Select the CPU in the Physical View.

Go to Configuration (tab) \ Timing \System timer (drop-down). Choose

EPL/X2X Interface. Then in the

Interface (drop-down) line below,select the PL inter!ace address.

Go to Configuration (tab) \ Timing \

Idle time \ Task class idle time[µs]. Chan"e it to a whole n#$ber$#ltiple o! the syste$ tic%.

Go to Configuration (tab) \esources \ Cyclic task classes.

Update each cyclic&s d#ration and

tolerance to prod#ce better so!tware

per!or$ance.

Go to Pro!ect ($en#) \ C"ange

untime #ersions \ Transfer (tab) \$efault task class (drop-down).

Choose a pre!erred de!a#lt cyclic.

Connect an 'CP'CPµ'CP$ sero

drie in the Syste$ *esi"ner.

+nsert an /0'CPµ stepper

drie in the Syste$ *esi"ner.

+n the drie con!i"#ration pop-#p,

select 1de!a#lt (2otionCon!i"#ration)3

!or the !#nction $odel.

Select the CPU in the Physical View.Go to Configuration (tab) \

esources \ Cyclic task classes \

Cyclic %&. Chan"e the d#ration to

4s and tolerance to 4s.

2oe the tas% ncsdctrl to Cyclic 56.

Go to Configuration (tab) \ Timing \

System timer (drop-down). Choose

EPL/X2X Interface. Then in the

Interface (drop-down) line below,select the inter!ace address.

7pen 'S (el) \ Communication \P*+ELI,- \ Calculations \ Cycle

time \ P*+ELI,- CycleTimeCalculation.ls !ile. Calc#late the

$ini$#$ cycle ti$e needed.

Select the PL inter!ace in the

Physical View. Go to Configuration

(tab) \ P*+ELI,- )arameters \

Cycle time [µs]. Chan"e the cycle

ti$e to a whole n#$ber $#ltiple o!

8 µs that is no less than the$ini$#$ cycle ti$e calc#lated

preio#sly.

Select eery PL b#s controller&sX2X inter!ace (displayed #nder b#sbase 99: :6 :). Go to

Configuration (tab) \ $e0ice

)arameters \ Cycle time [µs].

Chan"e the cycle ti$e to $atch the

PL cycle ti$e.

 'd. LeelCycle ti$e opti$i;ation

+nt. LeelSteppers

(de!a#lt -$s cloc% cycle)

+nt. LeelSeros

(de!a#lt -$s cloc% cycle)

9asic Leel*e!a#lt -$s cloc% cycle