HOUSTON,STANTON & PITT STS.
14360 - HAMILTON FISH PARK - POOL/BATHHOUSE
P-6CPOOL72011Average Cost Method
223,947
Total Planned activities for $223,947PAR0043 007
008PAR00431/1/2013Date of Last Survey:E. HOUSTON,STANTON & PITT STS.
14362 - HAMILTON FISH PARK - WADING POOL
P-6BPOOL72013Average Cost Method
222,792
Total Planned activities for $222,792PAR0043 008
003PAR004410/5/2010Date of Last Survey:FDR DR. E76TH-E78TH STS.
2819 - JOHN JAY PARK & POOL - BATHHOUSE & COMFORT STATION
P-308JJPB2012Exterior WallsArchitecture Exterior 83,771
P-308JJPB2012WindowsArchitecture Exterior 150,954
Total Planned activities for $234,725PAR0044 003
002PAR004510/6/2010Date of Last Survey:1ST AVE TO FDR DRIVE
846 - THOMAS JEFFERSON PARK - THOMAS JEFFERSON POOL, OLYMPIC
P-6CPOOL72011FloorsArchitecture Interior 109,797
Total Planned activities for $109,797PAR0045 002
02APAR004510/6/2010Date of Last Survey:1ST AVE TO FDR DRIVE
885 - THOMAS JEFFERSON PARK - POOL BUILDING
P-3ROOF9A2014RoofArchitecture Exterior 185,654
Total Planned activities for $185,654PAR0045 02A
002PAR004710/13/2010Date of Last Survey:E 120-E 124 MADISON AVENUE
886 - MARCUS GARVEY MEMORIAL PARK - PELHAM FRITZ REC. CENTER
P-6REC07A2012WindowsArchitecture Exterior 168,043
Total Planned activities for $168,043PAR0047 002
04APAR004710/13/2010Date of Last Survey:E 120-E 124 MADISON AVENUE
908 - MARCUS GARVEY MEMORIAL PARK - BATHHOUSE BLDG.
P-311MGLL2014Interior WallsArchitecture Interior 44,771
Total Planned activities for $44,771PAR0047 04A
N01PAR00471/1/2013Date of Last Survey:E 120-E 124 MADISON AVENUE
593 - MARCUS GARVEY MEMORIAL PARK - COMFORT STATION
P-311MGLL2014Average Cost Method
72,205
Page U - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
Total Planned activities for $72,205PAR0047 N01
N02PAR00471/1/2013Date of Last Survey:E 120-E 124 MADISON AVENUE
594 - MARCUS GARVEY MEMORIAL PARK - COMFORT STATION
P-311MGLL2014Average Cost Method
54,288
Total Planned activities for $54,288PAR0047 N02
N03PAR00471/1/2013Date of Last Survey:E 120-E 124 MADISON AVENUE
573 - MARCUS GARVEY MEMORIAL PARK - COMFORT STATION
P-311MGLL2014Average Cost Method
54,288
Total Planned activities for $54,288PAR0047 N03
001PAR00509/13/2010Date of Last Survey:EAST END AVE TO EAST RIVER
891 - CARL SCHURZ PARK - GRACIE MANSION HISTORIC HOUSE
P-3GMROOF2015RoofArchitecture Exterior 359,485
Total Planned activities for $359,485PAR0050 001
003PAR005412/8/2010Date of Last Survey:2 SEVENTH AVE. SO.
270 - TONY DAPOLITO RECREATION CENTER - AND INDOOR POOL
P-6REC07A2012ParapetsArchitecture Exterior 99,936
P-6REC07A2012RoofArchitecture Exterior 100,893
P-6REC11A2014DistributionMechanical Air Conditioning 111,029
Total Planned activities for $311,858PAR0054 003
001PAR00591/28/2011Date of Last Survey:35 W. 134TH STREET
256 - HANSBOROUGH RECREATION CENTER - GYMNASIUM & INDOOR POOL
P-310HRFT2016WindowsArchitecture Exterior 114,878
P-3ROOF9A2014ParapetsArchitecture Exterior 41,206
P-310HRLL2014CeilingsArchitecture Interior 47,724
P-6REC11A2014Conversion EquipmentMechanical Air Conditioning 40,052
P-6POL11B2014Pool Filter/TreatmentMechanical Plumbing 70,847
Total Planned activities for $314,707PAR0059 001
001PAR00619/6/2011Date of Last Survey:1 ASSER LEVY PLACE
2567 - ASSER LEVY RECREATION CENTER - ASSER LEVY BATHHOUSE
P-6ROOF9B2014RoofArchitecture Exterior 608,345
Total Planned activities for $608,345PAR0061 001
002PAR00611/1/2013Date of Last Survey:501 ASSER LEVY PLACE
14033 - ASSER LEVY PARK - WADING POOL
P-6BPOOL72013Average Cost Method
35,357
Total Planned activities for $35,357PAR0061 002
003PAR00611/1/2013Date of Last Survey:501 ASSER LEVY PLACE
14032 - ASSER LEVY PARK - INTERMEDIATE POOL
Page U - 6
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-6BPOOL72013Average Cost Method
183,229
Total Planned activities for $183,229PAR0061 003
002PAR00631/1/2013Date of Last Survey:W. 126TH/W. 129TH/AMSTERDAM
581 - SHELTERING ARMS PARK - INDOOR POOL
P-3ROOF9A2014Average Cost Method
154,727
Total Planned activities for $154,727PAR0063 002
002PAR00651/1/2013Date of Last Survey:SZOLD PLACE,AVENUE D,E 10TH ST
583 - PLAYGROUND & POOL - SZOLD POOL, INTERMEDIATE
P-302DRYD2014Average Cost Method
156,794
Total Planned activities for $156,794PAR0065 002
002PAR00661/1/2013Date of Last Survey:E 124 - 1ST & 2ND AVENUES
561 - WAGNER HOUSES POOL - INTERMEDIATE POOL
P6POOL11/P6POL11A,B2014Average Cost Method
76,345
Total Planned activities for $76,345PAR0066 002
000PAR00687/2/2012Date of Last Survey:1591 FULTON AVE.
13886 - CROTONA PARK - RECREATION CENTER
P-1CRPOHS2015Exterior WallsArchitecture Exterior 216,527
P-1CRPOHS2015WindowsArchitecture Exterior 305,864
P-1CRPOHS2015ParapetsArchitecture Exterior 114,973
Total Planned activities for $637,364PAR0068 000
020PAR00681/1/2013Date of Last Survey:1591 FULTON AVE.
14400 - CROTONA PARK - NATURE CENTER
P-1CRNATU2009Average Cost Method
122,019
Total Planned activities for $122,019PAR0068 020
050PAR00729/10/2012Date of Last Survey:BET SHORE RD & ORCHARD BEACH RD
227 - PELHAM BAY PARK - BARTOW PELL MANSION - 0005
P-110MANS2015WindowsArchitecture Exterior 40,160
P-110MANS2015ParapetsArchitecture Exterior 55,632
P-110MANS2015Interior WallsArchitecture Interior 35,811
P-110MANS2015CeilingsArchitecture Interior 59,887
Total Planned activities for $191,490PAR0072 050
004PAR007510/19/2010Date of Last Survey:450 ST. ANNS AVE
1115 - ST. MARY'S PARK RECREATION CTR. -
P-6REC11A2014Conversion EquipmentMechanical Air Conditioning 53,981
Total Planned activities for $53,981PAR0075 004
Page U - 7
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
S02PAR00779/7/2012Date of Last Survey:W. 240 STREET TO CITY LINE
302 - VAN CORTLANDT PARK - OLYMPIC SWIMMING POOL
P-6CPOOL72011FloorsArchitecture Interior 51,733
Total Planned activities for $51,733PAR0077 S02
02APAR00783/10/2010Date of Last Survey:VAN CORTLANDT AVE. EAST
2676 - WILLIAMSBRIDGE PLAYGROUND - COMFORT AND RECREATION BLDG.
P-1CRO17A2014Exterior WallsArchitecture Exterior 260,950
P-1CRO17A2014WindowsArchitecture Exterior 149,933
P-1CRO17A2014RoofArchitecture Exterior 67,039
P-1CRO17A2014Interior WallsArchitecture Interior 82,168
P-1CRO17A2014CeilingsArchitecture Interior 140,594
Total Planned activities for $700,684PAR0078 02A
001PAR00801/1/2013Date of Last Survey:HAMMERSLY-ELY-BURKS-GUNTHER AV
673 - HAFFEN PARK - INTERMEDIATE POOL
P-6BPOOL72013Average Cost Method
155,234
Total Planned activities for $155,234PAR0080 001
001PAR00831/1/2013Date of Last Survey:E 180-MAPES-PROSPECT AVES.
676 - PS 129 MAPES POOL - PS 129 MAPES POOL, INTERMEDIATE
P-6POL11A 2015Average Cost Method
166,736
Total Planned activities for $166,736PAR0083 001
N01PAR00879/9/2011Date of Last Survey:20 VICTORY BLVD
584 - JOSEPH H LYONS POOL - DIVING POOL
P-6CPOOL72011FloorsArchitecture Interior 37,361
Total Planned activities for $37,361PAR0087 N01
F99PAR00894/27/2009Date of Last Survey:FT WADSWORTH TO MILLER FIELD
613 - FDR BOARDWALK & BEACH - BOARDWALK
P-5SBEACH2006DeckBoardwalks Superstructure 16,880
P-5SBEACH2006BeamsBoardwalks Substructure 231,128
P-5SBEACH2006PiersBoardwalks Substructure 21,396
P-5SBEACH2006GirdersBoardwalks Substructure 18,092
P-5SBEACH2006Underside EnclosureBoardwalks Substructure 17,048
Total Planned activities for $304,545PAR0089 F99
001PAR00931/1/2013Date of Last Survey:JOLINE AVE - HYLAN BLVD
865 - TOTTENVILLE POOL - JOLINE POOL, INTERMEDIATE
P-6POOL112015Average Cost Method
162,869
Total Planned activities for $162,869PAR0093 001
Page U - 8
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
010PAR00954/23/2013Date of Last Survey:30 HYLAN BOULEVARD
14344 - ALICE AUSTEN PARK - BREDT - MCFARLANE HOUSE
P-501BRE12014Exterior WallsArchitecture Exterior 64,768
Total Planned activities for $64,768PAR0095 010
001PAR009711/29/2010Date of Last Survey:167 LIVONIA AVE.
2700 - BETSY HEAD MEMORIAL PLAYGROUND - BETSY HEAD POOL, OLYMPIC
P-6CPOOL72011FloorsArchitecture Interior 174,770
Total Planned activities for $174,770PAR0097 001
01APAR009711/29/2010Date of Last Survey:167 LIVONIA AVE.
183 - BETSY HEAD MEMORIAL PLAYGROUND - BATHHOUSE BLDG.
P-6ROOF9B2014CeilingsArchitecture Interior 117,368
Total Planned activities for $117,368PAR0097 01A
01CPAR009711/29/2010Date of Last Survey:167 LIVONIA AVE.
597 - BETSY HEAD MEMORIAL PLAYGROUND - FILTER HOUSE BLDG.
P-6ROOF9B2014CeilingsArchitecture Interior 66,148
Total Planned activities for $66,148PAR0097 01C
004PAR01001/1/2013Date of Last Survey:PARK AVE-NAVY ST-N ELLIOT ST
2720 - COMMODORE JOHN BARRY PARK - INTERMEDIATE POOL
P-6POOL112015Average Cost Method
209,593
Total Planned activities for $209,593PAR0100 004
N01PAR01001/1/2013Date of Last Survey:PARK AVE-NAVY ST-N ELLIOT ST
867 - COMMODORE JOHN BARRY PARK - WADING POOL
P-6POOL112015Average Cost Method
21,282
Total Planned activities for $21,282PAR0100 N01
02APAR01011/1/2013Date of Last Survey:NASSAU AVE-BAYARD-N.12TH ST.
868 - MCCARREN PARK - BATHHOUSE
P-2PNYC012014Average Cost Method
96,162
Total Planned activities for $96,162PAR0101 02A
010PAR01041/1/2013Date of Last Survey:BEDFORD-METROPOLITAN AVENUE
847 - METROPOLITAN BATH & INDOOR POOL - METROPOLITAN INDOOR POOL
P-2BOILB72011Average Cost Method
76,345
Total Planned activities for $76,345PAR0104 010
002PAR01059/13/2011Date of Last Survey:41-44 ST & 5TH AND 7TH AVE
599 - SUNSET PARK - OLYMPIC POOL
P-6POOL112015Exterior WallsArchitecture Exterior 199,783
P-6POOL112015FloorsArchitecture Interior 499,220
Page U - 9
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
Total Planned activities for $699,003PAR0105 002
N01PAR01051/1/2013Date of Last Survey:41-44 ST & 5TH AND 7TH AVE
848 - SUNSET PARK - COMFORT STATION
P-2PNYFL12013Average Cost Method
30,539
Total Planned activities for $30,539PAR0105 N01
001PAR010611/23/2010Date of Last Survey:LAFAYETTE, TOMPKINS, MARCY AVES.
1170 - VON KING (FORMERLY TOMPKINS PARK - CULTURAL/ARTS CENTER
P-203D17E2015Exterior WallsArchitecture Exterior 46,932
P-203D17E2015FloorsArchitecture Interior 49,593
Total Planned activities for $96,525PAR0106 001
002PAR01109/5/2012Date of Last Survey:OSTEGO/BAY/KICKS/HALLECK AVES
1172 - RED HOOK RECREATION AREA - OLYMPIC POOL
P-6POOL112014Exterior WallsArchitecture Exterior 86,069
P-6POOL112014FloorsArchitecture Interior 123,860
Total Planned activities for $209,929PAR0110 002
02DPAR01109/5/2012Date of Last Survey:OSTEGO/BAY/KICKS/HALLECK AVES
1175 - RED HOOK RECREATION AREA - FILTER HOUSE
P-6CPOOL72011Exterior WallsArchitecture Exterior 317,756
P-6CPOOL72011ParapetsArchitecture Exterior 152,884
P-6POOL112013FloorsArchitecture Interior 53,915
P-6POOL112015Interior WallsArchitecture Interior 655,269
P-6CPOOL72011GeneratorsElectrical Stand-by Power 72,988
P-6POL11B2013Pool Filter/TreatmentMechanical Plumbing 289,601
Total Planned activities for $1,542,413PAR0110 02D
F98PAR01116/1/2010Date of Last Survey:W.37 STREET TO BRIGHTON 15 ST.
606 - CONEY ISLAND BEACH & BOARDWALK - RIEGELMANN BOARDWALK
P-2STIMUA2013DeckBoardwalks Superstructure 178,780
P-2STIMUA2013RailingBoardwalks Superstructure 167,035
P-2STIMUA2013BeamsBoardwalks Substructure 2,176,813
P-2STIMUA2013PiersBoardwalks Substructure 2,794,076
P-2STIMUA2013GirdersBoardwalks Substructure 1,060,609
P-2STIMUA2013Underside EnclosureBoardwalks Substructure 207,014
Total Planned activities for $6,584,327PAR0111 F98
002PAR01151/1/2013Date of Last Survey:GLENMORE-STONE-EAST NEW YORK
960 - HOWARD HOUSE PLAYGROUND & POOL - HOWARD HOUSES POOL, INTERMEDI
P-6CPOOL72011Average Cost Method
165,144
Total Planned activities for $165,144PAR0115 002
Page U - 10
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
001PAR01167/10/2012Date of Last Survey:598 CHRISTOPHER AVENUE
962 - BROWNSVILLE REC CENTER & PLYGRND - BROWNSVILLE RECREATION CENTE
P-216BRWN2014CeilingsArchitecture Interior 266,761
Total Planned activities for $266,761PAR0116 001
002PAR01171/1/2013Date of Last Survey:FLUSHING-BUSHWICK-HUMBOLDT
964 - BUSHWICK HOUSES PLAYGRND & POOL - INTERMEDIATE POOL
P-6POOL112015Average Cost Method
152,690
Total Planned activities for $152,690PAR0117 002
001PAR01187/20/2010Date of Last Survey:SURF AVE, W. 19 ST. & BOARDWALK
914 - ABE STARK SKATING RINK - INDOOR FACILITY
P-213BOIL2014Conversion EquipmentMechanical Heating 696,605
P-213BOIL2014Terminal DevicesMechanical Heating 745,007
P-213BOIL2014Terminal DevicesMechanical Air Conditioning 607,795
P-213BOIL2014Heat RejectionMechanical Air Conditioning 716,032
P-213BOIL2014Exhaust FansMechanical Ventilation 150,284
P-213BOIL2014HW Heat ExchangerMechanical Plumbing 44,405
Total Planned activities for $2,960,128PAR0118 001
N02PAR01191/1/2013Date of Last Survey:MARCY-KOSCIUSKO-DEKALB
701 - KOSCIUSKO POOL - WADING POOL
P-6POOL112014Average Cost Method
47,230
Total Planned activities for $47,230PAR0119 N02
000PAR012712/10/2012Date of Last Survey:430 WEST 25 STREET
13442 - CHELSEA RECREATION CENTER - AND POOL
P-304CRLB2015Interior WallsArchitecture Interior 36,568
Total Planned activities for $36,568PAR0127 000
020PAR01497/13/2010Date of Last Survey:MERRICK BLVD AND 119TH AVE.
13631 - ROY WILKINS PARK RECREATION CTR -
P-412RWIL2016Exterior WallsArchitecture Exterior 54,353
P-412RWIL2016RoofArchitecture Exterior 52,597
P-412RWIL2016FloorsArchitecture Interior 46,392
P-412RWIL2016CeilingsArchitecture Interior 41,377
Total Planned activities for $194,719PAR0149 020
000PAR01631/1/2013Date of Last Survey:118TH AVE. AND 155TH STREET
13677 - BAISLEY POND PARK HOUSE -
P-4BCSGC12012Average Cost Method
55,139
Total Planned activities for $55,139PAR0163 000
Page U - 11
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
010PAR01631/1/2013Date of Last Survey:LAKEVIEW BLVD. AND 122ND AVE.
13678 - BAISLEY POND PARK - COMFORT STATION # 1
P-412BPP22011Average Cost Method
31,385
Total Planned activities for $31,385PAR0163 010
020PAR01631/1/2013Date of Last Survey:125TH AVE. AND 153RD STREET
13679 - BAISLEY POND PARK - COMFORT STATION # 2
P-412BPP22011Average Cost Method
20,359
Total Planned activities for $20,359PAR0163 020
030PAR01631/1/2013Date of Last Survey:155TH STREET AND 121ST AVE.
13680 - BAISLEY POND PARK - COMFORT STATION # 3
P-6CWCOMF2015Average Cost Method
16,287
Total Planned activities for $16,287PAR0163 030
000PAR01661/1/2013Date of Last Survey:146TH AVE. AND SPRINGFIELD BLVD.
13685 - SPRINGFIELD PARK HOUSE AND - COMFORT STATION
P-6BLDG132014Average Cost Method
49,642
Total Planned activities for $49,642PAR0166 000
000PAR01681/1/2013Date of Last Survey:NEPTUNE AVE AND WEST 29TH STREET
13690 - LEON S. KAISER PARK HOUSE -
P-213KPRB2011Average Cost Method
145,226
Total Planned activities for $145,226PAR0168 000
000PAR01711/1/2013Date of Last Survey:338 STORY AVE, FORT TOTTEN
14054 - FORT TOTTEN PARK - DIVING POOL
P-6CPOOL72011Average Cost Method
41,565
Total Planned activities for $41,565PAR0171 000
338PAR01711/1/2013Date of Last Survey:338 STORY AVE, FORT TOTTEN
14053 - FORT TOTTEN PARK - INTERMEDIATE POOL
P-6CPOOL72011Average Cost Method
152,690
Total Planned activities for $152,690PAR0171 338
430PAR01711/1/2013Date of Last Survey:430 WALTER REED ROAD
14367 - FORT TOTTEN - BLDG # 430
P-6ROOF9A2014Average Cost Method
138,983
Total Planned activities for $138,983PAR0171 430
Page U - 12
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
431PAR01711/1/2013Date of Last Survey:431 WALTER REED ROAD
14368 - FORT TOTTEN - BLDG # 431 OFFICE & SCIENCE LAB
P-6ABLDG72011Average Cost Method
138,983
Total Planned activities for $138,983PAR0171 431
638PAR01717/23/2010Date of Last Survey:638 TOTTEN AVE.
14371 - FORT TOTTEN - BLDG # 638 CHAPEL & MEETING BLDG
P-4FTTOTB2015Exterior WallsArchitecture Exterior 63,613
P-4FTTOTB2015RoofArchitecture Exterior 59,841
Total Planned activities for $123,454PAR0171 638
001PAR01774/5/2010Date of Last Survey:NORTH OF ENTRANCE ALONG
14493 - ROGER MORRIS PARK/ JUMEL MANSION - PERIMETER WALL
P-312MJM22014Wall/FenceRetaining Walls Wall 335,546
Total Planned activities for $335,546PAR0177 001
002PAR01774/5/2010Date of Last Survey:SOUTH OF ENTRANCE @JUMEL TERR.
14494 - ROGER MORRIS PARK/ JUMEL MANSION - PERIMETER WALL
P-312MJM22014Wall/FenceRetaining Walls Wall 157,075
Total Planned activities for $157,075PAR0177 002
000PAR01783/8/2007Date of Last Survey:1940 EAST 36TH STREET
4530 - LOTT HOUSE -
P-218C17U2008FloorsArchitecture Interior 153,163
P-218LOTT2015Interior WallsArchitecture Interior 77,138
P-218LOTT2015CeilingsArchitecture Interior 153,489
Total Planned activities for $383,790PAR0178 000
000PAR01805/17/2011Date of Last Survey:5816 CLARENDON RD
4532 - WYCKOFF FARMHOUSE MUSEUM -
P-217WYKF2015RoofArchitecture Exterior 81,313
Total Planned activities for $81,313PAR0180 000
000PAR01911/1/2013Date of Last Survey:BEDFORD AVE.
13916 - HARRIS PARK - COMFORT STATION / STORAGE BLDG.
P-6BLDG9A2013Average Cost Method
77,636
Total Planned activities for $77,636PAR0191 000
000PAR02121/1/2013Date of Last Survey:5TH AVE & E 135TH ST
14039 - ABE LINCOLN PLAYGROUND - MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0212 000
000PAR02131/1/2013Date of Last Survey:SPRING AND THOMPSON STS
14040 - THOMPSON ST (VESUVIO PLAYGROUND) - MINI POOL
Page U - 13
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0213 000
000PAR02151/1/2013Date of Last Survey:E 174TH ST AND BRONX RIVER AVE.
14044 - E 174TH STREET PLAYGROUND - WADING POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0215 000
000PAR02171/1/2013Date of Last Survey:SCHIEFFELIN AVE. AND E. 229TH ST
14045 - EDENWALD PLAYGROUND - MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0217 000
000PAR02201/1/2013Date of Last Survey:FARRAGUT ROAD AND RALPH AVENUE
14049 - GLENWOOD HOUSES PLAYGROUND - MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0220 000
000PAR02211/1/2013Date of Last Survey:E 60TH PLACE, MILL AVENUE,
14050 - LINDOWER PARK - MINI POOL
P-218D17L2013Average Cost Method
21,716
Total Planned activities for $21,716PAR0221 000
000PAR02221/1/2013Date of Last Survey:STUYVESANT AND LAFAYETTE AVES.
14051 - JESSE OWENS PLAYGROUND - MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0222 000
000PAR02231/1/2013Date of Last Survey:ADELPHI ST, CLERMONT, DEKALB &
14052 - PARHAM PLAYGROUND - ADELPHI MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0223 000
000PAR02271/1/2013Date of Last Survey:30TH ROAD, 45TH TO 46TH STREETS
14059 - ASTORIA HEIGHTS PLAYGROUND - JHS 10 WADING POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0227 000
001PAR02281/1/2013Date of Last Survey:HENDERSON AVENUE
14061 - LAWRENCE C. THOMPSON MEM. PARK - WEST BRIGHTON INTERMEDIATE PO
Page U - 14
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-6POL11A2015Average Cost Method
152,690
Total Planned activities for $152,690PAR0228 001
000PAR02291/1/2013Date of Last Survey:GRANDVIEW AVE AND CONTINENTAL PL
14062 - GRANDVIEW PLAYGROUND - MARINERS HARBOR MINI POOL
P-6POOL9D2014Average Cost Method
21,716
Total Planned activities for $21,716PAR0229 000
000PAR02371/1/2013Date of Last Survey:5TH AVE BETWEEN 66TH & 67TH STS
14207 - LEIF ERICSON PARK AND SQUARE - COMFORT STATION @ MILLENIUM PLGD
P-210DBCS2015Average Cost Method
23,996
Total Planned activities for $23,996PAR0237 000
000PAR02404/12/2010Date of Last Survey:37-01 BOWNE STREET
14454 - BOWNE HOUSE -
P-407BHRE2014RoofArchitecture Exterior 63,457
P-407BHRE2014CeilingsArchitecture Interior 51,455
Total Planned activities for $114,912PAR0240 000
000PAR02484/30/2012Date of Last Survey:143-35 37TH AVENUE
14552 - KINGSLAND HOMESTEAD -
P-407HOME2012Exterior WallsArchitecture Exterior 179,527
P-407HOME2012RoofArchitecture Exterior 77,999
P-407HOME2012FloorsArchitecture Interior 70,604
Total Planned activities for $328,130PAR0248 000
000PARB1251/3/2012Date of Last Survey:CONEY ISLAND CREEK
922 - DREIR OFFERMAN PARK - RIP-RAP
P-213018A2014RevetmentBulkheads Structural 449,339
Total Planned activities for $449,339PARB125 000
002PARM0312/10/2009Date of Last Survey:3RD AVE BRIDGE TO 145 ST BRIDGE
773 - HARLEM RIVER DR.WAY PROMENADE - SEAWALL
P-311BIKE2010Wales and ChocksBulkheads Fender 350,931
Total Planned activities for $350,931PARM039 002
100PARM1011/24/2009Date of Last Survey:RANDALLS ISLAND / 116TH STREET
13866 - WEST SHORE - BULKHEAD/SEAWALL
C007054,P-311RILS2014Gravity WallBulkheads Structural 4,447,714
C007054,P-311RILS2014FillBulkheads Backfill 212,097
C007054,P-311RILS2014SurfaceBulkheads Backfill 53,101
Total Planned activities for $4,712,912PARM104 100
000PARQ00911/2/2009Date of Last Survey:EAST RIVER
757 - HERMAN A. MACNEIL PARK - GRAVITY WALL/REVETMENT
Page U - 15
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF PARKS & RECREATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
U
P-407MPSW2014Gravity WallBulkheads Structural 144,399
P-407MPSW2014RevetmentBulkheads Structural 84,661
P-407MPSW2014RailingBulkheads Deck Elements 48,953
Total Planned activities for $278,013PARQ009 000
002PARX0396/20/2011Date of Last Survey:PELHAM BAY PARK
712 - PARK SHORELINE - RIP-RAP
SANDY1-012015Gravity WallBulkheads Structural 601,883
SANDY1-012015RevetmentBulkheads Structural 40,133
SANDY1-012015FillBulkheads Backfill 93,933
Total Planned activities for $735,949PARX039 002
000PARX12612/30/2011Date of Last Survey:WESTCHESTER CREEK/EAST RIVER
715 - FERRY POINT PARK - MARSH/RIP RAP
P-1FERRY82015RevetmentBulkheads Structural 402,220
Total Planned activities for $402,220PARX126 000
Total Planned Activities for : $76,645,665DEPT. OF PARKS & RECREATION
Total Required for "State of Good Repair" for : DEPT. OF PARKS & RECREATION $488,108,467
Page U - 16
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
000ACS00016/21/2010Date of Last Survey:115 CHRYSTIE STREET
13411 - ADMINISTRATION BUILDING -
PW77115CH2016WindowsArchitecture Exterior 62,306
PW77115CH2016FloorsArchitecture Interior 143,183
PW77115CH2016Motor ControllersElectrical Under 600 Volts 48,828
PW77115CH2016Interior LightingElectrical Lighting 126,656
Total Planned activities for $380,973ACS0001 000
000DCAS0033/27/2012Date of Last Survey:B 128TH ST ALONG BEACH CHANNEL
14018 - TIMBER BULKHEAD W/CONCRETE - SEAWALL
PT195-VAR2016Gravity WallBulkheads Structural 149,479
Total Planned activities for $149,479DCAS003 000
000DCAS0044/19/2012Date of Last Survey:FOOT OF 44TH DRIVE
14020 - PIER AT 44TH DRIVE -
RE2544DR22014DeckPiers Structural 138,194
RE2544DR22014Pile CapsPiers Structural 83,789
RE2544DR22014PilesPiers Fender 42,498
RE2544DR22014RailingPiers Deck Elements 86,562
Total Planned activities for $351,043DCAS004 000
000DCAS0092/17/2010Date of Last Survey:265 EAST 161 STREET
14315 - BRONX HALL OF JUSTICE -
CO290BCHJ2014Exterior WallsArchitecture Exterior 199,917
CO290BCHJ2014ParapetsArchitecture Exterior 159,928
CO290BCHJ2014RoofArchitecture Exterior 373,427
CO290BCHJ2014FloorsArchitecture Interior 68,980
CO290BCHJ2014Interior WallsArchitecture Interior 60,123
CO290BCHJ2014Interior LightingElectrical Lighting 143,586
CO290BCHJ2014Fire/Smoke DetectionElectrical Alarm 142,912
CO290BCHJ2014Terminal DevicesMechanical Heating 133,679
CO290BCHJ2014Conversion EquipmentMechanical Air Conditioning 888,515
CO290BCHJ2014Heat RejectionMechanical Air Conditioning 792,170
CO290BCHJ2014Sanitary PipingMechanical Plumbing 74,935
CO290BCHJ2014StandpipeMechanical Fire Suppression 78,486
Total Planned activities for $3,116,658DCAS009 000
000DGS00012/23/2012Date of Last Survey:1 CENTRE STREET
2071 - MUNICIPAL BUILDING -
850 CC1C32016FloorsArchitecture Interior 295,964
850 CC1C32016Interior WallsArchitecture Interior 15,800
850 CC1C32016CeilingsArchitecture Interior 98,242
850 CC1C32016WiringElectrical Under 600 Volts 55,144
Page V - 1
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
ENERG0212013Interior LightingElectrical Lighting 436,119
Total Planned activities for $901,269DGS0001 000
000DGS00021/29/2010Date of Last Survey:100 CENTRE STREET
2072 - MANHATTAN CRIMINAL COURTS BLDG. -
CO283CTIM2015FloorsArchitecture Interior 238,970
CO283CTIM2015Interior WallsArchitecture Interior 531,287
CO283CTIM2015CeilingsArchitecture Interior 45,783
CO283CTIM2015WiringElectrical Under 600 Volts 154,361
CO283CTIM2015Fuel StorageElectrical Stand-by Power 36,465
CO283CTIM2015Interior LightingElectrical Lighting 216,277
CO283CTIM2015Egress LightingElectrical Lighting 26,322
CO283CTIM2015Exterior LightingElectrical Lighting 141,140
CO283CTIM2015Conversion EquipmentMechanical Heating 220,229
CO283CTIM2015DistributionMechanical Heating 126,347
CO283CTIM2015Terminal DevicesMechanical Heating 1,347,785
CO283CTIM2015Conversion EquipmentMechanical Air Conditioning 930,051
CO283CTIM2015Terminal DevicesMechanical Air Conditioning 720,571
CO283CTSP2013Heat RejectionMechanical Air Conditioning 486,961
Total Planned activities for $5,222,549DGS0002 000
000DGS00031/29/2010Date of Last Survey:60 LAFAYETTE STREET
2048 - MANHATTAN FAMILY COURT -
CO285RENO2011Interior WallsArchitecture Interior 850,483
CO285RENO2011CeilingsArchitecture Interior 484,332
CO285RENO2011DistributionMechanical Heating 224,593
Total Planned activities for $1,559,408DGS0003 000
000DGS00067/11/2011Date of Last Survey:60 CENTRE STREET
2051 - MANHATTAN SUPREME COURT -
CO304HEA42016DistributionMechanical Heating 408,652
CO304HEA42016H/C Water PipingMechanical Plumbing 174,812
Total Planned activities for $583,464DGS0006 000
000DGS00072/2/2010Date of Last Survey:31 CHAMBERS STREET
2052 - SURROGATE'S COURT - MUNICIPAL ARCHIVES
CO81EXTR2011WindowsArchitecture Exterior 2,492,219
850 CO81SKY22014RoofArchitecture Exterior 147,062
PW310DHVA2014Conversion EquipmentMechanical Air Conditioning 253,788
856 PW310FAN2016Terminal DevicesMechanical Air Conditioning 873,893
Total Planned activities for $3,766,962DGS0007 000
000DGS00082/26/2009Date of Last Survey:CITY HALL PARK
153 - CITY HALL -
Page V - 2
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
850 CITYHALL22011WindowsArchitecture Exterior 95,476
850 CITYHALL22011RoofArchitecture Exterior 863,517
850 CITYHALL22011FloorsArchitecture Interior 104,640
850 CITYHALL22011CeilingsArchitecture Interior 939,918
850 CITYHALL22011Interior LightingElectrical Lighting 201,265
850 CITYHALL22011Conversion EquipmentMechanical Air Conditioning 71,908
Total Planned activities for $2,276,724DGS0008 000
000DGS00112/5/2010Date of Last Survey:137 CENTRE STREET
2054 - EXCELSIOR BUILDING -
PW77117F2010WiringElectrical Under 600 Volts 43,056
850 PW293137B2015Fire/Smoke DetectionElectrical Alarm 575,537
850 PW77117DC2014Conversion EquipmentMechanical Air Conditioning 143,130
Total Planned activities for $761,723DGS0011 000
000DGS00147/11/2011Date of Last Survey:280 BROADWAY
2055 - SUN BUILDING -
PW316BWAY2012Exterior WallsArchitecture Exterior 154,466
PW316BWAY2012ParapetsArchitecture Exterior 81,498
Total Planned activities for $235,964DGS0014 000
000DGS00152/3/2010Date of Last Survey:2 LAFAYETTE STREET
2056 - COURT SQUARE BUILDING - 2 LAFAYETTE
PW80DFTA 2012CeilingsArchitecture Interior 323,023
850 PW80DYCD22013Heat RejectionMechanical Air Conditioning 96,924
Total Planned activities for $419,947DGS0015 000
000DGS00162/27/2012Date of Last Survey:851 GRAND CONCOURSE
2057 - MARIO MEROLA BUILDING - BRONX COUNTY COURTHOUSE
CO293EXTR2013Exterior WallsArchitecture Exterior 327,972
CO293EXTR2013WindowsArchitecture Exterior 263,890
CO293ELEC2012WiringElectrical Under 600 Volts 149,473
CO293BOIL2015Conversion EquipmentMechanical Heating 54,968
Total Planned activities for $796,303DGS0016 000
000DGS00175/28/2013Date of Last Survey:215 E. 161 STREET
2058 - BRONX FAMILY/CRIMINAL COURT -
850 E14-00032014Conversion EquipmentMechanical Heating 2,301,748
850 E14-00032014Terminal DevicesMechanical Heating 38,240
850 E14-00032014DistributionMechanical Ventilation 204,039
Total Planned activities for $2,544,027DGS0017 000
000DGS00182/28/2012Date of Last Survey:1932 ARTHUR AVENUE
2059 - BERGEN BUILDING -
PW77207EL2016WiringElectrical Under 600 Volts 123,736
Page V - 3
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
Total Planned activities for $123,736DGS0018 000
000DGS00195/31/2013Date of Last Survey:360 ADAMS STREET
1573 - BROOKLYN SUPREME COURT -
CO278EXTR2015Exterior WallsArchitecture Exterior 2,477,881
CO278EXTR2015WindowsArchitecture Exterior 449,798
CO278EXTR2015ParapetsArchitecture Exterior 374,962
CO278EXTR2015RoofArchitecture Exterior 205,857
Total Planned activities for $3,508,498DGS0019 000
000DGS00213/1/2012Date of Last Survey:120 SCHERMERHORN STREET
2061 - BROOKLYN CENTRAL COURTS - BROOKLYN CRIMINAL COURTS
CO281EXTR2012Exterior WallsArchitecture Exterior 710,772
CO281EXTR2012RoofArchitecture Exterior 129,558
850 CO281ELEC2013WiringElectrical Under 600 Volts 92,244
Total Planned activities for $932,574DGS0021 000
000DGS00245/30/2013Date of Last Survey:45 MONROE PLACE
2036 - APPELLATE COURT - 2ND DEPT. -
CO272STA2015Conversion EquipmentMechanical Heating 311,031
Total Planned activities for $311,031DGS0024 000
000DGS00263/6/2012Date of Last Survey:125-01 QUEENS BOULEVARD
2764 - QUEENS CRIMINAL COURTS -
CO296EXTR2015Exterior WallsArchitecture Exterior 130,136
CO296EXTR2015ParapetsArchitecture Exterior 37,380
CO296EXTR2015RoofArchitecture Exterior 356,753
Total Planned activities for $524,269DGS0026 000
000DGS00275/20/2013Date of Last Survey:88-11 SUTPHIN BOULEVARD
2038 - QUEENS SUPREME COURT -
CO300EXTR2015Exterior WallsArchitecture Exterior 787,684
CO300EXTR2015ParapetsArchitecture Exterior 325,131
Total Planned activities for $1,112,815DGS0027 000
000DGS00285/31/2013Date of Last Survey:120-55 QUEENS BOULEVARD
2039 - QUEENS BOROUGH HALL -
856 PW77417P2015Exterior WallsArchitecture Exterior 273,956
856 PW77417P2015ParapetsArchitecture Exterior 251,679
Total Planned activities for $525,635DGS0028 000
000DGS00312/8/2010Date of Last Survey:10 RICHMOND TERRACE
2041 - STATEN ISLAND BOROUGH HALL -
PW77501RO2012RoofArchitecture Exterior 37,490
PWR0771242015FloorsArchitecture Interior 93,890
PW77501DT2015Conversion EquipmentMechanical Air Conditioning 111,722
Page V - 4
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
Total Planned activities for $243,102DGS0031 000
000DGS00347/8/2011Date of Last Survey:345 ADAMS STREET
2043 - KINGS SUPREME CIVIL COURT - OFFICE BUILDING
PW322FL122013FloorsArchitecture Interior 173,916
PW322FL122013Interior WallsArchitecture Interior 6,597
PW322FL122013CeilingsArchitecture Interior 127,412
PW322FL122013WiringElectrical Under 600 Volts 7,657
PW322GEN2015GeneratorsElectrical Stand-by Power 68,330
PW322AIR2015Terminal DevicesMechanical Air Conditioning 109,456
Total Planned activities for $493,368DGS0034 000
000DGS003510/21/2008Date of Last Survey:253-256 BROADWAY
49 - 253-256 BROADWAY - FMR HOME LIFE INSURANCE BLDG.
PW357EXTR2015Exterior WallsArchitecture Exterior 458,008
PW357EXTR2015WindowsArchitecture Exterior 2,385,068
PW357EXTR2015RoofArchitecture Exterior 47,446
PW357INFR2011FloorsArchitecture Interior 404,892
PW357INFR2011Interior WallsArchitecture Interior 257,218
PW357INFR2011CeilingsArchitecture Interior 203,630
PW357ELC22016PanelboardsElectrical Under 600 Volts 197,023
PW357ELC22016WiringElectrical Under 600 Volts 275,721
PW357ELC22016Motor ControllersElectrical Under 600 Volts 461,161
PW357INFR2011Terminal DevicesMechanical Heating 56,983
PW357COOS2014Heat RejectionMechanical Air Conditioning 303,365
Total Planned activities for $5,050,514DGS0035 000
000DGS00372/5/2010Date of Last Survey:170 EAST 121 ST
4167 - HARLEM COURTHOUSE - COMMUNITY JUSTICE CENTER
CO306EXTR2015Exterior WallsArchitecture Exterior 542,058
CO306REHB2015FloorsArchitecture Interior 69,502
CO306REHB2015Interior WallsArchitecture Interior 192,513
CO306REHB2015CeilingsArchitecture Interior 156,468
CO306REHB2015DistributionMechanical Heating 36,515
CO306REHB2015Conversion EquipmentMechanical Air Conditioning 37,631
Total Planned activities for $1,034,687DGS0037 000
000DGS00432/24/2012Date of Last Survey:130 STUYVESANT PLACE
4381 - OFFICE BUILDING - JUDICIAL CENTER
PW77SIFJC 2015CeilingsArchitecture Interior 15,770
Total Planned activities for $15,770DGS0043 000
000DGS00442/4/2010Date of Last Survey:100 GOLD STREET
13453 - 100 GOLD STREET - OFFICE BUILDING
Page V - 5
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPT. OF CITYWIDE ADMIN. SERV.
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report at the Component level.
Agency Activity Funding
V
PW77GLDRF2013RoofArchitecture Exterior 759,372
PW77GLDRS2013FloorsArchitecture Interior 64,502
E12-00462013Interior LightingElectrical Lighting 536,829
E12-00462013Terminal DevicesMechanical Heating 37,068
E10-000222010Heat RejectionMechanical Air Conditioning 592,018
Total Planned activities for $1,989,789DGS0044 000
000DGS00495/21/2013Date of Last Survey:100 RICHMOND TERRACE
13692 - STATEN ISLAND FAMILY COURT -
CO276EXTR2015Exterior WallsArchitecture Exterior 1,657,378
Total Planned activities for $1,657,378DGS0049 000
000DGS00527/14/2011Date of Last Survey:27 MADISON AVENUE
13870 - APPELLATE COURT - 1ST DEPT. -
850 CO80ROOF22014RoofArchitecture Exterior 510,719
Total Planned activities for $510,719DGS0052 000
000DGS00552/29/2012Date of Last Survey:80 CENTRE STREET
13877 - LOUIS LEFKOWITZ BLDG. -
PW7780EXT72014Exterior WallsArchitecture Exterior 237,394
PW7780RF2014RoofArchitecture Exterior 348,778
PWM77FJC2014FloorsArchitecture Interior 444,873
PWM77FJC2014Interior WallsArchitecture Interior 40,036
PWM77FJC2014CeilingsArchitecture Interior 31,544
Total Planned activities for $1,102,625DGS0055 000
000DGS00582/17/2012Date of Last Survey:314 W. 54 STREET
13880 - MIDTOWN COMMUNITY COURT -
CO305REHAB2014WindowsArchitecture Exterior 147,671
CO305REHAB2014FloorsArchitecture Interior 43,773
CO305REHAB2014Interior WallsArchitecture Interior 39,684
CO305REHAB2014Interior LightingElectrical Lighting 152,461
CO305REHAB2014Conversion EquipmentMechanical Air Conditioning 50,724
Total Planned activities for $434,313DGS0058 000
000DGS006610/12/2010Date of Last Survey:FOOT OF LIPSETT AVE. EAST
13943 - REVETMENT -
PT195-VAR2016RevetmentBulkheads Structural 82,475
Total Planned activities for $82,475DGS0066 000
Total Planned Activities for : $42,719,791DEPT. OF CITYWIDE ADMIN. SERV.
Total Required for "State of Good Repair" for : DEPT. OF CITYWIDE ADMIN. SERV. $143,875,787
Page V - 6
Asset Name / Address Asset IDFiscal
Year of
AppendixAssets to be Replaced/Abandoned:
Report of Asset Maintenance Schedule Activities not included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report
State of Good Repair Needs
W
FIRE DEPARTMENT
SUPPORT SERVICES BUILDING55-30 58TH STREET, MASPETH 2011 $7,439,928FIR0015.000
4437 -
Total Assets to be Replaced/Abandoned : $7,439,928FIRE DEPARTMENT
DEPT. OF HEALTH & MENTAL HYGIENE
WASHINGTON HEIGHTS DIST. HEALTH600 WEST 168TH STREET 2013 $469,511HEA0003.000
CENTER1999 -
Total Assets to be Replaced/Abandoned : $469,511DEPT. OF HEALTH & MENTAL HYGIENE
HEALTH AND HOSPITALS CORP.
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $388,296HHC0006.010
BLDG A114 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $558,769HHC0006.020
BLDG B115 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $2,153,981HHC0006.030
BLDG C116 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $931,290HHC0006.040
BLDG D93 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $2,285,182HHC0006.050
BLDG E94 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $1,015,450HHC0006.060
BLDG F95 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $199,442HHC0006.070
BLDG G96 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $199,442HHC0006.080
BLDG H97 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $315,512HHC0006.090
BLDG J98 -
GOLDWATER MEMORIAL HOSPITALROOSEVELT ISLAND 2013 $3,606,335HHC0006.100
BOILER99 -
W - 1Page
Asset Name / Address Asset IDFiscal
Year of
AppendixAssets to be Replaced/Abandoned:
Report of Asset Maintenance Schedule Activities not included in Agency's Four Year Plan Reconciliation with FY 2014 Asset Information Management System Report
State of Good Repair Needs
W
KINGS COUNTY HOSPITAL CENTER560 CLARKSON AVENUE 2012 $4,247,631HHC0009.030
BLDG G - PSYCHIATRIC127 -
KINGS COUNTY HOSPITAL CENTER604 WINTHROP STREET 2012 $2,753,368HHC0009.040
BLDG F - NEUROLOGY128 -
NEPONSIT HEALTH CARE CENTER149-25 ROCKAWAY BEACH BLVD. 2010 $3,658,484HHC0012.010
BLDG #1 - NURSING HOME740 -
QUEENS HOSPITAL82-68 164TH STREET 2013 $1,295,471HHC0014.030
TRIBORO - T735 -
Total Assets to be Replaced/Abandoned : $23,608,653HEALTH AND HOSPITALS CORP.
DEPARTMENT OF TRANSPORTATION
KEW LOOP YARD GARAGE135TH PARK DRIVE EAST $72,501DOT0100.000
1024 -
Total Assets to be Replaced/Abandoned : $72,501DEPARTMENT OF TRANSPORTATION
DEPT. OF PARKS & RECREATION
CONEY ISLAND BEACH & BOARDWALKCORBIN PLACE-WEST 37TH STREET 2010 $49,673PAR0111.020
LIFEGUARD BUILDING620 -
Total Assets to be Replaced/Abandoned : $49,673DEPT. OF PARKS & RECREATION
Total Assets to be Replaced/Abandone $31,640,266
W - 2Page
This page left intentionally blank.