Assessing the Performance of Sustainable Buildings in...
Transcript of Assessing the Performance of Sustainable Buildings in...
www.breeam.com
Briefing Paper
Dr Chris Ward, Alan Yates and Vicky Brown - BRE
Assessing the Performance of Sustainable Buildings in China Synergies between BREEAM and the Chinese Assessment Standard for Green Building (Three Star)
Since its launch in 1990, BREEAM has set scientifically robust standards that go beyond regulation and standard practice in minimising sustainability risks for buildings and has encouraged solutions that maximise the benefits to stakeholders including investors, developers, designers and occupiers. It does this as part of a balanced and broad ranging evaluation of a project’s impacts and benefits that avoids over-emphasis on single aspects of performance at the expense of others.
Originally developed to meet a need from developers in the United Kingdom (UK), the method has been used as the basis for the development of many locally derived schemes including LEED (US) and Green Star (Australia). A number of international versions of BREEAM are currently operated by BRE or its partner National Scheme Operators and in total the schemes have been used in over 75 countries worldwide. This allows a degree of international comparison whilst allowing local flexibility to accommodate differences in climate, economic opportunities, technological and constructional variations and local needs and priorities.
The Chinese property market is growing rapidly and given the importance of China as a global economic powerhouse it is increasingly important that development is carried out in the most sustainable way possible. Environmental problems are severe in many of China’s
cities and regions. In addition, the social changes that are occurring have the potential to create problems for many years to come if they are not tackled. For this reason the Chinese government has set targets and in many cases has mandated environmental sustainability assessments under their Assessment Standard for Green Building (Three Star), verified through the Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD). Whilst this performs a valuable task in raising local practice and improving building design and construction, the method is not internationally recognised, creating difficulties when it comes to demonstrating performance improvements to international property markets.
BRE’s BREEAM International methods are increasingly being used to provide this global credibility within the Chinese property sector as they are widely understood and respected by global property players. For this reason BRE has carried out a detailed comparison of its BREEAM International New Construction 2016 standard with the 2014 version of the Three Star standard. This document sets out the alignments that currently exist between the two standards. This work has highlighted significant areas of overlap between the two standards. For building projects undertaking certification against both standards, this will help to improve the efficiency and cost effectiveness of assessments.
Introduction
This document sets out the areas where Three Star requirements and evidence align with those required under the BREEAM International New Construction 2016 standard. It provides assistance and guidance for those seeking to obtain a BREEAM rating alongside a Three Star rating by setting out the areas where evidence prepared to meet Three Star can be used to help demonstrate compliance under BREEAM.
The synergies identified in this document can be used to achieve significant reductions in cost and time in the assessment process where both Three Star and BREEAM assessments are being carried out. This allows buildings to be assessed without the need for duplication in evidence. It provides a clear route to dual certification that streamlines the process of complying with the local standards and achieving an
internationally accepted rating of whole building performance that is understood and respected by the international business community globally.
This document is based on current methodologies for the two standards. BRE is continuing to evaluate Three Star with the aim of identifying areas where mutual recognition may be possible in the future. At present this is not the case given the different natures of the assessment criteria and quality assurance processes employed by the two standards. BRE intend to update this document as the standards are significantly updated. BREEAM standards are typically updated on a 3 to 4 year cycle.
Purpose of this document
About BRE
BRE was established in 1921 as the Building Research Establishment – a Government owned and operated research body focused on improving quality and understanding in the construction sector following the First World War. Since 1997 it has had the status of a non-governmental organisation owned by the BRE Trust, a registered charity that is dedicated to research and education in the built environment. BRE is an international body and is one of the world’s leading centres of excellence providing independent and impartial, research-based advisory, testing, certification and training expertise in every aspect of the built environment. It offers a wide range of industry tools, guidance and training products and services.
Website: www.bre.co.uk Contact: [email protected]
About BREEAM
BREEAM (Building Research Establishment Environmental Assessment Method) is the world’s first sustainability rating scheme for the built environment. It is an internationally recognised measure of sustainability for master planning, infrastructure, buildings and communities, covering all stages of an asset’s life, including new construction, in-use and refurbishment. Through its application and use, BREEAM helps clients to measure and reduce the impacts of their buildings and in doing so, create higher value, lower risk assets that are better for people and the environment.
BREEAM building level assessments cover technical issues across ten categories as follows:
1. Management - encourages the sustainable management of design, construction, commissioning and operational processes
2. Health and Wellbeing - addresses the comfort, health and safety of occupants, visitors and others within the vicinity
3. Energy - encourages the sustainable use of energy in the asset
4. Transport - encourages sustainable means of transport for the users of the asset
5. Water - encourages the sustainable use of water in the asset
6. Materials - encourages the sustainable procurement and use of materials
7. Waste - encourages the sustainable management of construction and operational waste
8. Land Use and Ecology - encourages sustainable land use, habitat protection/creation and ecological improvement for the asset site and surrounding areas/habitats
9. Pollution - addresses the prevention and control of pollution associated with the asset location and use
10. Innovation - encourages the use of innovative solutions to improve the sustainability performance of the asset
Website: www.breeam.org Contact: [email protected]
About the Chinese Assessment Standard for Green Building (Three Star)
The Chinese Assessment Standard for Green Building (Three Star) has been developed by the Chinese Ministry of Housing and Urban-Rural Development (MOHURD) and is operated on their behalf by the Chinese Society for Urban Studies for 3 Star rated buildings and local building control bodies across China for 1 and 2 star rated buildings. It includes an evaluation system for both public and residential buildings. The standard is divided into a design evaluation method and an operational evaluation method, both of which can result in certification. The evaluation system has eight assessment categories as follows:
1. Land Saving and Outdoor Environment
2. Energy Saving and Energy Utilisation
3. Water Saving and Water Resource Utilisation
4. Material Saving and Material Resource Utilisation
5. Indoor Environmental Quality
6. Construction Management
7. Operation Management
8. Promotion and Innovation
The indicators in each category are divided into mandatory/pre-requisite and optional/scoring items. The evaluation system also has additional bonus items covered by the Promotion and Innovation category. Green Buildings are assessed as 1 Star, 2 Star or 3 Star rated buildings. Whilst the lower ratings are certified through the local regulatory systems, all Three Star buildings are independently evaluated through a network of appointed independent experts in green buildings to give additional credibility to the rating claims.
Website: http://www.cngb.org.cn Contact: [email protected] or [email protected]
Table 2 sets out in detail the synergies between BREEAM International New Construction 2016 and Three Star (2014 version) requirements and evidence. It maps all of the Three Star standard’s clauses against specific BREEAM criteria providing guidance on the degree to which evidence collected for Three Star can be used in BREEAM assessments.
Given the differences in the assessment and quality assurance processes between BREEAM and Three Star, it is not currently possible for BREEAM to accept certification against Three Star as evidence of compliance with its requirements, although this is an outcome that we will be working to achieve in the future. At present, design teams and other stakeholders will need to submit all evidence to the BREEAM International Assessor for review in the normal way. The aim is to minimise the amount of additional evidence that is required to demonstrate compliance with BREEAM and the guidance indicates the degree of additional evidence that will currently be required.
In addition to setting out areas of significant alignment, the table also identifies areas where the broad aims of the Three Star and BREEAM
issues are the same but methodological differences mean that there is no direct comparison between BREEAM and Three Star requirements. In these instances it is likely that compliance with Three Star issues will aid in achieving BREEAM credits but this cannot be guaranteed. In such cases, evidence produced for Three Star may be helpful in a BREEAM assessment but additional information will be required. It should, however, be possible to avoid unnecessary duplication of assessment evidence and/or calculations.
It should be noted that buildings assessed as 3 Star rated under Three Star are likely to find it much easier to demonstrate compliance with BREEAM. Those rated as 1 or 2 Star are likely to require considerably more additional evidence.
Table 2 provides details of the alignment for each clause in the 2014 version of the Assessment Standard for Green Building (Three Star) and the BREEAM International New Construction 2016 standard. The level of alignment has been classified as defined in Table 1.
How to use this document
Symbol Alignment classification Alignment details
Þ Good alignment
Evidence used to certify under Three Star can be used as evidence of compliance with the specified BREEAM criterion/criteria. Verification will be required by the BREEAM assessor but no further evidence is likely to be necessary. Note: This is unlikely to occur where buildings have been rated as 1 or 2 Star under Three Star.
p Partial alignment
Evidence used to certify under Three Star can be used as evidence of partial compliance with the specified BREEAM criterion/criteria. Verification will be required by the BREEAM assessor and further evidence will be required to demonstrate full compliance with BREEAM requirements. Note: This is unlikely to occur where buildings have been rated as 1 or 2 Star under Three Star.
General alignment
The outcomes and methodologies are broadly aligned but there are material differences between the requirements of the standards. For instance the required performance levels or calculation methods may be different. It may be possible that the evidence collected for Three Star can be used for a BREEAM assessment, although additional evidence will be required to demonstrate compliance with the specified BREEAM criterion/criteria.
− Not addressed
This classification applies where Three Star requirements are not covered in BREEAM New Construction or BREEAM covers the issue in a completely different way or are outside the scope of BREEAM New Construction (e.g. cover the operational/in-use performance of buildings).
Table 1 - Alignment classification
Figures 1 and 2 provide an overview of the alignment between the Three Star requirements and the BREEAM criteria.Figures&1&and&2&provide&an&overview&of&the&alignment&between&the&Three&Star&requirements&and&the&BREEAM&criteria.&
&
&
&
19%
54%
21%
6%
Figure&1:&Percentage&of&Three&Star&standard&clauses&aligned&with&BREEAM&International&New&Construction&2016&criteria
Not&addressed General&alignment Partial&alignment Good&alignment
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Land&Saving&and&Outdoor&Environment
Energy&Saving&and&Energy&Utilisation
Water&Saving&and&Water&Resource&
Utilisation
Material&Saving&and&Material&
Resource&Utilisation
Indoor&Environmental&
Quality
Construction&Management
Operation&Management
Promotion&and&Innovation
Figure&2:&Percentage&of&Three&Star&standard&clauses&for&each&category&aligned&with&BREEAM&International&New&Construction&2016&criteria
Not&addressed General&alignment Partial&alignment Good&alignment
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Land
Sav
ing
and
Out
door
Env
ironm
ent
Prer
equi
site
Item
s
4.1.1
Loca
l urb
an-r
ural
pla
nnin
g re
quire
men
ts
Man
01
Proj
ect b
rief a
nd d
esig
n
Crite
rion
3
Plan
ning
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
sta
keho
lder
con
sulta
tion
(pro
ject
del
ivery
) req
uire
men
ts,
alth
ough
add
ition
al in
form
atio
n on
the
othe
r con
sulta
tion
issue
s w
ould
be
requ
ired
to
dem
onst
rate
com
plia
nce.
4.1.
2N
atur
al a
nd m
an-m
ade
haza
rds
and
pollu
tant
s
Hea
07
Haz
ards
Cr
iteria
1-2
LE 0
1 Si
te s
elec
tion
Crite
ria 2
-4
Pol 0
3 Su
rface
wat
er ru
n-of
f Cr
iteria
1-3
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce a
gain
st
the
BREE
AM
Hea
07
haza
rds,
LE 0
1 co
ntam
inat
ed la
nd a
nd P
ol 0
3 flo
od re
silie
nce
requ
irem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d to
dem
onst
rate
com
plia
nce
with
thes
e iss
ues.
4.1.
3A
ir an
d no
ise p
ollu
tion
sour
ces
Hea
02
Indo
or a
ir qu
ality
Cr
iterio
n 5
Hea
05
Aco
ustic
per
form
ance
Cr
iterio
n 1
Po
llutio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M H
ea 0
2 ve
ntila
tion
and
Hea
05
prer
equi
site
acou
stic
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
4.1.
4Su
nlig
ht d
esig
nH
ea 0
1 Vi
sual
com
fort
Crite
rion
4
Sunl
ight
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
day
light
ing
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
e da
yligh
ting
met
hodo
logy
.
Land
Use
4.2.
1Ec
onom
ic an
d in
tens
ive u
se o
f lan
dN
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
4.2.
2Pr
ovisi
on o
f gre
en s
pace
Non
e−
BREE
AM
New
Con
stru
ctio
n do
es n
ot c
over
this
issue
.
4.2.
3Ut
ilisat
ion
of u
nder
grou
nd s
pace
N
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
Out
door
Env
ironm
ent
4.2.
4Lig
ht p
ollu
tion
Pol 0
4 Re
duct
ion
of n
ight
tim
e lig
ht
pollu
tion
Crite
ria 1
-4
Light
ing
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
ligh
t pol
lutio
n re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d in
term
s of
ligh
ting
curfe
ws
and
safe
ty a
nd s
ecur
ity li
ghtin
g.
4.2.
5Ex
tern
al n
oise
Hea
05
Aco
ustic
per
form
ance
Cr
iterio
n 1
Pol 0
5 Re
duct
ion
of n
oise
pol
lutio
n Cr
iteria
1-5
N
oise
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
ag
ains
t the
BRE
EAM
Hea
05
prer
equi
site
acou
stic
and
Pol 0
5 no
ise p
ollu
tion
requ
irem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d to
dem
onst
rate
com
plia
nce
with
thes
e iss
ues.
4.2.
6W
ind
envir
onm
ent
Non
e−
BREE
AM
New
Con
stru
ctio
n do
es n
ot c
over
this
issue
.
4.2.
7H
eat i
sland
effe
ctN
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
Tran
spor
tatio
n Fa
cility
an
d Pu
blic
Serv
ice
4.2.
8Co
nnec
tivity
to p
ublic
tran
spor
t fa
ciliti
es
Hea
06
Acc
essib
ility
Crite
ria 3
and
6
Tra
01 P
ublic
tran
spor
t acc
essib
ility
Crite
ria 1
-2
pW
alki
ng d
istan
ce a
nd fo
otpa
th in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
co
mpl
ianc
e w
ith th
e BR
EEA
M H
ea 0
6 sa
fe a
cces
s an
d Tr
a 01
acc
essib
ility
inde
x re
quire
men
ts,
alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
to c
alcu
late
the
acce
ssib
ility
inde
x.
4.2.
9Ba
rrier
-fre
e fo
otpa
th d
esig
n H
ea 0
6 A
cces
sibilit
y Cr
iteria
1-1
6
Acc
ess
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
ag
ains
t the
BRE
EAM
saf
e ac
cess
and
inclu
sive
and
acce
ssib
le d
esig
n re
quire
men
ts, a
lthou
gh
addi
tiona
l inf
orm
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
Tabl
e 2
- Alig
nmen
t be
twee
n B
REE
AM
Inte
rnat
iona
l New
Con
stru
ctio
n 20
16 a
nd T
hree
Sta
r 20
14 r
equi
rem
ents
Land
Sav
ing
and
Out
door
Env
ironm
ent
Tran
spor
tatio
n Fa
cility
an
d Pu
blic
Serv
ice
4.2.
10Bi
cycle
and
car
par
king
Hea
06
Acc
essib
ility
Crite
ria 1
-11
Tra
03a
Alte
rnat
ive
mod
es o
f tra
nspo
rt O
ptio
n 5
Tra
03b
Alte
rnat
ive
mod
es o
f tra
nspo
rt O
ptio
n 5
Tra
04 M
axim
um c
ar p
arki
ng c
apac
ity
Crite
rion
1
Pa
rkin
g in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M H
ea 0
6 sa
fe a
cces
s, Tr
a 03
cyc
le s
tora
ge a
nd T
ra 0
4 ca
r par
king
re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d to
dem
onst
rate
com
plia
nce
with
thes
e iss
ues.
4.2.
11Pr
ovisi
on o
f pub
lic s
ervic
es
Hea
06
Acc
essib
ility
Crite
rion
14
Tra
02 P
roxi
mity
to a
men
ities
Cr
iteria
1-2
pW
alki
ng d
istan
ce a
nd s
hare
d fa
ciliti
es in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
de
mon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M H
ea 0
6 in
clusiv
e an
d ac
cess
ible
des
ign
and
Tra
02
prox
imity
to a
men
ities
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
in te
rms
of
dist
ance
s to
oth
er a
men
ities
.
Prem
ise D
esig
n an
d Pr
emise
Eco
logy
4.2.
12Pr
otec
tion
of la
ndsc
ape
and
ecol
ogica
l fea
ture
s
LE 0
2 Ec
olog
ical v
alue
of s
ite a
nd
prot
ectio
n of
eco
logi
cal f
eatu
res
Crite
ria 1
-3
LE 0
4 En
hanc
ing
site
ecol
ogy
Crite
ria 1
-3
LE 0
5 Lo
ng te
rm im
pact
on
biod
iver
sity
Crite
ria 1
-3
La
nd u
se a
nd e
colo
gy in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
LE
02 p
rote
ctio
n of
eco
logi
cal f
eatu
res,
LE 0
4 en
hanc
ing
site
ecol
ogy
and
LE 0
5 lo
ng te
rm im
pact
on
biod
ivers
ity re
quire
men
ts, a
lthou
gh
addi
tiona
l inf
orm
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
4.2.
13G
reen
rain
wat
er in
frast
ruct
ure
Pol 0
3 Su
rface
wat
er ru
n-of
f Cr
iteria
4-1
6
Dra
inag
e an
d ru
noff
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
sur
face
wat
er ru
n-of
f req
uire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e (e
.g. p
eak
rate
of r
un-o
ff ca
lcula
tions
, al
low
ance
for c
limat
e ch
ange
, mai
nten
ance
agr
eem
ents
, etc
.).
4.2.
14Su
rface
and
roof
rain
fall
run-
off
Pol 0
3 Su
rface
wat
er ru
n-of
f Cr
iteria
4-1
6
Runo
ff in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M s
urfa
ce w
ater
run-
off r
equi
rem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e (e
.g. p
eak
rate
of r
un-o
ff ca
lcula
tions
, allo
wan
ce fo
r cli
mat
e ch
ange
, mai
nten
ance
agr
eem
ents
, etc
.).
4.2.
15Pl
antin
g st
rate
gy
LE 0
4 En
hanc
ing
site
ecol
ogy
Crite
ria 1
-3
LE 0
5 Lo
ng te
rm im
pact
on
biod
iver
sity
Crite
ria 1
-3
Pl
antin
g in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M L
E 04
enh
ancin
g sit
e ec
olog
y an
d LE
05
long
term
impa
ct o
n bi
odive
rsity
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te
com
plia
nce
with
thes
e iss
ues.
Ener
gy S
avin
g an
d En
ergy
Util
isatio
nPr
ereq
uisit
e Ite
ms
5.1.1
Nat
iona
l ene
rgy
effic
ienc
y de
sign
stan
dard
s
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Info
rmat
ion
colle
cted
for T
hree
Sta
r (e.
g. th
erm
al p
erfo
rman
ce o
f bui
ldin
g el
emen
ts, h
eatin
g an
d co
olin
g ef
ficie
ncie
s, et
c.) c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
the
BREE
AM
Opt
ion
1 (U
se
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es)
requ
irem
ents
.
5.1.
2Us
e of
ele
ctric
ity fo
r HVA
C an
d hu
mid
ifica
tion
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
BREE
AM
doe
s no
t pro
hibi
t the
use
of e
lect
ricity
for h
eatin
g or
coo
ling.
How
ever
, mee
ting
the
Thre
e St
ar re
quire
men
t will
help
tow
ards
ach
ievin
g th
e BR
EEA
M e
nerg
y pe
rform
ance
re
quire
men
ts a
s th
ese
are
base
d on
min
imisi
ng o
pera
tiona
l ene
rgy
dem
and,
prim
ary
ener
gy
cons
umpt
ion
and
CO2
emiss
ions
.
5.1.
3En
ergy
sub
-met
erin
g
Ene
02a
Ener
gy m
onito
ring
(non
-re
siden
tial)
Crite
ria 1
-5
Sub-
met
erin
g in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly c
ontri
bute
to a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M s
ub-m
eter
ing
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e.
Ene
02b
Ener
gy m
onito
ring
(resid
entia
l)−
Thre
e St
ar re
quire
men
ts a
re n
ot a
pplic
able
to re
siden
tial b
uild
ings
.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Ener
gy S
avin
g an
d En
ergy
Util
isatio
n
5.1.
4Lig
htin
g po
wer
den
sity
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Light
ing
pow
er d
ensit
y in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
co
ntrib
ute
to th
e BR
EEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts. T
he O
ptio
n 2
requ
irem
ents
spe
cify
light
ing
effic
acie
s in
lum
inai
re lu
men
s/W
att r
athe
r tha
n lig
htin
g po
wer
den
sity
(Wat
t/m2 ),
so
proj
ect t
eam
s w
ould
nee
d to
per
form
a c
onve
rsio
n ca
lcula
tion
in o
rder
to s
how
com
plia
nce
with
th
e BR
EEA
M re
quire
men
ts.
Cons
truct
ion
and
Build
ing
Enve
lope
5.2.
1O
ptim
isatio
n of
bui
ldin
g fo
rm
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
rion
1
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 1
-3
A
chie
ving
the
Thre
e St
ar d
esig
n op
timisa
tion
requ
irem
ents
will
help
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e En
e 01
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
requ
irem
ents
. The
des
ign
optim
isatio
n in
form
atio
n ca
n po
tent
ially
be
used
as
evid
ence
in
mee
ting
the
Ene
04 p
assiv
e de
sign
anal
ysis
requ
irem
ents
.
5.2.
2O
pena
ble
win
dow
sH
ea 0
2 In
door
air
qual
ity
Crite
rion
18p
Ach
ievin
g th
e Th
ree
Star
ope
nabl
e w
indo
ws
requ
irem
ents
wou
ld d
emon
stra
te c
ompl
ianc
e w
ith
the
BREE
AM
ope
nabl
e w
indo
ws
area
requ
irem
ents
, but
add
ition
al e
viden
ce w
ould
be
requ
ired
to d
emon
stra
te th
at th
e de
sign
prov
ides
an
adeq
uate
cro
ss fl
ow o
f air.
5.2.
3Th
erm
al p
erfo
rman
ce o
f bui
ldin
g en
velo
pe
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ther
mal
per
form
ance
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e BR
EEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy
calcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es) r
equi
rem
ents
.
Hea
ting,
Ven
tilat
ion
and
Air
Cond
ition
ing
5.2.
4En
ergy
effi
cienc
y of
coo
ling
and
heat
ing
syst
ems
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
5.2.
5En
ergy
effi
cienc
y of
HVA
C eq
uipm
ent
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
5.2.
6O
ptim
isatio
n of
HVA
C sy
stem
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 5
-6
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Ene
01
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts. I
f a fr
ee c
oolin
g st
rate
gy
has
been
use
d, T
hree
Sta
r inf
orm
atio
n w
ill he
lp to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M E
ne 0
4 fre
e co
olin
g re
quire
men
ts.
5.2.
7En
ergy
effi
cienc
y m
easu
res
for
HVA
C sy
stem
dur
ing
trans
ition
se
ason
s
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 5
-6
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Ene
01
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts. I
f a fr
ee c
oolin
g st
rate
gy
has
been
use
d, T
hree
Sta
r inf
orm
atio
n w
ill he
lp to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M E
ne 0
4 fre
e co
olin
g re
quire
men
ts.
5.2.
8En
ergy
effi
cienc
y m
easu
res
for
HVA
C sy
stem
for p
art l
oads
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
Light
ing
and
Elec
trics
5.2.
9En
ergy
effi
cienc
y an
d co
ntro
l of
light
ing
syst
ems
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Light
ing
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
5.2.
10Lig
htin
g po
wer
den
sity
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Light
ing
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
5.2.
11En
ergy
effi
cienc
y of
ele
vato
rs a
nd
esca
lato
rsEn
e 06
Ene
rgy
effic
ient
tran
spor
t sys
tem
s Cr
iteria
1-6
pA
chie
ving
the
Thre
e St
ar e
leva
tor a
nd e
scal
ator
ene
rgy
savin
g re
quire
men
ts w
ould
hel
p to
de
mon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M e
nerg
y ef
ficie
nt fe
atur
es re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
to d
emon
stra
te th
at th
e m
easu
res
have
bee
n se
lect
ed in
acc
orda
nce
with
the
BREE
AM
ene
rgy
cons
umpt
ion
requ
irem
ents
(crit
erio
n 1)
.
5.2.
12En
ergy
effi
cient
ele
ctric
al
equi
pmen
t
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ener
gy e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Ener
gy S
avin
g an
d En
ergy
Util
isatio
nCo
mpr
ehen
sive
Utilis
atio
n of
Ene
rgy
5.2.
13H
eat r
ecov
ery
syst
ems
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
BREE
AM
doe
s no
t con
tain
spe
cific
requ
irem
ents
with
resp
ect t
o he
at re
cove
ry fr
om e
xhau
st
air.
How
ever
, mee
ting
the
Thre
e St
ar re
quire
men
t will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
des
ign
feat
ures
) req
uire
men
ts.
5.2.
14Co
ld a
nd h
eat s
tora
ge s
yste
ms
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
BREE
AM
doe
s no
t con
tain
spe
cific
requ
irem
ents
with
resp
ect t
o co
ld a
nd h
eat s
tora
ge. H
owev
er,
mee
ting
the
Thre
e St
ar re
quire
men
t may
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es) r
equi
rem
ents
.
5.2.
15W
aste
hea
t util
isatio
n
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 7
-8
p
Was
te h
eat i
nfor
mat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith
the
Ene
04 lo
w a
nd z
ero
carb
on te
chno
logi
es re
quire
men
ts, b
ut a
dditi
onal
evid
ence
wou
ld
be re
quire
d to
dem
onst
rate
that
a lo
w/z
ero
carb
on fe
asib
ility
stud
y ha
s be
en c
arrie
d ou
t. Th
is in
form
atio
n w
ill al
so h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Ene
01
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
de
sign
feat
ures
) req
uire
men
ts.
5.2.
16Re
new
able
ene
rgy
sour
ces
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 7
-8
p
Rene
wab
le e
nerg
y in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
the
Ene
04 lo
w a
nd z
ero
carb
on te
chno
logi
es re
quire
men
ts, b
ut a
dditi
onal
evid
ence
wou
ld
be re
quire
d to
dem
onst
rate
that
a lo
w/z
ero
carb
on fe
asib
ility
stud
y ha
s be
en c
arrie
d ou
t. Th
is in
form
atio
n w
ill al
so h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Ene
01
Opt
ion
1 (U
se o
f app
rove
d bu
ildin
g en
ergy
cal
cula
tion
softw
are)
or O
ptio
n 2
(Ene
rgy
effic
ient
de
sign
feat
ures
) req
uire
men
ts.
Wat
er S
avin
g an
d W
ater
Res
ourc
e U
tilisa
tion
Prer
equi
site
Item
s
6.1.1
Wat
er re
sour
ces
plan
Non
e−
BREE
AM
New
Con
stru
ctio
n do
es n
ot c
over
this
issue
.
6.1.
2W
ater
dra
inag
e sy
stem
sN
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
6.1.
3W
ater
effi
cient
equ
ipm
ent
Wat
01
Wat
er c
onsu
mpt
ion
Crite
rion
3Þ
The
wat
er e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M re
quire
men
ts fo
r effi
cienc
y of
‘dom
estic
-sca
le’ w
ater
-con
sum
ing
com
pone
nts.
Wat
er s
avin
g sy
stem
6.2.
1W
ater
con
sum
ptio
n of
bui
ldin
gW
at 0
1 W
ater
con
sum
ptio
n Cr
iteria
1-3
pIn
form
atio
n us
ed to
cal
cula
te th
e av
erag
e da
ily w
ater
con
sum
ptio
n of
the
build
ing
in T
hree
Sta
r ca
n be
use
d in
the
BREE
AM
Wat
01
wat
er c
alcu
lato
r, al
thou
gh a
dditi
onal
info
rmat
ion
may
be
requ
ired
to fu
lly p
opul
ate
the
calcu
lato
r.
6.2.
2W
ater
leak
pre
vent
ion
Wat
02
Wat
er m
onito
ring
Crite
ria 1
-2
The
wat
er m
eter
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
con
tribu
te to
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
wat
er m
eter
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at th
e m
eter
s en
able
con
nect
ion
to a
wat
er m
onito
ring
and
man
agem
ent s
yste
m.
6.2.
3W
ater
sup
ply
pres
sure
Non
e−
BREE
AM
New
Con
stru
ctio
n do
es n
ot c
over
this
issue
.
6.2.
4W
ater
con
sum
ptio
n m
easu
rem
ent
Wat
02
Wat
er m
onito
ring
Crite
ria 1
-4p
Wat
er m
eter
Info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
in to
dem
onst
rate
com
plia
nce
with
th
e BR
EEA
M w
ater
mon
itorin
g re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
de
mon
stra
te th
at th
e m
eter
s en
able
con
nect
ion
to a
wat
er m
onito
ring
and
man
agem
ent s
yste
m.
6.2.
5W
ater
sav
ing
mea
sure
s fo
r pub
lic
bath
room
sN
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
Wat
er S
avin
g A
pplia
nces
an
d Eq
uipm
ent
6.2.
6W
ater
effi
cient
com
pone
nts
Wat
01
Wat
er c
onsu
mpt
ion
Crite
rion
3Þ
The
wat
er e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M re
quire
men
ts fo
r effi
cienc
y of
‘dom
estic
-sca
le’ w
ater
-con
sum
ing
com
pone
nts.
6.2.
7W
ater
effi
cient
irrig
atio
nW
at 0
4 W
ater
effi
cient
equ
ipm
ent
Crite
rion
2p
Irrig
atio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
th
e BR
EEA
M w
ater
effi
cient
equ
ipm
ent r
equi
rem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
re
quire
d to
dem
onst
rate
that
a m
eani
ngfu
l red
uctio
n in
the
tota
l wat
er d
eman
d of
the
build
ing
has
been
ach
ieve
d.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Wat
er S
avin
g an
d W
ater
Res
ourc
e U
tilisa
tion
6.2.
8W
ater
effi
cient
coo
ling
equi
pmen
tW
at 0
4 W
ater
effi
cient
equ
ipm
ent
Crite
rion
2p
Wat
er s
avin
g te
chno
logy
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
wat
er e
fficie
nt e
quip
men
t req
uire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at a
mea
ning
ful r
educ
tion
in th
e to
tal w
ater
de
man
d of
the
build
ing
has
been
ach
ieve
d.
6.2.
9O
ther
wat
er e
fficie
nt te
chno
logi
esW
at 0
4 W
ater
effi
cient
equ
ipm
ent
Crite
rion
2p
Wat
er s
avin
g te
chno
logy
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
wat
er e
fficie
nt e
quip
men
t req
uire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at a
mea
ning
ful r
educ
tion
in th
e to
tal w
ater
de
man
d of
the
build
ing
has
been
ach
ieve
d.
Non
-tra
ditio
nal W
ater
So
urce
Util
izatio
n
6.2.
10N
on-t
radi
tiona
l wat
er s
ourc
es
Wat
01
Wat
er c
onsu
mpt
ion
Crite
ria 4
-5
Wat
04
Wat
er e
ffici
ent e
quip
men
t Cr
iterio
n 2
p
Non
-tra
ditio
nal w
ater
sou
rce
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
in th
e BR
EEA
M
Wat
01
wat
er c
alcu
lato
r, al
thou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
dem
onst
rate
that
su
ch s
yste
ms
are
spec
ified
and
inst
alle
d in
acc
orda
nce
with
nat
iona
l bes
t pra
ctice
sta
ndar
ds.
Whe
re g
reyw
ater
and
/or r
ainw
ater
is u
sed
for v
ehicl
e w
ashi
ng p
urpo
ses
in a
Thr
ee S
tar
proj
ect,
this
info
rmat
ion
can
be u
sed
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M W
at 0
4 w
ater
effi
cient
equ
ipm
ent r
equi
rem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
to
dem
onst
rate
that
a m
eani
ngfu
l red
uctio
n in
the
tota
l wat
er d
eman
d of
the
build
ing
has
been
ac
hiev
ed.
6.2.
11N
on-t
radi
tiona
l wat
er s
ourc
e fo
r co
olin
gW
at 0
4 W
ater
effi
cient
equ
ipm
ent
Crite
rion
2p
Non
-tra
ditio
nal c
oolin
g w
ater
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
wat
er e
fficie
nt e
quip
men
t req
uire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at a
mea
ning
ful r
educ
tion
in th
e to
tal w
ater
de
man
d of
the
build
ing
has
been
ach
ieve
d.
6.2.
12W
ater
feat
ures
Non
e−
BREE
AM
New
Con
stru
ctio
n do
es n
ot c
over
this
issue
.
Mat
eria
l Sav
ing
and
Mat
eria
l Res
ourc
e U
tilisa
tion
Prer
equi
site
Item
s
7.1.1
Rest
ricte
d co
nstru
ctio
n m
ater
ials
Hea
02
Indo
or a
ir qu
ality
Cr
iterio
n 1
Th
e re
stric
ted/
bann
ed m
ater
ials
info
rmat
ion
colle
cted
for T
hree
Sta
r may
hel
p to
con
tribu
te
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
requ
irem
ents
that
pro
hibi
t the
use
of
asbe
stos
in b
uild
ings
.
7.1.2
Hot
rolle
d rib
bed
stee
l bar
sN
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
7.1.3
Arc
hite
ctur
al m
odel
ling
elem
ents
Mat
06
Mat
eria
l effi
cienc
y Cr
iteria
1-2
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M m
ater
ial e
fficie
ncy
requ
irem
ents
, but
add
ition
al e
viden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
Savin
g m
ater
ial d
esig
n
7.2.1
Build
ing
shap
eM
at 0
6 M
ater
ial e
fficie
ncy
Crite
ria 1
-2
Build
ing
shap
e in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M m
ater
ial e
fficie
ncy
requ
irem
ents
, but
add
ition
al e
viden
ce
wou
ld b
e re
quire
d w
ith re
spec
t to
iden
tifyin
g ot
her o
ppor
tuni
ties
for m
ater
ial e
fficie
ncy.
7.2.2
Foun
datio
n an
d st
ruct
ure
optim
isatio
nM
at 0
6 M
ater
ial e
fficie
ncy
Crite
ria 1
-2
Stru
ctur
al o
ptim
isatio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
7.2.3
Inte
grat
ed d
esig
n of
civi
l en
gine
erin
g an
d de
cora
tion
Mat
06
Mat
eria
l effi
cienc
y Cr
iteria
1-2
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M m
ater
ial e
fficie
ncy
requ
irem
ents
, but
add
ition
al e
viden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
7.2.4
Reus
able
par
titio
n w
alls
Wst
06
Func
tiona
l ada
ptab
ility
Crite
ria 1
-2
Reus
able
par
titio
n w
all i
nfor
mat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e BR
EEA
M fu
nctio
nal a
dapt
abilit
y re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r ada
ptab
ility.
7.2.5
Pref
abric
ated
con
stru
ctio
n el
emen
tsM
at 0
6 M
ater
ial e
fficie
ncy
Crite
ria 1
-2
Pref
abric
ated
par
ts in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
7.2.6
Inte
grat
ed d
esig
n of
kitc
hens
and
ba
thro
oms
Mat
06
Mat
eria
l effi
cienc
y Cr
iteria
1-2
In
tegr
ally
desig
ned
kitc
hen
and
bath
room
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to
cont
ribut
e to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M m
ater
ial e
fficie
ncy
requ
irem
ents
, bu
t add
ition
al e
viden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r m
ater
ial e
fficie
ncy.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Mat
eria
l Sav
ing
and
Mat
eria
l Res
ourc
e U
tilisa
tion
Mat
eria
l Sel
ectio
n
7.2.7
Loca
lly s
ourc
ed c
onst
ruct
ion
mat
eria
ls
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
18-
19
Cons
truct
ion
mat
eria
l tra
nspo
rt di
stan
ce fo
r inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M tr
ansp
ort o
f con
stru
ctio
n m
ater
ials
and
was
te re
quire
men
ts, b
ut a
dditi
onal
evid
ence
wou
ld b
e re
quire
d w
ith re
spec
t to
cons
truct
ion
was
te tr
ansp
ort d
istan
ces.
7.2.8
Prem
ixed
conc
rete
Mat
06
Mat
eria
l effi
cienc
y Cr
iteria
1-2
Pr
emixe
d co
ncre
te in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
7.2.9
Read
y-m
ixed
mor
tar
Mat
06
Mat
eria
l effi
cienc
y Cr
iteria
1-2
Re
ady-
mixe
d m
orta
r inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut a
dditi
onal
ev
iden
ce w
ould
be
requ
ired
with
resp
ect t
o id
entif
ying
othe
r opp
ortu
nitie
s fo
r mat
eria
l effi
cienc
y.
7.2.10
Hig
h-st
reng
th s
truct
ural
mat
eria
lsM
at 0
6 M
ater
ial e
fficie
ncy
Crite
ria 1
-2
Hig
h-st
reng
th s
truct
ural
mat
eria
l inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut
addi
tiona
l evid
ence
wou
ld b
e re
quire
d w
ith re
spec
t to
iden
tifyin
g ot
her o
ppor
tuni
ties
for m
ater
ial
effic
ienc
y.
7.2.11
Hig
h du
rabi
lity
cons
truct
ion
mat
eria
ls
Mat
05
Des
igni
ng fo
r dur
abilit
y an
d re
silie
nce
Crite
rion
2p
Conc
rete
and
ste
el d
urab
ility
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
Pro
tect
ing
expo
sed
parts
of t
he b
uild
ing
from
mat
eria
l de
grad
atio
n re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
dem
onst
rate
that
du
rabi
lity
mea
sure
s ha
ve b
een
spec
ified
for o
ther
bui
ldin
g el
emen
ts.
7.2.12
Reus
able
or r
ecyc
labl
e co
nstru
ctio
n m
ater
ials
Mat
01
Life
cycle
impa
cts
Crite
ria 1
-4
Reus
able
and
recy
clabl
e co
nstru
ctio
n m
ater
ial i
nfor
mat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to
cont
ribut
e to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M li
fe c
ycle
impa
cts
requ
irem
ents
, bu
t add
ition
al in
form
atio
n w
ould
be
requ
ired
to p
opul
ate
the
Mat
01
calcu
lato
r.
7.2.13
Cons
truct
ion
mat
eria
ls m
ade
from
w
aste
mat
eria
ls
Mat
01
Life
cycle
impa
cts
Crite
ria 1
-4
Wst
02
Recy
cled
agg
rega
tes
Crite
ria 1
-2
Reus
able
and
recy
clabl
e co
nstru
ctio
n m
ater
ial i
nfor
mat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Mat
01
life
cycle
impa
cts
requ
irem
ents
, but
add
ition
al in
form
atio
n w
ould
be
requ
ired
to p
opul
ate
the
Mat
01
calcu
lato
r. Th
e in
form
atio
n co
uld
also
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M W
st 0
2 re
cycle
d ag
greg
ates
requ
irem
ents
.
7.2.14
Dur
abilit
y of
dec
orat
ive m
ater
ials
Mat
05
Des
igni
ng fo
r dur
abilit
y an
d re
silie
nce
Crite
rion
2p
Dur
abilit
y in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
th
e BR
EEA
M P
rote
ctin
g ex
pose
d pa
rts o
f the
bui
ldin
g fro
m m
ater
ial d
egra
datio
n re
quire
men
ts,
alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at d
urab
ility
mea
sure
s ha
ve
been
spe
cified
for o
ther
bui
ldin
g el
emen
ts.
Indo
or E
nviro
nmen
t Q
ualit
yPr
ereq
uisit
e Ite
ms
8.1.1
Indo
or n
oise
leve
lsH
ea 0
5 A
cous
tic p
erfo
rman
ce
Crite
ria 2
-3p
The
noise
leve
l inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
the
BREE
AM
requ
irem
ents
for i
ndoo
r am
bien
t noi
se le
vels,
alth
ough
con
firm
atio
n w
ill be
re
quire
d th
at a
sui
tabl
y qu
alifi
ed a
cous
ticia
n ha
s ca
rried
out
noi
se m
easu
rem
ents
.
8.1.
2So
und
insu
latio
nH
ea 0
5 A
cous
tic p
erfo
rman
ce
Crite
ria 4
and
8p
The
soun
d in
sula
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
requ
irem
ents
for s
ound
insu
latio
n, a
lthou
gh c
onfir
mat
ion
will
be
requ
ired
that
noi
se m
easu
rem
ent/t
estin
g ha
s be
en p
erfo
rmed
.
8.1.
3In
tern
al li
ghtin
gH
ea 0
1 Vi
sual
com
fort
Crite
ria 7
-8Þ
The
light
ing
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith
the
BREE
AM
inte
rnal
ligh
ting
requ
irem
ents
.
8.1.
4Th
erm
al d
esig
n
Hea
02
Indo
or a
ir qu
ality
Cr
iterio
n 4
Hea
04
Ther
mal
com
fort
Crite
ria 1
-3
p
The
fresh
air
vent
ilatio
n ra
te in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
co
mpl
ianc
e w
ith th
e BR
EEA
M H
ea 0
2 fre
sh a
ir re
quire
men
ts, a
lthou
gh a
cal
cula
tion
to c
onve
rt un
its m
ay b
e re
quire
d. T
empe
ratu
re ra
nge
and
hum
idity
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
use
d to
dem
onst
rate
com
plia
nce
with
the
BREE
AM
Hea
04
ther
mal
mod
ellin
g re
quire
men
ts,
alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te th
at th
erm
al m
odel
ling
has
been
pe
rform
ed in
acc
orda
nce
with
ISO
773
0.
8.1.
5Co
nden
satio
nM
an 0
4 Co
mm
issio
ning
and
han
dove
r Cr
iterio
n 8
Th
erm
al b
ridgi
ng in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M te
stin
g an
d in
spec
ting
build
ing
fabr
ic re
quire
men
ts, b
ut
addi
tiona
l inf
orm
atio
n w
ould
be
requ
ired
in te
rms
of a
irtig
htne
ss/a
ir le
akag
e pe
rform
ance
.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Indo
or E
nviro
nmen
t Q
ualit
y
8.1.
6Th
erm
al in
sula
tion
of ro
of a
nd
wal
ls
Hea
04
Ther
mal
com
fort
Crite
ria 1
-3
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
In
sula
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Hea
04
ther
mal
mod
ellin
g re
quire
men
ts a
nd th
e En
e 01
O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt
desig
n fe
atur
es) r
equi
rem
ents
.
8.1.
7Co
ncen
tratio
n of
pol
luta
nts
in
indo
or a
irH
ea 0
2 In
door
air
qual
ity
Crite
ria 1
2-16
pTh
e po
lluta
nt c
once
ntra
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
pos
t-co
nstru
ctio
n in
door
air
qual
ity m
easu
rem
ent r
equi
rem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
dem
onst
rate
that
sam
plin
g an
d an
alys
is ha
s be
en p
erfo
rmed
in a
ccor
danc
e w
ith th
e IS
O 1
6000
ser
ies
of s
tand
ards
.
Indo
or S
ound
En
viron
men
t
8.2.
1In
door
noi
se le
vels
Hea
05
Aco
ustic
per
form
ance
Cr
iteria
2-3
pTh
e no
ise le
vel i
nfor
mat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M re
quire
men
ts fo
r ind
oor a
mbi
ent n
oise
leve
ls, a
lthou
gh c
onfir
mat
ion
will
be
requ
ired
that
a s
uita
bly
qual
ified
aco
ustic
ian
has
carri
ed o
ut n
oise
mea
sure
men
ts.
8.2.
2A
irbor
ne a
nd im
pact
sou
nd
insu
latio
nH
ea 0
5 A
cous
tic p
erfo
rman
ce
Crite
ria 4
-5 a
nd 8
-9p
The
soun
d in
sula
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
requ
irem
ents
for s
ound
insu
latio
n, a
lthou
gh c
onfir
mat
ion
will
be
requ
ired
that
noi
se m
easu
rem
ent/t
estin
g ha
s be
en p
erfo
rmed
.
8.2.
3N
oise
miti
gatio
n m
easu
res
Hea
05
Aco
ustic
per
form
ance
Cr
iterio
n 1
N
oise
redu
ctio
n m
easu
res
info
rmat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
pre
requ
isite
requ
irem
ents
, alth
ough
add
ition
al
info
rmat
ion
will
be re
quire
d in
term
s of
the
appo
intm
ent o
f a s
uita
bly
qual
ified
aco
ustic
ian.
8.2.
4A
cous
tic d
esig
nH
ea 0
5 A
cous
tic p
erfo
rman
ce
Crite
rion
7Þ
The
acou
stic
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith
the
BREE
AM
reve
rber
atio
n tim
e re
quire
men
ts.
Indo
or L
ight
ing
Envir
onm
ent a
nd V
ision
8.2.
5Vi
ew o
utsid
eH
ea 0
1 Vi
sual
com
fort
Crite
ria 5
-6
Win
dow
/vie
w in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
vie
w o
ut re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be
requ
ired
in te
rms
of d
istan
ces
from
win
dow
s an
d w
indo
w o
peni
ng s
izes.
8.2.
6D
aylig
htin
gH
ea 0
1 Vi
sual
com
fort
Crite
rion
4p
The
dayli
ghtin
g in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
th
e BR
EEA
M d
aylig
htin
g re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d in
term
s of
uni
form
ity ra
tio, v
iew
of s
ky a
nd/o
r roo
m d
epth
.
8.2.
7Im
prov
ed d
aylig
htin
g an
d gl
are
cont
rol
Hea
01
Visu
al c
omfo
rt Cr
iteria
2-4
and
7-9
D
aylig
htin
g an
d gl
are
cont
rol i
nfor
mat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
day
light
ing,
gla
re c
ontro
l and
inte
rnal
ligh
ting
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
for e
ach
of th
ese
elem
ents
to
achi
eve
com
plia
nce.
Indo
or h
eat
envir
onm
ent
8.2.
8So
lar s
hadi
ngH
ea 0
1 Vi
sual
com
fort
Crite
ria 2
-3
Shad
ing
info
rmat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e gl
are
cont
rol r
equi
rem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
re
quire
d w
ith re
spec
t to
a gl
are
cont
rol s
trate
gy.
8.2.
9Te
mpe
ratu
re c
ontro
lsH
ea 0
4 Th
erm
al c
omfo
rt Cr
iterio
n 11
pTh
e th
erm
al c
ontro
ls in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
the
BREE
AM
ther
mal
zon
ing
and
cont
rols
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
in te
rms
of th
e w
ider
tem
pera
ture
con
trol s
trate
gy.
Indo
or a
ir qu
ality
8.2.
10N
atur
al v
entil
atio
nH
ea 0
2 In
door
air
qual
ity
Crite
ria 1
8-19
pTh
e na
tura
l ven
tilat
ion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
pot
entia
l for
nat
ural
ven
tilat
ion
requ
irem
ents
, alth
ough
add
ition
al
info
rmat
ion
will
be re
quire
d in
term
s of
the
prov
ision
of a
n ad
equa
te c
ross
flow
of a
ir an
d us
er
cont
rol o
n th
e su
pply
of fr
esh
air.
8.2.
11A
ir di
strib
utio
n
Hea
02
Indo
or a
ir qu
ality
Cr
iteria
4-5
Hea
04
Ther
mal
com
fort
Crite
ria 1
-3
Th
erm
al e
nviro
nmen
t and
air
supp
ly an
d ex
haus
t inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Hea
02
vent
ilatio
n an
d H
ea
04 th
erm
al m
odel
ling
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ill be
requ
ired
for e
ach
of
thes
e el
emen
ts to
ach
ieve
com
plia
nce.
8.2.
12In
door
air
qual
ity m
onito
ring
syst
emH
ea 0
2 In
door
air
qual
ity
Crite
rion
7Þ
Air
qual
ity m
onito
ring
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
car
bon
diox
ide/
air q
ualit
y se
nsor
requ
irem
ents
.
8.2.
13Ca
rbon
mon
oxid
e m
onito
ring
in
unde
rgro
und
park
ing
Non
e−
This
issue
is n
ot c
over
ed b
y BR
EEA
M N
ew C
onst
ruct
ion.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Cons
truct
ion
Man
agem
ent
Prer
equi
site
Item
s
9.1.1
Gre
en c
onst
ruct
ion
man
agem
ent
Man
01
Proj
ect b
rief a
nd d
esig
n Cr
iteria
1-1
4
Man
agem
ent s
yste
m in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e BR
EEA
M p
roje
ct b
rief a
nd d
esig
n re
quire
men
ts, a
lthou
gh
addi
tiona
l inf
orm
atio
n w
ill be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
9.1.
2En
viron
men
tal p
rote
ctio
n pl
anM
an 0
3 Re
spon
sible
con
stru
ctio
n pr
actic
es
Crite
ria 3
-4 a
nd 8
-9
Envir
onm
enta
l pro
tect
ion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te to
war
ds
achi
evin
g pe
rform
ance
aga
inst
the
BREE
AM
env
ironm
enta
l man
agem
ent a
nd c
onsid
erat
e co
nstru
ctio
n re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d in
acc
orda
nce
with
th
e BR
EEA
M c
heck
lists
for t
hese
issu
es.
9.1.
3H
ealth
and
saf
ety
man
agem
ent
plan
Man
01
Proj
ect b
rief a
nd d
esig
n Cr
iteria
2-3
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iterio
n 2
H
ealth
and
saf
ety
man
agem
ent i
nfor
mat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
Man
01
stak
ehol
der c
onsu
ltatio
n (p
roje
ct
deliv
ery)
and
Man
03
natio
nal h
ealth
and
saf
ety
legi
slatio
n re
quire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
9.1.
4Re
view
of g
reen
bui
ldin
g de
sign
docu
men
tsM
an 0
1 Pr
ojec
t brie
f and
des
ign
Crite
ria 1
-14
D
esig
n re
view
info
rmat
ion
colle
cted
for T
hree
Sta
r can
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M p
roje
ct b
rief a
nd d
esig
n re
quire
men
ts, a
lthou
gh a
dditi
onal
in
form
atio
n w
ill be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
Envir
onm
enta
l pr
otec
tion
9.2.
1D
ust p
rote
ctio
n m
easu
res
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
3-4
pD
ust p
rote
ctio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
env
ironm
enta
l man
agem
ent r
equi
rem
ents
, alth
ough
ad
ditio
nal i
nfor
mat
ion
will
be re
quire
d in
acc
orda
nce
with
the
BREE
AM
che
cklis
t for
this
issue
.
9.2.
2Co
nstru
ctio
n no
ise re
duct
ion
mea
sure
s
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
3-4
pD
ust p
rote
ctio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
env
ironm
enta
l man
agem
ent r
equi
rem
ents
, alth
ough
ad
ditio
nal i
nfor
mat
ion
will
be re
quire
d in
acc
orda
nce
with
the
BREE
AM
che
cklis
t for
this
issue
.
9.2.
3Co
nstru
ctio
n w
aste
redu
ctio
n an
d re
cycli
ng p
lan
Wst
01
Cons
truct
ion
was
te m
anag
emen
t Cr
iteria
1-1
1
Cons
truct
ion
was
te in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
con
stru
ctio
n w
aste
redu
ctio
n an
d di
vers
ion
of re
sour
ces
from
la
ndfil
l req
uire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
dem
onst
rate
com
plia
nce
with
thes
e iss
ues.
Savin
g re
sour
ces
9.2.
4Co
nstru
ctio
n en
ergy
effi
cienc
yM
an 0
3 Re
spon
sible
con
stru
ctio
n pr
actic
es
Crite
ria 1
1-13
and
17-
19Þ
Ener
gy m
onito
ring
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M m
onito
ring
of s
ite im
pact
s re
quire
men
ts fo
r ene
rgy
cons
umpt
ion
and
trans
port
of c
onst
ruct
ion
mat
eria
ls an
d w
aste
.
9.2.
5Co
nstru
ctio
n w
ater
effi
cienc
y M
an 0
3 Re
spon
sible
con
stru
ctio
n pr
actic
es
Crite
ria 1
4-16
ÞW
ater
mon
itorin
g in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an b
e us
ed to
dem
onst
rate
com
plia
nce
with
the
BREE
AM
mon
itorin
g of
site
impa
cts
requ
irem
ents
for w
ater
con
sum
ptio
n.
9.2.
6Pr
emixe
d co
ncre
te w
aste
redu
ctio
nW
st 0
1 Co
nstru
ctio
n w
aste
man
agem
ent
Crite
ria 1
-8
Conc
rete
was
te in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
th
e BR
EEA
M c
onst
ruct
ion
was
te re
duct
ion
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
with
resp
ect t
o ot
her c
onst
ruct
ion
was
te ty
pes.
9.2.
7Re
info
rcin
g ba
r was
teW
st 0
1 Co
nstru
ctio
n w
aste
man
agem
ent
Crite
ria 1
-8
Stee
l was
te in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
the
BREE
AM
con
stru
ctio
n w
aste
redu
ctio
n re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d w
ith re
spec
t to
othe
r con
stru
ctio
n w
aste
type
s.
9.2.
8Fo
rmw
ork
Wst
01
Cons
truct
ion
was
te m
anag
emen
t Cr
iteria
1-8
Fo
rmw
ork
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
be
used
to c
ontri
bute
to th
e BR
EEA
M c
onst
ruct
ion
was
te re
duct
ion
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
with
resp
ect t
o ot
her c
onst
ruct
ion
was
te ty
pes.
Proc
ess
man
agem
ent
9.2.
9Im
plem
enta
tion
of g
reen
bui
ldin
g de
sign
Man
01
Proj
ect b
rief a
nd d
esig
n Cr
iteria
9-1
4
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
5-7
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
the
BREE
AM
Man
01
and
Man
03
sust
aina
bilit
y ch
ampi
on re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d w
ith re
spec
t to
BREE
AM
per
form
ance
targ
ets.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Cons
truct
ion
Man
agem
ent
Proc
ess
man
agem
ent
9.2.
10St
rictly
con
trol m
odifi
catio
n of
de
signs
Man
01
Proj
ect b
rief a
nd d
esig
n Cr
iteria
9-1
4
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
5-7
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
the
BREE
AM
Man
01
and
Man
03
sust
aina
bilit
y ch
ampi
on re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d w
ith re
spec
t to
BREE
AM
per
form
ance
targ
ets.
9.2.
11Co
nstru
ctio
n te
sts
Man
03
Resp
onsib
le c
onst
ruct
ion
prac
tices
Cr
iteria
5-7
Man
04
Com
miss
ioni
ng a
nd h
ando
ver
Crite
ria 7
-9
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te to
the
BREE
AM
Man
03
sus
tain
abilit
y ch
ampi
on a
nd M
an 0
4 te
stin
g an
d in
spec
ting
build
ing
fabr
ic re
quire
men
ts,
alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
9.2.
12In
tegr
atio
n of
con
stru
ctio
n an
d de
cora
tion
wor
ksM
an 0
4 Co
mm
issio
ning
and
han
dove
r Cr
iteria
10
and
11
Info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
be
used
to c
ontri
bute
to th
e BR
EEA
M
hand
over
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
with
resp
ect t
o th
e bu
ildin
g us
er g
uide
and
trai
ning
con
tent
.
9.2.
13Co
mm
issio
ning
Man
04
Com
miss
ioni
ng a
nd h
ando
ver
Crite
ria 1
-6p
Com
miss
ioni
ng in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
an h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
aga
inst
the
BREE
AM
com
miss
ioni
ng re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d w
ith re
spec
t to
com
miss
ioni
ng s
ched
ulin
g, m
onito
ring
and
resp
onsib
ilitie
s.
Ope
ratio
n M
anag
emen
t
Prer
equi
site
Item
s
10.1.
1O
pera
tiona
l man
agem
ent o
f en
ergy
, wat
er a
nd m
ater
ials
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.1.
2W
aste
man
agem
ent s
yste
m
Wst
03a
Ope
ratio
nal w
aste
Cr
iteria
1-6
Wst
03b
Ope
ratio
nal w
aste
Cr
iteria
1-6
W
aste
man
agem
ent i
nfor
mat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
be
used
to c
ontri
bute
to
the
BREE
AM
ope
ratio
nal w
aste
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
inclu
ding
sto
rage
spa
ce s
ize/v
olum
es.
10.1.
3Em
issio
ns o
f pol
luta
nts
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.1.
4En
ergy
and
wat
er e
fficie
ncy
mee
t th
e de
sign
requ
irem
ents
Man
05
Afte
rcar
e Cr
iteria
2-6
En
ergy
and
wat
er m
anag
emen
t inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed
to c
ontri
bute
to th
e BR
EEA
M a
fterc
are
supp
ort,
seas
onal
com
miss
ioni
ng a
nd P
OE
requ
irem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d w
ith re
spec
t to
each
of t
hese
issu
es.
10.1.
5H
VAC
mon
itorin
g an
d co
ntro
l sy
stem
s op
erat
e co
rrect
lyM
an 0
5 A
fterc
are
Crite
ria 2
-6
Build
ing
man
agem
ent i
nfor
mat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
be
used
to c
ontri
bute
to
the
BREE
AM
afte
rcar
e su
ppor
t, se
ason
al c
omm
issio
ning
and
PO
E re
quire
men
ts, a
lthou
gh
addi
tiona
l inf
orm
atio
n w
ould
be
requ
ired
with
resp
ect t
o ea
ch o
f the
se is
sues
.
Man
agem
ent s
yste
m
10.2
.1M
anag
emen
t sys
tem
cer
tifica
tion
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.2O
pera
ting
proc
edur
es a
nd
emer
genc
y pl
ans
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.3En
ergy
man
agem
ent i
ncen
tives
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.4G
reen
bui
ldin
g in
form
atio
n di
ssem
inat
ion
Man
04
Com
miss
ioni
ng a
nd h
ando
ver
Crite
ria 1
0-11
Man
05
Afte
rcar
e Cr
iteria
1 a
nd 5
Bu
ildin
g m
anag
emen
t inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te
to th
e BR
EEA
M M
an 0
4 ha
ndov
er a
nd M
an 0
5 af
terc
are
supp
ort a
nd P
OE
requ
irem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d w
ith re
spec
t to
each
of t
hese
issu
es.
Tech
nolo
gy
man
agem
ent
10.2
.5O
ngoi
ng m
onito
ring,
mai
nten
ance
an
d co
mm
issio
ning
Man
05
Afte
rcar
e Cr
iterio
n 3
pBu
ildin
g m
anag
emen
t inf
orm
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly b
e us
ed to
con
tribu
te
to th
e BR
EEA
M s
easo
nal c
omm
issio
ning
requ
irem
ents
, alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M te
stin
g re
quire
men
ts.
10.2
.6In
spec
tion
and
clean
ing
of H
VAC
syst
ems
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.7W
ater
con
sum
ptio
n an
d qu
ality
m
onito
ring
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Ope
ratio
n M
anag
emen
t
10.2
.8O
pera
tion
of ‘in
tellig
ent’
syst
ems
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.9Bu
ildin
g m
anag
emen
t inf
orm
atio
n sy
stem
N
one
−Th
is iss
ue is
out
side
the
scop
e of
a B
REEA
M N
ew C
onst
ruct
ion
asse
ssm
ent.
Envir
onm
ent
man
agem
ent
10.2
.10Pe
st c
ontro
l and
che
mica
l m
anag
emen
tN
one
−Th
is iss
ue is
out
side
the
scop
e of
a B
REEA
M N
ew C
onst
ruct
ion
asse
ssm
ent.
10.2
.11Su
rviva
l rat
e of
pla
nted
or
trans
plan
ted
trees
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.12Cl
eanl
ines
s of
was
te s
tora
ge a
reas
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
10.2
.13W
aste
col
lect
ion
Non
e−
This
issue
is o
utsid
e th
e sc
ope
of a
BRE
EAM
New
Con
stru
ctio
n as
sess
men
t.
Prom
otio
n an
d In
nova
tion
Perfo
rman
ce p
rom
otio
n
11.2
.1Th
erm
al p
erfo
rman
ce o
f bui
ldin
g en
velo
pe
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ther
mal
per
form
ance
info
rmat
ion
colle
cted
for T
hree
Sta
r will
help
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e BR
EEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy
calcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es) r
equi
rem
ents
.
11.2
.2En
ergy
effi
cienc
y of
HVA
C sy
stem
s En
e 01
Red
uctio
n of
ene
rgy
use
and
carb
on e
miss
ions
Cr
iteria
1-3
En
ergy
effi
cienc
y in
form
atio
n co
llect
ed fo
r Thr
ee S
tar w
ill he
lp to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es) r
equi
rem
ents
.
11.2
.3Co
mbi
ned
cool
ing
heat
ing
pow
er
tech
nolo
gy
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-3
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 7
-8
Com
bine
d co
olin
g, h
eatin
g an
d po
wer
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to
dem
onst
rate
com
plia
nce
with
the
Ene
04 lo
w a
nd z
ero
carb
on te
chno
logi
es re
quire
men
ts, b
ut
addi
tiona
l evid
ence
wou
ld b
e re
quire
d to
dem
onst
rate
that
a lo
w/z
ero
carb
on fe
asib
ility
stud
y ha
s be
en c
arrie
d ou
t. A
dditi
onal
ly, th
is in
form
atio
n w
ill he
lp to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce a
gain
st th
e BR
EEA
M O
ptio
n 1
(Use
of a
ppro
ved
build
ing
ener
gy c
alcu
latio
n so
ftwar
e) o
r Opt
ion
2 (E
nerg
y ef
ficie
nt d
esig
n fe
atur
es) r
equi
rem
ents
.
11.2
.4W
ater
effi
cienc
y of
san
itary
ap
plia
nces
Wat
01
Wat
er c
onsu
mpt
ion
Crite
rion
3Þ
The
wat
er e
fficie
ncy
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te c
ompl
ianc
e w
ith th
e BR
EEA
M re
quire
men
ts fo
r effi
cienc
y of
‘dom
estic
-sca
le’ w
ater
-con
sum
ing
com
pone
nts.
11.2
.5Re
sour
ce e
fficie
nt b
uild
ing
stru
ctur
eM
at 0
6 M
ater
ial e
fficie
ncy
Crite
ria 1
-2
Info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
ag
ains
t the
BRE
EAM
mat
eria
l effi
cienc
y re
quire
men
ts, b
ut a
dditi
onal
evid
ence
wou
ld b
e re
quire
d w
ith re
spec
t to
iden
tifyin
g ot
her o
ppor
tuni
ties
for m
ater
ial e
fficie
ncy.
11.2
.6In
door
air
treat
men
tH
ea 0
2 In
door
air
qual
ity
Crite
ria 2
and
6
Info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld h
elp
to c
ontri
bute
tow
ards
ach
ievin
g pe
rform
ance
ag
ains
t the
BRE
EAM
indo
or a
ir qu
ality
pla
n an
d ve
ntila
tion
requ
irem
ents
, but
add
ition
al e
viden
ce
wou
ld b
e re
quire
d w
ith re
spec
t to
thes
e iss
ues.
11.2
.7Co
ncen
tratio
n of
pol
luta
nts
in
indo
or a
irH
ea 0
2 In
door
air
qual
ity
Crite
ria 1
1-17
pTh
e po
lluta
nt c
once
ntra
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r can
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
pos
t-co
nstru
ctio
n in
door
air
qual
ity m
easu
rem
ent r
equi
rem
ents
, al
thou
gh a
dditi
onal
info
rmat
ion
will
be re
quire
d to
dem
onst
rate
that
sam
plin
g an
d an
alys
is ha
s be
en p
erfo
rmed
in a
ccor
danc
e w
ith th
e IS
O 1
6000
ser
ies
of s
tand
ards
.
Inno
vatio
n
11.2
.8Pa
ssive
des
ign
mea
sure
s
Ene
01 R
educ
tion
of e
nerg
y us
e an
d ca
rbon
em
issio
ns
Crite
ria 1
-6
Ene
04 L
ow c
arbo
n de
sign
Crite
ria 1
-6
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M E
ne 0
1 en
ergy
per
form
ance
and
Ene
04
pass
ive d
esig
n re
quire
men
ts,
alth
ough
add
ition
al in
form
atio
n w
ould
be
requ
ired
to d
emon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
11.2
.9Pr
evio
usly
deve
lope
d la
nd a
nd
reus
e of
exis
ting
build
ings
Wst
01
Cons
truct
ion
was
te m
anag
emen
t Cr
iterio
n 5
LE 0
1 Si
te s
elec
tion
Crite
ria 1
-4
In
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
hel
p to
con
tribu
te to
war
ds a
chie
ving
perfo
rman
ce
agai
nst t
he B
REEA
M W
st 0
1 pr
e-de
mol
ition
aud
it an
d LE
01
prev
ious
ly de
velo
ped
land
and
co
ntam
inat
ed la
nd re
quire
men
ts, a
lthou
gh a
dditi
onal
info
rmat
ion
wou
ld b
e re
quire
d to
de
mon
stra
te c
ompl
ianc
e w
ith th
ese
issue
s.
11.2
.10Bu
ildin
g in
form
atio
n m
odel
ling
(BIM
)N
one
−BR
EEA
M N
ew C
onst
ruct
ion
does
not
cov
er th
is iss
ue.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
Prom
otio
n an
d In
nova
tion
Inno
vatio
n
11.2
.11Bu
ildin
g ca
rbon
em
issio
n an
alys
isM
at 0
1 Lif
e cy
cle im
pact
s Cr
iteria
1-4
Ca
rbon
em
issio
n in
form
atio
n co
llect
ed fo
r Thr
ee S
tar c
ould
pot
entia
lly h
elp
to c
ontri
bute
tow
ards
ac
hiev
ing
perfo
rman
ce a
gain
st th
e BR
EEA
M li
fe c
ycle
impa
cts
requ
irem
ents
, alth
ough
add
ition
al
info
rmat
ion
wou
ld b
e re
quire
d to
pop
ulat
e th
e M
at 0
1 ca
lcula
tor.
11.2
.12O
ther
inno
vatio
nsIn
n 01
Inno
vatio
n Cr
iterio
n 2
In
nova
tion
info
rmat
ion
colle
cted
for T
hree
Sta
r cou
ld p
oten
tially
be
used
to d
emon
stra
te
com
plia
nce
with
the
BREE
AM
app
rove
d in
nova
tion
requ
irem
ents
, alth
ough
a B
REEA
M
inno
vatio
n ap
plica
tion
wou
ld n
eed
to b
e su
bmitt
ed to
and
app
rove
d by
BRE
Glo
bal.
Thre
e St
ar c
ateg
ory
Thre
e St
ar s
ub-
cate
gory
Thre
e St
ar
stan
dard
cl
ause
Thre
e St
ar r
equi
rem
ents
BR
EEA
M In
tern
atio
nal N
ew
Cons
truc
tion
201
6 as
sess
men
t is
sue
crit
eria
Alig
nmen
tN
otes
BRE Global Bucknalls Lane Watford United Kingdom WD25 9XX
T +44 (0)333 321 8811 E [email protected] www.breeam.com
Acknowledgements:
BRE would like to thank Professor Xiao Feng Li of Tsinghua University, China for providing guidance on the Three Star method and processes. This has proved invaluable in the evaluation of the alignment between the two standards and the preparation of this document.
Use of Trademarks
All third-party trademarks are the property of their respective owners. All third-party trademarks referenced in this document are used in an editorial fashion and not to the detriment of the trademark holders.
BREEAM is a registered trademark owned by BRE (the Building Research Establishment Ltd. Community Trademark E5778551). The BREEAM marks, logos and symbols are the Copyright of BRE and are reproduced by permission.
Copyright
© Copyright 2017 BRE. All rights reserved. No part of this document or the information contained within it may be (a) used for any purpose other than that stated within this document by the recipient; or (b) reproduced, transmitted or translated in any form or
by any means, electronic, mechanical, manual, optical or otherwise, without prior written permission of BRE Global Ltd. Unauthorised use of this document violates copyright, trademark, and other laws and is prohibited.
Permission is granted for this report to be distributed in its entirety only, without amendment and with copyright attribution to BRE Global Ltd.
Disclaimer
BRE do not accept any liability or responsibility to the user or any third parties for the accuracy, completeness, use of or reliance on any information contained in this document. Although the information contained in this document is believed to be reliable and accurate, all materials set forth within are provided without warranties of any kind, either express or implied, including but not limited to warranties of the accuracy or completeness of information or the suitability of the information for any particular purpose.
Every effort has been taken to ensure the accuracy of this report but no warranty is made in respect of any conclusions or opinions expressed herein. BRE Global Ltd’s liabilities in respect of this report and any reliance thereupon is disclaimed and they shall have no liability to third parties to the extent permitted by law.