Submitted by:Ashish Kumar
Mechanical(2011-15)Roll no.:110300104017
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
2/12
The company was established as a
single monoethylene Glycol plant in
1983
Company holds the distinction ofbeing the only green petrochemical
company of its kind.
It is the first and only company in the
world to have commercialised theproduction of ethylene oxide
State-of-the-art, integrated facilities
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
3/12
It is an ISO 9001, ISO 14001, OHSAS 18001 and ISO 22000
certified company
Companys facilities have been approved and certified by
international agencies including Det Norske Veritas (DNV).
We believe in green
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
4/12
Glycols
Ethoxylates
Glycol ethers and acetates
Various performance chemicals
Its product range spans the chemicals, spirits, herbal and other
phytochemical extracts and guar gum, industrial gases and
realty sectors, and finds application across an increasing
number of industries
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
5/12
Boiler Trainee under mechanical
Department
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
6/12
Water tube boiler is used there for generating steam
Boilers are limited to a maximum working pressure of 15
psig for steam and 160 psig for hot water
Operating water temperatures for hot water boilers are
limited to 250oF
Fuel used: COAL
Sizes range from 30,000 to 11,000,000 BTU input with
overall efficiency generally in the range of 92% to 96%
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
7/12
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
8/12
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
9/12
A Central Safety Committee to review and
upgrade safe working practices has been set up.
An emergency management plan is in place.
Systems have been set up to record and report
any accident. All reported incidents arethoroughly investigated and corrective action
taken for preventing similar occurrences in the
future.
Provision of appropriate protective equipment
and gear with usage being strictly monitored toensure safety.
Regular safety training programmes are
conducted to train employees.
Various incentive schemes that serve to motivate
employees to follow safe working practices are inoperation.
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
10/12
A fertiirrigation project, which has generated an enthusiastic
response from farmers
A biocomposting facility to produce natural manure. Farmers use
the biocompost as an environmentally friendly substitute tochemical fertilizers
IGL has also developed a green belt around its factory where
approximately 65,000 trees of various species have been planted.
The company also achieved zero discharge from its ethanol plants
by adopting fertiirrigation, biocomposting, RO and concentration
followed by incineration, to conserve fossil fuel
The company is also actively working on various projects targeted
towards developing a Clean Development Mechanism (CDM)
-
8/10/2019 Ashish+Kumar_SUMMER+TRAINING+INTERNSHIP (1)
11/12
To be one of the most
respected and innovative
manufacturers of
internationally sustainableproducts derived from
natural, green or renewable
resources, which add value
and continuous growth toall stakeholders and the
society at large.
To manufacture and promote
products, with concern for the
environment and the wellness
of people across the globe, byderiving them from renewable,
natural, agro and waste feed
stock. And to achieve this
mission by deploying safe,ecofriendly and costeffective
processes and technologies.
-