4th German-AmericanEnergy Efficiency Conference
December 6, 2011
Stephen V. Skalko, P.E.Chair – SSPC 90.1
ASHRAE Standard 90.1-2013
Aiming at 50% Energy SavingsFor 90.1-2013
Background on Standard 90.1- 2013The “Goals” for 2013Changes under considerationThe Future
ASHRAE Standard 90.1-2013
Timeline
1990
1970
1980
2000
2010
1975Std 90-75
1989Std 90.1-89
1999Std 90.1-99
2004Std 90.1-04
2007Std 90.1-07
1980Std 90A-80Std 90B-75
2001Std 90.1-99
Growing period Maturity period
ASHRAE Standard 90.1
Timeline
2010
1999Std 90.1-99
2004Std 90.1-04
2007Std 90.1-07
MILESTONES
1999 – Major rewrite,economic basis & CM
2001 – 3 Year cycles90.1 Work Plan – 30%energy cost savings Expand TPS
2001Std 90.1-04
30%
200630%
ASHRAE Standard 90.1
ASHRAE Standard 90.1
Section 1: PurposeSection 2: ScopeSection 3: Definitions
AbbreviationsSection 4: Admin. And
EnforcementSection 5: Building
EnvelopeSection 6: HVAC
Section 7: SWHSection 8: PowerSection 9: LightingSection 10: Elec. MotorsSection 11: ECB Section 12: ReferencesAppendices
Appendix C – EnvelopeAppendix G - ECB
Sections
ASHRAE SSPC 90.1
Standing Standard Project
CommitteeChair & VCs
Liaisons ExCom
ECBSubcommittee
CH 11App G
FORMAT & COMPLIANCESubcommittee
CH 4
LIGHTINGSubcommittee
CH 8, 9, 10
MECHANICALSubcommittee
CH 6, 7
ENVELOPE
CH 5App C
Subcommittee
ASHRAE Standard 90.1 Revision Process
Proposals Received by SSPC 90.1
Proposals Reviewed in
Subcommittee
Interested Parties
Engaged
Subcommittee Sends to
Full Committee
Proposal Issued for
Public Review
Public Comments
Received by SSPC 90.1
Public Draft Approved for Publication
Standards Committee and BOD Approval
New Standard or Addendum
PublishedBoard Appeals
ProcessSubstantive
Changes
ANSIApproval
ASHRAE Standard 90.1 Revision Goals
Technically justified
Simplicity
Flexibility
Enforceable
ASHRAE Standard 90.1
• ASHRAE Technology Committee - Ad-Hoc Committee on Energy Targets – June 2010
SSPC 90.1 responsible for our energy targetsStandard 90.1 IS NOT the foundation for meeting Vision 2020 or NZEBAEDGs are mechanism for NZEBPromote EUI as measurement
90.1-2010 – Major Step
• Expand to new areas• Commercial/industrial equipment/processes
• Identify & engage stakeholders
Title, Purpose & Scope change
TimelineMILESTONES
90.1-10 Work Plan – 30%
90.1-13 Work Plan – 50% on regulated end use loads
90.1-13 Work Plan – 40% whole building (all end uses)
90.1-13 Work Plan – EUI
90.1-13 Work Plan – AlternatePerformance Methodology (APM)
ASHRAE Standard 90.1-2013
2004Std 90.1-04
2010Std 90.1-10
2013Std 90.1-13
2007Std 90.1-07 Fu
ture
30%
50%
40%
APM
ASHRAE Standard 90.1
Since July 1, 2010
• 2010 Users Manual• 32 New Addenda in
process• 4 from previous cycle
ASHRAE Standard 90.1In Progress
• Building envelope (Addendum “bb” – 4th PR)
• Door leakage• Cool Roof standards• Dynamic glazing &
fenestration labeling
ENVELOPE
• Escalator controls• Elevator lighting• LPD revisions• Electric motors• Electrical Metering• Branch circuit controls
LIGHTING
ASHRAE Standard 90.1In Progress
• Commercial refrigeration• Heat pump efficiencies• SPVAC & SPVHP efficiencies• Transformer testing• Damper leakage
MECHANICAL
ASHRAE Standard 90.1In Progress
•Fan efficiencies –Advisory Public Review (APR)• Engaged interested parties• Set min Fan Efficiency Grade (FEG) > 67• Based on AMCA 205-10
• Covers fan motor ratings > 1/6 hp• Does not cover fan systems
• Addendum excludes• Fans with bhp < 5• Fans covered by 6.4.1.1
MECHANICAL
ASHRAE Standard 90.1In Progress
• Cooling Towers• Laboratory Exhaust• Building Orientation• Fenestration• Temp & Humid Schds• Computer room criteria
(Addendum cj - 3rd PR)
Energy Cost Budget
ASHRAE Standard 90.1In Progress
• Site-recovered & Site-generated energy credit allowed• Not considered “purchased energy”• Deducted from “proposed design” energy consumption• Credit < 5% for calculated energy cost budget
Energy Cost Budget - Renewables
ASHRAE Standard 90.1In Progress
Data Centers Continuous Maintenance Proposal (CMP)
ASHRAE Standard 90.1Under Discussion
PUE = Total Energy @ Meter ÷ Peak IT Equipment Energy
ASHRAE Standard 90.1Under Discussion
Continuous Maintenance Proposal (CMP)
ASHRAE Standard 90.1Under Discussion
Other Continuous Maintenance Proposals (CMPs)
• Systems testing personnel limitations
• Economizer revisions
• Luminaire limitations
• Definition of cooling design temperature
• Revisions to evaluate systems with Appendix G
ASHRAE Standard 90.1Under Discussion
Other Informal Concepts
• Revisions to single & multi-zone VAV systems
• PTUHP and DX equipment revisions
• Occupancy controls for dedicated HVAC system
• Energy recovery systems enhancements
• Energy recovery for space heating
• Cooling tower controls and efficiency
90.1-2010 – 2013 & Future
• Wholistic systems designs• Systems Design and
subsystems effects
90.1-2010 – Future
• Alternate Performance MethodologiesDetermine “base minimum” using whole building designsExplore regional utility ratesExplore time/demand ratesConsider water use and ratesExplore criteria metrics other than cost savings (e.g. system efficiencies)Address renewables (site based & grid based)Use AEDG format for the 90.1 standard
90.1– Moving Forward
Input Needed – Ideas WelcomeDesigners
Equipment & Material interests
Code Officials
the list goes on ……… Come join the fun!