52
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/2641 Jabalpur, dated:18.10.2016 To As per distribution list Sub: Agenda of 54 th meeting of Operation and Coordination Committee of MP. The Agenda of 54 th meeting of the Operation and Coordination Committee of MP scheduled on 22 nd October 2016 at 11.00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur vkbZ ,l vks : 9001-2008 ISO: 9001-2008

Transcript of As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during...

Page 1: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/2641 Jabalpur, dated:18.10.2016

To

As per distribution list

Sub: Agenda of 54th meeting of Operation and Coordination Committee of MP.

The Agenda of 54th meeting of the Operation and Coordination Committee of MP

scheduled on 22nd October 2016 at 11.00 AM at SLDC, MPPTCL, Nayagaon, Jabalpur has been

uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Memebr Secretary OCC SLDC, MPPTCL, Jabalpur

vkbZ ,l vks : 9001-2008ISO: 9001-2008

Page 2: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Distribution List

1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected]

2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected]

4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected]

5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749.

6. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected]

7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]

8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]

9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]

10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]

11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]

12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]

13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected]

16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]

18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

20. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old

Itarsi, Distt. Hoshangabad, Email – [email protected]

21. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected]

22. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

Page 3: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

AGENDA FOR 54TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD AT SLDC, MPPTCL, NAYAGAON, JABALPUR ON 22ND

OCTOBER 2016 AT 11.00 AM. ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 53rd meeting of Operation & Coordination Committee of MP held on 27th August 2016 at SCADA Control Centre, Nayagaon, MPPTCL Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2288 dated 22.09.2016.

[OCC may confirm the minutes] ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUG 2016 TO SEPT 2016.

2.1 Frequency Particulars: During Sept 2016 the system frequency was below 49.9 Hz for 5.85% of time against 5.94% of time during Aug 2016. The system frequency was above 50.05 Hz for 19.00% of time during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 75.15% of the time during Sept 2016 against 73.74% of time during Aug 2016. The average monthly frequency was 50.00 Hz during month of Aug and Sept 2016. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Aug 2016 and Sept 2016 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous minimum frequency

Instantaneous maximum frequency

Aug 2016 50.00 Hz 49.67 Hz 50.14 Hz 49.65 Hz 50.35 Hz Sept 2016 50.00 Hz 49.85 Hz 50.09 Hz 49.67 Hz 50.24 Hz

[Committee may like to note]

2.2 Operational Matters

2.2.1 Operational Discipline : System operated in terms of frequency profile for the months Aug 2016 and Sept 2016 is as given below for discussion by the committee :

Month % of time

Frequency Below 49.9

Hz

% of time Frequency

above 50. 05 Hz

% of time frequency within the permissible range of 49.9-

50.05 Hz

Average monthly

frequency

No. of times frequency

dipped below 49.2 Hz

Aug 2016 5.94 % 20.32 % 73.74 % 50.00 Hz 0 Sept 2016 5.85 % 19.00 % 75.15 % 50.00 Hz 0

[Committee may like to note.]

Agenda Of 54th OCCM Of M.P 1

Page 4: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

2.3.1 Voltage Profile: During the months Aug 2016 and Sept 2016, the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid.

Sr No

Name of 400 KV

Substation

Aug 2016 Sept 2016 Max. Voltage

observed Min. Voltage

observed Max. Voltage

observed Min. Voltage

observed

Voltage KV

Date Voltag

e KV

Date

Voltage

KV

Date Voltage

KV Date

1 Indore 423 08.08.16 401 27.08.16 424 17.09.16 397 12.09.16 2 Itarsi 420 07.08.16 398 27.08.16 420 03.09.16 395 12.09.16

3 Bina 419 08.08.16 399 27.08.16 419 01.09.16 397 12.09.16

4 Gwalior 421 10.08.16 385 04.08.16 420 16.09.16 387 12.09.16

5 Nagda 427 08.08.16 406 29.08.16 426 02.09.16 399 12.09.16

6 Satpura 427 01.08.16 409 26.08.16 427 02.09.16 409 12.09.16

7 Birsinghpur 424 07.08.16 409 04.08.16 424 29.09.16 410 12.09.16

8 ISP 422 07.08.16 404 30.08.16 429 28.09.16 409 28.09.16 [Committee may please note & discuss]

2.3.2 Status of Capacitor Banks in sub-transmission system : The updated information of the status of capacitor banks in sub-transmission system as on 30th Sept 2016 as submitted by DISCOMs is detailed below:

[Action: DISCOMS]

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

No of 100

KVAR Units

required

600 KVA

R

1200 KVA

R

600 KVA

R

1200 KVA

R

600 KVA

R

1500 KVA

R

EZ 381 159 26 - - - 60 13 01 29 0 0 0 0 0 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 626 544 406 18 11 16 30 21 73 357 4 15 - - 0 170

Agenda Of 54th OCCM Of M.P 2

Page 5: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of Installed capacitor banks (in MVAR) in EHV transmission system as on 30.09.2016 as submitted by MPPTCL is given below:-

As decided in the meeting regarding calculation of ATC/TTC using PSS/E software, held at WRLDC on

18th April 2016, the calculation of ATC/TTC cannot be done without modeling of capacitor bank details in PSS/E software. In view this, it is therefore requested that the details of capacitor banks installed at various locations along with their capacity and healthiness may please be submitted in the meeting by MPPTCL so that the same can be modeled in PSS/E software.

In earlier 52nd & 53rd OCCM MPPTCL stated that the details of capacitor banks will be submitted within a

week time but the information has not yet been received. MPPTCL is again requested to submit the details of capacitor banks installed at various locations along with their capacity and healthiness in the 54th OCC meeting.

[Action: MPPTCL]

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the current financial year 2016-2017 (up to Sept. 2016) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).

[Action: Committee may like to note]

2.3.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during Aug 2016 and Sept 2016. There was no df/dt operation during the same period.

[Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation. [Committee may like to note]

2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation

to 33 KV feeders :

(i) Details of DISCOM wise Power supply given to various domestic categories during the period Aug 2016 and Sept 2016 is enclosed at Annexure 2.4(i).

[Committee may like to note]

Voltage Class

Capacitor bank installed as on 30.09.16(MVAR)

Capacity Added after Last OCC Meeting (MVAR)

Capacitor banks already covered under ADB T-V

Capacitor Bank Installed but defective

& are not repairable (No & MVAR)

220 KV 100.00 MVAR 0.00 100.00 MVAR All in Service 132 KV 1205.00 MVAR 0.00 1205.00 MVAR

33 KV 4336.50 MVAR 48.00 4384.50 MVAR Total 5641.50 MVAR 48.00 5689.50 MVAR

Agenda Of 54th OCCM Of M.P 3

Page 6: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to

be allocated 01

EAST

Jabalpur 03 02 Sagar 00 03 Rewa 00 04 Total 03 05

WEST Indore 10

06 Ujjain 09 07 Total 19 08

CENTRAL Bhopal 18

09 Gwalior 05 10 Total 23

TOTAL Grand Total 45 Discoms are requested to furnish the details as per list enclosed at Annexure-2.4(ii) in the

meeting. [ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : The annual maintenance /outages of thermal generating units of MPPGCL during Nov’16 to Dec‘16 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

[Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers : The proposed shutdown of transmission elements for the period 01.11.2016 to 31.12.2016 submitted by MPPTCL is enclosed as Annexure-3.2. [Committee May like to discuss]

3.3 Long Outages of transmission elements and protections : The status submitted by MPPGCL / MPPTCL are given below :

SN

Line/Transformer/Breaker/ Reactor etc under long outage

Outage date Reason Response from Utility

1. 220 KV Bus bar protection scheme at SGTPS Birsinghpur

07.09.2016 Due to mal-operation 220 KV Bus Bar Protection kept out.

MPPGCL representative informed that 220 KV Busbar protection scheme of M/s GE India Bangalore has been commissioned on dtd.23-05-2016 & taken into service w.e.f 26.07.2016. Due to mal-operation

Agenda Of 54th OCCM Of M.P 4

Page 7: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

it has been kept out since 07.09.2016 as intimated by SE (ET&I), SGTPS. MPPGCL is requested to submit the latest status and reason of keeping 220 KV Bus Bar Protection out.

2. Main Breaker of 400 KV Nagda-Rajgarh-II 23.07.15 Y-phase CT burst /

BKR Problem

400 KV Rajgarh II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda-Rajgarh–II circuit. MPPTCL is requested to submit the latest status.

3.

40 MVA 132/33 KV Transformer ECE make at 132 KV Lakhnadon

06.10.2015 Internal sparking in

Y Ph. HV side winding.

The defect developed in transformer and matter taken up with M/s ECE for its repair. The transformer has been shifted to ECE works for repairs and reconditioning. Repair work is completed, testing is also completed. Transformer will be commissioned by 31.10.2016 as intimated by MPPTCL.

4. 3x105 MVA, 400/220 KV ICT-I at 400 KV Indore

02.08.15

Differential protection optd. and

33 KV tertiary PT burst

The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to be replaced with 1X315 MVA 3 Ph. Transformer. 315 MVA BHEL make transformer has been unloaded on plinth on 28.04.2016 and erection work is in progress. Charging of transformer is expected by 15.10.2016 as intimated by MPPTCL.

5. 315 MVA, 400/220 kV ICT-I at 400 kV S/s Bina

15.10.15 Due to Buchholtz relay alarm.

The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s BHEL works for repairs. The order for repair has been placed and expected ICT to be received by end of October 2016 as intimated by MPPTCL.

6. 315 MVA, 400/220 KV ICT at 400 KV S/s, Julwaniya

05.01.2016

The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. In 52nd OCCM MPPTCL representative informed the committee that new Transformer of 315 MVA, 400/220 KV EMCO make order has been placed and it will be commissioned by the end of Jan-2017. MPPTCL is requested to submit the latest status in the meeting.

Agenda Of 54th OCCM Of M.P 5

Page 8: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

7.

315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni

03.11.2015

X’mer commissioned through bus coupler

breaker since commissining.

It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 52nd & 53rd OCCM MPPTCL informed the committee that work will be completed by the Sep-2016. MPPTCL is requested to submit the latest status in the meeting.

8. 20 MVA, 132/33 KV transformer at 132 KV Neemuch

01.03.2016

Differential Protection optd. 20

MBA BBL make X’mer Sr. No. 1991/2 failed on 01.03.2016

The replacement of the failed transformer by another 20 MVA transformer carried out and transformer charged on 05.10.2016 as intimated by MPPTCL.

9.

40 MVA ,132 /33 KV EMCO make X’mer Sr.No. HT-1344/11641 at 132 KV S/s Ashta

10.05.2016

Transformer failed on dated 10.05.2016 as intimated by T&C,

MPPTCL.

Internal inspection of X’mer will be done after rainy season and transformer is likely to be charged by 15.11.16 as intimated by MPPTCL. MPPTCL is requested to submit the latest status in the meeting.

10.

20 MVA APEX make 132/33 KV X’mer Sr. No. T-739/45342 at 220 KV S/s Nepanagar

16.05.2016

Transformer failed on 16.05.16 as

intimated by T&C, MPPTCL.

New 50 MVA X’mer charged on 28.09.2016 as intimated by MPPTCL.

11.

12.5 MVA, 132/66/33 KV X’mer CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.2016

Transformer failed on 19.05.2016 as intimated by T&C,

MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd OCCM, Chairman OCC requested MPPTCL, P&D to submit the letter for removal of transformer from Asset. Latest status in the matter is requested from T&C/P&D, MPPTCL.

12.

20 MVA, BBL Make X’mer (Sr. No.-2195/4) at 132 KV S/s Katangi.

08.07.2016 Tripped on differential indication.

X’mer is under testing and investigation. Another transformer has been allocated for replacement and likely to be charged by 15.11.2016 as intimated by MPPTCL. Latest status may please be submitted.

13. 12.5MVA, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated X’mer failed

It has been proposed to withdraw the X’mer from system as intimated by MPPTCL. Latest status may please be submitted by MPPTCL in the meeting.

14.

40 MVA, ECE Make X’mer (Sr. N0.-86020) at 132 KV S/s Shajapur.

14.06.2016 Tripped in differential indication.

X’mer is under investigation and testing. Internal Inspection of X’mer shall be done as soon as monsoon permits. Transformer is likely to be charged by 30.10.2016 as intimated by MPPTCL. Latest status may please be submitted in the meeting.

15. 50 MVAR Line Reactor of 400 KV Not intimated. Tan-∂ of the bushing

was not correct. MPPTCL is requested to submit the latest status in the meeting.

Agenda Of 54th OCCM Of M.P 6

Page 9: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Katni – Damoh Ckt at 400 KV S/s Damoh (PGCIL).

16. 40 MVA, 132/33 KV BBL X’mer at 132 KV S/s, Chourai

25.09.2016 Defect developed in transformer

DI of 50 MVA transformer is issued and likely to be charged by 15.11.16 as intimated by MPPTCL. Latest status may please be submitted by MPPTCL in the meeting.

17. 40 MVA, 132/33 KV APEX X’mer at 220 KV S/s S/Z, Indore

17.08.2016 Defect developed in transformer

Another transformer is likely to be commissioned by 20.10.16 as intimated by MPPTCL. Latest status may please be submitted by MPPTCL in the meeting.

18. 160 MVA, 220/132 KV BHEL X’mer at 220 KV S/s Jabalpur

30.09.2016 Not intimated Latest status may please be submitted by MPPTCL in the meeting.

19. 20 MVA, 132/33 KV X’mer at 132 KV S/s Jaora.

07.09.2016

Capacity enhancement work

(20 MVA X’mer to be replaced by 50 MVA

X’mer).

Latest status may please be submitted by MPPTCL in the meeting.

The utilities may submit the latest status. [Action : MPPGCL/MPPTCL]

3.4 Shut down proposed by O&M Hydel, MPPGCL(During Nov. & Dec., 2016):- 3.4.1 Gandhisagar HPS –

(i) 132 KV RPS Feeder, 132 KV Bus Coupler and 20 MVA ICT – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

(ii) 132 KV RPS-2, 132 KV Manasa, Garoth & Suwasara feeders, GT-4 & 5 – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in December 2016.

3.4.2 Pench HPS –

132 KV Seoni feeders 1 & 2 and 132 KV Kanhan feeders 1 & 2 – 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

3.4.3 Bargi HPS –

132 KV Jabalpur 1st & 2nd Ckts, 132 KV Lakhnadon feeder and 132 KV Bus Coupler- 3 days S/D for each bay will be required for replacement of existing 132 KV MOCB with SF6 GCB in November 2016.

MPPGCL is requested to submit the time line of above works and date wise S/D proposal for each work in the meeting.

[Committee may like to discuss]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUG 2016 AND SEPT 2016: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units.

Annex. 4.2 Power Supply Position.

Agenda Of 54th OCCM Of M.P 7

Page 10: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note]

ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING AUG 2016 AND SEPT 2016 : There was no

major grid disturbance in MP during Aug 2016 and Sept 2016. Moreover, the Grid Disturbances and Grid

Incidents in MP during these months are given in Annexure 5.0.

[Committee May like to discuss] ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /

TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

Sr. No.

400 KV S/S Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated

in last OCC 1 Bus Reactor : ISP 125 MVAR NHDC Price bid has to be opened and

the date of commissioning will be intimated in next OCCM of M.P. NHDC is requested to submit the latest status in the meeting.

2 Line reactor at Nagda-ISP line at Nagda end

50 MVAR MPPTCL September 2016. MPPTCL is requested to submit the latest status.

3 Line Reactor on 400 kV Satpura –ISP line at STPS.

50 MVAR MPPGCL MPPGCL representative informed that procurement of line reactor is under process and tender has been opened & will be made available by February-2017. In 53rd OCCM MPPGCL informed that tendering for the procurement of line reactor will be taken up in September 2016 and it is expected by end of July 2017.

4 Bus Reactor at SSTPS 125 MVAR MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. Thereafter Chairman OCC intimated that procurement process can be started without waiting for PSDF approval. MPPGCL representative informed in the 53rd OCCM that NIT shall be floated in September 2016 and Reactor is expected by June 2017.

The latest status may be submitted in the meeting. [Action: MPPGCL/MPPTCL/NHDC]

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- As per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-

Agenda Of 54th OCCM Of M.P 8

Page 11: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that the procurement of synchronization trolley is under tendering stage. Further it was informed by chairman OCC that synchronization trolley at 400 KV S/s Indore is not in order and requires immediate attention for its proper functioning.

The MPPTCL is requested to submit latest status along with time line in the meeting.

[Action: MPPTCL]

6.3 System Protection Scheme (SPS) in MADHYA PRADESH:- In last meeting Chairman OCC had requested MPPTCL to submit the complete details of all SPS commissioned in MP along with load shed quantum to SLDC, so that the copy of the same could be placed in Control room of SLDC and concerned substation / power station for reference and record.

The same is not furnished so far. MPPTCL is again requested to submit the information in the

meeting. [Action: MPPTCL]

6.4 SCHEDULING ACTIVITY BY MPPMCL ON BEHALF OF DISCOM:- SLDC has taken up the issue of

round the clock functioning of MPPMCL Control Room so that revision to schedule requisitions are made on

behalf of DISCOMs as only two shifts were running and only day ahead activities were performed by

MPPMCL CR.

In 52nd OCCM CGM (PM), MPPMCL informed the committee that independent functioning from

MPPMCL Control Room shall be started from 1st August 2016. The MPPMCL has again requested to extend

the date for functioning of their control room and shifting their officials from SLDC Control Room for 15 days

i.e., till 15th August 2016. Accordingly SLDC vide letter no. 07-05/RPC-54/1734 dated-06.08.2016 requested

MPPMCL to arrange to shift the MPPMCL officials from SLDC Control Room to MPPMCL Control Room by

16.08.2016 positively. In last 53rd OCCM, MPPMCL representative informed the Committee that independent

functioning from MPPMCL Control Room will be started by 15th September 2016. However the functioning

from MPPMCL Control Room has not yet been started.

MPPMCL is again requested immediately to start their functioning from MPPMCL Control Room

where SLDC SCADA terminal has been provided.

[Action: MPPMCL]

6.5 BLACK START MOCK DRILL OF OSP:- The Black Start Mock Drill of Omkareshwar Hydel Power Station was carried out successfully by SLDC on 15th October 2016. The Black Start Mock Drill of each Hydel Power Station is conducted as per standard procedure developed by the SLDC. It is observed while conducting the Black Start Mock Drill of OSP, 220 KV bus voltage could not be kept low i.e. within 130 to 140 KV, at the time of restoration of islanded portion of the State Grid due to some inherent setting in the control circuitry of OSP machine. The voltage at 220 KV Chhegaon end was about 225 KV which is quite high for charging of transformer during restoration of the system after black out. NHDC may check the control circuitry and find out the solution for controlling bus voltage / generator voltage while restoration of the system. It was also found that during the restoration process, substation staff of 220 KV Chhegaon S/s had charged the 160 MVA Transformer-I by their own with MP Grid without instruction of SLDC which was not to be charged as per procedure prepared by the SLDC. Such type of switching operations may interrupt the

Agenda Of 54th OCCM Of M.P 9

Page 12: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

whole Black Start Mock Drill. Some other operational & maintenance issues were also noticed at 400/220 KV S/s Chhegaon. MPPTCL is requested to instruct all the sub-station staff under their jurisdiction to follow the instruction of SLDC strictly. [Action: NHDC/MPPTCL] 6.6 Overloading of 220 KV Gwalior(PGCIL)-Malanpur Ckt. I & II:- Presently loading of 220 KV Gwalior (PGCIL)-Malanpur Ckt. I & II remain on higher side and it is expected to increase further in the ensuing rabi season and may cause over loading of these lines. The matter of over loading was intimated to the Chief Engineer (T&C), MPPTCL and as suggested, request was made to the WRLDC to allow radial feed of 220 KV S/s Mehgaon from 220 KV Auraiya-Mehgaon and bunching of 220 KV Auraiya-Malanpur line & 220 KV Malanpur-Mehagaon line. This proposal was forwarded to GM, WRLDC to allow SLDC for making this temporary arrangement to cater the load of 220 KV Mehalgan and Mehgaon Substations during rabi season. WRLDC has examined the matter and intimated non feasibility for this temporary arrangement on the plea that it would stress the WR-NR corridor and make the Malanpur & Mehgaon areas vulnerable. MPPTCL may suggest any alternate arrangement for meeting the round the clock load of Malanpur and Mehgaon area without any load shedding and also plan the system strengthening on long term requirement.

[Action: MPPTCL]

6.7 Generation from Tons HPS during Rabi Season:- In the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had intimated that 315 MW power would be available from Tons HPS in peak load hours during the rabi season. It has been observed in the past years that availability of water for generation from the Tons HPS is very less due to restriction imposed by WRD for discharge of water through Jinna HPS and only 10 to 15 LU per day generation was possible from Tons HPS in the rabi season of last year. It is to mention here that simultaneous operation of all the three machines of Tons HPS is not possible during peak demand hours in rabi season with such a low availability of water of generation of electricity. Further, Tons machines are also required to be run to meet the load of Rewa, Satna & Sidhi areas to off load the over loading of 400/220 KV ICTs at 400 KV S/s Satna (PGCIL) as & when required. MPPGCL should take up the matter with WRD, GoMP for sufficient discharge of water for generation from Bansagar reservoir so that all the three machines of Tons HPS could be run all together to meet the peak demand hours. Tons machines may also be required during other than peak hours to avoid any system contingency arising due to over loading of 400/220 KV ICTs at 400 KV S/s, Satna (PGCIL). MPPGCL should also obtain the Ten Daily reservoir operation table from WRD for all its reservoirs and submit the same to SLDC latest by 29th October 2016.

[Action: MPPGCL] 6.8 Requirement of load details of transmission elements for reliability study using PSS/E Software:- the PSS/E Software Modelling for reliability/load flow studies is being done at National level so that the grid security matters are dealt efficiently and reliably to avert grid disturbance like situations and for availing shut downs. Work for this has been undertaken at state level/regional levels throughout the country. Further the reliability studies using PSS/E software is being done at state level by SLDC for which loading details (in MW & MVAr) of 132/33 KV X’mers, 220/33 KV X’mers, 220 KV & 132 KV Railway Traction feeders and 220 KV & 132 KV Industrial feeders of M.P State Grid were requested from CE(T&C) vide letter No.-07-05/RPC-35/502 dated- 07.05.2016 for following date & time:-

Agenda Of 54th OCCM Of M.P 10

Page 13: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

1. 25th December 2015 – 11:00:00 Hrs. 2. 25th June 2015 – 13:00:00 Hrs. 3. 19th May 2016 – 23:00 Hrs.

The above details have not been provided to SLDC so far. Hence it is requested to provide the above details in the 54th OCC meeting of M.P in soft & hard copies. [Action: MPPTCL] 6.9 Less generation from ISP Machines for not getting schedule as per Ten Daily:- As recorded in the Minutes of Meeting held in MPPMCL, Bhopal 24th September 2016 to ascertain hydel availability during rabi season 2016-17, NHDC had reported that they are not getting schedule from SLDC as per ten daily. In 2015-16, more generation from ISP & OSP could have been made if ten daily was followed. NVDA, Bhopal had instructed to maintain reservoir of ISP upto 247 Mtrs by 30th June 2016 and SSRRC also proposed discharge of ISP & OSP considering the limitation put on ISP reservoir and issued ten daily discharge schedule accordingly. SLDC by giving appropriate scheduling, had brought down the ISP level to 246.91 Mtrs on 30.06.2016 i.e. below the minimum level that was to be maintained as per instructions of NVDA, Bhopal. The full quantum of water available for electricity generation in ISP reservoir had utilized and ISP may apprise the committee how more generation from ISP & OSP machines could have been possible with strictly following ten daily.

[Action: NHDC]

6.10 Non Compliance of SLDC Instructions by ISP:- It has been noticed that on several occasions, Shift In-charge of ISP has refused to reduce generation on the running machines whenever it is required to do for better system operation of the State Grid. Request was made to ISP to reduce the generation to the tune of 90MW on each running machines for the time being to avert emergency in the grid. Such act of NHDC is violation of IEGC & MPEGC.

[Action: NHDC] 6.11 Reactive Power Management in high demand period:- During the ensuing rabi season, irrigational load shall increase tremendously. This would deteriorate the voltage profile of the grid. Thus to improve the voltage profile and to keep the system parameter within operational limit, it is necessary to provide appropriate reactive compensation in the transmission as well as distribution network. Transco and Discoms shall ensure that Capacitor Banks installed under their area of jurisdiction are in healthy conditions and may be taken into service as & when required with the increased load of irrigational pumps to maintain voltage profile of the grid. Any low voltage noticed in the transmission & distribution network should be reported to SLDC promptly for taking appropriate measures to improve the voltage profile in that particular area.

[Action: MPPTCL/Discoms]

6.12 Integration of New Transmission Elements into the Grid:- the transmission system in Madhya Pradesh is growing at a rapid pace. The process of integration/charging of new transmission elements belonging to each entity requires compliance of certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC. Therefore mandatory documents and not limited to, to be submitted to SLDC/RLDC prior to issue of charging code for new transmission element are as follows:-

1. Copy of approval by Electrical Inspector. 2. Intimation by Transmission Licensee Regarding anticipated charging of new elements (Annexure6.12-A) 3. List Of Elements to be charged and Element Rating details. (Annexure- 6.12-B).

Agenda Of 54th OCCM Of M.P 11

Page 14: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure- 6.12-C). All the intra-state entities are requested to provide the above data in prescribed formats (enclosed) to

SLDC/RLDC prior to charging of new transmission elements. [Action: MPPTCL/MPPGCL/IPP/REGs/Railway]

6.13 Deviation in Merit Order Despatch for Grid Security:- MPPMCL on behalf of Discoms gives requisition based on individual merit order i.e. in ascending order of cost of energy (variable cost) of ISGS, SSGS, IPPs etc. As per Section 5.12 of Balancing & Settlement Code while preparing generation schedules, SLDC shall keep in view the transmission system constraints and provision of operating margins (reserves). In compliance to aforesaid provision of Balancing & Settlement Code, SLDC may direct MPPMCL not to take certain generating units under Reserved Shut Down though higher variable cost for safe, secure & reliable operation of the State Grid. Some of the critical locations in the State Grid are 220 KV Side evacuation from STPS to ensure reliability of ICT at 400 KV Itarsi S/s and over voltage scenario at SGTPS 400 KV side mandating running of 5000 MW unit during monsoon season/low load conditions.

[Action: MPPMCL]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 Black Start mock drill of Hydel stations of MPPGCL :- The last black start mock drill of Gandhisagar HPS have been completed successfully on 04.04.2016 with extending supply to 132 KV S/s, Bherugarh Ratadiya & Ujjain for Simhastha 2016. The Black Start Mock Drill at Bargi, Pench, Indira Sagar Power Station (ISP) and Omkareshwar Power Station ( OSP) was successfully completed on 28.09.16, 06.10.16, 14.10.16 & 15.10.16 respectively. As per IEGC Black Start Mock Drill shall be conducted in every 6 months duration.

[Committee may like to note] In compliance to IEGC, SLDC has proposed that the black start mock drill of all the Hydel Power stations in MP including Tons, Birsinghpur, Rajghat and Madikheda HPS shall be conducted on 20.10.16, 10.11.16, 16.11.16, & 18.11.16, respectively. MPPGCL is requested to take up necessary measures for conducting the Black Start Mock Drill at these Hydel Power Stations.

[ Action : MPPGCL] ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION:

8.1 Quarterly Review of Crisis Management Plan: The NHDC & SLDC is submitting the quarterly crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

However despite continuous persuasion by SLDC other state utilities i.e. MPPTCL, MPPGCL

and IPPs are not submitting the report to CEA. It is requested to submit the CMP report in prescribed format for the First quarter & second quarter of 2016-17 (April-June & July-Sept 2016) to CEA under intimation to SLDC.

[ACTION: MPPTCL, MPPGCL, IPPs]

8.2 Status of Physical & Cyber Security in Power Sector regarding: Status of physical & cyber security in Power Sector for the first quarter (April to June 2016) has not been received from any of the state utilities. In the past also this report is not being furnished by any of the state utilities

Agenda Of 54th OCCM Of M.P 12

Page 15: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.

The state entities are requested to furnish the Status of physical & cyber security in Power

Sector for First quarter and second quarter of 2016-17 (April-June & July-Sept 2016) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

[ACTION: MPPGCL, MPPTCL, NHDC & IPPs]

ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Status of AMR system installed at SLDC:

In the month of Sept 2016, the complete data of 558 meters was received through AMR system and data of 65 Nos meters (Monthly-55 & Partial – 10) was not received through AMR system. The incomplete data is received due to site related issues such as network problem, modem burnt, Non ABT meter installed, meter defective, elster meter installed and time drift in meters or due to some other problems. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to discuss the following as an action plan for receiving the complete data through AMR system in in a time bound manner.

1. CE(T&C) office may take up the matter with M/s Secure Meters Ltd for resolving the site

related issues such as time drift in meters, meter defective, Non ABT meter & elster meters installed, network problem and modem burnt. Details are shown in enclosed Annexure-9.1.

2. Integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs / REGs – 83 Nos. In Sept 2016, 10 no of meters have been successfully integrated and data downloaded successfully , however, balance 73 No of meters are yet to be integrated with AMR server. (T&C) office may take up the matter with M/s Secure for integration of balance meters.

[Action : CE(T&C) MPPTCL] 9.2 Providing AMR facility for the ABT meters installed at MPPGCL :

In compliance to state commission directives for computation of weekly transmission losses

and Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The ABT meters installed at the interface points have been integrated except 9 meters out of 22 at AMKTPS, Tons HPS, Pench HPS and Bargi HPS through AMR system. The list of meters yet to be integrated with AMR system of SLDC has been emailed to GCC, MPPGCL on 18th Oct 2016. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. for integrating the balance meter with AMR system of SLDC and instruct the site officials to furnish the meter master of ABT meters installed at the interface points.

[Action : MPPGCL ] 9.3 Injection of power by RE generators connected at 33KV level without taking the injection permission by SLDC.:

In accordance with regulatory provisions, all the RE generators has to comply the regulatory requirements such as providing telemetry, AMR facility, registration with SLDC etc. prior to injection of power into the grid. Recently, from the monthly JMR data furnished by the SE(O&M),

Agenda Of 54th OCCM Of M.P 13

Page 16: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

it has been observed that West Discom has allowed some of RE Generators to inject power into the grid without the injection permission / issuance of injection code by SLDC. The details of RE generators are given below: 1. 0.63MW Solar Power Project of M/s Seattle Power Solutions Pvt. Ltd. connected through

33KV Vivan Ckt-II to 132KV Delchi (Makdon) substation. 2. 3MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV Ckt

to 33/11KV Kalukheda substation. 3. 14.7 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV

Ckt to 33/11KV Ringnod substation. 4. 14.7 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV

Ckt to 33/11KV Dodhar substation. 5. 7.5 MW Wind Power Project of M/s Choksi Energy & Infra Pvt. Ltd. connected through 33KV

Ckt to 33/11KV Akyadeh substation.

The injection of power into the grid without issuance of injection code from SLDC is a violation of regulatory provisions. West Discom is therefore requested to issue instructions to all field officers not to allow injection of power from RE Generators into the grid at 33KV Discom feeders without issuance of injection code by SLDC. [Action : West Discom] 9.4 Allocation of power from all the existing and future generating capacities to MPPMCL by Energy Deptt, GoMP: The Energy Deptt. Govt. of Madhya Pradesh (GoMP) vide notification no. 2211/F-3-13/2016/XIII dated 21st March, 2016, has allocated all existing and future generating capacities to MPPMCL for maintaining uniform tariff across the state w.e.f. April 2016. The matter was discussed with CGM(PM), MPPMCL officials in SLDC regarding implementation of the notification, but, MPPMCL officials has informed to continue with the existing practice of capacity Allocation in generating capacities to Discoms as per GoMP notification dtd 19.03.2013 effective from 01.04.2013. Accordingly, SLDC is allocating the power to Discoms as per GoMP notification dated 19.03.2013, however, SLDC shall have to incorporate necessary changes in the ABT application software prior to implementation of order. MPPMCL is requested to inform the date of implementation of GoMP notification dated 21.03.2016.

. [Action : MPPMCL/ Discoms]

9.5 Revision in allocation of MPAKVN (SEZ) power from MPPGCL stations in case of unit trippings:

MPPMCL has executed a Bulk Power Supply Agreement (BPSA) with MPAKVN on 29th March 2016 for supply of 40MW power from MPPGCL Stations to MPAKVN, Indore. In accordance with BPSA, SLDC furnish the entitlment of MPAKVN from MPPGCL Stations to MPPMCL which in turn forward their requisition in consulation with MPAKVN to SLDC. However, in case of Unit tripping, MPPMCL revise the requisition of MPAKVN from other MPPGCL station as per Merit Order Operation whithout revising the allocation of power. This leads to scheduling of power to MPAKVN from MPPGCL Station beyond the entitlement i.e. allotment done in BPSA. MPPMCL is therefore requested to revise the allocation of power from MPPGCL stations in day ahead and real time operatios in case of unit tripping.

[Action : MPPMCL] 9.6 Energy Accounting and settlement of DSM charges of Discom embedded Open Access Customers connected at 33KV level.

In accordance with Madhya Pradesh Electricity Balancing and Settlement Code (BSC) 2015 and as decided in the 48th OCC meeting that energy accounting of Discom Embedded Open Access Customers (DEOACs) shall be done by the Discom Energy Accounting Group (DEAG) of Discoms.

Agenda Of 54th OCCM Of M.P 14

Page 17: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Accordingly, SLDC has provided the training and necessary inputs to Discom officials on 11th Dec 2015. Further, SLDC vide this office letters No. 4605 dated 05.01.2016 and 133 dated 13.04.2016 has also requested the Commercial Sections of Discons to issue necessary instructions to Discom Energy Accounting Group (DEAG) to take over the energy accounting of DEOACs from the month of April 2016. The East Discom & West Discom has started the energy accounting and issuing the DSM charges Bill of embedded customers from the month of April 2016, but, no feed back regarding issuance of DSM Bill / energy accounting of the embedded customers from the month of April 2016 is received by SLDC from Central Discom.

The Committee may like to discuss the status of energy accounting of embedded customers in

Central Discoms.

[Action : Central Discoms]

9.7 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter installed at the pooling station:

It was discussed and decided in the 45th OCC meeting, that energy accounting of Renewable Energy Generators (REGs) shall be done as per the actual data recorded in ABT meters installed at the pooling station. The energy accounting of REGs connected at 132KV level has already been started, but, energy accounting of REGs connected at 33KV level could not be started due to non availability of meter data. SLDC has requested the commercial sections of Discoms to furnish the meter, modem & SIM details of the pooling station and % of energy purchased by MPPMCL and % of energy wheeled to Discoms for configuration at SLDC. However, Central & West Discom has mainly furnished the generator wise meter, modem & SIM details whereas pooling station wise meter, modem & SIM details are required for the purpose of energy accounting at pooling station. Further, Discom officials has informed that in case of solar generators ABT meters are installed at the generators end only and standby meter is installed at the grid substation. In such cases where there is no seperate pooling station and standby meter is installed at the grid substation, the grid substation shall be considered as a pooling substation as per MPERC draft REG regulations, Accordingly, SLDC vide letter no. 2117 dated 02.09.2016 has requested the SE(T&C), Nagda, Bhopal, Ujjain of MPPTCL to furnish the details of ABT meters installed at the grid substations, but, details have not been received so far. CE(T&C) office is therefore requested to instruct the site officials for furnishing the details of ABT meter installed at the grid substation and coordinate with Wind & Solar Generators for providing AMR facility. [Action : MPPTCL]

ITEM NO 10: SCADA/EMS RELATED ISSUES: 10.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS - The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. Two number special meetings of MPPTCL filed officers/T&C officers have already been held at SLDC Jabalpur regarding integration issues. The matter was also discussed in the meeting held in the office of CE(T&C) on dated 07-06-2016. The integration of around twenty RTUs (220KV Sirmore, 132KV Suasara,132KV Ratangarh,132KV Khilchipur,132KV Rewa, 132KV Satna, 132KV Biora,132KV Sironj, 132KV Chanderi,132KV Arniakala, 132KV Sonkach,132KV Kannod, 132KV Bercha, 132KV Poliakala, 132KV Momin Barodia,132KV Pachore, 132KV Jeerapur, 132KV Petlabad,132KV Jaora ) is pending for want of commissioning of data channel which is pending due to shortage of PLCC panels/modems etc.

Agenda Of 54th OCCM Of M.P 15

Page 18: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Further, in recently commissioned RTU following is also observed:-

(i) Most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 132KV Khilchipur, 132KV Alot, 132KV Kushi, 132KV Mandideep is commissioned but out just after its commissioning.

(ii) In addition to above, it is also observed that SOE signal from Dongfeng RTU is

not getting received from RTU buffer i.e. when RTU is functioning and communication channel is not healthy, the SOE of that time, after restoration of communication channel is received with time of comm. Channel restoration and not actual SOE time.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C.

[Action: - CE (T&C)/CE (T&P), MPPTCL]

10.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS & The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as annexure-10.2. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:- Sl No. Name of Substation

whose RTU is required to be upgraded

Name of feeders/transformers required to be included in telemetry

01 220KV Sidhi S/s

220KV Sidhi –Hindalco and 220KV Sidhi- Rewa feeder is not functioning since last three months.

02 132KV Gudgaon S/s

RTU is to be upgraded to provide telemetry of important renewable feeders i.e. 132KV Gudgaon-Kukru Windfarms. 132KV Gudgaon- 33kV Inox -1, 132KV Gudgaon- 33KV Inox-2.

03 220KV Birsingpur S/s

The telemetry of 220KV IC-1 & 132KV Shahdol feeder is not available since last six month

04

220 KV Dewas S/s

33 KV MP Windfarm feeder is not available 33 KV Jamgodarani feeder 1,2 is not available

05

132 KV Jaora S/s

33 KV Ratlam Wind 1,2 is not availble

06

132 KV Alot S/s

33 KV Narbheram is not available

07

220 KV Badnagar S/s

33 KV Kshama Power is not available

Agenda Of 54th OCCM Of M.P 16

Page 19: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

08

220KV Pipariya S/S

220/132KV Transformer, 220KV Pipariya- 220KV Chichli feeder not available

09 220KV Bairagad S/S Telemetry of 220/132KV Transformer, 132KV Runaha-1 & 2 feeder, 132/33KV transformer is not available

10

132KV Gadarwara

132KV Gadarwara - Orient Green

11

220KV Shivpuri S/s

220/132KV Transformer telemetry is not available

12 220KV Pandhurna 220KV Pandhurna-Chhindwara telemetry is not available

During Black start mock drill of ISP/OSP following telemetry discrepancy are observed:-

(1) At Indira Sagar Hydel Power Station :- abnormally high value of MW (approximately 510MW0 on 400Kv ISP Indore line (circuit -ii) after opening of bus coupler CB i.e. islanding mode but its actual value was 45 MW. Similarly while picking load around 8-10 MW on unit No. 7, it was showing 210-250 MW value in SCADA system.

(2) At Indore 400KV Sub Station :- While Indore-ISP circuit was opened, it is showing 10MW

value in SCADA system similarly 4 MW value was shown on 220KV Indore-Indore(east) circuit while feeder was open from both end.

(3) AT OSP :- Even after charging of 220KV bus, the bus frequency and bus voltage in SLDC

SCADA system displayed is zero. The same parameters values were normalized after line charging. It seems that in place of bus PT, line PT is extended to Voltage and Frequency transducers. The same is required to be corrected.

The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

[ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL] 10.2 PRESENT STATUS OF PROCUREENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansgar III HPS was discussed in detail in last sixteen OCCM meetings as well as on two number special telemetry meetings, without any conclusive result. The Telemetry of Rajghat HPS is out since LAST TWO YEARS. In the last meeting it was informed by MPPGCL that order for RTU has been placed by MPPGCL. The latest status in the matter along with commissioning schedule, may please be provided by MPPGCL.

[Action: - ED (O&M: GEN: MMPPGCL]

Agenda Of 54th OCCM Of M.P 17

Page 20: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

10.3 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTIG OF RTUS AS PER BACKUP SLDC REQUIREMENT:- The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already in advance stage and the additional communication channel is required to be extended to respective control centre's for testing with new SCADA/EMS system. The RTU wise progress may please be provided by MPPTCL & MPPGCL. The wideband node at Birsingpur TPS is commissioned but its utilization is pending due to distance in locations between wideband node equipment, RTU panels etc. M/s Tejas engineer was deputed to Birsingpur to work out the requirement. The complete scheme along with material requirement for shifting of RTUs on wideband node was prepared and forwarded to Birsingpur for arranging on top most priority. Present status may please be informed. 10.4 Arrangement of space, Power Supply for installation of PMUs panels & wideband

node equipments:- The PMUs at MPPTCL 400KV Sub stations namely Bhopal, Bina, Indore, Katni, Nagda has already been delivered and installation shall be taken up shortly. The necessary arrangement for space and power supply at these sub stations may please be ensured by MPPTCL. Similarly wideband node equipments at 220Kv Chindwara, 220KV Seoni, 220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan, 220KV Rajgarh, 220KV Maalnpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench & Gandhisagar HPS is expected to be commissioned within next four months. The necessary provision of space, DCPS, Air conditions is required to be ensured by MPPTCL & MPPGCL.

[Action: - CE (T&C)/CE (T&P), MPPTCL, ED (O&M: GEN: MPPGCL]

10.5 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:- Sl No. Name of Sub

Station Out from /Remark

01 Rajghat HPS Out from last two years 02

132KV Morwa S/s

More then one and half Year

03

132KV Beohari

Out due to data Channel Problem

04 132KV Mandideep 05 132KV Kushi 06 132KV Waidhan 07 132KV Umariya 08 132KV Khilchipur Out due to RTU configuration issue 09 132KV Alot Out due to communication problem 10 132KV Balaghat Frequent Outage at least three four time in

a day is observed. 11 220KV Mandideep MPPTCL, MPPGCL requested to sort out rectification of above RTU/data channel on top most priority.

Agenda Of 54th OCCM Of M.P 18

Page 21: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

10.6 Telemetry of railway TSS Sub Stations:- The telemetry of 36 Nos railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. Accordingly, to finalise the telemetry scheme, a meeting of various filed offices from railway & SLDC was held at SLDC Jabalpur on 08-01-2016. The further clarification required in the matter was also provided to railway officers during the meeting held at SLDC in first week of October 2016. Railway officials to provide progress in the matter. 10.7 Draft Regulation on the CERC(Communication System for Inter-State transmission of electricity) Regulation 2016:- CE(P&D), MPPTCL through UO Note No. 1156 dated 06.10. 2016 has forwarded the draft regulation on the Central Electricity Regulatory Commission (Communication System For Inter-State Transmission of Electicity) Regulations to ED(CRA), CE(SLDC), CE(T&C) separately for suggestion/objection/comments on the Draft Regulation. The same is available on the CERC website. All the intra-state entities are requested to download & review the same. SLDC has already furnished its suggestion/objection/comments to CERC. . [Committee may like to discuss ] ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 55th OCC meeting of Operation and Coordination Committee of MP on 22.12.2016. The host and venue of the same shall be decided in the meeting.

***********

Agenda Of 54th OCCM Of M.P 19

Page 22: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

S. No. Particulars

1

1.1 Maximum Frequency 50.14 HzBetween 13.00 hrs & 14.00 Hrs on 01.08.16

50.09 HzBetween 03.00 hrs & 04.00 Hrs on 01.09.16

1.2 Minimum Frequency 49.67 HzBetween 13.00 hrs & 14.00 Hrs on 10.08.16

49.85 HzBetween 14.00 hrs & 15.00 Hrs on 19.09.16

1.3 Average Frequency 50 Hz 50 Hz

2

2.1 Maximum Frequency 50.35 Hz AT 13.03 HRS ON 10.08.16 50.24 Hz AT 18.01 HRS ON

02.09.16

2.2 Minimum Frequency 49.65 Hz AT 08.10 HRS ON 21.08.16 49.67 Hz AT 18.53. HRS

ON 19.09.163 Percentage of time when frequency was :-

%age of time when frequency was Aug-16 Sep-16

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.11 0.1

3.6 Between 49.70 Hz and 49.9 Hz 5.83 5.75

3.7 Between 49.9 Hz and 50.05 Hz 73.73 75.15

3.8 Between 50.05 Hz AND 51.5 Hz 20.32 19

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Aug-16 Sep-16

Agenda Of 54th OCCM Of M.P 20

Page 23: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

I

S. No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH

CIRCUIT

KMS.

DATE OF COMPL-

ETION

DATE OF COMMI- SSIONING

A. 400 KV TRANSMISSION LINESNIL 0 0

B. 220 KV TRANSMISSION LINES

1 LILO of 220 KV Katni - Satna line at PGCIL, Satna

DCDS 0.7 1.40 April'16 09.04.2016

2LILO of one Ckt of 220kv DCDS Bhopal - Ashta line at 220kv S/S Mugaliya chhap. (DCDS) (2x26.459) (JICA)

DCDS 26.46 52.92 June'16 18.06.2016

3LILO of 220KV line Indore 400 -Pithampur at Pithampur-II 220Kv S/s in Indore (2x6.898) (PFCIIi)

DCDS 6.90 13.80 June'16 10.06.2016

4220Kv DCDS line from 400Kv S/s Bina to plant of M/s Bharat Oman Refinaries Ltd. Agasod, Bina (2x18.197) (Contr.Works)

DCDS 18.197 36.394 Aug'16 01.08.2016

C. 132 KV TRANSMISSION LINES

12nd Circuit of 132 Kv Gudgaon - Kukru Wind Power Ltd. Betul (Contributory work) 2nd ckt 22.5 22.50 Aprilo'16 07.04.2016

2LILO of one circuit of Mandideep - Hoshangabad for 132 KV Sub-Station Tamot(2x1.686) (REC-I)

DCDS 1.686 3.37 Aprilo'16 30.04.2016

3 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line (48.30) ADB-III

2nd ckt 48.27 48.27 May'16 10.05.2016

4 132Kv 2phase 2wire S/c line from 132Kv s/s Amla to GSS Bordehi of RVNL(1x23.5) Contrib

DCSS 23.29 23.29 May'16 06.05.2016

5132Kv DCSS line from 132Kv S/s Madhotal to 11.5 MW Processing Plant of M/s Essel Jabalpur MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib.

DCSS 2.52 2.515 May'16 02.05.2016

6

2nd Ckt.of 132 KV Rewa - Mangawan line (Dist. Rewa ) (JICA) approch section of mangawan end (4x2.079+1x6.75) (JICA) (Balance work)

2nd Ckt 8.829 15.066 June'16 27.06.2016

7 132 kv DCSS Datiya- Bhander line (1x34.038)ADB-III

DCSS 34.04 34.04 June'16 27.06.2016

8 132 kv DCSS Ashoknagar - Kothiya line (1x27.5+4x2.5) ADB-III

DCSS 37.50 37.50 June'16 09.06.2016

9 132 kv DCSS line from 132Kv S/s Lahar - 132Kv S/s Seondha (1x15.5) PFC-III

DCSS 16.70 16.70 June'16 24.06.2016

10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016

11 132 kv DCDS line Panagar - Katangi (2x29.471) PFC-II

DCDS 29.47 58.94 JULY'16 04.07.2016

12 132 kv DCSS line from 132Kv S/s Porsa - 132Kv S/s Ambah (1x22.524) PFC-III

DCDS 22.52 22.52 Aug'16 11.08.2016

132nd Ckt.of 132Kv DCSS Katangi tap line tapped to one ckt. Of 132Kv Balaghat-Seoni line (1x0.5+35.67) ADB-III

DCDS 35.67 35.67 Aug'16 29.08.2016

14 132 kv DCSS line Mehgaon - Pratappura (1x29.74) ADB-III

DCDS 29.74 29.74 Aug'16 31.08.2016

15 132kv Jeerapur -Susner DCSS line (1x30.236) (JICA)

DCSS 30.24 30 Sept'16 21.09.2016

16 2nd ckt of 132kv Bairagarh - Shyampur line (1x0.5+4x1.9+19) (ADB-III)

2nd ckt 19.04 19.04 Sept'16 28.09.2016

17132 kv Ashoknagar - Eshagarh DCSS line (1x37) (Transco)(Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67)

DCSS 38.50 38.50 Sept'16 30.09.2016

18132KV DCDS line from 132KV S/s Pithampur (to be upgrated) for Pithampur SEZ Phase-II of AKVN(2x0.54) (contr. work)

DCDS 0.54 1.08 Sept'16 10.09.2016

ANNEXURE - 2.3.4.iM.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 30.09.2016)EHV TRANSMISSION LINES

Agenda Of 54th OCCM Of M.P 21

Page 24: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer & Cap.(MV

A)

EFFECTIVE

CAPACITY MVA

DATE OF COMPL-ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

11x125 MVAR 400 Kv Bus Reactor at existing 400Kv S/s Nagda ADB-III

400Kv Aug'16 09.08.2016

Nil 0.00B. 220 KV SUBSTATIONSa. 220 KV NEW SUBSTATIONS

1220kv switching S/s at Nagra Dist- Ratlam Contrib.

220/132 KV

0.00 0 May'16 30.05.2016

2Mugaliachhap(Bhopal) 220kv (New S/s)(1x160+40) (JICA)

220/132 KV

1x160 160 June'16 20.06.2016

C. 132 KV SUBSTATIONSa. 132KV NEW SUBSTATIONS

1Pratappura 132 KV New S/s (1x40) ADB-III (Dist- Bhind)

132/33KV 1x40 40 April'16

12.04.2016(fom 33 KV

side) & 31.08.2016 (132KV side)

2Tamot 132kv s/s (Distt. Raisen ) 1x50MVA (Transco)

132/33KV 1x40 40 May'16 05.05.2016

3Bhander 132kv s/s (Distt. Datia) 1x63 (ADB-II)

132/33KV 1x63 63 June'16 28.06.2016

4Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA (ADB-III)

132/33KV 1x40 40 June'16 09.06.2016

5Katangi 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III)

132/33KV 1x40 40 June'16

28.06.2016from 33kV

& 05.07.2016 from 132Kv

6Pithampur SEZ- II 132kv s/s 1x63 MVA (Distt.Dhar) (contr.work)

132/33KV 1x63 63 Sept'16 19.09.2016

EHV SUB - STATIONS

Agenda Of 54th OCCM Of M.P 22

Page 25: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

S. No.

NAME OF THE TRANSMISSION LINECKT.KMS.

PROGRESS

IN %

Target for

commis-sioning

A. 400 KV TRANSMISSION LINES1 NIL 0 0% -B. 220 KV TRANSMISSION LINES1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17

2

Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv Indore-II (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7)

35.8 31% 2018-19

3 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 27% 2016-17

4LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

66 3% 2017-18

5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18

6220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

34 4% 2017-18

7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-188 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18C. 132 KV TRANSMISSION LINES1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 33% 2017-182 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 79% 2016-173 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-174 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-175 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-176 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-177 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5) 35.5 55% 2017-188 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 9% 2016-17

9132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209)

53.209 34% 2017-18

10LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

40 5% 2017-18

11 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-1812

132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32 859)

32.859 32% 2017-1813 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-1814 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 4% 2017-1815 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-18

16132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.059)

31.059 3% 2017-18

17 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 13% 2016-1718

132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50)

50 23% 2016-17

19LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

55.09 36% 2016-17

20 132 kv DCSS line Datiya - Dabra (1x30) 30 99% 2016-17

21132Kv DCDS line for LILO of both circuit of 132Kv Banmore -Morena/Hetampur DCDS line for 220Kv S/s Morena(2x0.616+2x3.122)

7.476 70% 2016-17

ANNEXURE - 2.3.4.ii

TRANSMISSION WORKS UNDER PROGRESS (AS ON 30.09.2016)

Agenda Of 54th OCCM Of M.P 23

Page 26: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

22 2nd ckt of 132Kv Chhatarpur- Khajuraho line (1x0.5+33.2) 33.7 65% 2016-1723 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 10% 2017-1824 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.46) 32.46 90% 2016-1725 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 19% 2017-18

26LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping )

32.6 96% 2017-18

27 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-1728 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 28% 2018-1929 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-1830 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 17% 2016-1731 2nd ckt of 132kv Kukshi - Alirajpur line (1x1+36) 37 89% 2018-1932 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18

33LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv S/s Pandhana(2x1.895) (This line is proposed in place of Chhegaon -Pandhana Estt. Sanc.no. 0121dtd.06.08.2014)

3.79 60% 2016-17

34LILO of 132 kv Manawar - Kukshi Line at 132Kv S/s Singhana(2x3 1)

6.2 60% 2016-17

35

LILO of Khargone - Julwaniya DP line(132Kv) at Talakpura (2x1.1+1x0.8)(This line is proposed in place of Julwaniya- Talakpura line Rev. Estt. Sanc.no. 0245 dtd.15.01.2016 for Rs.185.40lac.)

3 60% 2017-18

36LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4)

14.8 2%

37 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 43% 2017-1838 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-1839 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 13% 2017-1840 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11% 2017-1841 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-1842 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 4% 2016-1743 132kv Birsinghpur -Shahdol DCSS line (1x48) 48 4% 2018-19

44132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s Kishangarh (1x57.139)

57.139 63% 2016-17

45 2nd ckt of 132kv RTS Mangliyagaon line 8.852 96%

46132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS to RTS Bagra Tawa(1x4.3)

4.3 98%

47132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS Majhgawan(1x0.19)

0.19 89%

48132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS Rewa(1x0.4)

0.4 73%

49132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1)

3.1 30%

S.No.

NAME OF THE SUBSTATIONEFFECTIVE CAPACITY

MVA

PROGRESS

IN %

Target for

commis-sioning

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)

200 9% 2017-18

2400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer (Distt.Balaghat)

630 4% 2017-18

3Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Bhopal)

315 19% 2016-17

4Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa)

315 30% 2016-17

Agenda Of 54th OCCM Of M.P 24

Page 27: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

B. a 220 KV SUBSTATIONS

1Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015)

320 79% 2016-17

2Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged on31.3.2015)

160 95% 2016-17

3Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA (Distt. )

160 2% 2017-18

4Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA(Distt. )

160 9% 2017-18

5 Adampur 220/33kv S/s 2x50MVA 100 6% 2017-18

6 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA (Distt. )

160 11% 2017-18

7Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank

160 66% 2016-17

C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Rahatgarh132kv s/s (Distt.Sagar) 40 58% 2016-172 Bairad 132kv s/s(Dist.-Shivpuri ) 40 13% 2017-183 Barahi 132kv s/s (Distt.Katni) 40 11% 2017-184 Karapgaon 132kv s/s (Distt-Narsinghpur) 40 14% 2017-185 Indergarh 132kv s/s (Distt.Datia) 40 25% 2017-186 Biston 132kv s/s (Distt. ) 1x40 MVA 40 24% 2017-187 Agrod 132kv s/s (Distt. ) 1x40 MVA 40 54% 2017-188 Chhayan 132kv s/s (Distt. ) 1x40 MVA 40 54% 2016-179 Teesgaon 132kv s/s (Distt. ) 1x40MVA 40 16% 2016-17

10 Pandhana 132kv s/s (Distt. ) 1x63 MVA 63 35% 2016-1711 Singhana 132kv s/s (Distt. ) 1x40 MVA 40 46% 2016-1712 Talakpura 132kv s/s (Distt. ) 1x40 MVA 40 47% 2017-1813 Waraseoni 132kv s/s (Distt.Balaghat ) 1x40 MVA 40 1% 2017-1814 Devnagar 132kv s/s (Distt. Narsighpur) ) 1x40 MVA 40 33% 2017-1815 Belkheda 132kv s/s (Distt. Jabalpur) ) 1x40 MVA 40 1% 2017-1816 Khimlasa 132kv s/s (Distt. ) 1x40 MVA 40 3% 2017-1817 Karakbel 132kv s/s (Distt. Narsinghpur) 1x40 MVA 40 17% 2017-1818 Chinaur 132kv s/s (Distt. ) 1x40 MVA 40 28% 2016-1719 Kelaras 132kv s/s with 1x63 MVA (Distt. ) 63 14% 2016-1720 Narsinghgarh 132kv s/s with 1x40 MVA (Distt. ) 40 5% 2016-1721 Salamatpur 132kv s/s with 1x40 MVA (Distt. ) 40 47% 2016-1722 Intkhedi 132kv s/s (Distt. ) 1x63 MVA 63 69% 2017-1823 Silvani 132kv s/s with 1x40 MVA (Distt. ) 40 12% 2017-1824 Udaipura 132kv s/s with 1x40 MVA (Distt. ) 40 3%

25Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Dewash)

40 77% 2016-17

Agenda Of 54th OCCM Of M.P 25

Page 28: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Aug-16 Sep-16 Aug-16 Sep-16

Commissinary HQ 23:45 23:50 23:42 23:42

District HQ 23:54 23:54 23:40 23:46

Tehsil HQ 23:48 23:49 23:28 22:39

Rural -Mixed 23:27 23:28 22:40 22:47

Rural -DLF 23:27 23:28 22:57 23:01

Rural -Irrigation 9:57 9:58 9:26 9:31

Aug-16 Sep-16 Aug-16 Sep-16

Commissinary HQ 23:53 23:52 23:45 23:47

District HQ 23:51 23:46 23:49 23:50

Tehsil HQ 23:42 23:37 23:40 23:38

Rural -3Phase 23:09 23:20 23:05 23:10

Rural -1Phase 23:01 23:20 23:18 23:17

Total Rural 9:43 9:39 9:42 9:43

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda Of 54th OCCM Of M.P 26

Page 29: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV Kundali 27.07.2015 21.11.201533KV Bangaon 27.07.2015 ----

132KV Borgaon 33KV FS-II 26.02.2013 12.04.2016

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220KV Indore (Jetpura)-II 33KV PGCIL-II feeder 24.08.2014220KV Nimrani 33KV Maral Overseas 08.06.2015

33KV DLF-I 01.03.201433KV DLF-II 01.03.201433KV Exep.Panther-IV 09.07.201533KV Feeder No.2 31.12.201433KV Feeder No.3 31.12.201433KV Feeder No.4 31.12.2014

132KV Badgaon 33KV Discom Bay 29.11.2014 25.09.2015132KV Anjad 33KV Discom Bay 08.12.2014 26.11.2015

220KV Chhindwara

220KV

JABALPUR REGION

132KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

Annexure-2.4(ii)

220KV

132KV

132KV Raukhedi

132KV Chandrawatiganj

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

Agenda Of 54th OCCM Of M.P 27

Page 30: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Annexure-2.4(ii)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220KV Barod 33KV M&B-I&II

132KV Susner 33KV Evershine 21.05.201433KV Enercon-I33KV Enercon-II33KV M&B-I33KV M&B-II33KV Kachnariya33KV Lasuldiya Kelwa

132KV Sonkatch 33KV Industrial (MPAKVN)

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Betul 33 KV Industrial 13.06.2014220 KV Vidisha 33 KV ISanchi 30.01.2015

33 KV Barna 19.02.201433 KV Boras 19.02.201433 KV Nagar Palika 09.03.201433 KV Water Works 09.03.201433 KV Jatkheda-I 07.05.201433 KV Jatkheda-II 07.05.201433 KV Runaha 15.04.201533 KV Nazirabad 18.09.201533 KV Ramgarh 19.09.201533 KV Nayasamand 19.12.2015

132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014132 KV Gopalpur 33 KV AE, PHE 27.02.2015

33 KV AIIMS Hospital 29.02.201633 KV AIIMS Residence 29.02.201633 KV C-21 Mall 01.06.201633 KV Katara Hills-II 01.06.2016

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Sagalgarh 33 KV Mangrol 30.05.2014

132 KV Datia 33 KV Karapura 17.05.2014132 KV Ron 33 KV Mangarh 21.11.2013

132 KV Morar 33 KV Readymade Garment 22.08.2014

132 KV Amrawad Khurd

132 KV Biora

GWALIOR REGION

220 KV

132 KV

220 KV

132 KV Runaha

132 KV Shyampur

132 KV Bareli

132 KV

UJJAIN REGION

(For which group to be allocated)BHOPAL REGION

220KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL

132KV Agar

132KV

132KV Nalkheda

Agenda Of 54th OCCM Of M.P 28

Page 31: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Agenda Of 54th OCCM Of M.P 29

Page 32: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

A. ThermalStn. Name UNIT No. Capacity

MW Aug-16 Sep-163 120 0.00 0.004 120 0.00 0.00

PH II 240 0.00 0.005 210 14.25 92.98

PH III 210 14.25 92.98TOT 210 14.25 92.98

6 200 8.07 6.567 210 13.78 39.89

PH II 410 21.84 46.448 210 0.00 38.779 210 0.00 20.71

PH III 420 0.00 59.4710 250 0.00 7.8811 250 0.00 98.08

PH IV 500 0.00 105.95TOT 1330 21.84 211.87

1 210 0.00 16.122 210 29.35 108.83

PH I 420 29.35 124.953 210 5.89 104.894 210 0.00 72.22

PH II 420 5.89 177.115 500 310.73 328.50

PH III 500 310.73 328.50TOT 1340 345.97 630.56

1 600 0.00 61.892 600 0.00 27.01

PH1 1200 0.00 88.90

4080 382.06 1024.31

B. HydelCapacity

MW Aug-16 Sep-16115.0 23.45 13.00172.0 54.99 19.0699.0 45.61 14.56

386.0 124.05 46.62193.0 62.03 23.31160.0 30.63 85.13107.0 20.42 56.7590.0 60.28 61.34

315.0 146.10 178.6320.0 14.31 10.1860.0 20.47 32.0030.0 0.52 10.0145.0 12.18 0.0022.5 6.09 0.0020.0 1.23 10.9860.0 45.01 14.13

1186.0 454.78 449.01915.0 354.18 415.39917.5 376.46 397.32

CapacityMW Aug-16 Sep-16

Indira Sagar Hydel Project 1000 740.600 310.630Omkareshwar Hydel Project 520 290.228 131.966

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

Agenda Of 54th OCCM Of M.P 30

Page 33: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total30 31 30 31 31 30 0 0 0 0 0 0 183

A.1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 0.00 0.00 0.00 0.00 0.00 0.00 4847.812 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 0.00 0.00 0.00 0.00 0.00 0.00 1105.983 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 0.00 0.00 0.00 0.00 0.00 0.00 5953.79

B.1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 0.00 0.00 0.00 0.00 0.00 0.00 1853.612 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 0.00 0.00 0.00 0.00 0.00 0.00 810.823 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 0.00 0.00 0.00 0.00 0.00 0.00 8337.864 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 0.00 0.00 0.00 0.00 0.00 0.00 124.325 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 0.00 0.00 0.00 0.00 0.00 0.00 8462.186 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -73.79 0.00 0.00 0.00 0.00 0.00 0.00 -432.827 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 0.00 0.00 0.00 0.00 0.00 0.00 841.398 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.809 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 0.00 0.00 0.00 0.00 0.00 0.00 908.29

10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 0.00 0.00 0.00 0.00 0.00 0.00 4836.5811 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 0.00 0.00 0.00 0.00 0.00 0.00 1774.9813 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 0.00 0.00 0.00 0.00 0.00 0.00 355.0614 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.7115 STOA Schedule other than MPPMCL 0.00 0.00 64.44 75.76 80.19 19.73 0.00 0.00 0.00 0.00 0.00 0.00 240.1216 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0017 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 0.00 0.00 0.00 0.00 0.00 0.00 1160.8019 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 0.00 0.00 0.00 0.00 0.00 0.00 916.8920 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0021 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 0.00 0.00 0.00 0.00 0.00 0.00 44.63

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.5325 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0026 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 0.00 0.00 0.00 0.00 0.00 0.00 -891.5727 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 0.00 0.00 0.00 0.00 0.00 0.00 -1666.3128 Total MP Schedule (Including Railway) 3253.22 3163.74 3477.52 2627.92 1890.17 2605.51 0.00 0.00 0.00 0.00 0.00 0.00 17018.0929 Total MP Drawal (Including Railway) 3205.75 3093.57 3417.72 2539.32 1797.19 2531.71 0.00 0.00 0.00 0.00 0.00 0.00 16585.2730 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 0.00 0.00 0.00 0.00 0.00 0.00 26.5831 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 0.00 0.00 0.00 0.00 0.00 0.00 92.3632 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 0.00 0.00 0.00 0.00 0.00 0.00 74.6233 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.00 0.00 0.00 0.00 0.00 0.00 4.3834 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0035 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 0.00 0.00 0.00 0.00 0.00 0.00 -14.8636 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 0.00 0.00 0.00 0.00 0.00 0.00 2324.7037 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 0.00 0.00 0.00 0.00 0.00 0.00 453.08

38 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 20.37 8.23 8.07 21.17 23.00 50.10 0.00 0.00 0.00 0.00 0.00 0.00 130.93

39Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

10.35 8.46 9.39 6.14 8.23 8.82 0.00 0.00 0.00 0.00 0.00 0.00 51.40

40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 0.00 0.00 0.00 0.00 0.00 0.00 27.7741 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.00 0.00 0.00 15.4542 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 0.00 0.00 0.00 0.00 0.00 0.00 21.1343 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.5844 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 0.00 0.00 0.00 0.00 0.00 0.00 -55.3345 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 6.0646 State Supply (Ex-Power st. Bus) 5397.37 5038.53 4767.84 4299.45 4111.75 4747.43 0.00 0.00 0.00 0.00 0.00 0.00 28362.3647 AVERAGE DAILY (Ex-Bus) 179.91 162.53 158.93 138.69 132.64 158.25 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 154.9948 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 0.00 0.00 0.00 0.00 0.00 0.00 92.8249 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 0.00 0.00 0.00 0.00 0.00 0.00 177.7550 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4281.50 4822.95 4090.97 4214.27 4371.53 5133.25 6395.72 6376.15 6847.93 6256.30 5773.75 5310.94 26914.4851 Year ((16-17)-(15-16))*100/Year (15-16) 26.06 4.47 16.55 2.02 -5.94 -7.52 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 5.3852 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.6453 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 0.00 0.00 0.00 0.00 0.00 0.00 12.9754 Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4749.29 0.00 0.00 0.00 0.00 0.00 0.00 28380.9855 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0056 Un-Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4749.29 0.00 0.00 0.00 0.00 0.00 0.00 28380.98

ENERGY BALANCE SHEETYear : 2016 - 17

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda Of 54th OCCM Of M.P 31

Page 34: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17C.1 DEMAND MET 7984 7347 7019 6147 6146 7909 0 0 0 0 0 0 79842 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 8011 7902 7501 6903 6964 7963 0 0 0 0 0 0 80112 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 0 0 0 0 0 0 8119G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 0 0 0 0 0 0 8153H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 0 0 0 0 0 0 8153I.1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 0:00 0:00 0:00 0:00 0:00 0:00 23:432. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 0:00 0:00 0:00 0:00 0:00 0:00 23:483. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 0:00 0:00 0:00 0:00 0:00 0:00 23:374. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 0:00 0:00 0:00 0:00 0:00 0:00 23:045. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 0:00 0:00 0:00 0:00 0:00 0:00 23:166. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 0:00 0:00 0:00 0:00 0:00 0:00 9:42J LOAD FACTOR % 92.33 79.51 82.87 78.80 74.42 78.89 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 81.14

S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17A. INTGRATED FREQUENCY

1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 0.00 0.00 0.00 0.00 0.00 0.00 50.202 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 0.00 0.00 0.00 0.00 0.00 0.00 49.67

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 0.00 0.00 0.00 0.00 0.00 0.00 50.442 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 0.00 0.00 0.00 0.00 0.00 0.00 49.56

C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 0.00 0.00 0.00 0.00 0.00 0.00 20.263 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 0.00 0.00 0.00 0.00 0.00 0.00 72.504 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 0.00 0.00 0.00 0.00 0.00 0.00 7.125 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.126 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2016 - 17

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2016-17

Agenda Of 54th OCCM Of M.P 32

Page 35: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs Injecti

on

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

1:00 49.99 506 460 455 993 393 26 529 2857 1192 4 0 73 767 0 395 21 0 885 218 0 -223 -858 0 0 63 10 2547 5404 2494 -53 0 5351 0 0 0 5354 5354

2:00 50.01 507 462 449 987 393 26 528 2844 1092 0 0 64 728 0 386 16 0 873 218 0 -223 -757 0 0 75 10 2483 5327 2404 -79 0 5248 0 0 0 5249 5249

3:00 50.01 505 460 430 988 394 26 517 2816 1031 3 0 64 732 0 386 9 0 869 218 0 -223 -684 0 0 81 10 2496 5312 2378 -118 0 5193 0 0 0 5195 5195

4:00 50.01 506 460 434 990 394 26 511 2815 1049 4 0 64 709 0 392 6 0 861 218 0 -223 -785 0 0 86 10 2392 5207 2324 -68 0 5139 0 0 0 5141 5141

5:00 49.98 506 461 433 990 394 26 503 2805 1023 4 0 61 692 0 387 11 0 848 218 0 -223 -683 0 0 98 10 2446 5251 2336 -110 0 5141 0 0 0 5144 5144

6:00 50.01 502 457 452 989 394 26 510 2828 1091 0 0 64 743 0 392 10 0 655 218 0 -224 -630 0 0 98 10 2427 5256 2427 -1 0 5255 0 0 0 5257 5257

7:00 50.00 508 462 480 986 394 26 532 2880 1258 0 0 64 810 0 392 2 0 536 218 0 -598 -410 0 0 156 10 2440 5320 2455 15 0 5335 0 0 0 5337 5337

8:00 50.04 506 460 463 977 395 26 595 2918 1311 0 0 64 807 0 392 10 0 557 218 0 -598 -431 0 0 146 10 2486 5403 2417 -68 0 5335 0 0 0 5336 5336

9:00 50.01 512 466 466 983 395 26 667 3003 1365 0 0 68 830 0 393 16 0 387 218 0 -598 -448 0 0 127 10 2368 5371 2329 -39 0 5331 0 0 0 5333 5333

10:00 50.00 497 452 473 984 393 26 717 3046 1333 12 0 72 831 0 393 15 0 340 218 0 -598 -501 0 0 103 10 2228 5275 2175 -53 0 5222 0 0 0 5224 5224

11:00 50.01 503 458 470 985 393 26 758 3091 1327 17 0 80 809 0 393 23 0 343 218 0 -597 -550 0 0 84 10 2156 5247 2007 -150 0 5098 0 0 0 5099 5099

12:00 50.01 496 451 468 987 393 26 782 3107 1321 15 0 71 768 0 393 25 0 358 218 0 -597 -727 0 0 51 10 1906 5014 1757 -149 0 4865 0 0 0 4867 4867

13:00 50.02 493 448 451 988 393 26 787 3093 1218 15 0 71 746 0 393 18 0 538 218 0 -619 -844 0 0 84 10 1849 4942 1752 -97 0 4845 0 0 0 4846 4846

14:00 50.00 502 457 436 989 393 26 770 3071 1146 13 0 64 716 0 389 18 0 537 218 0 -620 -797 0 0 97 10 1794 4865 1690 -103 0 4762 0 0 0 4763 4763

15:00 49.99 511 465 441 993 394 26 745 3064 1150 7 0 64 710 0 385 11 0 618 218 0 -616 -933 0 0 86 10 1710 4774 1662 -48 0 4726 0 0 0 4729 4729

16:00 50.01 501 456 450 985 395 26 671 2983 1070 4 0 64 710 0 378 6 0 720 218 0 -615 -901 0 0 110 10 1775 4758 1777 2 0 4760 0 0 0 4761 4761

17:00 49.99 506 460 438 988 394 26 599 2906 945 0 0 64 695 0 384 0 0 865 218 0 -617 -749 0 0 134 10 1950 4856 1970 19 0 4876 0 0 0 4878 4878

18:00 50.01 513 467 448 991 394 26 503 2829 871 0 0 61 657 0 403 0 0 1102 218 0 -616 -608 0 0 159 10 2258 5086 2200 -57 0 5029 0 0 0 5031 5031

19:00 49.97 534 486 490 998 393 27 461 2856 1326 23 0 85 786 0 427 25 0 756 214 0 -30 -1026 0 0 104 10 2701 5557 2836 135 0 5692 0 0 0 5698 5698

20:00 49.98 545 496 512 986 392 27 460 2873 1618 65 0 91 805 0 432 64 0 691 214 0 -90 -634 0 0 48 10 3315 6189 3216 -99 0 6089 0 0 0 6095 6095

21:00 50.00 541 492 480 988 393 27 451 2829 1585 49 0 85 798 0 423 56 0 697 214 0 -87 -623 0 0 47 10 3254 6084 3132 -123 0 5961 0 0 0 5965 5965

22:00 50.04 538 489 479 986 395 27 464 2840 1456 30 0 85 791 0 424 40 0 716 214 0 -79 -634 0 0 63 10 3117 5957 2958 -159 0 5798 0 0 0 5799 5799

23:00 50.02 528 481 472 985 393 26 489 2846 1344 4 0 75 785 0 424 23 0 806 214 0 -61 -603 0 0 36 10 3058 5904 2850 -208 0 5696 0 0 0 5697 5697

24:00 50.02 522 475 478 980 393 26 506 2858 1328 9 0 78 795 0 413 12 0 893 216 0 -600 -441 0 0 54 10 2767 5625 2617 -150 0 5476 0 0 0 5477 5477

Avg. 50.01 512 466 460 987 394 26 586 2919 1227 12 0 71 759 0 399 18 0 685 217 0 -399 -677 0 0 91 10 2413 5333 2340 -73 0 5259 0 0 0 5261 5261

00 TO 06 HRS. 50.00 505 460 442 990 394 26 516 2828 1080 3 0 65 728 0 390 12 0 832 218 0 -223 -733 0 0 83 10 2465 5293 2394 -71 0 5221 0 0 0 5223 5223

06 TO 12 HRS. 50.01 504 458 470 984 394 26 675 3008 1319 7 0 70 809 0 393 15 0 420 218 0 -597 -511 0 0 111 10 2264 5272 2190 -74 0 5198 0 0 0 5199 5199

12 TO 18 HRS. 50.00 504 459 444 989 394 26 679 2991 1067 7 0 65 706 0 389 9 0 730 218 0 -617 -805 0 0 112 10 1889 4880 1842 -47 0 4833 0 0 0 4835 4835

06TO 18 HRS. 50.01 504 459 457 986 394 26 677 2999 1193 7 0 67 758 0 391 12 0 575 218 0 -607 -658 0 0 111 10 2077 5076 2016 -61 0 5015 0 0 0 5017 5017

18 TO 24 HRS. 50.01 535 487 485 987 393 27 472 2851 1443 30 0 83 793 0 424 37 0 760 215 0 -158 -660 0 0 59 10 3035 5886 2935 -101 0 5785 0 0 0 5788 5788

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2016

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Agenda Of 54th OCCM Of M.P 33

Page 36: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs Injecti

on

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

1:00 50.00 1404 1278 560 451 197 91 392 2969 2135 63 0 185 847 0 430 54 0 438 212 0 -226 -603 0 0 2 26 3562 6531 3555 -7 0 6524 0 0 0 6526 6526

2:00 50.01 1381 1256 540 420 181 91 407 2895 2069 67 0 185 850 0 423 51 0 458 212 0 -224 -524 0 0 6 26 3599 6494 3489 -110 0 6384 0 0 0 6384 6384

3:00 50.00 1375 1251 515 393 176 90 410 2835 1986 56 0 185 851 0 423 50 0 447 211 0 -223 -490 0 0 9 26 3531 6367 3504 -27 0 6340 0 0 0 6342 6342

4:00 50.02 1386 1261 523 400 168 93 411 2856 1962 68 0 181 844 0 423 50 0 440 212 0 -225 -481 0 0 3 26 3504 6360 3442 -62 0 6298 0 0 0 6299 6299

5:00 49.97 1392 1267 510 415 169 93 383 2838 1970 66 0 185 845 0 423 52 0 419 212 0 -229 -465 0 0 6 26 3510 6348 3451 -59 0 6289 0 0 0 6295 6295

6:00 49.99 1397 1271 548 419 182 96 363 2879 2003 68 0 190 844 0 423 49 0 346 210 0 -236 -397 0 0 3 26 3527 6406 3502 -25 0 6381 0 0 0 6385 6385

7:00 50.00 1398 1273 569 437 188 96 366 2928 1971 67 0 194 838 0 422 34 0 256 212 0 -250 -269 0 0 49 26 3550 6477 3568 18 0 6495 0 0 0 6497 6497

8:00 50.03 1388 1263 533 435 190 95 426 2942 2003 68 0 194 842 0 421 34 0 261 212 0 -216 -243 0 0 30 26 3632 6574 3536 -96 0 6478 0 0 0 6479 6479

9:00 50.02 1390 1265 535 429 182 96 539 3045 2013 73 0 190 835 0 422 43 0 263 213 0 -214 -315 0 0 3 26 3552 6597 3407 -145 0 6452 0 0 0 6453 6453

10:00 50.01 1401 1275 514 425 183 96 619 3111 2035 81 0 190 835 0 423 50 0 262 214 0 -209 -566 0 0 -21 26 3321 6432 3221 -100 0 6332 0 0 0 6334 6334

11:00 50.02 1400 1274 499 427 179 95 649 3123 2012 82 0 186 822 0 427 50 0 268 213 0 -206 -636 0 0 -38 26 3207 6330 3127 -80 0 6250 0 0 0 6251 6251

12:00 50.01 1395 1269 502 410 179 94 658 3112 1977 77 0 186 809 0 428 52 0 277 210 0 -194 -714 0 0 -51 26 3083 6195 2842 -241 0 5954 0 0 0 5955 5955

13:00 50.00 1370 1247 478 393 170 92 660 3039 1884 73 0 183 803 0 427 55 0 344 208 0 -194 -791 0 0 -48 26 2970 6009 2981 11 0 6020 0 0 0 6022 6022

14:00 50.00 1366 1243 479 396 170 93 648 3029 1861 75 0 183 803 0 427 48 0 320 209 0 -193 -750 0 0 -35 26 2974 6002 2925 -49 0 5954 0 0 0 5957 5957

15:00 49.98 1365 1242 489 399 175 93 638 3035 1867 75 0 184 790 0 427 44 0 340 212 0 -187 -825 0 0 -29 26 2923 5958 2911 -12 0 5946 0 0 0 5951 5951

16:00 49.99 1374 1250 475 392 166 92 567 2943 1869 77 0 184 790 0 427 47 0 368 211 0 -197 -816 0 0 -9 26 2977 5920 2900 -77 0 5843 0 0 0 5847 5847

17:00 49.98 1370 1247 505 395 172 94 452 2864 1859 78 0 185 780 0 413 58 0 430 210 0 -189 -858 0 0 11 26 3004 5868 3034 31 0 5899 0 0 0 5903 5903

18:00 49.98 1421 1293 566 414 187 95 309 2863 1956 82 0 185 789 0 423 59 0 488 214 0 -195 -904 0 0 32 26 3155 6018 3114 -41 0 5977 0 0 0 5983 5983

19:00 49.95 1519 1383 637 521 234 101 290 3166 2203 123 0 194 815 0 432 88 0 377 214 0 -239 -557 0 0 40 26 3715 6881 3753 38 0 6919 0 0 0 6929 6929

20:00 50.03 1554 1414 606 503 241 107 314 3184 2314 139 0 194 823 0 434 113 0 377 215 0 -242 -392 0 0 12 26 4012 7197 3891 -121 0 7076 0 0 0 7076 7076

21:00 50.01 1515 1379 590 472 209 107 323 3080 2244 94 0 194 824 0 431 94 0 371 215 0 -220 -372 0 0 12 26 3913 6993 3817 -97 0 6897 0 0 0 6898 6898

22:00 50.05 1482 1349 560 443 199 105 342 2997 2209 90 0 194 822 0 433 77 0 378 213 0 -214 -383 0 0 28 26 3873 6870 3783 -89 0 6781 0 0 0 6781 6781

23:00 50.02 1459 1327 584 429 189 101 361 2991 2188 85 0 197 824 0 440 66 0 389 214 0 -200 -333 0 0 -3 26 3894 6885 3866 -29 0 6857 0 0 0 6857 6857

24:00 50.03 1460 1328 552 405 192 97 374 2948 2142 86 0 194 827 0 441 67 0 415 211 0 -206 -340 0 0 -2 26 3860 6808 3737 -124 0 6685 0 0 0 6685 6685

Avg. 50.01 1415 1288 536 426 187 96 454 2986 2031 80 0 188 823 0 427 58 0 364 212 0 -214 -543 0 0 0 26 3452 6438 3390 -62 0 6376 0 0 0 6379 6379

00 TO 06 HRS. 50.00 1389 1264 533 416 179 92 394 2879 2021 64 0 185 847 0 424 51 0 425 212 0 -227 -493 0 0 5 26 3539 6418 3490 -48 0 6369 0 0 0 6372 6372

06 TO 12 HRS. 50.01 1395 1270 525 427 184 95 543 3044 2002 75 0 190 830 0 424 44 0 264 212 0 -215 -457 0 0 -5 26 3391 6434 3283 -108 0 6327 0 0 0 6328 6328

12 TO 18 HRS. 49.99 1378 1254 498 398 173 93 546 2962 1883 77 0 184 793 0 424 52 0 382 211 0 -193 -824 0 0 -13 26 3000 5963 2978 -23 0 5940 0 0 0 5944 5944

06TO 18 HRS. 50.00 1386 1262 512 413 178 94 544 3003 1942 76 0 187 812 0 424 48 0 323 211 0 -204 -641 0 0 -9 26 3196 6199 3130 -65 0 6133 0 0 0 6136 6136

18 TO 24 HRS. 50.02 1498 1363 588 462 211 103 334 3061 2217 103 0 194 822 0 435 84 0 384 214 0 -220 -396 0 0 14 26 3878 6939 3808 -70 0 6869 0 0 0 6871 6871

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2016

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Agenda Of 54th OCCM Of M.P 34

Page 37: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.99 1914 1829 -85 0 0 1830 1830 1802 1748 -54 0 0 1749 1749 1803 1571 -232 0 0 1572 1572 218 203

2:00 50.01 1838 1803 -35 0 0 1803 1803 1719 1700 -19 0 0 1700 1700 1786 1545 -241 0 0 1545 1545 218 200

3:00 50.01 1827 1784 -43 0 0 1784 1784 1695 1675 -20 0 0 1675 1675 1787 1538 -249 0 0 1538 1538 218 197

4:00 50.01 1789 1757 -31 0 0 1758 1758 1653 1645 -9 0 0 1645 1645 1751 1535 -216 0 0 1536 1536 218 202

5:00 49.98 1775 1744 -32 0 0 1745 1745 1641 1640 -1 0 0 1641 1641 1765 1559 -206 0 0 1560 1560 218 199

6:00 50.01 1771 1702 -69 0 0 1702 1702 1646 1667 20 0 0 1667 1667 1827 1689 -138 0 0 1690 1690 218 197

7:00 50.00 1690 1646 -44 0 0 1647 1647 1647 1649 2 0 0 1650 1650 1933 1839 -94 0 0 1839 1839 218 201

8:00 50.04 1687 1612 -74 0 0 1613 1613 1671 1671 0 0 0 1671 1671 1945 1844 -101 0 0 1844 1844 218 207

9:00 50.01 1681 1585 -96 0 0 1585 1585 1698 1683 -15 0 0 1683 1683 1946 1852 -94 0 0 1853 1853 218 212

10:00 50.00 1653 1563 -90 0 0 1563 1563 1674 1662 -13 0 0 1662 1662 1910 1785 -125 0 0 1786 1786 218 212

11:00 50.01 1663 1553 -110 0 0 1554 1554 1681 1627 -53 0 0 1628 1628 1893 1717 -175 0 0 1718 1718 218 200

12:00 50.01 1630 1503 -127 0 0 1503 1503 1625 1559 -65 0 0 1560 1560 1799 1619 -180 0 0 1619 1619 218 184

13:00 50.02 1592 1507 -86 0 0 1507 1507 1587 1541 -46 0 0 1542 1542 1766 1615 -151 0 0 1616 1616 218 182

14:00 50.00 1538 1482 -56 0 0 1483 1483 1550 1540 -10 0 0 1541 1541 1739 1563 -176 0 0 1563 1563 218 177

15:00 49.99 1514 1463 -51 0 0 1464 1464 1511 1509 -2 0 0 1509 1509 1774 1579 -195 0 0 1580 1580 218 175

16:00 50.01 1497 1464 -33 0 0 1464 1464 1495 1500 5 0 0 1500 1500 1776 1603 -173 0 0 1603 1603 218 193

17:00 49.99 1511 1460 -52 0 0 1460 1460 1518 1538 20 0 0 1539 1539 1835 1679 -156 0 0 1679 1679 218 199

18:00 50.01 1546 1512 -34 0 0 1512 1512 1565 1563 -2 0 0 1564 1564 1885 1742 -142 0 0 1743 1743 218 212

19:00 49.97 1736 1847 111 0 0 1849 1849 1577 1741 164 0 0 1743 1743 1886 1891 5 0 0 1893 1893 214 213

20:00 49.98 2058 2046 -13 0 0 2048 2048 1811 1907 96 0 0 1909 1909 1992 1923 -69 0 0 1925 1925 214 213

21:00 50.00 2125 2036 -89 0 0 2037 2037 1838 1886 48 0 0 1887 1887 1950 1831 -119 0 0 1832 1832 214 209

22:00 50.04 2133 1975 -157 0 0 1976 1976 1838 1846 8 0 0 1847 1847 1925 1768 -158 0 0 1768 1768 214 209

23:00 50.02 2117 1929 -188 0 0 1929 1929 1875 1847 -28 0 0 1847 1847 1925 1711 -213 0 0 1712 1712 214 209

24:00 50.02 1980 1868 -112 0 0 1868 1868 1774 1783 9 0 0 1783 1783 1820 1619 -201 0 0 1619 1619 216 206

Avg. 50.01 1761 1695 -66 0 0 1695 1695 1670 1672 2 0 0 1673 1673 1851 1692 -158 0 0 1693 1693 217 200

00 TO 06 HRS. 50.00 1819 1770 -49 0 0 1770 1770 1693 1679 -14 0 0 1680 1680 1787 1573 -214 0 0 1573 1573 218 200

06 TO 12 HRS. 50.01 1667 1577 -90 0 0 1578 1578 1666 1642 -24 0 0 1642 1642 1904 1776 -128 0 0 1777 1777 218 203

12 TO 18 HRS. 50.00 1533 1481 -52 0 0 1482 1482 1538 1532 -6 0 0 1532 1532 1796 1630 -165 0 0 1631 1631 218 190

06TO 18 HRS. 50.01 1600 1529 -71 0 0 1530 1530 1602 1587 -15 0 0 1587 1587 1850 1703 -147 0 0 1704 1704 218 196

18 TO 24 HRS. 50.01 2025 1950 -75 0 0 1951 1951 1785 1835 50 0 0 1836 1836 1916 1790 -126 0 0 1791 1791 215 210

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- August 2016

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda Of 54th OCCM Of M.P 35

Page 38: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.00 2206 2142 -64 0 0 2143 2143 2318 2310 -7 0 0 2311 2311 2037 1867 -170 0 0 1868 1868 212 204

2:00 50.01 2159 2112 -47 0 0 2112 2112 2230 2256 26 0 0 2256 2256 1986 1814 -172 0 0 1814 1814 212 202

3:00 50.00 2111 2094 -16 0 0 2095 2095 2173 2228 56 0 0 2229 2229 1956 1818 -137 0 0 1819 1819 211 198

4:00 50.02 2096 2081 -15 0 0 2082 2082 2144 2201 57 0 0 2201 2201 1972 1810 -161 0 0 1811 1811 212 205

5:00 49.97 2085 2078 -7 0 0 2080 2080 2135 2174 39 0 0 2176 2176 1992 1835 -158 0 0 1836 1836 212 202

6:00 49.99 2075 2046 -28 0 0 2048 2048 2125 2161 36 0 0 2162 2162 2116 1974 -142 0 0 1975 1975 210 199

7:00 50.00 1984 1992 8 0 0 1993 1993 2067 2115 47 0 0 2115 2115 2222 2184 -38 0 0 2185 2185 212 204

8:00 50.03 1970 1941 -28 0 0 1942 1942 2074 2108 34 0 0 2108 2108 2274 2220 -54 0 0 2220 2220 212 208

9:00 50.02 1975 1905 -70 0 0 1905 1905 2106 2143 37 0 0 2143 2143 2309 2195 -115 0 0 2195 2195 213 210

10:00 50.01 1916 1890 -26 0 0 1890 1890 2072 2108 36 0 0 2109 2109 2233 2117 -115 0 0 2118 2118 214 217

11:00 50.02 1906 1878 -29 0 0 1878 1878 2052 2102 50 0 0 2102 2102 2167 2066 -102 0 0 2066 2066 213 205

12:00 50.01 1881 1811 -70 0 0 1812 1812 2024 2014 -10 0 0 2015 2015 2084 1940 -144 0 0 1940 1940 210 188

13:00 50.00 1823 1830 7 0 0 1830 1830 1956 2017 61 0 0 2017 2017 2052 1998 -54 0 0 1998 1998 208 176

14:00 50.00 1807 1772 -35 0 0 1773 1773 1949 2010 61 0 0 2011 2011 2072 1997 -75 0 0 1998 1998 209 175

15:00 49.98 1800 1753 -47 0 0 1755 1755 1943 1995 52 0 0 1997 1997 2107 2011 -96 0 0 2012 2012 212 187

16:00 49.99 1773 1702 -71 0 0 1703 1703 1932 1951 19 0 0 1953 1953 2117 1997 -120 0 0 1999 1999 211 193

17:00 49.98 1753 1700 -53 0 0 1702 1702 1906 1942 36 0 0 1944 1944 2139 2057 -81 0 0 2059 2059 210 199

18:00 49.98 1803 1770 -33 0 0 1771 1771 1916 1960 44 0 0 1962 1962 2127 2035 -91 0 0 2037 2037 214 212

19:00 49.95 2075 2249 175 0 0 2253 2253 2005 2237 232 0 0 2240 2240 2227 2222 -5 0 0 2225 2225 214 210

20:00 50.03 2347 2306 -41 0 0 2306 2306 2319 2384 66 0 0 2385 2385 2287 2168 -119 0 0 2168 2168 215 217

21:00 50.01 2338 2285 -53 0 0 2286 2286 2316 2352 36 0 0 2353 2353 2179 2048 -131 0 0 2048 2048 215 212

22:00 50.05 2319 2242 -77 0 0 2242 2242 2314 2334 20 0 0 2334 2334 2145 1989 -156 0 0 1989 1989 213 215

23:00 50.02 2291 2231 -60 0 0 2232 2232 2344 2426 82 0 0 2426 2426 2112 1988 -124 0 0 1988 1988 214 211

24:00 50.03 2268 2190 -78 0 0 2190 2190 2352 2371 19 0 0 2371 2371 2086 1919 -167 0 0 1920 1920 211 204

Avg. 50.01 2032 2000 -32 0 0 2001 2001 2116 2163 47 0 0 2163 2163 2125 2011 -114 0 0 2012 2012 212 202

00 TO 06 HRS. 50.00 2122 2092 -29 0 0 2093 2093 2187 2222 35 0 0 2223 2223 2010 1853 -157 0 0 1854 1854 212 202

06 TO 12 HRS. 50.01 1939 1903 -36 0 0 1903 1903 2066 2098 32 0 0 2099 2099 2215 2120 -95 0 0 2121 2121 212 205

12 TO 18 HRS. 49.99 1793 1754 -39 0 0 1756 1756 1934 1979 45 0 0 1980 1980 2102 2016 -86 0 0 2017 2017 211 190

06TO 18 HRS. 50.00 1866 1829 -37 0 0 1829 1829 2000 2039 39 0 0 2040 2040 2159 2068 -91 0 0 2069 2069 211 198

18 TO 24 HRS. 50.02 2273 2251 -22 0 0 2251 2251 2275 2351 76 0 0 2352 2352 2173 2056 -117 0 0 2056 2056 214 212

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2016

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda Of 54th OCCM Of M.P 36

Page 39: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

ANNEXURE-5.0 System Disturbance / System Incidence

1. System Disturbance on 03.08.2016 at 220 KV S/s Satna: On dated 03.08.2016 at around

17:20 Hrs. M.P system was normal and frequency of National Grid was 49.98 Hz. At around 17:22 Hrs. 132 KV Satna Interconnector – I tripped from 132 KV S/s Satna end. Due to non-tripping of 132 KV Satna Interconnector – I from 220 KV S/s Satna, the fault was fed from 160 MVA X’mer – I & II at 220 KV S/s Satna, resulting in tripping of both 160 MVA X’mer at 220 KV S/s Satna. Consequently 132 KV Supply failed at 220 KV S/s Satna, 132 KV S/s Satna, 132 KV S/s Panna, 132 KV S/s Pawai, 132 KV S/s Nagod & 132 KV S/s Majhgawan 32 KV Satna Cement & 132 KV Prism Cement industrial feeders. The complete system was normalized by 18:00 Hrs.

At around 18:02 Hrs. while test charging 132 KV Satna Interconnector – I from 220 KV S/s Satna end, the feeder did not hold and again tripped from 132 KV S/s Satna end only and fault was fed through 160 MVA X’mer – I & II at 220 KV S/s Satna. Consequently 220/132 KV, 160 MVA X’mer – I & II tripped at 220 KV S/s Satna resulting in interruption at 220 KV S/s Satna, 132 KV S/s Satna, 132 KV S/s Panna, 132 KV S/s Pawai, 132 KV S/s Nagod & 132 KV S/s Majhgawan and 132 KV Satna Cement & 132 KV Prism Cement industrial feeders. Thereafter 132 KV Satna Interconnector – I was declared faulty and on patrolling top string disc at Loc No. 17 was found failed and also the DPR of 132 KV Satna Interconnector – I at 220 KV S/s Satna was defective and was not operating which resulted in above tripping. Due to the above tripping there was load loss of about 43.51 MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 04.08.2016 at 220 KV S/s Rewa & 220 KV S/s Sidhi: On dated 04.08.2016 at around 12:10 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. Prior to fault, to avail S/d on 220 KV Satna – Satna (PGCIL) Interconnector – I for attending hot point and maintenance, 132 KV Satna – Rampur Bhagalen Ckt was opened – at 11:04 Hrs., 220 Rewa – Tons Ckt – II was opened – at 11:20 Hrs. and 220 KV Rewa – Tons Ckt – I was opened – at 11:30 Hrs. After making the above arrangements complete load of 220 KV S/s Rewa & 220 KV S/s Sidhi was fed through 220 KV Rewa – SGTPS Ckt & 220 KV Sidhi – Amarkantak Ckt. Thereafter 220 KV Satna – Satna (PGCIL) Interconnector – I was opened at 11:44 Hrs. 9425806842 pyasi

At 12:04 Hrs. on 04.08.2016, 220 KV Birsinghpur (SGTPS) – Rewa Ckt tripped on transient fault from both end. Simultaneously 132 KV Amarpatan – Maihar Ckt tripped due to overloading. Consequently complete load of 220 KV S/s Rewa & 220 KV Sidhi shifted on 220 KV Amarkantak – Sidhi Ckt, resulting in over loading and tripping of 220 KV Amarkantak – Sidhi Ckt at 12:16 Hrs. and interruptin occurred at 220 KV S/s Rewa, 220 KV S/s Sidhi, 132 KV S/s Rewa, 132 KV S/s Sidhi, 132 KV S/s Deosar, 132 KV S/s Mauganj, 132 KV S/s Katra, 132 KV S/s Mangawan, 132 KV S/s Rewa II (Sagra/Paharia), 132 KV S/s Rampur Naikin, 132 KV Beohari, 132 KV S/s Amarpatan, Jhinna HPS, Silpara HPS, Devlond HPS, 220 KV Hindalco (Industary). Due to the above tripping there was load loss of about 240MW. There was no generation loss and System was normalized in due course of time.

Agenda Of 54th OCCM Of M.P 37

Page 40: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

3. System Disturbance on 05.08.2016 at 400 KV S/s Indore: On dated 05.08.2016 at around 19:20 Hrs. M.P system was normal and frequency of National Grid was 50.10 Hz. At around 19:24 Hrs. bird fault occurred on 400 KV ‘B’- Phase, 400 KV ICT of 400/220 KV, 315 MVA ICT – IV resulting in tripping of 400/220 KV, 315 MVA ICT – IV, 400 KV Indore – ISP Ckt – II, 400 KV Indore – Indore (PGCIL) Ckt – I and 220 KV Indore – South Zone Ckt – I. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

4. System Disturbance on 29.08.2016 at 220 KV S/s Mehgaon: On dated 29.08.2016 at around 01:20 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. Prior to fault 220 KV Malanpur – Mehgaon Ckt tripped at 21:19 Hrs. on 28.08.2016 and was declared faulty due to top string disc failure at Loc. No. 102. At around 01:27 Hrs., on 29.08.2016, Bus Bar Protection at Auriya (U.P) operated resulting in tripping of 220 KV Mehgaon – Auraiya Ckt and 220 KV Malanpur – Auraiya Ckt. Simultaneously 132 KV Malanpur – Mehgaon Clt tripped due to overloading and interruption occurred at 220 KV S/s Mehgaon, 132 KV S/s Bhind, 132 KV S/s Porsa, 132 KV S/s Ron, 132 KV S/s Lahar, 132 KV S/s Seondha. Due to the above tripping there was load loss of about 83.2 MW occurred. There was no generation loss and System was normalized in due course of time.

5. System Disturbance on 14.09.2016 at 220 KV S/s Maihar: On dated 14.09.2016 at around 17:20 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. Prior to fault 220 KV Satna (PG)– Maihar Ckt, 132 KV Satna – Maihar Ckt & 132 KV Amarpatan – Jhinna Ckt was kept open for load management. At around 17:27 Hrs. 132 KV, R-Phase CT of 132/33 KV, 40 MVA X’mer burst at 220 KV S/s Maihar resulting in 132 KV Bus Fault at 220 KV S/s Maihar and tripping of 132 KV Maihar – Kymore Ckt & 132 KV Maihar – Amarpatan Ckt from far end. Simultaneously 220 KV Katni – Maihar Ckt tripped from 400 KV S/s Katni. Consequently interruption occurred at 220 KV S/s Maihar, 132 KV S/s Amarpatan, 132 KV KJS (industrial feeder), 132 KV Reliance Cement (industrial feeder) & 132 KV Maihar Cement (industrial feeder). Due to the above tripping there was load loss of about 25MW. There was no generation loss and System was normalized in due course of time.

6. System Disturbance on 14.09.2016 at 220 KV S/s Mehgaon: On dated 14.09.2016 at around 16:15 Hrs. M.P system was normal and frequency of National Grid was 49.99 Hz. At 16:20 Hrs. 220/132 KV, 160 MVa X’mer – II tripped on B-phase, O/C indication. Simultaneously heavy sparking was observed on 132 KV B-phase isolator of 220/132 KV, 160 MVA X’mer – I, hence X’mer – I was handtripped. Consequently 132 KV Malanpur – Mehgaon Ckt tripped due to overloading and interruption occurred at 220 KV S/s Mehgaon, 132 KV S/s Ron, Porsa, Bhind & Lahar. Later at around 16:56 Hrs. while charging 220/132 KV, 160 MVA X’mer – II, 220 KV ‘B’-phase CT of X’mer – II failed resulting in 220 KV Bus fault and operation of 220 KV Bus Bar protection at 220 KV S/s Mehgaon. Consequently 220 KV Malanpur – Mehgaon Ckt & 220 KV Mehgaon – Auriya Ckt tripped. Due to the above tripping there was load loss of about 142.2MW. There was no generation loss and System was normalized in due course of time.

7. System Disturbance on 20.09.2016 at 220 KV S/s Jabalpur: On dated 20.09.2016 at around 15:50 Hrs. M.P system was normal and frequency of National Grid was 50.00 Hz. At around 15:57 Hrs. transient fault occurred on 220 KV Jabalpur – Birsinghpur Ckt – II and Ckt Agenda Of 54th OCCM Of M.P 38

Page 41: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

tripped from 220 KV S/s Birsinghpur end only and main breaker at 220 KV S/s Jabalpur end did not trip resulting in operation of LBB protection and Bus Bar Protection of 220 KV Main Bus – II operated at 220 KV S/s Jabalpur. Consequently 220 KV Jabalpur – Amarkantak Ckt – II, 220 KV Jabalpur – Narsinghpur Ckt – II, 220 KV Jabalpur – Sukha Ckt – II, 220 KV Bus Tie tripped.

At around 16:33 Hrs. while charging the 220 KV Bus Tie, one of its breaker pole did not close and resulting in 220 KV Bus Fault. Consequently Bus Bar Protection of 220 KV Main Bus – II operated at 220 KV S/s Jabalpur, resulting in tripping of all 220 KV Feeders connected to 220 KV Main Bus – I & II. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

Agenda Of 54th OCCM Of M.P 39

Page 42: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

 

Annexure-6.12-A

FORMAT-I Intimation by Transmission Licensee regarding anticipated charging of new elements

<Name of Transmission Licensee>

Name of the transmission element :

Type of Transmission Element : Transmission Line / ICT / Bus Reactor / Line Reactor / Bus / Bay/Series Capacitor/Series Reactor

Voltage Level : AC/DC kV

Owner of the Transmission Asset :

Likely Date a n d time of Charging :

Likely Date and time of start of Trial Operation :

Place:

Date:

(Name and Designation of the authorized person with official seal)

Agenda Of 54th OCCM Of M.P 40

Page 43: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

 

Annexure 6.12-B

Format II

List of elements to be charged and Element Rating details

I. List of Elements to be charged:

II. Element Ratings a. Transmission Line

1 From Substation 2 To Substation 3 Voltage Level (kV) 4 Line Length (km) 5 Conductor Type 6 No of sub Conductors

b. ICT

1 Voltage (HV kV / LV kV) 2 Capacity (MVA) 3 Transformer Vector group4 Total no of taps 5 Nominal Tap Position 6 Present Tap Position 9 Tertiary Winding Rating and Ratio10 % Impedance

c. Shunt / Series Reactor

1 Substation Name / Line Name2 Voltage 3 MVAR Rating 4 Switchable / Non Switchable5 In case of Bus Reactor, whether it can be taken

as line reactor

(Name and Designation of the authorized person with official seal)

Agenda Of 54th OCCM Of M.P 41

Page 44: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

 

Annexure-6.12.C

Format III

< Name and Address of Transmission Licensee>

Undertaking by Transmission Licensee in respect of Telemetry and communication

The following transmission element is proposed to be charged on <date> tentatively

around hours.

S no and Name of transmission element: The list of data points that would be made available to RLDC in real time had been indicated vide

communication dated _. It is certified that the following data points have been mapped

and real time data would flow to RLDC immediately as the element is charged and commissioned.

S

no Name

of substation Data point (analog as well

as digital) identified in

earlier

Communication dated

Point to point

checking

done jointly

with RLDC

(Y/N)

Data would be

available at RLDC

(Y/N)

Remarks (path may be specified)

1 Sending end Analog Digital SoE Main Channel Standby Channel Voice Communication

(Specify: )

2 Receiving end Analog Digital SoE Main Channel Standby Channel Voice Communication

(Specify: )

It is also certified that the data through main channel is made available to RLDC as well as alternate communication channel is available for data transfer to RLDC to ensure reliable and redundant data as per IEGC (as amended from time to time). Also, Voice communication is established as per IEGC. The arrangements are of permanent nature. In case of any interruption in data in real time, the undersigned undertakes to get the same restored at the earliest.

Place:

Date:

(Name and Designation of the authorized person with official seal)

Agenda Of 54th OCCM Of M.P 42

Page 45: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

Sr. No Modem NoPresent Meter

NoCircle Name Div Name Sub Station Name Name of Interface Point Problem At Site

1 MOD70208 MPE53472 BHOPAL Testing Division -I Bhopal 132KV S/S KURAWAR 33KV KHOKRAKALA FEEDER (CZ TO WZ)Meter Replaced details not furnished.

2 MOD70547 MPE51896 UJJAIN Testing Division - Ujjain 132KV AGAR 33KV Suzlon-II Meter defective3 MOD70445 MPE53491 400KV BINA Testing Division Guna 132KV S/S MAKSUDANGARH 40MVA MAKE BBL SN 5033/14 Meter defective4 MOD70473 MPE51930 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA,BBL Meter defective5 MOD70471 MPE51923 GWALIOR Testing Division- Shivpuri 132KV S/S SHIVPURI 40MVA, BHEL Meter defective

6 MOD70418 MPE53498 GWALIOR Testing Division -II Gwalior 132KV S/S DATIA 40 MVA MAKE EMCO SN HT-12510 Meter defective

7 MOD70304 MPC58763 Satna Testing Division - Rewa 132KV S/S MORWA 132 KV Bina Meter defective8 MOD70339 MPE51744 Satna Testing Division - Satna 220KV S/S SATNA 63 MVA XMER Meter defective9 MOD70310 APMB2639 SATNA Testing Division - Satna 220 KV S/S KOTAR 132KV JP Bhilai feeder Modem Brunt

10 MOD70128 MSP44327 BHOPAL Testing Division -II Bhopal 132KV S/S GOPALPUR 40MVA TRANSFORMER PC0100096 T&R Network Problem

11 MOD70575 MPP28454 400KV Indore 440 KV Testing Division- Indore 132KV S/S JAMLI 63MVA BBL MAKE SN 5032/15 Network Problem12 MOD70381 MPP28538 SAGAR Testing Division -II Sagar 132KV S/S HATTA 63MVA MAKE Network Problem13 MOD70502 MPP28447 UJJAIN Testing Division - Dewas 132KV S/S BNP DEWAS 40MVA MAKE CGL SN 47292 Network Problem

14 MOD70602 MPP28500 INDORE Testing Division - I Indore 132KV S/S GAUTAMPURA 20 MVA EMCO MAKE SN 1197/11213 Network weak

15 MOD70289 MPP28328 SATNA Testing Division - Satna 132 KV S/S AMARPATAN 40 MVA X-mer-1 (33 kv side) Network weak

16 MOD70562 GEC08911 INDORE Testing Division - II Indore 132KV S/S GHATA BILLOD40MVA 132/33KV XMER NGEF S.NO. 2500051108

Sim defective

17 MOD70413 MPE51932 GWALIOR Testing Division -II Gwalior 132KV S/S DABRA 40MVA MAKE IMP SN TT-6724 Sim defective 18 MOD70465 MPE53503 GWALIOR Testing Division- Shivpuri 132KV S/S PICHORE 12.5MVA,CGL Time Drift

19 MOD70705 MPP28623 UJJAIN Testing Division - Ratlam 220KV S/S RATLAM 40MVA MAKE BHEL SN 2014006 Time Drift

20 MOD70686 MPE51880 UJJAIN Testing Division - Ratlam 132KV S/S JAORA 63MVA MAKE BBL SN 4909/2 Time Drift

21 MOD70651 MPE22178 INDORE Testing Division - KHANDWA 132KV S/s BAHADURPUR 63 MVA ABB SN 12018-005 Time Drift / NABT

22 MOD70508 MPE51824 UJJAIN Testing Division - Shujalpur 132KV S/S ARNIAKALA 40MVA MAKE ABB SN 12020-018 Time Drift

23 MOD70451 MPE53482 400KV BINA Testing Division Guna 132KV S/S ARON 40MVA,EMCO Time Drift24 NO MODEM MPU02676 GWALIOR Testing Division -II Gwalior 132KV S/S MORENA 40 MVA BBL SN.5423/3 Non ABT Meter25 NO MODEM 05246422 BHOPAL Testing Division -I Bhopal 132 KV S/s JEERAPUR 20MVA NGEF ELSTER METER

List of interface points / meters having problem at siteAnnexure-9.1

Agenda Of 54th OCCM Of M.P 43

Page 46: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

1 GEN 6 GT MW/MVAR 76/4 02 GEN 7 GT MW/MVAR 152/4 03 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE

1 220 KV SGTPS 3 CB TRANSIT CLOSE2 220 KV SGTPS 3 MW 456 50

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT CB FAULTY CLOSE2 400 KV DAMOH 1 CB FAULTY CLOSE3 4004 KV DAMOH 2 CB FAULTY CLOSE4 220 KV GEN 4 CB FAULTY OPEN

1 220 KV SIRMORE MVAR 494 52 221 KV SIRMORE MVAR 685 53 220 KV Satna Feeder CB close open

TELEMETRY DISCRIPIENCY

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site1 GEN 7 MVAR 125 52 GEN 3 MVAR 125 53 400 KV INDORE 2 MVAR 256 25

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

Annexure 10.2

I SP H P S

O S P H P S

FOR 220 KV BUS VOLTAGE & FREQUENCY , LINE PT IS USED BUT ACTUALLY BUS PT IS REQUIRED

RAJGHAT H P S RTU OUT

TONS H P S

SATPURA T P S

A T P S T P S

SINGHA JI S T P S

S G T P S

Agenda Of 54th OCCM Of M.P 44

Page 47: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

1132 KV JULWANIA-NIMRANI CKT I CB/SOE N/C

2132 KV JULWANIA-NIMRANI CKT II CB/SOE N/C

3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C4 132 KV JULWANIA- I/C I CB/SOE N/C5 132 KV JULWANIA- I/C II CB/SOE N/C6 400KV BUS 2 KV N/C7 400KV BUS 2 HZ N/C8 132/33 KV 40 MVA TR CB FAULTY

1 220/132 KV TR OLTC N/A2 132/33 KV TR I CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI CB FAULTY CLOSE

1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 220/132 TR2 160MVA MW Direction wrong4 220/132 TR 1 4*40 MVA MW Direction wrong Need to be reverse from field

1 220 KV BUS COUPLER CB FAULTY CLOSE

2220/132 KV TR 160 MVA (PRIMARY) CB FAULTY CLOSE

1 220/132 KV TR3 160 MVA MW,MVAR,OLTC N/A2 220 KV BUS 1 MW,HZ N/A3 220kv BUS COUPLER CB FAULTY CLOSE4 132 KV CHAPDA 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED5 132 KV CHAPDA 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED6 132 KV SHANKARGARH 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED7 132 KV GAMESHA FATANPUR CB/MW/MVAR N/A

1 220 KV BADNAGAR CB FAULTY CLOSE2 220 KV BUD I & II FREQ NOT SHOWING3 400 KV ISP II MW SHOWING 10 MW IN OPEN CONDITION4 220 KV INDORE EAST MW SHOWING 04 MW IN OPEN CONDITION

2 220/132 TR 3 P CB FAULTY3 400 KV REACTOR CB FAULTY4 400 KV BUS COUPLER CB FAULTY OPEN5 63 MVA TR CB FAULTY CLOSE

1 132 KV I/C 2 MW N/C 2 220 KV B/C CB FAULTY3 132 KV RATANGARH II MW/MVAR/CB N/C

Annexure 10.2JULWANIA 400 KV S/S

PROCESSES CONNECTION/ CONFIGURATION REQUIRED

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S

CHEGAON 400 KV S/S

NEEMUCH 220 KV S/S

JULWANIA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBARWAHA 220 KV S/S

INDORE 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda Of 54th OCCM Of M.P 45

Page 48: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

1 220KV BUS COUPLER CB FAULTY CLOSE2 132 KV BUS COUPLER CB FAULTY OPEN3 132 KV SARANGPUR II CB FAULTY CLOSE4 132 KV CAPECITOR BANK CB FAULTY CLOSE5 132 KV KURAWAR CB FAULTY CLOSE6 132 IC-1 MW,MVAR N/A PROCESSES CONNECTION REQUIRED7 132 IC-2 MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE

2 132 KV BUS COUPLER CB FAULTY CLOSE3 220/132 KV TR (160 MVA) 2 SEC CB N/A CLOSE

1 132 KV BUS COUPLER CB FAULTY CLOSE2 132 KV GRASIM CB FAULTY CLOSE3 132 KV MAHIDPUR -2 MW,MVAR N/A4 132 KV CAP BANK MVAR N/C

1 400KV BUS TIE CB FAULTY CLOSE2 400 KV RAJGRAH 1 CB FAULTY CLOSE3 400 KV DEHGAON LINE REACTO MVAR N/A4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE5 400 KV SHUJALPUR I MVAR N/A6 220 KV BUS II KV/FREQ N/A

1 132 KV SIDTUBE CB /MW/MVAR N/A2 132 KV INOX CKT (RE) CB /MW/MVAR N/A8

1 220 KV BUSCOUPLER CB FAULTY CLOSE2 220 KV INDORE CB FAULTY CLOSE

2 220/132 TR 1 & 2 OLTC N/A3 132/33 TR CB/OLTC N/A

1 220 KV BUS -1 KV,HZ N/A2 220KV RAJGARH (PG) CB FAULTY CLOSE2 220/132 KV TR 2 SEC CB FAULTY CLOSE3 220KV BUSTIE CB FAULTY CLOSE4 220KV BUS COUPLER CB FAULTY CLOSE5 132 KV BUS COUPLER CB FAULTY CLOSE6 132KV JHABUA CB FAULTY CLOSE7 220/132 TR 1 &2 OLTC N/A

1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR1 OLTC N/C

3 132/33 TR3 MW/MVAR/CB/OLTC N/C

INDORE EAST 220 KV S/S

NIMRANI 220 KV S/S

RAJGRAH (DHAR) 220 KV S/S

SHUJALPUR 220 KV S/S

BADOD 220 KV S/S

NAGDA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S

SHAJAPUR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE)

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda Of 54th OCCM Of M.P 46

Page 49: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

1 220 KV NAGDA I CB OPEN CLOSE2 220 KV MAXI CB OPEN CLOSE3 220/132 TR1 OLTC N/C4 220/132 TR2 OLTC N/C5 132 KV B/C CB FAULTY6 132 KV TARANA I CB FAULTY7 132/33 TR3 OLTC N/C

1 220/132 TR1 & TR2 OLTC N/C2 220/132 TR2(SECONDARY SIDE) CB FAULTY2 132KV BUS COUPLER CB FAULTY CLOSE

1 CAP BANK MVAR -33.1 -16.52 CAP BANK MVAR -33.1 -16.53 132/33 TR1 OLTC,MW,MVAR4 132/33 TR2 OLTC,MW,MVAR

1 132/33 KV TR-1 40 MVA MVAR NOT COMING2 132 KV MAIN BUS KV,HZ NOT COMING

1 CAP BANK MVAR N/C 10.66

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

TELEMETRY IS YET TO BE COMMISSIONED & PLCC LINK IS ALSO TO BE ESTABLISHED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEPALPUR 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NOT COMINGNOT COMING

132 KV S/S AGAR

SANWER 132KV S/S

INDORE NZ (JETPURA) 220KV S/S

GHOSLA 132 KV S/S

TELEMETRY IS YET TO BE COMMISSIONED, PLCC LINK HAS ESTABLISHEDINGORIA 132 KV S/S

DEWAS BNP 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

UJJAIN 220 KV S/S

INDORE SZ 220KV S/S

Agenda Of 54th OCCM Of M.P 47

Page 50: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV RAGHOGRAH CB,MW/MVAR N/C2 132 KV MAQSUDANGRAH CB,MW/MVAR N/C3 220 KV BUS TIE CB FAULTY OPEN

4 220/132 KV TR S 2 MW /MVAR /CB N/CPROCESSES CONNECTION REQUIRED

5 220/132 KV TR S 1 MW /MVAR Non-current6 220 KV & 132 Kv BUS MAIN BUS 1 & 2 VOLTAGE N/C7 220 KV Shujalpur-1 (PG) MW /MVAR Non-current

1 400 KV BUS 2 VOLTAGE/FREQ N/C2 400/220 Kv Xmer-2 CB faulty.

1 132 Kv Harda-1 CB FAULTY2 132 Kv bus-coupler CB FAULTY3 132 kv KANNOD-1 CB FAULTY4 132 KV KHATEGAON CB FAULTY

1 220 KV BPL MW /MVAR N/C

1 132/33 KV TR CB FAULTY CLOSE2 132 KVBUSCOUPLER CB FAULTY CLOSE3 220 KV BUS COUPLER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY2 220/132 TR 3(160MVA 2) OLTC MW/MVAR INCORRECT VALUES.

1 BPL400-BDTL 765 1 & 2 TIE CB FAULTY2 80 MVAR REACTOR CB FAULTY3 400/220 ICT 1 & 3 CB FAULTY

1 132 KV TRACTION-2 CB FAULTY

1 160 MVA XMER-1&2 OLTC Non-current2 132 KV BUS-COUPLER CB FAULTY

220 KB BUS-2 FREQUENCY Non-current50 MVA XMER CB & OLTC FAULTY132 KV SHYAMPUR-2 CB Non-current20 MVA XMER OLTC FAULTY

1 132 KV BUS FREQUENCY Non-current2 132 KV I / C 2 CB FAULTY

1 220 KV BUS FREQUENCY N/A160 MVA XMER-1&2 OLTC Non-current160 MVA -1(132 KV SIDE) CB FAULTY132 KV BUS VOLTAGE,FREQUENCY INCORRECT/NON CURRENT 10

1 132 KV DATIA CB FAULTY CLOSE2 132 KV RAJGHAT CB FAULTY CLOSE3 132/33 KV TR NGEF CB FAULTY CLOSE

1 220 KV BUS-COUPLER CB FAULTY2 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current

Annexure 10.2

RAJGRAH (B) 220 KV S/SPROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDASHTA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDHANDIA 220 KV S/S

VIDHISHA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGUNA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGWALIOR 220 KV S/S

BHOPAL 400 KV S/S

SARNI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBAIRAGRAH 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDASTHA 132 KV S/S

MALANPUR 220 KV S/S

PICHORE 132 KV S/S

MANDIDEEP 220 KV S/S

Agenda Of 54th OCCM Of M.P 48

Page 51: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

220 KV BUS-2 VOLTAGE,FREQUENCY INCORRECT/NON CURRENT1 132/33 TR 4 CB FAULTY CLOSE

1 132 KV GADARWARA CB MW/MVAR TRANSIT/NON CURRENT CLOSE2 220 KV CHICHLI MW /MVAR /CB 0 110/103 220/132 KV TR 2 (160 MVA) CB,MW/MVAR/OLTC N/A PROCESSES CONNECTION

1 220/132 KV TR MW/MVAR 0/0 40/102 ALL 220KV &132KV CB NON CURRENT CLOSE

1 220/132 KV TR 2 MW/MVAR/CB N/A

REQUIRED220 KV BUS-COUPLER CB FAULTY220 KV BUS-2 VOLTAGE,FREQUENCY Non-current132 KC XMER-1 CB FAULTY

220 KV BINA MW/MVAR/CB Non-current/FAULTY

40 MVA XMER CB Non-current

132 KV BUS COUPLER CB FAULTY Open

132 KV TRACTION-1 MW/MVAR Non-currentALL 220KV &132KV CB NON CURRENT CLOSE

132 KV BUS VOLTAGE,FREQUENCY Non-currentALL 132 KV CB NON CURRENT CLOSE

NON- CURRENT DUE TO MODEM PROBLEM.

NON- CURRENT DUE TO MODEM PROBLEM.

VIJAYPUR 132 KV S/S

HARDA 132 KV S/SALL CB FAULTY EXCEPT HANDIA1

DATIA 220 KV S/S

GANJBASODA 220 KV S/S

MANDIDEEP 132 KV S/S

KHILCHIPUR 132 KV S/S

RAISEN 132 KV S/S

ITARSI 220 KV S/S

PIPARIA 220 KV S/S

BETUL 220 KV S/S

SHIVPURI 220 KV S/S

ASHOKNAGAR 220 KV S/S

Agenda Of 54th OCCM Of M.P 49

Page 52: As per distribution listsldcmpindia.com/uploads/meeting/Agenda of 54th OCCM of MP.pdf · during Sept 2016 against 20.32% of time during Aug 2016. The system frequency was within the

DATA OUT FROM LONG TIME1 WAIDHAN 132KV S/S2 MORWA 132 KV S/S3 BEOHARI 132 KV S/S

OBSERVATION DURING MOCK DRILL AT TONS HPS1 220 KV SATNA - TONS CKT CB CLOSE OPEN

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERSr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15

1 220 KV KOTOR CB FAULTY CLOSE2 220 KV CHATARPUR CB FAULTY CLOSE1 220 KV B/C CB FAULTY CLOSE

1 400/200/33 KV TERTIARY REACTOR 1 & MVAR N/A

2 220 KV PGCIL 2 CB FAULTY CLOSE

1 220 KV BUS TIE CB FAULTY CLOSE

2 220 KV REWA MW/MVAR N/C3 220 KV HINDALCO MW/MVAR N/C

1 132 KV JP NIGRI CB/MW/MVAR N/C PROCESSES CONNECTION REQUIRED

2 220/132 TR 2 SEC CB N/C PROCESSES CONNECTION REQUIRED

1 220 KV TONS PH MW /MVAR 0 45/51 220 KV SATNA MW /MVAR 0 15/5

1 132 KV KOTMA CB N/A

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

3 132 KV SHAHDOL CB ,MW,MVAR N/A

4 132 KV KOTMA 2 CB ,MW,MVAR N/A

1 220 KV SATPURA T P S CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 132 KV ASHOK NAGAR CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 220/132 KV TR 1 (160 MVA) SEC CB FAULTY CLOSE

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED

1 220 KV PGCIL SATNA MW 0 MFM PROBLUM

Annexure 10.2

BIRSINGHPUR 220 KV S/S

SATNA220 KV S/S

BINA 400 KV S/S

DAMOH 220 KV S/S

TIKAMGRAH 220 KV S/S

SIDHI 220 KV S/S

CHINDWARA 220 KV S/S

KOTMA 132 KV S/S

MAIHAR 220 KV S/S

REWA 220 KV S/S

KOTAR 220 KV S/S

ANUPPUR 220 KV S/S

PROCESSES CONNECTION REQUIRED

PANDURNA 220 KV S/S

BINA 220 KV S/S

Agenda Of 54th OCCM Of M.P 50