As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil...
Transcript of As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil...
![Page 1: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/1.jpg)
As of Nov, 2019
![Page 2: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/2.jpg)
© TTCL Vietnam Corporation Limited (TVC)
About TTCL Group
TTCL is the engineering contractor who specializes in design and engineering, procument of equipment and materials, and construction of turnkey project for industrial and process plants including related facilities.
In 1997, TTCL expanded its activities to ASIAN countries including Vietnam, Malaysia, Cambodia, Myanmar and Bangladesh. To facilitale its strength, TTCL has set up an engineering company in Vietnam, namely TTCL – Viet Nam corporation, to serve the demand for process plants design and construction there.
1
![Page 3: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/3.jpg)
© TTCL Vietnam Corporation Limited (TVC)
TTCL Group Structure
TTCL is proud to be the first successful Thai company who has proved its competence and competitiveness to any other leading foreign companies.
2
TTCL PUBLIC COMPANY LTD.
CONSTRUCTION GROUP
TTCL MALAYSIA (TTML).
TTCL MYANMAR ENG&CONST (TTMEC).
TTCL VIETNAM (TVC)
EPC GROUP ENERGY DEVELOPMENT GROUP
GLOBAL NEW ENERGY (GNE)
BIO NATURAL ENERGY (BNE)
NAVANAKORN ELECTRIC (NNE)
SIAM SOLAR POWER (SSP)
TTCL POWER HOLDINGS (TTPHD)
TOYO THAI-US (TT US)
TTCL QATAR (TT QA)
TTCL PHILIPPINES (TT PH)
TOYO THAI POWER MYANMAR (TTPMC)
TTCL GAS POWER (TTGP)
TTCL SOLAR POWER (TTSP)
TTCL COAL POWER (TTCP)
TTCL NEW ENERY (TTNE)
![Page 4: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/4.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Established by ITD and
Toyo Engineering
First entry into international
project constructing
fertilizer plant and
establishment of subsidiary in
Vietnam.
Won Ethane cracker and downstream polyethylene plants (LDPE
& LLDPE) with value
over 15 Billion baht.
1996
1997 1985
2003
2007 2008
2009
2010
2011
2012 2013
2014 2015
Conversion
from
Private
Company
into Public
Company
Initial public
offering
("IPO") in
the Stock
Exchange of
Thailand
Established
subsidiaries
in Malaysia
(TTML),
Myanmar
(TTMC), and
USA (TTUS)
+ Formed
Singapore
holding to
support Power
plant
businesses
(TTPHD)
+ International
ISO 14001
recognition
Changed
Company
name from
Toyo-Thai
Corporation
PLC. to
TTCL PLC.
+ Sojitz
Corporation
invested in
TTCL
+ TTCL has
entered into
Russia and
NIS
Countries
2018
Engineering
Design
Plant
Construction
Procument of
Machinery and Equipment
Power Business
And Energy
3
Key Corporate Milestones
![Page 5: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/5.jpg)
© 2018 TTCL Public Company Limited 4
Major Experiences
Thailand
‘18 Ethylene Expansion
‘15 LLDPE & Hexene-1
‘14 Power Plant
‘13 PBS
‘12 MMA & TMAA
‘11 SSBR
‘11 Butiene-1 and Butadiene
‘11 Photovoltaic Electric
’10 Epichlorohydrin
‘09 1,6 Hexanediol
‘08 Hydrogen Peroxide
‘08 Bisphenol-A
‘07 Methyl Methacrylate Phase II
‘06 LLDPE
‘06 LDPE
‘06 Ethane Cracker
Malaysia
‘14 OSBL for
Steam Cracker Complex
‘12 Photovoltaic Electric ‘11 Rare Earth
‘09 Bio-Pellet (FS)
‘98 OXO (Engineering)
Bangladesh
‘04 DAP
USA
‘17 Chlor-Alkali
‘13 CO2 Capture
‘07 VCM & Chlor-Alkali
‘05 Chlor-Alkai
Indonesia
‘10 VCM & Chlor-Alkali (FS)
Qatar
‘13 Desalination
‘15 Desalination
Spain
‘11 Chlor-Alkali
‘18 Full Cycle Zinc
Oxide (TVC)
Philippines
‘11 PE Expansion
UAE
’10 DTEC
Myanmar
‘12 Power Plant
‘97 Aviation Fueling
‘18 Denko Thilawa (TVC)
China
’06 MDA/UAT
’04 MMDI
’03 Polymer
Lao ‘15 KCl
Timor Leste
‘18 Petrochem (FEED)
‘13 Refinery (FEED)
‘18 LLDPE
‘12 Ammonium Nitrate
‘11 DAP2
’10 Ethanol
’05 Dun Quat Refinery
(Engineering)
‘97 NPK Fertilizer
Vietnam
![Page 6: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/6.jpg)
© TTCL Vietnam Corporation Limited (TVC)
TTCL Vietnam Corporation Limited (TVC), known as Toyo-Vietnam
Corporation Limited, the First All-Round Engineering Company in
Vietnam, was established in 1997 by TTCL Public Company
Limited, formerly Toyo-Thai Corporation Public Company Limited,
a leading international engineering company in Thailand.
TVC is an integrated EPC contractor company providing integrated
design and engineering, procurement of equipment and materials,
and construction (integrated EPC) services for EPC turnkey projects
including related facilities in fields of Oil & Gas, Petrochemicals,
Chemicals, Fertilizer, Pharmaceutical, Food and Beverage,
Environment industries, Renewable energy and including related
facilities works.
5
5
About TTCL Vietnam
![Page 7: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/7.jpg)
© TTCL Vietnam Corporation Limited (TVC)
First batches
were dispatched to TTCL Thailand
for on-job-training.
Company establishment.
The first contract – Procter & Gamble Vietnam project.
1997 1996 1999 2001 2004 2005
2014 2015 2017
Company
obtained
ISO
9001:1998
Certificate
The first
EPCM
contract for
Procter &
Gamlbe, in
Binh Duong
There are many
EPC & EPCM
projects in many
field (Amway,
Dow Chemical,
United Pharma,
PVFCCo,
UFC-85 …)
Toyo – Vietnam
Corporation
Limited
officially
renamed TTCL
VietNam
corporation
limited.
Company
obtained
OHSAS
18001: 2007
Certificate.
The first EPC contract:
+ Bio & Renewable
Energy: Mui Ne solar
Power Plant
+ Myanmar Market:
Denko Petrochemical
in Thilawa Industrial
Zone Myanmar
2018
6
Key Corporate Milestones
![Page 8: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/8.jpg)
© TTCL Vietnam Corporation Limited (TVC) 7
Teamwork and Dedication is the foundation of
everything we build. TVC is very proud of having built
up a human resource with technical excellence and a
professional, self-motivated teamwork spirit..
7
Manpower Resource
![Page 9: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/9.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Section Man Power
Board of Management 6
Engineering Division 141
Process 16
Civil, Structural & Architectural 27
Mechanical Equipment & HVAC 24
Electrical 26
Instrumentation 20
Planning & Piping 26
IT 2
Proposal/Project & Procurement Div. 115
Project & Construction (*) 79
Procurement 13
Quality Control 13
HSSE 10
Sales & Admin & Others 18
TOTAL OF MAN POWER 280
TVC's manpower resource covers all design and engineering from process, instrument
and control, electrical, layout and piping, fire fighting, mechanical equiment, HVAC, civil
and structure, to procurement, project and construction management including safety and
quality assurance.
We have created and maintained a working environment and company culture where
every individual feels valued and can contribute to his maximum potential to achieve
shared business objectives. This results in greater dedication, commitment and
productivity.
Manpower Resource
8
TTCL PUBLIC COMPANY LTD. BOARD OF DIRECTOR
HSSE & QUALITY GM : Mrs. N.M.THUY TIEN
DGM : Mr. LUU VAN BA
ELECTRICCAL DEPARTMENT
INSTRUMENTATION & CONTROL DEPARTMENT
PROCESS DEPARTMENT
PLANNING & PIPING DEPARTMENT
CIVIL & ARCHITECTURE DEPARTMENT
MECHANICAL & MACHINERY DEPARTMENT
PROJECT DEPARTMENT
CONSTRUCTION DEPARTMENT
COMMISSIONING
FORMALITY
SALES - PROPOSAL DIVISION SGM :Mr. KAZUOKI URABE
GM :Mr. HO DAC TUAN
ENGINEERING DIVISION SGM :Mr. KAZUOKI URABE
GM :Mr. HO DAC TUAN
PROJECT EXECUTION DIVISION ADVISOR :Mr. HAJIME IDA
GM :Mr. NGUYEN VAN LANH
IT
PROCUREMENT & LOGICTIC DEPARTMENT
LEGAL
PROCUREMENT DIVISION GM Mrs. N.M .THUY TIEN
ADMIN-HR-ACCOUNTING GM Mrs. D.T. THANH CHAU
ACCOUTING
ADM & HR
GENERAL DIRECTOR Mrs. BUI BOI HAI
MARKETING & BUSINESS DEV.
SALE & CONTRACT
PROPOSAL
DGM : Mr. TRAN THIEN PHUC
![Page 10: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/10.jpg)
© TTCL Vietnam Corporation Limited (TVC)
2018,
2,196,778
2017,
1,957,853
2016,
1,032,342
Total safety Man-hours
worked in last 3 years:
Plan
Daily inspection plan
Job plan for HSSE
Do
Daily inspection
Executive management contractor’s daily activity
Check
Job control for dangerous work
Daily HSSE activity of contractor
Action
Daily Report
Education or meeting with work team
HSSE
Control
HSSE Performance
9
![Page 11: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/11.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Our Services …
EPC / EPCM / DESIGN & BUILD …
DESIGN & ENGINEERING /
PERMITTING FORMALITY …
PROJECT & CONSTRUCTION
MANAGEMENT (PMC SERVICES)
TURNAROUND SERVICES…
The field of plant Engineering, Procurement and Construction service covers to
Chemical & Petrochemical
Oil and Gas Fertilizer Pharmaceutical
Food & Beverage
Infrastructure & Utilities
Bio & Renewable
Energy
10
10
Our Services
![Page 12: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/12.jpg)
© TTCL Vietnam Corporation Limited (TVC)
TTCL VietNam has been certified for
• Quality Management System in accordance with ISO 9001: 2015
• Environmental Management System in accordance with ISO 14001: 2015
• Occupational Health and Safety Management System in accordance with ISO 45001: 2018
by DNV GL Business Assurance Vietnam Co., LTD.
11
Our Certificates
![Page 13: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/13.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Strong in-house engineering and project management with all specialties experienced in execution of integrated engineering services, permitting services, Design & Build, EPC / EPCM contracts for Oil & Gas, Chemical, Petrochemical, Pharmaceutical, Food processing plant projects both green field and brown field
Familiar with International Management System (Quality, HSSE, Project and Construction Management), International Codes & Standards (NFPA, FM Global, GMP, LEED, ASME, API, ...) and local regulation.
Sufficient software for engineering design, 3D Modelling and project management (ACAD, Cadworx, PDMS, BIM, Revit, Etap, Stad Pro, PV Elite, Primavera, Microsoft project) and facility (Plotter A0, Color printer, Scanner, Video Conference, 1200 m² working area, meeting room)
Experience with worldwide procurement network and local knowledge including mobilization and coordination of qualified local resources
Continuous improvement on professional capability thru collaboration with Mother Company (TTCL Public Co. Ltd.), international and reputable partners (Process licensors, Vendors, SeerPharma, Toyo Engineering Corp...) and big clients
12
Competitive Strengths
![Page 14: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/14.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Certification achieved
LEED Certified Ver.4 for Warehouse and LEED Certified Ver.4 for Office Certificate of VD157-
CP Paper Corporation Project (Aug 2019)
![Page 15: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/15.jpg)
© TTCL Vietnam Corporation Limited (TVC) 14
Engineering design software
Software name License Major used fuction
ENGINEERING
AutoCAD Autodesk 2D drawing
PDMS Aveva Datacentric, multi-disciplinary design environment for full 3D modeling of
process plant
CADWorx Plant Intergraph Plant design automation
AutoCAD Plant 3D Autodesk Plant design automation
Naviswork Autodesk 3D plant navigator
Revit Autodesk 3D model
Micro station Bentley Drafting system
Plant Design System
(PDS) Intergraph
Intelligent computer-aided design/engineering (CAD/CAE) application for
plant design, construction, and operations
Smart Plant 3D Intergraph Intelligent 3D plant design solutions
SmartSketch Intergraph Drafting system
Smart Plant Review Intergraph 3D plant navigator
SYSTEM Major used fuction
PMI® GLOBAL STANDARD
PROJECT MANAGEMENT for manage the Scope, Schedule, Cost,
Quality, Resource, Communication, Risk, Procurement, Stakeholder
included the Change Management for all.
![Page 16: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/16.jpg)
© TTCL Vietnam Corporation Limited (TVC) 15
Engineering design software
Software name License Major used fuction
PROCESS
HTRI HTRI Design and rating of heat exchangers
PROII AVEVA Process simulation, Design and operational analysis
Visual Flare AVEVA Flare system simulation
DYNSIM AVEVA Dynanic process simulation
INPLANT AVEVA Hydraulic calculation for pipe net work
PIPEPHASE AVEVA Oil and Gas pipe network simulation
AspenOne AVEVA Process simulation
Breeze AERMOD AVEVA Steady-state Gaussian air dispersion model
SoundPlan SoundPLAN
GmbH Noise modeling simulation
SmartPlant P&ID Intergraph Develop and manage P&IDs
AutoCAD P&ID Autodesk designers and engineers quickly create and edit P&IDs
PIPING
Pipenet Sunrise Fire fighting hyraulic calcualtion
CAESAR II Intergraph Piping stress analysis
AUSE KMC/TTCL AutoCAD assisting software
AutoPLANT
SPECGEN EDA 2D Isometric drawing and material take-off
![Page 17: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/17.jpg)
© TTCL Vietnam Corporation Limited (TVC) 16
Engineering design software
Software name License Major used fuction
PIPING
TOP B/M TTCL Piping material take-off
MECHANICAL
PV Elite COADE Pressure Vessel/ Shell & tube heat exchanger Strength Calculation
TANK COADE Design and analysis of aboveground oil storage tanks in accordance with
API 650 and API 653
FE/Pipe PRG Finite Element Analysis for cylinder, head & nozzle
INSTRUMENT
INSTRU CALC Gulf Publishing
co.
Instrument engineering software for sizing of control valve, safety valve,
pressure relief devices and flow elements.
Intools SmartPlant
Instrumentation Intergraph Instrumentation systems engineering, design and maintenance
ISA datasheet TTCL Datasheet form for field instrument
SIZEMASTER Farris Sizing of safety valve
LADDER CMH Ladder diagram
ELECTRICAL
PSAF-Flow Cyme Internat'l
Inc. Power System Analysis Framework Load flow study
PSAF-MOTOR
START PSAF- FAULT
Cyme Internat'l
Inc. Motor starting time calculation
Short circuit calculation
![Page 18: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/18.jpg)
© TTCL Vietnam Corporation Limited (TVC) 17
Engineering design software
Software name License Major used fuction
ELECTRICAL
Smart Plant Electrical Intergraph Electrical distribution network design and management
ETAP Operation Tech,
Inc.
The most comprehensive analysis platform for the design, simulation,
and operation of generation, distribution, and industrial power systems
Calculux By Vendor Ilumination Calculation for Lighting System
Luxicon By Vendor Ilumination Calculation for Lighting System
Pvsyst ISE University of
Geneva
Software package for the study, sizing, simulation and data analysis of
complete PV system
PV*SOL premium Valentin Software
GmbH
Dynamic Simulation Program for all PV Systems inclusive 3D
visualization
CIVIL
ArchiCAD Graphisoft AEC industry design professionals
Staad Pro Bentley Design reinforced concrete and steel structure
StruCAD AceCad software
Ltd
Steel fabrication and joint detail arrangement drawing and bill of
material take-off
Tekla Structures Tekla Structural design Structural building information modeling (BIM)system
Microfeap II (Dos
version) A.I.T 2D structural analysis
GRASP A.I.T 2D structural analysis
GEAR A.I.T General engineering assistance and reference
![Page 19: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/19.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Chemical & Petrochemical
Oil & Gas
18
High Profile Clients
![Page 20: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/20.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Fertilizer
Pharmaceutical & Medical - Food & Beverage
19
High Profile Clients
![Page 21: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/21.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Infrastructure & Utilities
Bio - Renewable energy
20
High Profile Clients
![Page 22: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/22.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
OIL & GAS
21
Project Experiences
![Page 23: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/23.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
DENKO THILAWA OIL
STORAGE TANK TERMINAL
PROJECT
CLIENT Denko Petrochemical
Management Co., Ltd.
LOCATION 10 ha, Thilawa Industrial Zone
Myanmar
PROJECT
PERIOD Jun‘18 – Nov’19 (18 months)
PROJECT
DESCRIPTION
135,000 m³ fuel storage to
import and export the fuel
product which are normal
diesel (HSD), premium diesel
(PD), gasoline 92 (G92)
gasoline 95(G95)
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
Oil & Gas
22
Project Experiences
![Page 24: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/24.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
LPG SYSTEM UPGRADING
PROJECT
CLIENT Total Vietnam Limited
LOCATION Go Dau IZ, Dong Nai, VN
PROJECT
PERIOD May‘17 – Jan’18 (8 months)
PROJECT
DESCRIPTION
Upgrade 12 Bullet tanks and 1
Spare Tank with Pumps, pipes,
Valves modification, Scada
automation control and Fire
Gas Detector to meet Total
Global standard.
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES Total Global standard.
OTHER N/A
23
Project Experiences Oil & Gas
![Page 25: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/25.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
NATURAL GAS
CONVERSION PROJECT
CLIENT Japan Vietnam Fertilizer
Co.Ltd
LOCATION Go Dau IZ, Dong Nai, VN
PROJECT
PERIOD Dec‘10 – Jul’11 (7 months)
PROJECT
DESCRIPTION
Natural gas pipeline and
conversion of fuel oil burners
(Boiler & Furnace)
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
24
Project Experiences Oil & Gas
![Page 26: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/26.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME HOT OIL BOILER PROJECT
CLIENT Van Phong Petroleum
Terminal
LOCATION Van Phong Bay, Nha Trang, VN
PROJECT
PERIOD Dec‘10 – Jul’11 (7 months)
PROJECT
DESCRIPTION
Hot Oil Boiler system to
supply hot oil to Van Phong
Petroleum Terminal
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
Project Experiences
25
Project Experiences Oil & Gas
![Page 27: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/27.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
300,000 LPD BIO
ETHANOL PLANT
PROJECT
CLIENT The Orient Bio-Fuels
Co.Ltd (PV Oil & Itochu)
LOCATION Binh Phuoc Province,VN
PROJECT
PERIOD
Apr‘10 – Mar’12 (23
months)
PROJECT
DESCRIPTION
300,000 little/day Bio
Ethanol
plant
CAPACITY As above
SCOPE Commissioning (Consortium
with TTCL Public)
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
26
Project Experiences Oil & Gas
![Page 28: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/28.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
PM3- CAMAU GAS PIPELINE
PROJECT
CLIENT J.P. Kenny/ Vietsovpetro
LOCATION Ca Mau ,Vietnam
PROJECT
PERIOD Jul‘05 – May’08 (29 months)
PROJECT
DESCRIPTION N/A
CAPACITY N/A
SCOPE Engineering design
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
27
Project Experiences Oil & Gas
![Page 29: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/29.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
VTN-P PETROCHEMICAL
PROJECT
CLIENT VTN- P Petrochemical JV.Co.Ltd
LOCATION Can Tho Province, VN
PROJECT
PERIOD Oct‘03 – Jul’04 (09 months)
PROJECT
DESCRIPTION
Supply pressure vessels and
technology towers
CAPACITY N/A
SCOPE Engineering & Equipment Supply
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
28
Project Experiences Oil & Gas
![Page 30: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/30.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Project Experiences
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
CHEMICAL &
PETROCHEMICAL
29
Project Experiences
![Page 31: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/31.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Chemical & Petrochemical
PROJECT
NAME GREEN FIELD PROJECT
CLIENT Jotun Paints Vietnam Co.Ltd
LOCATION 10 ha, Hiep Phuoc IZ, HCMC
PROJECT
PERIOD Apr'18 - Apr‘20 (24 months)
PROJECT
DESCRIPTION
Water – Based paint 85 mill
litter per year & 10,000 TPY
Power Coating
CAPACITY As above
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES LEED Silver Certificate,
Solar Rooftop
OTHER N/A
30
Project Experiences
![Page 32: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/32.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME DNS CHLOR ALKALI PROJECT
CLIENT Dai Ngan Son Service Trading
Manufacturing Co.
LOCATION Tien Giang Province, Vietnam
PROJECT
PERIOD May'18 - Sep'19 (16 months)
PROJECT
DESCRIPTION
54,000 t/y NaOH (as NaOH 100%)
32,000 t/y HCL (As 100% Cl2)
7,166 t/y NaClO
CAPACITY As above
SCOPE EPCM
PROCESS
LICENSOR Asahi Kasei (Japan)
FEATURES N/A
OTHER N/A
31
Project Experiences
Chemical & Petrochemical
![Page 33: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/33.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Project Experiences
PROJECT
NAME
AICA LAMINATES VIETNAM
FACTORY PROJECT
CLIENT AICA Laminates Viet Nam/
Soltec Viet Nam Company
LOCATION
Road 2, Nhon Trach 3 IZ -
Phase
2, Long Tho Commune, Nhon
Trach District, Dong Nai
Province, Vietnam
PROJECT
PERIOD May’ 2018 – Apr’2019
PROJECT
DESCRIPTION EPC
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
32
Project Experiences
Chemical & Petrochemical
![Page 34: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/34.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
HAI PHONG TERMINAL
PROJECT
CLIENT Top Solvent Vietnam (ThaiOil)
LOCATION Dinh Vu IZ, Hai Phong, Vietnam
PROJECT
PERIOD Jul‘17 - Sep‘18 (15 months)
PROJECT
DESCRIPTION
Total project area is 28000m2,
phase 1 is 8,000 m³ Solvent
storage and process filling system,
warehouse, office building and
utilities.
CAPACITY As Above
SCOPE Project Management
Consultancy (PMC) Services
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
33
Project Experiences
Chemical & Petrochemical
![Page 35: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/35.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME HUNTSMAN VIP PROJECT
CLIENT Huntsman (Singarpore) Pte
Ltd
LOCATION Amata IZ, Dong Nai, Vietnam
PROJECT
PERIOD Jul‘17 - Jun‘18 (11 months)
PROJECT
DESCRIPTION
Engineering design,
Procurement and
Construction
Management services for
Project VIP
CAPACITY N/A
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
34
Project Experiences
Chemical & Petrochemical
![Page 36: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/36.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
VIETNAM RECYCLING
PLANT PROJECT
CLIENT Zinc Oxide Corporation VN
LOCATION Phu My 3 IZ, Ba Ria, Vung Tau
PROJECT
PERIOD May‘17 - Jul‘17 (02 months)
PROJECT
DESCRIPTION
Basic design for the project of
recycling plant to recover zinc
and iron from the waste dust
collected from the gas cleaning
systems of Electric Arc
Furnaces of steel mills
CAPACITY 100.000 TPY (EAFD)
SCOPE Basic Engineering
PROCESS
LICENSOR
Zincox Resources Ltd.
(ZINCOX,UK)
PROJECT
NAME
SPANISH FULL CYCLE ZINC
OXIDE PROJECT
CLIENT Zincox Resources Ltd.
(ZINCOX,UK)
LOCATION Port of Castellon, Western of Spain
PROJECT
PERIOD 16 Nov‘18 – 15 May‘19
PROJECT
DESCRIPTION
Basic engineering design,
material take off, 3D modeling for
Zinc oxide recycling plant from
Electrical Arc Furnaces Dust
(EAFD)
CAPACITY 100.000 TPY (EAFD)
SCOPE Basic Engineering
PROCESS
LICENSOR
Zincox Resources Ltd.
(ZINCOX,UK)
35
Project Experiences
Chemical & Petrochemical
![Page 37: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/37.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
TAIYO KOKO RECYCLE
PLANT PROJECT
CLIENT
Toyo Engineering &
Construction Sdn Bhd./ Taiyo
Koko Company LTD
LOCATION Nghi Son, Thanh Hoa, Viet
Nam
PROJECT
PERIOD Mar’16 - May’16 (3 months)
PROJECT
DESCRIPTION
Feed of Vanadium &
Molybdenum reconery plan
from de – 50x spent catalyst.
CAPACITY Treating capacity 7000 T/Y
SCOPE FEED
PROCESS
LICENSOR Taiyo Koko Company LTD
FEATURES N/A
OTHER N/A
36
Project Experiences
Chemical & Petrochemical
![Page 38: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/38.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Project Experiences
PROJECT
NAME
HOT DE – MINERALIZED
WATER CHARGE SYSTEM
PROJECT
CLIENT AGC Chemical Vietnam Co. Ltd
LOCATION Ba Ria – Vung Tau – Vietnam
PROJECT
PERIOD Nov‘15 - Apr‘16 (05 months)
PROJECT
DESCRIPTION
Engineering and construction
of Hot Demineralized Water
Charge System to increase
capacity of the factory from
100,000 TPY to 152,000 TPY
CAPACITY As above
SCOPE EPC Lump Sum
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
37
Project Experiences
Chemical & Petrochemical
![Page 39: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/39.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
UFC85/ FORMALDEHYDE
PLANT PROJECT
CLIENT PetroVietnam Fertilizer and
Chemicals Corp.
LOCATION
Phu My 1 IZ ,Ba Ria – Vung
Tau
Vietnam
PROJECT
PERIOD Apr‘14 - Nov‘15 (19 months)
PROJECT
DESCRIPTION
UFC85 15,000 TPY and
Formaldehyde 37% 25,000
TPY
CAPACITY As above
SCOPE EPC Turn – key Lump Sum
PROCESS
LICENSOR Haldor Topsoe (Denmark)
FEATURES N/A
OTHER N/A
38
Project Experiences
Chemical & Petrochemical
![Page 40: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/40.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
AMMONIUM NITRATE
PLANT PROJECT
CLIENT Vinacomin – Mining Chemical
Industry Holding Co., Ltd.
LOCATION Thai Tho IZ, Thai Thuy Dist,
Thai Binh
PROJECT
PERIOD Jun‘12 – Dec’14 (30 months)
PROJECT
DESCRIPTION Ammonium Nitrate 200,000 TPY
CAPACITY As above
SCOPE EPC Turn – key Lump Sum
(Consortium with TTCL Public)
PROCESS
LICENSOR Thyssenkrupp Uhde GMBH
FEATURES N/A
OTHER N/A
39
Project Experiences
Chemical & Petrochemical
![Page 41: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/41.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
VIETNAM EMULSION
PLANT PROJECT
CLIENT ROHM & Haas (Dow Chemical)
LOCATION Nhon Trach No.3 IZ, Dong Nai
PROJECT
PERIOD Nov‘10 – May’12 (18 months)
PROJECT
DESCRIPTION Vietnam Emulsion Plant
CAPACITY 25.000 MT per year.
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
40
Project Experiences
Chemical & Petrochemical
![Page 42: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/42.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
ICI PAINTS PLANT
PROJECT
CLIENT ICI Paints Vietnam
(AKZO NOBEL)
LOCATION My Phuoc 2 IZ, Binh Duong
PROJECT
PERIOD Nov‘05 – Sep’07 (22 months)
PROJECT
DESCRIPTION
ICI Emulsion & Sovent Paint
Factory
CAPACITY N/A
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
41
Project Experiences
Chemical & Petrochemical
![Page 43: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/43.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
CALCIUM CARBONATE
POWER PROJECT
CLIENT Surint Omya Vietnam
LOCATION Go Dau IZ, Dong Nai
PROJECT
PERIOD Sep‘05 – Jun’06 (10 months)
PROJECT
DESCRIPTION Calcium Carbonate Powder Plant
CAPACITY N/A
SCOPE E & C
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
42
Project Experiences
Chemical & Petrochemical
![Page 44: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/44.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
FERTILIZERS
43
Project Experiences
![Page 45: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/45.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
DI –AMMONIUM
PHOSPHATE (DAP) PLANT
PROJECT
CLIENT DAP 2 – Vinachem JSC
LOCATION 32 ha, Tang Loong IZ, Lao Cai
Province, VN
PROJECT
PERIOD Jan’12- Oct’14 (28 months)
PROJECT
DESCRIPTION
Di –Ammonium Phosphate
(DAP) 330,000 MTPY
(Base case)
CAPACITY As above
SCOPE EPC Turn – Key Lump Sum
(Consortium with TTCL Public)
PROCESS
LICENSOR
Monsanto Enviro –Chem
System , Inc .( MECS)
S.A.SNC –Lavalin N.V.
& Prayon Technologies /
INCRO S.A
FEATURES N/A
OTHER N/A
44
Project Experiences
Fertilizers
![Page 46: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/46.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
ROCK SALT EXPLOITATION
& PROCESSING PLANT
PROJECT
CLIENT Vinachem/ Vilachemsalt
LOCATION Khammouane, Laos
PROJECT
PERIOD Aug’15- Nov’18 (40 months)
PROJECT
DESCRIPTION
Potash (KCL95%) 320,000
TPY
NaCl( NaCl 98%) ≤ 300,000
TPY
CAPACITY As above
SCOPE EPC Turn – Key Lump Sum
(Consortium with TTCL Public)
PROCESS
LICENSOR
K-UTEC AG Salt Technologies
( KUTEC)
FEATURES N/A
OTHER N/A
45
Project Experiences
Fertilizers
![Page 47: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/47.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
NPK FERTILIZER 100,000
TPY PRODUCTION LINE
PROJECT
CLIENT Baconco Company Limited
LOCATION Phu My 1 IZ, Ba Ria
Vung Tau, Vietnam
PROJECT
PERIOD Nov’13- Jul’14 ( 8 months)
PROJECT
DESCRIPTION
100,000 TPY
NPK Fertilizer
CAPACITY As above
SCOPE EPC Turn – Key Lump Sum
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
46
Project Experiences
Fertilizers
![Page 48: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/48.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
PHARMACEUTICAL
FOOD & BEVERAGE
47
Project Experiences
![Page 49: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/49.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
MANUFACTURING
SURGICAL SUTURES NANO
COATED PROJECT
CLIENT Medical Devices & Biomaterial
Plant J.S.Co ( MEDEP)
LOCATION
Lot 1 -4B -2.1 N3 street
Long Thanh My Ward, Dist.9,
HCMC, Vietnam
PROJECT
PERIOD Oct’18- May’19 (7 months)
PROJECT
DESCRIPTION
Surgical sutures coated with
silver nano material for
medical purpose with the
capacity of 2 million
meters/ year
CAPACITY About 25 clean rooms class
7/8/9 following ISO 14644
SCOPE EPC (Except process equipment)
PROCESS
LICENSOR from Japan
FEATURES ISO 14644 , ISO 8573
OTHER N/A
48
Project Experiences
Pharmaceutical - Food & Beverage
![Page 50: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/50.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
CRYSTALLINE LENS
FACTORY PROJECT
CLIENT Medical Devices & Biomaterial
Plant J.S.Co ( MEDEP)
LOCATION 1 ha, Saigon Hi-Tech Park
HCMC, Vietnam
PROJECT
PERIOD Jul’17- Apr’18 (10 months)
PROJECT
PRODUCT
Hydrophobic & hydropphilic
intraocular lenses
CAPACITY about 32 clean rooms class
9/8/7 following ISO 14644
SCOPE EPC (Except process
equipment)
PROCESS
CONSULTANT Ocular Technology Inc., USA
PROJECT
STANDARD
ISO 13485( Process),
ISO 14644 (Cleanroom)
ISO 8573 (Compressed Air)
ASTM D1193 (Purifield water)
OTHER N/A
49
Project Experiences
Pharmaceutical - Food & Beverage
![Page 51: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/51.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
AMWAY NUTRITION
MANUFACTURING FACILITY
PROJECT
CLIENT Amway Vietnam
LOCATION VSIP IIA
Binh Duong Province, Vietnam
PROJECT
PERIOD Nov’13- Nov’14 (12 months)
PROJECT
DESCRIPTION
Vitamin , mineral and
nutritional supplemental food
(phase 1)
PROJECT
STANDARD GMP/ FM Gobal
SCOPE EPC for the whole plant
(except process equipment)
FEATURES
55 Clean rooms Class
100 000, clean panels
walk-able ceiling,
PU coated heat resistance
floor
50
Project Experiences
Pharmaceutical - Food & Beverage
![Page 52: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/52.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
UNITED INTERNATIONAL
PHARMA PROJECT
CLIENT United International Pharma
LOCATION VSIP II
Binh Duong Province, Vietnam
PROJECT
PERIOD Sep’10- Jan’12 (12 months)
PROJECT
PRODUCT
Non – Steile solid and
liquid dosage
STANDARD GMP- WHO/PICS, ISO 14000
OHSAS 18001
SCOPE EPC for the whole plant
(except process equipment)
GMP-PICS
CONSULTANT Seer - Pharma (Singapore)
FEATURES
200 clean rooms,class100 000
clean panels demountable wall
panel, walk-able ceiling,
Epoxy self leveling floor
OTHER N/A
51
Project Experiences
Pharmaceutical - Food & Beverage
![Page 53: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/53.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
TETRA PAK BINH DUONG
PROJECT
CLIENT Tetra Pak Vietnam JSC
LOCATION VSIP 2A
Binh Duong Province, Vietnam
PROJECT
PERIOD Nov’17- June’18 (8 months)
PROJECT
DESCRIPTION
Capacity of 12 billion packages /
year and construction area of
34,950m2, on an area of 100,000 m2.
CAPACITY 12 billion packages / year
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES
5 Chillers of total capacity 2750 ton
and 24 Big AHUs. Project to comply
with FM Global and this is 1st project in
Viet Nam to comply with LEED Gold
version 4
OTHER N/A
52
Project Experiences
Pharmaceutical - Food & Beverage
![Page 54: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/54.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
CHICKEN MEAT PROCESSING
PLANT PROJECT
CLIENT Koyu & Unitek Corporation Ltd
LOCATION
Lot C8, Long Binh IP,
Long Binh Ward, Bien Hoa
Dong Nai
PROJECT
PERIOD Jul’16- Feb’17 (7 months)
PROJECT
DESCRIPTION
Chicken meat with the capacity of
10,000 ton product/ year
CAPACITY 10.000 TPY
SCOPE EPC (Except process equipment)
PROJECT
STANDARD HACCP (Hygiene clean room)
FEATURES About 20 hygiene clean
room following HACCP
OTHER N/A
53
Project Experiences
Pharmaceutical - Food & Beverage
![Page 55: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/55.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME CHILLI SAUCE PROJECT
CLIENT Masan Food Corporation
LOCATION Tan Dong Hiep B IZ,
Binh Duong, VN
PROJECT
PERIOD Mar’17- Dec’17 (10 months)
PROJECT
DESCRIPTION N/A
CAPACITY N/A
SCOPE E& CM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
54
Project Experiences
Pharmaceutical - Food & Beverage
![Page 56: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/56.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
COCA – COLA BEVERAGES
PLANT EXTENSION
PROJECT
CLIENT Coca Cola Vietnam
LOCATION Da Nang City, VN
PROJECT
PERIOD Apr’16 - Dec’16 (09 months)
PROJECT
DESCRIPTION Area: 4800 m2
CAPACITY N/A
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
55
Project Experiences
Pharmaceutical - Food & Beverage
![Page 57: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/57.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
MASAN BREWERY HG
BEER FACTORY PROJECT
CLIENT Masan Brewery HG Beer
Company .Ltd
LOCATION Can Tho City , VN
PROJECT
PERIOD May’15- Feb’16 (9 months)
PROJECT
DESCRIPTION Area: 14.5 ha
CAPACITY 100 million liters / year
SCOPE PMC Service
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
56
Project Experiences
Pharmaceutical - Food & Beverage
![Page 58: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/58.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
NEW UNILEVER FOOD
FACTORY PROJECTS
CLIENT Unilever Vietnam
LOCATION Tay Bac – Cu Chi IZ, HCMC
PROJECT
PERIOD Oct’10- Oct’11 (12 months)
PROJECT
DESCRIPTION N/A
CAPACITY N/A
SCOPE PMC Service
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
57
Project Experiences
Pharmaceutical - Food & Beverage
![Page 59: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/59.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Project Experiences
PROJECT
NAME
NEW HOME CARE LIQUID
PLANT (Phase 1.2.3….)
CLIENT Unilever Vietnam
LOCATION Tay Bac – Cu Chi IZ, HCMC
PROJECT
PERIOD N/A
PROJECT
DESCRIPTION
Factory project of liquid
household care products
(phase 1, 2, 3) and VIM factory
CAPACITY N/A
SCOPE Engineering Service
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
58
Pharmaceutical - Food & Beverage
Project Experiences
![Page 60: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/60.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
INFRASTRUCTURE
& UTILITIES
59
Project Experiences
![Page 61: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/61.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Infrastructure & Utilities
PROJECT
NAME
THE CP PAPER CORPORATION
PROJECT
CLIENT CP Paper Corporation
LOCATION Le Minh Xuan 3 IZ, HCMC, VN
PROJECT
PERIOD May’18 - Apr’19
PROJECT
DESCRIPTION
Project total area is 38,000m2
including the warehouse is nearly
20,000m2 and office building 3 floors
is 800m2 construction area.
CAPACITY As above
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES LEED Silver Certificate
OTHER N/A
60
Project Experiences
![Page 62: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/62.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
WAREHOUSE EXTENSION
PROJECT
CLIENT USG Boral Vietnam
LOCATION Hiep Phuoc I, HCMC, VN
PROJECT
PERIOD May’18 - Apr’19
PROJECT
DESCRIPTION 5,000 m²
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
61
Project Experiences
Infrastructure & Utilities
![Page 63: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/63.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
EUROFIN OFFICE &
LABORATORY BULDING
PROJECT
CLIENT Eurofins Sac Ky Hai Dang
LOCATION Saigon HiTech Park, Dist 9 ,VN
PROJECT
PERIOD Jun’16 - Feb’17 (09 months)
PROJECT
DESCRIPTION N/A
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
62
Project Experiences
Infrastructure & Utilities
![Page 64: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/64.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME BAMBOO LOBP PROJECT
CLIENT Shell Vietnam
LOCATION Go Dau IZ, Long Thanh, Dong
Nai
PROJECT
PERIOD Apr’16 – Nov’16 (08 months)
PROJECT
DESCRIPTION
Re-organize and expand
the current plant
CAPACITY As above
SCOPE EPC Lump Sum
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
63
Project Experiences
Infrastructure & Utilities
![Page 65: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/65.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
COLD STORAGE
WAREHOUSE PROJECT
CLIENT New land VJ JSC
LOCATION Binh Duong Province, VN
PROJECT
PERIOD Dec’15 - Jun’16 (08 Months)
PROJECT
DESCRIPTION
Project total area is 23,000 m²
including construction area is nearly
17,000 m²
CAPACITY As above
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES
Frozen storage-40°C, -20°C
Chilled storage 0°C, 5°C
with 20 import/ export dock
OTHER N/A
64
Project Experiences
Infrastructure & Utilities
![Page 66: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/66.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
BIO – RENEWABLE
ENERGY
65
Project Experiences
![Page 67: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/67.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
SOLAR ROOFTOP COATS
PHONG PHU PROJECT
CLIENT Solar Power Utility Company
(SPUC)
LOCATION
48 Tang Nhon Phu Street,
Tang Nhon Phu B Ward, District 9,
HCMC, VN
PROJECT
PERIOD Apr’19 - Jul’19 (04 months)
PROJECT
DESCRIPTION
4 building roofs with an area
approximate 4000m2, including:
Raw material warehouse, Office,
Dyehouse, QA building
CAPACITY Nearly 500KWp
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
66
Project Experiences
Bio - Renewable energy
![Page 68: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/68.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME Solar Roof Top Project
CLIENT CP Paper Corporation –
Phung Vinh Hung
LOCATION Ho Chi Minh, VietNam
PROJECT
PERIOD Feb ~ Apr 2019
PROJECT
DESCRIPTION ~ 350 m²
CAPACITY As above
SCOPE EPCM
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
67 67
Project Experiences
Bio - Renewable energy
![Page 69: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/69.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
MUI NE SOLAR
POWER PROJECT
CLIENT Duc Thanh - Mui Ne JSC
LOCATION Phan Thiet, Binh Thuan, VN
PROJECT
PERIOD Aug’18 - May’19 (09 months)
PROJECT
DESCRIPTION Capacity of 40 MWp, total area
of 36 hectares, stretching over 4 km
CAPACITY As above
SCOPE EPC
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
68
Project Experiences
Bio - Renewable energy
![Page 70: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/70.jpg)
© TTCL Vietnam Corporation Limited (TVC)
EXPERIENCES
AND
CLIENTS
As of Nov, 2019
TURNAROUND
SERVICES
69
Project Experiences
![Page 71: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/71.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
3RD TURNAROUND
PROJECT
CLIENT AGC Chemicals Vietnam
Co., Ltd.
LOCATION Cai Mep Iz, Ba Ria,Vung
Tau
PROJECT
PERIOD Oct’14 - Dec’14
PROJECT
DESCRIPTION
Mechanical, Electrical,
Instrumentation and
associated turnaround
works
CAPACITY As above
SCOPE Turnaround Service
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
70
Project Experiences
Turnaround Services
![Page 72: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/72.jpg)
© TTCL Vietnam Corporation Limited (TVC)
PROJECT
NAME
NPK FERTILIZER
GRANULATOR RENEWAL
PROJECT
CLIENT Japan Vietnam Fertilizer
Company
LOCATION Go Dau IZ, Dong Nai, Vietnam
PROJECT
PERIOD Aug’16 - Nov’17
PROJECT
DESCRIPTION Replace the M122 granulator
CAPACITY Keeping factory capacity of
350000 TPY
SCOPE Turnaround Service
PROCESS
LICENSOR N/A
FEATURES N/A
OTHER N/A
71
Project Experiences
Turnaround Services
![Page 73: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/73.jpg)
© TTCL Vietnam Corporation Limited (TVC)
72
Project Experiences
Name of Owner (Client) Location Project Description Service Year
A. CHEMICAL & PETROCHEMICAL
Mitsubishi Corporation (MC) Phu My 3 SIP, Ba Ria Vung Tau, Vietnam Mitsubishi Chlor Alkali/ VCM Complex
Project E 2019
TTCL Public Co., Ltd./ Long Sơn
Petrochemicals Co., Ltd. Long Son, Ba Ria – Vung Tau, Vietnam LLDPE Plant Project Consultant 2019
Japan Chemical Engineering &
Machinery Vietnam (JCEM)/ A&A
Green Phoenix Group Joint Stock
Company (PHENIKAA)
Hoa Lac High Industrial Zone, Thach That,
Ha Noi
PEKN Resin Manufacture Factory Plant
Project EPC
2015-
2019
Zincox Resources Ltd. (ZINCOX, UK) Port of Castellon, Western of Spain, Spain Spanish Full Cycle Zinc Project E 2019
Jotun Paints Vietnam Ltd. Hiep Phuoc IZ – Nha Be District - HCMC Jotun Vietnam – Greenfield project EPCM 2018
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Vietnam Capacity Expansion Project E.P.C 2018
Dai Ngan Son Service Trading
Manufacturing Co. Ltd. Tien Giang Province, Vietnam Chlor Alkali plant project EPCM 2018
Top Solvent Vietnam (Thaioil) Dinh Vu IZ, Hai Phong, Vietnam Haiphong Terminal Project PMC 2017
Huntsman (Singapore) Pte Ltd. Amata IZ, Dong Nai province VIP Project EPCM 2017
Zinc Oxide Corporation Vietnam J.S Ltd. Phu My 3 Specialized IZ, Ba Ria, Vung Tau Vietnam Recycling Plant Project E 2017
Vietnam Lubricants & Chemicals JS
(VILUBE) Hiep Phuoc - Nha Be District, HCMC Vilube Plant Development Project EPCM 2017
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Dong Nai High Pressure Project E.P.C 2016
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Bamboo LOBP Project E.P.C 2016
Toyo Engineering & Construction Sdn
Bhd. / Taiyo Koko Company Limited Nghi Son, Thanh Hoa , Vietnam Taiyo Koko Recycle Plant Project FEED 2016
AGC Chemicals Vietnam Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam Hot Demineralized Water Charge System E.P.C 2015
PetroVietnam Fertilizer & Chemical
Corporation (PVFCCo) Phu My IZ, Baria – Vung Tau, Vietnam UFC85/Formaldehyde Plant project E.P.C 2014
Vinacomin-Mining Chemical Industry
Holding Co., Ltd Thai Binh, Vietnam 200,000 TPY Ammonium Nitrate plant E.P.C 2012
Top Solvent Vietnam Go Dau IZ, Dong Nai, Vietnam Top Solvent & Shell separation project E 2012
PetroVietnam Fertilizer & Chemical
Corporation (PVFCCo) Phu My IZ, Baria – Vung Tau, Vietnam Glyphosate Project FS 2012
![Page 74: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/74.jpg)
© TTCL Vietnam Corporation Limited (TVC)
73
Project Experiences
Name of Owner (Client) Location Project Description Service Year
Shell Vietnam Ltd. GoDau IZ, Dong Nai Province VII Dissolving Unit Project
E &
Construction
Consultant
2010
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Vietnam Emulsion Plant EPCM 2010
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Gantry Extension E.P.C 2007
Vopak & AP Petrochemical Co. Ltd. Nhon Trach, Dong Nai, Vietnam
26,000m3 Tank Farm Terminal (19
storage tanks, total capacity
26,000m3)
Basic
Engineering
Cost
Estimation
2006
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Polymer Modified Bitumen (PMB)
Project FEED & E 2006
Exxon Mobil Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Fire Water System (Piping, Pumping
system and Storage Tank 1000m3) E.P.C 2006
Shell Vietnam Ltd. Dinh Vu IZ, Hai Phong City, Vietnam Shell Bitumen Depot E 2006
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam New Chemical Storage Tank FEED & E 2006
ICI Paints Vietnam (Holdings) Pte. Ltd. My Phuoc IZ, Binh Duong, Vietnam ICI Emulsion & Solvent Paint Factory
Project EPCM 2005
Surint Omya Vietnam Go Dau IZ, Dong Nai, Vietnam Calcium Carbonate Powder Plant E 2005
B. OIL & GAS
Denko Petrochemical Management Co.,
Ltd. Thilawa, Yangon, Myanmar
Denko Thilawa Oil Storage Tank
Terminal Project E.P.C
2018-
2019
Total Vietnam Limited Go Dau IZ, Dong Nai, Vietnam LPG System Upgrading Project E.P.C 2017
Posco Engineering Co., Ltd / Tokyo Gas
Engineering Co., Ltd Ba Ria – Vung Tau, Vietnam
PVGas Fast Track LNG Terminal
FEED Project FEED 2012
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam Natural gas pipeline and conversion of
fuel oil burners (Boiler & Furnace) E.P.C 2010
Penjico / Van Phong Petroleum Terminal VanPhong Bay, Nha Trang, Vietnam Hot Oil Boiler system -Van Phong
Petroleum Terminal project E.P.C 2010
Orient Bio-Fuels Co., Ltd. Binh Phuoc, Vietnam 300,000 little/day Bio-Ethanol plant E.P.C 2010
PetroVietnam Gas Investment &
Construction (PV Gas-D) Ca Mau, Vietnam
Train 2 for Gas Supply to Camau
Fertilizer Plant E 2009
Orient Bio-Fuels Co., Ltd. Binh Phuoc, Vietnam 300,000 little/day Bio-Ethanol Plant FS 2009
PVGas-South Dung Quat, Quang Ngai, Vietnam Verification Dung Quat LPG terminal E 2009
![Page 75: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/75.jpg)
© TTCL Vietnam Corporation Limited (TVC)
74
Project Experiences
Name of Owner (Client) Location Project Description Service Year
PVGas-South Ba Ria – Vung Tau, Vietnam Verification CNG stations E 2009
PetroVietnam Gas Corporation Nhon Trach, Dong Nai, Vietnam Gas supply Train for Nhon Trach 2 Power Plant FEED 2009
PetroVietnam Gas Corporation Hiep Phuoc – HCMC Civil work for Phu My – Ho Chi Minh City Gas
Pipeline Project E 2008
Itochu /PV Gas Baria-Vungtau, Vietnam LPG Refrigerated Storage tanks FS & E 2008
Saigon Gas Holdings Corporation Cai Mep IZ, Baria-Vungtau, Vietnam Thi Vai LPG Tank Farm project FS & E 2007
J.P Kenny Pty Ltd. / Vietsov Petro Ca Mau, Vietnam PM3 – Ca Mau Gas Pipeline E 2005
VTN-P Petrochemical JV. Co. Ltd. Can Tho, Vietnam Supply of pressure vessels and towers for
petrochemical plant E.P 2003
C. FERTILIZER
Japan Vietnam Fertilizer Company (JVF) Go Dau IZ, Long Thanh, Dong Nai,
Vietnam
Reinforced Concrete Structure Repairing
Project EPC
2015-
2019
Japan Vietnam Fertilizer Company (JVF) Go Dau IZ, Long Thanh, Dong Nai,
Vietnam Replacement of Granulator Project EPC 2017
VINACHEM / VILACHEMSALT Khammouane, Lao Rock Salt Exploitation & Processing Plant E.P.C 2015
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam 100,000 TPY NPK Fertilizer E.P.C 2013
DAP-2 VINACHEM JSC. Lao Cai, Vietnam 330,000 TPY Diammonium Phosphate
Fertilizer Plant E.P.C 2012
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam Dust Exhaust System of NPK Fertilizer Plant E.P.C 2008
PetroVietnam Fertilizer & Chemical
Corporation (PVFCCo) Phu My IZ, Baria – Vung Tau, Vietnam NPK Fertilizer Plant FS 2008
PetroVietnam Fertilizer & Chemical
Corporation (PVFCCo) Phu My IZ, Baria – Vung Tau, Vietnam SA Fertilizer Plant FS 2008
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Raw Material Section extension including
facility E.P.C 2007
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Product warehouse extension including
facility E.P.C 2006
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam Dust Exhaust System of NPK Fertilizer Plant E.P.C 2000
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam 350,000TPY NPK Compound Fertilizer Plant
E.P.C
(Under
TTCL
Public
Co., Ltd)
1997
![Page 76: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/76.jpg)
© TTCL Vietnam Corporation Limited (TVC)
75
Project Experiences
Name of Owner (Client) Location Project Description Service Year
D. PHARMACEUTICAL – FOOD & BEVERAGE
Medical Devices and Biomaterial Plant
Joint Stock (MEDEP JSC.) Saigon High Tech Park, District 9, HCMC Infrastructure Surgical Suture Project E.P.C
2015-
2020
Glomed Pharmaceutical Company Ltd.
(Abbott) VSIP-1 Binh Duong Province HVAC Remediation and R&D project E 2017
Medical Devices and Biomaterial Plant
Joint Stock (MEDEP JSC.) Saigon High Tech Park, District 9, HCMC Crystalline Lens Factory Project E.P.C 2016
Amway Vietnam Company Limited VSIP-2A , Binh Duong, Vietnam Nutrition Food Manufacturing Plant Design &
Build 2013
United International Pharma Company
Ltd. VSIP-2, Binh Duong, Vietnam Pharmaceutical Factory Project
Design &
Build 2010
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Chilly Sauce project E & CM 2017
Tetra Pak Vietnam JSC VSIP 2A, Binh Duong, Vietnam Tetra Pak SE Asia Project EPCM 2017
Koyu & Unitek Co., Ltd. Bien Hoa – Dong Nai New Chicken Meat Processing Plant
Project E.P.C 2016
Masan Phu Quoc Phu Quoc – Kien Giang Nam Ngu Factory Project E & CM 2016
Coca-Cola Beverages Vietnam Company
Limited Lien Chieu District, Da Nang City, Vietnam
Coca-Cola Beverages Plant extension
project EPCM 2016
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam R&D building and Soy Sauce factory E & CM 2016
Masan Brewery HG Company Ltd. Can Tho, Vietnam Masan Brewery HG Beer Factory CM 2015
One More Limited (VITAL) Pnom Penh, Cambodia Instant Noodle Factory E & CM 2015
Suntory PepsiCo Vietnam Beverage Co.,
Ltd. Can Tho, Vietnam
Suntory PepsiCo Can Tho Distribution
Center E & CM 2014
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Masan Food factory project E & CM 2014
Vietnam Brewery Limited HCMC, Vietnam VBLHCMC Brewery Extension
Extension Phase 4 –Step 2 and Phase 5 E 2010
Unilever Vietnam Tay Bac–Cu Chi IZ, HCMC, Vietnam New Unilever Food Factory CM 2010
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Masan Food factory complex CM 2010
P&G Indochina Dong An IP, Binh Duong Province Tanzanite Facilities and Untilities Design
Project E 2017
Kimberly-Clark Vietnam Limited VSIP-1, Binh Duong, Vietnam Infrastructure Expansion EPCM 2012
Unilever Vietnam Tay Bac–Cu Chi IZ, HCMC, Vietnam New Homecare Liquid (Phase 1, 2, 3) and
VIM Plant
E &
Services 2010
![Page 77: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/77.jpg)
© TTCL Vietnam Corporation Limited (TVC)
Name of Owner (Client) Location Project Description Service Year
Procter & Gamble Indochina Dong An IZ, Binh Duong, Vietnam Facility engineering projects E 2005-
2013
Lever Vietnam (Unilever) Tay Bac–Cu Chi IZ, HCMC, Vietnam Skincare Migration Project E 2005
Procter & Gamble Co., Ltd. Dong An IZ, Binh Duong, Vietnam Increase capacity of Detergent Factory (VTCI
Project) E.P.C 2004
Procter & Gamble Co.Ltd Dong An IZ, Binh Duong, Vietnam Robinhood Project E 1999
E. BIO – RENEWABLE ENERGY
Solar Power Utility Company (SPUC) Tang Nhon Phu B Ward, District 9,
HCMC, Vietnam Solar Rooftop Coats Phong Phu Project EPC 2019
Duc Thanh – Mui Ne Joint Stock
Company (PACIFICO) Binh Thuan Province, Vietnam 40MWp Mui Ne Solar Power Plant Project E.P.C
2018-
2019
Phung Vinh Hung Paper JSC LMX3 IP, Binh Chanh, HCM, Vietnam Paper Warehouse PVH Project EPCM 2018
F. INFRASTRUCTURE & UTILITY
Phung Vinh Hung Paper JSC LMX3 IP, Binh Chanh, HCM, Vietnam Paper Warehouse PVH Project EPCM 2018
USG Boral Vietnam Hiep Phuoc IZ, Nha Be Dist., HCMC Warehouse Extention Project E.P.C 2018
Coca-Cola Beverages Vietnam Company
Limited
Lien Chieu District, Da Nang City,
Vietnam Coca-Cola Beverages Plant extension project EPCM 2016
EUROFINS Saigon High Tech Park, District 9,
HCMC New Office & Laboratory Building project E.P.C 2016
New Land Company Limited Binh An IP, Di An District, Binh Duong
Province, Vietnam
Warehouse Project (13,000m2 cool storage
and cold storage) EPCM 2015
ON Semiconductor Binh Duong VSIP-1, Binh Duong, Vietnam HVAC/Exhaust and Fire Protection Upgrade
Project E & Service 2015
Yueh Chaeng Canned Food Co.Ltd Long An, Vietnam Cold Storage 400 Ton E.P.C 2003
Yueh Chaeng Canned Food Co.Ltd Long An, Vietnam Plant Utilities Building and Revamping E.P.C 2003
H. TURNAROUND SERVICE
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Fertilizer Granulator Renewal Project EPC 2016
AGC Chemicals Vietnam Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam Mechanical, Electrical, Instrumentation and
associated turnaround works Turnaround 2014
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Fertilizer Dryer Renewal Project EPC 2012
E: Engineering P: Procurement C: Construction EPCM: Engineering, Procurement and Construction Management
FS: Feasibility Study FEED: Front-End Engineering Design CM: Construction Management
PMC: Project & Construction Management
Project Experiences
76
![Page 78: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/78.jpg)
© TTCL Vietnam Corporation Limited (TVC)
TTCL VIETNAM CORPORATION.,LTD
11th floor, Centre Point Building ,
106 Nguyen Van Troi Street, Ward 8,
Phu Nhuan District, Ho Chi Minh City, VN
Mr. Ho Dac Tuan (+84) (0) 764501711
Mr. Kazuoki Urabe (+84) (0) 902575009
Tel : (+84-28) 39977118
Fax : (+84-28) 39977086
http:// www.ttcl-vn.com
Emai : [email protected]
77
Contact Us
![Page 79: As of Nov, 2019ttcl-vn.com/wp-content/uploads/2019/12/TVC-Present-05-11-19.pdfPIPEPHASE AVEVA Oil and Gas pipe network simulation AspenOne AVEVA Process simulation Breeze AERMOD AVEVA](https://reader033.fdocuments.us/reader033/viewer/2022041911/5e6777f01368b82f6e284576/html5/thumbnails/79.jpg)
© TTCL Vietnam Corporation Limited (TVC)