Ascend’s journey to higher quality material master data
Ocal YilmazGlobal MDM Leader
Ascend Performance Materials
3
Ascend Performance Materials
Who we are
• PA66 manufacturer for more than 60 years
• Company headquarters in Houston, Texas; regional offices in Belgium and China
• Five world-scale plants in the United States; local compounding of plastics in all regions
Our Vision
• To be the recognized leader in the nylon 6,6 value chain, creating solutions that inspire every one, everywhere, every day
The world’s largest fully integrated producer of PA66 resin
4
About me
• Houston, TX
• Global MDM Leader in Ascend since March 2015
• 17 years of professional experience in managing projects related to master data management, data governance, data quality, procurement and supply chain management.
• Implemented SAP solutions in numerous industries such as upstream oil-gas, chemicals, distribution, high tech, contract manufacturing, medical devices, and pharmaceutical.
• Soccer
5
Challenge facedProblem Statement:
• Data quality problems leading to downstream issues (Shipping, Order processing, Analytics).
• Process inefficiency due to lack of discrete approval workflow and segregation of duties.
• Compliance issues due to manual master data processes.
• Cost and inability of enhancing custom master data process.
• IT Capital Investment – Vistex, CRM, APO and new P&L all reliant on good master data.
Project Objective:
A2E (six sigma) expert project to improve master data quality, provide a process orchestration solution for better master data governance, reduce rework and hours spent in master data maintenance, and improve cycle time.
6
The Solution• Ascend solution is built on Winshuttle Foundation product (v11.2)
Start build: Feb 2017
Go-live: July 2017
• Studio Query is used to update key SAP tables in SQL
• Master data processes:
o Create, Reinstate, Extend, Change, Flag for deletion
• Material types:
o Finished, Semi-finished, Raw, Packaging
• Search functionality
• Rule based approval routing
• Duplicate check (create scenario)
• Inventory level check (deletion scenario)
7
Ascend MDG - Material
• Dashboard: all request types are under Form Library.
• Tasks: assigned workflow tasks are in “Tasks” tab.
• Processes: process history, reassign process to someone else.
• Reports: Assignment Status and Process Status standard reports.
8
Process History & Edit Process
• “Process History” shows all the assigned swim-lanes and status of each task (Assigned, Approved, Rejected, Completed).• “Edit” can be used to reassign a task to someone else.
9
Search functionality
• Multiple search criteria is available to find the reference material.• Using reference material improves data quality and shortens data entry process.
10
SKU Governance Form
• High level SKU information, business case justification for “Business approvals”.• Key attributes determines approvers in the workflow.• Hierarchy maintenance using cascading drop-down lists built with different “Queries”.
11
Expected Benefits
• Create master data correctly at first time, and avoid data quality issues and rework.
• Faster cycle time for master data setup; increased productivity across all Ascend functions.
• Improved MDM FTE productivity, more focus on process improvement, data quality improvement projects.
• Generate more accurate enterprise wide reports leveraging consistent master data.
• Audit trail for change, approval tracking.
12
MetricsCycle time for Material Master creation: process efficiency measure.
Step Description Duration
Business case form creation Requestor completes “SKU governance form” (word) 2-3 days
Manual Approvals Requestor distributes the form and obtains email approvals 5-8 days
Request creation in SAP Master Scheduler creates request in SAP ECC 1-2 days
MDM processing MDM team processes error-free request in SAP 1-2 days
Transportation Compliance Transportation compliance manager reviews 2-3 days
Costing step Site Cost accountant completes costing 5-7 days
Total 16-25 days
Before
Automated workflow routing and better traceability shortens the cycle time by 2 weeks (~ 50%)
Go-live:
July 2017
Step Duration
Request creation 1 day
Business Approvals 2-3 days
Data Enrichment 1-2 days
MDM processing 1 day
Transportation Compliance 1 day
Costing step 2-6 days
Total 8-14 days
After
# of Updates in key Material attributes: rework/data quality issue measure
# updates in key material master attributes (monthly):
Before After Winshuttle Foundation
Baseline (monthly average): 750 July: 153August: 163
The better we govern “Creation” of Master Data; the less rework and data quality issues we will have (reduced by 75+ %)
13
Lessons learnedProject Planning:
• Plan and request for specific “proof-of-concept” to understand Foundation capabilities.o Determine “Quick wins” vs. “Longer term”
o Phased approach for costly and complex development
Training:
• Plan for multiple end-user training sessions per role/swim-lane.o Better adoption and learning curve
Development:
• Early engagement with functional unit test, and learn technical design & developmento Increased confidence and early ownership of the solution
• Understand and document “troubleshooting guidelines” o Help Ascend team to better prepare for post go-live.
14
What’s next
Winshuttle Foundation road-map:
✓Enhancements project after initial Material Master go-live (by end of 2017)
✓MRO (HIBE) materials request, workflow approval process (by end of 2017)
✓Customer master project (by end of Q1 2018)
✓Vendor master project (by end of Q2 2018)
✓BOM governance, Costing governance, Commercial Hierarchy, New Plant setup process, Supplier Qualification process,… (after 2018).