Agenda 29th, April
14:30 – 15:15 Introduction- Action Group- Who is ASD- Quality System, Quality Performance, Lean, etc.
15:15 – 16:15 Factory tour- Lean Production
16:15 – 16:30 Break
16:30 – 16:45 Q&A
16:45 – 17:00 Group photo
ASD Electronics Ltd.
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing
- Action Group Evolution (3 pages)
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing
1976 Founded with a capital of US$80,000. Clock radio launched to market.
1979 Established Optoelectronics Plant. Capital reached US$400,000.
1985 Developed dual-deck Hi-fi system and world smallest 3-in-1 combo (radio, tape, recorder and TV).
1987 Developed 6’’ color TV.
1988 Established IT plant and HQ in Chung Li. Subsidiary in Malaysia (Action Industries).
1990 No. 1 leader for development of portable color TV/monitor combo products.
1992 Announced 10’’ color CRT display. Subsidiary office in USA (America Action).
1993 Announced 4”LCD TV and 15”/17”color display. Far Year HK indirect invested in Shenzhen Action.
1999 Established Shanghai Far Year Technology.
2001 Shenzhen Action won the Shenzhen Top 100 Hi-Tech Award.
2002 Public publication into stock market.
2003 Total Sales reached US$300 million. Singapore Action publicly listed in the Singapore stock market.
2004 Issued Zero Coupon Euro Convertible Bond (ECB) of US$35 millions.
2005 Won 50 fastest growth awarded number 22.
2006 ASD establishment for Philips OEM business.
2007 Established another new plant in China Ji’an.
2008 ASD started to be a major supplier for Philips AVM business.
2009 Merged Taiwan Best and started to involved 3C retailer store business and selling in China domestic market.
2010 Establishment of ASD self-owned factory.
• 10 branches worldwide under Action Group
• 3200 staffs in Action Group
Groups Locations
Headquarters Taiwan
AFY Hong Kong
ASD Shenzhen, China
AAS Shenzhen, China
ATS Shenzhen, China
AMP Penang, Malaysia
ASJ Shanghai, China
AST Shanghai, China
ATJ Ji’an, China
AXN America
ASD is a member of Action Group who is a 36 years consumer electronics group company.
Action Asia Limited (Singapore shareholder) is sub-group of Action Group, and ASD is a company under Action Asia Limited.
ASD is company owned competent Developing and Manufacturing capability in PDVD/TV, DPF and DVDP and blue–ray DVD products.
ASD serves Philips as the key OEM supplier for their AVM business for years, supporting Philips become the dominated brand in Portable DVD world wide with sales volume of 3M in year 2010 and No. 1 brand of DPF in Europe.
Manageable capacity, 3KK units monthly, for consumer AVM products, based on ASD current financial strength / supported by two stock listed company in Taiwan and Singapore, RD capability / 160+ RD engineers and Manufacture facility / 38,640 m²land area.
ASD was awarded global “Best Supplier” of Philips in 2010
With “Lean” operation and culture built, the factory capacity is flexible meet any potentials.
- Action Group Evolution
- ASD Vision (3 pages)
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing
打 拼 成 为“PHILIPS”的
核心策略伙伴及最优秀供应厂商
WE PROMISE TO MAKE BEST EFFORTS TO BECOME
PHILIPS EXCELLENT SUPPLIER AND CORE STRATEGIC PARTNER
- Action Group Evolution
- ASD Vision
- ASD Organizations (1 page)
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing
CQA DQE QCD SQM
1. Process quality plan
2. IPQC
3. OQC
4. OQA
5. Drive issue fixed in process
6. Guide prod. Related in Quality improvement
1. Material verification
2. Material release
3. Material spec
4. Product verification
5. Product spec
6. Product release
Carrie Zou BJ Jiang
JQM/CQO
Henry Kuo
Sam Li Crays Jue
QSQRE
1. New model reliability test
2. New material reliability test
3. PS models ORT
4. ORT test plan control
1. SKD customer Q
2. CKD customer Q
3. CBU
4. RMA
5. Drive quality improvement from SKD, CKD, CBU etc.
1. SQM plan, strategies
2. IQC
3. New supplier certification
4. QPA / QSA
5. Supplier disqualification
6. Drive material issues fixed
7. Leverage Key component supplier’s quality improvement
1. Quality system
2. Quality system Certification
3. RoHS control system
4. Safety part control system
5. Vendor RoHS / Safety audit
Hua LiSitu Shujian
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence (3 pages)
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing
2009-20102006 2007-2008 2011
Only Portable DVD7’’ & 8.5’’
Portable DVD
- Dual Screen- Slide screen- iPod function- TV
Clock Radio w/DPF
Portable DVD with TV- 7’’ & 8.5’’ & 9’’
DVD player
Blu-Ray - Portable- Home Player
Non-disc Media Player
DVD+ATSC+M/H
DPF w/ touch key
Home Media Player
Current Human Resources:
New Model Average Time to Market: 15weeks
HW Engineers: X65SW Engineers: X25Mech. Engineers: X30DQA: X32Supporting staff: X22
Capacity:38 models and extended 150 versions in 2010
Wk0 Wk4 Wk8 Wk12 Wk15
HWPlatform
PCB layout
SWDev. & Ver.
MechanicalTooling
Packing
Maturity TestDVT/EVT
TR
PMT
• Owned experienced R&D and operational engineering staffs
• Action Group, more than 10 years portable audio/video product R&D and mfg. experience
• ASD R&D and Engineering team focus developing & mfg. in audio/video electronic devices more than 5 year.
• 24 hours response way of working
People System Resources
• Certified and qualified by ISO, Wal-Mart, 3C, etc. 3rd parties
• SAP system application
• SFC traceability application (to be ready by 2011 Q2)
• All the current system built to focus audio/video product in R&D and mfg.
• Action Group, cross-factories support from 6 locations - All the group focus upon audio/video products R&D and mfg.
• Flexible capacity:
- 3KK/month capacity in ASD
- Customer own capacity in ASD under customer demand
• Strong key component sourcing capability (Leveraged from Group capacity in cost and volume)
• Panel/loader sourcing competence from price & volume from long term of cooperation relationship
• Key component “multi-resources single buy” strategy
• Key components build strategic cooperation suppliers pool
Supplier Chain Development Competence
• Strong developing engineering team built thru more than 30 new models/yearly practice
• Successful achievement from DVDP, PDVD/TV, DPF and BD series in “Quick –Design” from mature platform copy
• New models design leveraged from DFM, DFQ and DFC application
• Strong experienced engineering team in product development capacity
• Fast time to volume ramping vs. yield rate (2wks), Short time to market (15wks)
• Flexible capacity, e.g. Wal-Mart black Friday deal support, 1 million units in 45days
• Audio/video product 6 million units/year delivery performance
• Lean mfg. capability is rooted in operation
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance (2 pages)
- Factory Brief
- Quality System
- Lean Manufacturing
Year Sub - total
Y2005 31K
Y2006 26K
Y2007 1.3KK
Y2008 1.5KK
Y2009 3.2KK
Y2010 5.7KK
Total 11KK 0.00
1.00
2.00
3.00
4.00
5.00
6.00
Y2005 Y2006 Y2007 Y2008 Y2009 Y2010
KK pcs
Product Line From Y2007 to Y2010
Portable DVD Player 7.5KK
DVD Player 2.1KK
Digital Picture Frame 1.5KK
Total 11KK
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief (3 pages)
- Quality System
- Lean Manufacturing
Building AFloor area: 13625m21st floor: PCBA SMT 2nd floor: PCBA DIP3rd floor: ASD Office
Building BFloor area: 20832m21st floor: Warehouse2nd floor: DPF+DVD player3rd floor: Portable DVD0
Building # C,D,E, F1. Dormitories2. Dining rooms3. Entertainments, ATM, etc
facilities
Maximum Capacity : 3KK/month
Traditional production--- Belt Line Lean Production %
Lean Production--- Cell line:
Lean Production: each cell 8 operatorsFlexibility: High Mix Low Volume models
55.5%44.5%
传统生产模式
精益生产模式
Traditional line: 55.5%
Lean Production: 44.5%
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System (10 pages)
- Lean Manufacturing
Certificate Certified by
UL
3C
Thai TISI / Malaysian SIRIM
Wal-Mart ES / GSV / FCCA
BEST BUY SER / C-TPAT
ISO9001:2008 / ISO14001:2004
UAT_534C(EICC) / UAT_520+++ (4QP) / RoHS / Process / ESD
DMT PMT PSCVT DVT
Quality target proposedSustainability requirements proposedPredecessor field quality analyzed
Sustainability requirements approvedPast project performance analyzed
Quality targets committed , first field quality predictionApprobation requirements approvedSafety risk assessment approvedProvisional product validation test plan Measure system capability evaluated
Approved planQuality target verifiedSafety risk assessment updatedStart approbationSustaining scan finalized
Quality organization in place for outgoing quality and field quality monitoringApprobation approved: drawings and paper of introducing countries available
Agreement for delivery and dispensations approved(including safety and approbation)Field call rate and predictions approved
New project instruction
Risk assessment
Define team members
Define milestones.
PQP
Safety approbation plan
Key components release plan
CTQ Deployed
Design FMEA
PAR process
Functional Specification
(FRS,CRS,Sh190) defined
HW evaluation, PAR process
Product spec. confirmed
CTQ verification,
Test case finalized
Beta, Halt test
IFU/QSG preparation
Safety and Environmental
checklist approach
DVT/DMT: Mechanical reliability,
MTBF
DFM, PFMEA ,IR Release
PMT: Process evaluation
SMT
Outstanding Issues action plan
PAR process & close
Waive & concession
CR sample approval
Shipment Release
Client on-site QA inspection
other stuffs for MP ready
ORT process
2nd tier supplier monitoring
Weekly FOR review
Quality Control plan
ECN process
FFB/OSFA/IWS
MS improvement plan
X 5-10 X 60-120
15weeks
Kick off
X 40 - 60 X 300- 1500
Key component reliability test control
C24, C168, C520 reliability test control
RoHS test control
ShippingOn-Time Delivery
Supplier Receiving IQC Warehouse
- Packing check- Q'ty, marking, etc. check
OQA Assembly
Quality Service
- Identification control- FIFO- Periodical cycle count- Shelf life control- Environmental Control
- Supplier chain strategy- Supplier dis-/ qualificatioin- Supplier quality management
- Inspector certification- Material spec.- Sampling plan and Inspection standard- IQA process- MRB process
- Inspector certification- Quality control plan- SOP - Check List,
Cosmetic and function spec.- Quality issue treatment procedure
- Site quality service process - RMA process- Correction/Improvementprocess
- Operator/Inspector certification
- Quality control plan- SOP, Cosmetic and function spec.- First Article check & last article check- Patrol audit- 100% full function test - ORT- Calibration - Quality issue treatment procedure
Kiting and Handling
- Handling SOP- Identification control
- SOP- Packing requirements checklist
Operator self inspection:Document: SOP, issues historyExecute: OperatorCosmetic check before assembling part Cosmetic check after assembling part
Frequency:100%
IPQC Patrol Audit :Document: SOP, issue history, Check list SampleExecute: IPQCOperator operation vs. documentEquipment parametersDisciplineKey component inspectionFAI and LAI
Frequency: according to SOP
Operator Handling Control:Document: SOPExecute: Operator Packing for Cosmetic Protection Delivering for Cosmetic PreventionOperation Discipline
OQA :Document: SOP, issue history, Check list, Sample, Safety/SW/IFU criteriaExecute: OQC
Cosmetic checkFull function inspectionFit checkPacking check
Frequency: according to SOP
Issue Treatment:Document: SOP, ProcedureExecute: Line management, PE, PQE Reflection processPE/PQE evaluate to1. Hold product & Quarantined from quality abnormality sheet2. Record and Traceability 3. Root cause/ Correction process
Full functiontest
Cosmeticcheck
Storage
Sub-assemblyMaterialPrepared
Assembly Function test Burn-in
1.IPQC Patrol Audit2.IPQC Sampling Inspection, FAI, LAI3.Operator Handling Control
Packing OQACustomer
OQA
1.IPQC Patrol Audit2.IPQC Sampling Inspection, FAI, LAI3.Operator Handling Control
1. Incoming Inspection or STS
2. Monthly Quality Scorecard and quarterly review meeting
3. Quality System Guidance, if needed.
1. Incoming Inspection or STS
2. QSA/QPA process
3. Monthly quality scorecard
4. Monthly review meeting ,if
needed
5. Source Inspection, if needed
1. Incoming Inspection and Cpk
monitoring
2. QSA/QPA process
3. LRR control
4. Monthly quality scorecard
5. Weekly and/or monthly
review meeting
6. Dedicated engineer doing site
quality mag’t, CIP promoted
7. Source inspection, if needed
BacklightConnector
Plastic Parts Hinge
SpeakerRC
PackingLabel
Instruction sheetScrew
HardwareSMT/AI component
TFT,IC
C
B
SQM resources allocation:
Group A : 70%
Group B : 25%
Group C : 5%
Adapter/Power BPCBA
Loader Battery
Wire/Cord
A
Qualified Supplier Registration
•Qualified Suppliers List
New Supplier Survey
•New supplier Survey Sheet
Supplier Management Incoming QC•Incoming Inspection Procedure •Material Approval Sheet(spec.)•Incoming Quality History•SAP control
Process Survey•New Built ComponentProduction Survey• Periodically Audit•Site located management
Supplier Quality Management System
Source Inspection
•External Inspection operation Procedure
Incoming Inspection Operation•Incoming Sampling Standard •Loosen/Tighten/STS Standard •Inspection standard•Fist Art Golden Sample
Nonconforming Material Management•MRB Operation • CAR•IQA Control •Labeling Management•Concession Procedure
Conforming Material Management
•CPK Statistical Application•Labeling Management•FIFO control
Incoming Materials Performance Assessment• Monthly Performance Assessment(score card) • Material incoming control adjustment
Monthly Suppliers whose grade is under 70’ Review
• Meeting With Supplier Individually
Guidance Process for Qualified Supplier•Supplier Management Procedure•Plan For Supplier Management( Resources allocation based on A,B,C component family classification )
Annual Quality Assessment
Disqualified/Re-qualified• Supplier QualificationCancelled Report
•Supplier Re-qualifiedApplication Report
Supplier Quality SystemAudit• Periodically Audit•Quality system guidance
Supplier Receiving (WH) Raise Receiving Sheet (WH)
Inspected
JudgmentMRB ?
Ship to Stock
Treatment Decided
Screening Material Move to
Warehouse
No
Non-Conforming
WaivedRejected
Rejected
Accepted
Return
Sorted
Conforming
Sampling (IQC)
Correction Process: * 8D report* Process audit
MRB core Team:CE, SQE, PQE
ANSI Z1.4 Level ⅡCritical: 0 Major: PCBA:0.25, others:0.4Minor: Packing & Accessories:
1.0, others:0.65
DMT: 5 sets Climatic(high/low temp.) test. 5 sets bare drop test. 2 boxes drop & vibration test. 1 box stacking test. 5 sets socket & switch life test. 30 sets CTQ validation. 40 sets design maturity test @40℃burn-in 1000Hrs.
DVT DMT PMT PS
DVT: 5 sets Climatic(high/low temp.) test. 5 sets bare drop test. 2 boxes drop & vibration test. 1 box stacking test. 5 sets socket & switch life test. 30 sets CTQ validation. 30 sets full function @40 ℃ burn-in 1000Hrs .
PMT: 5 sets Climatic(high/low temp.) test.2 de-boxes drop& vibration test. 20 sets process maturity test@40℃burn-in 168Hrs .
Finished product: Burn-in reduction: 100% vs.30% product 2 hrs @40℃ burn-in 40 sets full function burn-in 24Hrs/model family/day. 10 sets full function burn-in 168Hrs/model family/day. 5 sets full function burn-in 520Hrs/model family/month. 5 sets Climatic (high/low temp.) test/model family/month. 2 sets drop& vibration test /model family/month. 2 sets socket & switch life test /model family/month.
Component level:60 pcs AC adapter power dynamic on/off burn-in 168Hrs 30 pcs battery charge & discharge 30cycles /spec/supply/month. IEC/UL safety test 3pcs each /3models/month
MP: ORTDeveloping Phases
32 pcs/lot (lot: less than1800pcs)
1 pc/lot
1 pc/lot
Accepted
Rejected
Warehousing
Judgment
Escalated to QA manager
Screen/Rework100%
Reject Report
MRB?(Risk assessment)
Treatment Decided
Scrapped
Finished Goods
Sampling
Cosmetic Check
Full function test
Packing/IFU content Check
Product vs.CR samplecheck
Inform customer
Correction Process: * 8D report* Traceability & Identification
MRB core Team:NPI, PE, PQE
48 hours
24 hours
Failure symptomConfirmed
Root CauseAnalysis
Root CauseAnalysis
Containment Plan
Preventive/ Corrective Actions
Standardization & Close
Root CauseAnalysis
Customer CQA PQE/PE RD/DQE SQE
Initial 8D Report
Approval
Issue
Implementation
Dedicated CQA/COE
On site supporting ?
Escalated ?
72 hoursFinal 8D Report
Approval & Close
QA Leader
Review & Confirmation
Approval
Informed
- Action Group Evolution
- ASD Vision
- ASD Organizations
- Product Road Map & Competence
- Sales Performance
- Factory Brief
- Quality System
- Lean Manufacturing (8 pages)
CSD
Alex Zhang
Projects team
Leader
Champion JiangPhilips
Steven Fang
Lean CoordinatorOu Ming/Sheng Zhigang
Production
Sun Liang
Planning
Zhu Weibo
Engineering
Gary Yang
Purchasing
Meya Huang
QC
Crays Jue
Warehouse
Mo Caijiang
GM
King Yang
consultant ASD Lean TeamCSD:财团法人中卫发展中心Corporate Synergy Development Center
Formed in July, 1984 by the Industrial
Development Bureau
A Team Fully Dedicated To Promoting
Industrial Cooperation and Progress
Number participated in CSD has reached
170, and number of registered factories in
CSD up to 2500 covering 24 kinds of
industries, and influence of manufacturing
industrial production value is up to 1/3.
Dedicated Team
Mar 2011- Apr 2012
4. Improvement Plan Draft
As-Is Problem Define
Set up Objectives
5. Deploy improvements
M’TL Handling
Benchmark line set up
Productivity
Lead time
• Continuous Improvement
• Productivities Improvement
• WIP & Stock Improvement
• Establish JIDOKA (自働化)
Sys.
• KANBAN Management
• Pull production System
Jul-Sep 2010
1. Lean Concept and Tools Training
2. As-Is State Review
3. Invite Philips team to have close review with CSD
7. Projects review
8. Results Presentation
Oct-Dec 2010 Jan-Feb 2011
6. Review with Philips
期 程 第一阶段 第二阶段
期 間 2010/7-2011/6 2011/7-2012/6
目 標
1. 縮短生產Lead Time2. 降低庫存3. 提升生產力4. 減少不良率
1. 縮短生產Lead Time2. 降低庫存3. 提升生產力4. 減少不良率5. 人力低減
課 題
1. 降低零件庫存2. 縮短生產流程(L/T)3. 提升作業生產力4. 拉式生產系統局部建構
1. 持續點庫存降低及生產力提升2. 簡易自働化系統導入3. 目視化管理4. 拉式生產系統全面架構
作 法
1. 物與情報流程導入
2. 物料需求管理、交期管理、進料管理&倉庫管理、配送管理等
3. 現場Layout及作業改善4. 生產指示系統改善5. 2S(整理/整頓)
1. 情報流程改善2. 整流及流程化3. 定時或定量搬運系統導入4. 換模換線改善5. 自働化導入6. 2S(整理/整頓)7. 製造現場目視化管理8. 改善措施標準化
• Y2010 (Aug-Jan)
20%
• Y2011
10%
Total: 30%
Lead Time时间缩短
PPH生产力提升
WIP库存天数-金额
• Y2010 (Aug-Jan)
20%
• Y2011
10%
Total: 30%
• Y2010 (Aug-Jan)
15%
• Y2011
10%
Total: 25%
Yield rate品质提升
• Y2010 (Aug-Jan)
20%
• Y2011
10%
Total: 30%
NO. Description Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11
1Lean production Training
Courses
2Value Stream Mapping
(As-Is)
3Baseline measures
Review
4 Define the problem
5To Draft The
Improvement Plan
6Setting the challenge
objectives
7Layout & Operation
Improvement
8 6S Improvement
9 Projects Presentation
No Lean No Project Actual Status Leader Team member
1AAS-LEAN-
001
Video BU pre-forming PPH improvement : 20%
Battery: 50pcs to 62pcsPanel: 41pcs to 50.3pcs
Done 张安生张安生,游慧兰,韦友华,佘有盛
2AAS-LEAN-
002PCBA SMT on time shipment: 98%
On time delivery:78%----> 83%----> ??
On going
朱伟波黄珉全,欧立娇,鲍祥孝,何异江,刘小静,周俊峰,李应平
3AAS-LEAN-
003
Home BU testing capacity improvement: 25%
Testing PPH : 27pcs/H to 34pcs/H, improve 26%
Done 周俊峰罗孝华,李教辉,刘永安,施扬毅,李应平
4AAS-LEAN-
004QA working Eff: 25%
Eff improve: 39%:2.5 PCS/H to 3.6PCS/H
Done 施扬毅岳长明,陈远洋,张政,曾建军,周理论,刘永安
5AAS-LEAN-
005
Portable model set up Cell mode1.PPH: 3.87pcs2. Line balance: 90%3. Change over: 5 mins.
1.PPH: 2.66pcs to 4.4pcs2.Line balance: 78% to 92%3. Change over: 30 minsto 15 mins.
Done 杨勇陈建云,张安生,佘有盛,张静
No Lean No Project Actual Status Leader Team member
6AAS-LEAN-
006
Home BU pre-forming PPH improvement: PPH: 60pcs
Phase1 (Oct-30):PPH from 47pcs to 53pcsPhase2(Dec-10):PPH from 53pcs to 60pcs
Done 孙亮李应平,徐国华,罗孝华,周星光,谢晓玲,袁伟平
7AAS-LEAN-
007
Warehouse(Space saving; materials turn over days)
1. Raw material Turn over day: 20days to 8.5 days2. Space utilization: 39%~61%
Done 黄香英杨斌 ,罗丽华 ,陆棋妹,王丽君,吉桂兰 ,覃玉领 ,胡小群 ,刘志红
8AAS-LEAN-
008Avoid wasting
Electronic cost saving : about 80K RMB, is waiting for FIN dept confirmation
Done 陈外兵王世峰,章凯,彭少建,钟德顺,乔金志龚德武,张丽娟,陈芳
9AAS-LEAN-
019
PCBA DIP PPH improvement: Target: 7.2pcs
PPH from 5.5pcs/H to 7.3pcs/H Done 欧明戴丽萍,黄培龙,朱伟波,卢文召,陶伟军
10AAS-LEAN-
010
Material supply Efficiency: 400pcs to 1200pcs /H
1.Materials supply Eff: 1050pcs/H2. Manpower saving: 2 operators
Ongoing
杨珂杨斌 ,各仓管,SQE ,采购员,欧明,佘有盛
序号 专案编号 专案名称 专案改善目标 负责人
1 AAS-LEAN-011 降低电源板来料抽检不良率电源板来料抽检DPPM由4800降低到900
李绍良
2 AAS-LEAN-012 降低P-DVD按键板不良率 P-DVD按键板不良率降低30% 焦火根
3 AAS-LEAN-013 降低P-DVD作业不良 P-DVD组装作业不良降低30% 章爱兵
4 AAS-LEAN-014 提升P-DVD组装线效率提升P-DVD CBU组装PPH由2.3提升到2.9pcs/per/h
张长新
5 AAS-LEAN-015提升出AAS-P SKD机种生产效率
提升出AAS-P SKD生产效率25% 李应平
6 AAS-LEAN-016 物流效率提升1.供料人员减少10%2.实现小批量供料上线
莫财江
7 AAS-LEAN-017 二楼车间生产节能改善 生产电费降低8% 陈外兵