Arthur Flury AG - ozenray.com · Crimping sleeve Conical couplings and collar sockets Company...
Transcript of Arthur Flury AG - ozenray.com · Crimping sleeve Conical couplings and collar sockets Company...
Presentation contents
General company data
Products of Arthur Flury AG
«ALL IN HOUSE» Philosophy
21.07.2016 Company presentation Arthur Flury AG 2
Company details
• Founded: 1920
• Employees: 110
• Turnover: CHF 40 million
• Export share: > 50 %
• ISO 9001; ISO 14001
and OHSAS 18001
21.07.2016 Company presentation Arthur Flury AG 3
21.07.2016
Own organisations:
• Arthur Flury S.R.L., Milano, Italy 100 %
• Arthur Flury U.K. Ltd, Milton Keynes, United Kingdom 100 %
Representations abroad: > 30
Representations and own organisation abroad
Company presentation Arthur Flury AG 5
Railway technology
with the three domains overhead contact line
components, safety- and earthing material,
section insulators and phase breaks.
Earthing and lightning protection
with the domains lightning protection components,
earthing components, over voltage protection and
equipotential bonding.
Power distribution technology
with the domains srewed couplers, conical
couplers, compression sleeves, cutting and
compression tools, voltage detectors, short-circuit
indicators. A wide range of products for power lines
and cables.
Product line of Arthur Flury AG
21.07.2016 Company presentation Arthur Flury AG 7
21.07.2016
Conical coupling
Forked collar socket
Eyelet collar socket
Crimping sleeve
Conical couplings and collar sockets
Company presentation Arthur Flury AG 9
21.07.2016
Dropper clamps Cable droppers
Strap droppers
Catenary suspension
Company presentation Arthur Flury AG 10
21.07.2016
Feeder clamps
Contact wire splices /
Special contact wire splices
Guide arm clamps
Turnbuckles / Divers
Catenary material Clamps / Turnbuckles
Company presentation Arthur Flury AG 11
21.07.2016
Earthing bar
Voltage detector up to 36 kV AC
up to 6.6 kV DC
Rail clamps / Accessory
Earthing accessory
Catenary material / Earthing material
Company presentation Arthur Flury AG 12
21.07.2016
Messenger wire isolators
Catenary material / Isolators and accessory
Accessory
Contact wire isolators
Company presentation Arthur Flury AG 13
21.07.2016
Contact wire crossing
FDX
50° - 90°
FFDX
50° - 90°
Company presentation Arthur Flury AG 14
21.07.2016
Section insulators 0.7 kV DC – 25 kV AC
v = 60km/h 80km/h 140km/h 160km/h 200km/h 250km/h
DC
1 kV
3 kV
AC
15 kV
25 kV
Company presentation Arthur Flury AG 15
Neutral sections / Phase breaks
DC, DC – AC and AC up to 25 kV AC
DC 1.5 kV
AC
15 kV
25 kV
v = 60km/h 80km/h 200km/h 250km/h
21.07.2016 Company presentation Arthur Flury AG 16
Speed up to 60 km/h
Max. operating voltage 1 kV
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 80 kN
Working load max. 24 kN
Weight 3.6 kg
21.07.2016
Type LT1
1 kV DC Section insulator, Tram
optional
suspension
Company presentation Arthur Flury AG 17
Speed Up to 60 km/h
Max. operating voltage 3 kV DC
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 60 kN
Working load max. 24 kN
Weight 4.1 kg
21.07.2016
Type LT3
3 kV DC Section insulator
optional
suspension
Company presentation Arthur Flury AG 18
21.07.2016
Type FB1
1.5 kV DC Section insulator, Trolley
Speed Up to 60 km/h
Max. operating voltage 1.5 kV DC
Contact wire 1 contact wire
up to 107 mm²
Max. breaking load 80 kN
Working load max. 15 kN
Weight 5.5 kg
Company presentation Arthur Flury AG 19
21.07.2016
Type FT1
1.5 kV DC Section insulator, Tram
Speed Up to 80 km/h
Max. operating voltage 1.5 kV DC
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 80 kN
Working load max. 15 kN
Weight 11 kg
Company presentation Arthur Flury AG 20
21.07.2016
Type FTN
1.5 kV DC Neutral section, Tram
Speed Up to 80 km/h
Max. operating voltage 1.5 kV DC
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 80 kN
Working load max. 15 kN
Weight 11 kg
Company presentation Arthur Flury AG 21
21.07.2016
Type FT/B1
1.5 kV DC Neutral section, Trolley & Tram
Speed Up to 70 km/h
Max. operating voltage 1.5 kV DC
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 80 kN
Working load max. 15 kN
Weight 11 kg
Company presentation Arthur Flury AG 22
21.07.2016
Type FG3
3 kV DC Section insulator
Speed Up to 140 km/h
Max. operating voltage 3 kV DC
Contact wire 1 or 2
contact wires
up to 160 mm²
Max. Breaking load 120 kN
Working load Max 2x12 kN
Weight 22,5 kg
Company presentation Arthur Flury AG 23
21.07.2016
Type FO3
3 kV DC Section insulator
Speed Up to 100 km/h
Max. operating voltage 3 kV DC
Contact wire 1 contact wire
up to 170 mm²
Max. breaking load 80 kN
Working load Max. 15 kN
Weight 11.5 kg
Installation
«JIG»
Company presentation Arthur Flury AG 24
21.07.2016
Type ZBLT15 and ZBLT25
15 kV and 25 kV AC Section insulator
Speed Up to 60 km/h
Max. operating voltage ZBL15: 15 kV
ZBLT25: 25 kV
Contact wire 1 contact wire
up to 150 mm²
Max. breaking load 50 kN
Working load Max. 12 kN
Gewicht 12 kg
Installation
«JIG»
Company presentation Arthur Flury AG 25
21.07.2016
TYP ZS3 / ZS15
3 kV DC and 15 kV AC Section insulator
Speed Up to 160 km/h
Max. operating voltage ZS3: 3 kV DC
ZS15: 15 kV AC
Contact wire 1 or 2
contact wires
up to 150 mm²
Max. breaking load 70 kN
Working load 1 x 15 kN or
2 x 10 kN
Weight 11 - 18 kg
Installation
«JIG»
Company presentation Arthur Flury AG 26
21.07.2016
Type LS25
25 kV AC Section insulator
Speed Up to 120 km/h
Max. operating voltage 25 kV AC
Contact wire 1 contact wire
up to 193 mm²
Max. breaking load 80 kN
Working load Max. 20 kN
Weight 16 kg
Installation
«JIG»
Company presentation Arthur Flury AG 27
21.07.2016
Type HS3 / HS25
3 kV DC and 25 kV AC Section insulator
Speed Up to 200 km/h
Max. operating voltage HS3: 3 kV DC
HS25: 25 kV AC
Contact wire 1 or 2
contact wires
up to 193 mm²
Max. breaking load 120 kN
Working load 1 x 22.5 kN or
2 x 22.5 kN
Weight 17 - 20 kg
Installation
«JIG»
Company presentation Arthur Flury AG 28
Type HID3 / HI15 / HI25
speed up to 250 km/h
max. operating voltage HID3: 3 kV DC
HI15: 15 kV AC
HI25: 25 kV AC
contact wire 1 (2 with HID3) CW 100 to 120 mm²
max. breaking load 120 kN
working load max. 25 kN
weight 24 kg
21.07.2016 Company presentation Arthur Flury AG 29
21.07.2016
Type NS25
25 kV AC Phase break
Speed Up to 200 km/h
Max. operating voltage 25 kV AC
Contact wire 1 or 2
contact wires
up to 193 mm²
Max. breaking load 120 kN
Working load Max. 2 x 22.5 kN
Weight 38 kg
Installation
«JIG»
Company presentation Arthur Flury AG 30
Single rod phasebreak
Speed > 200 km/h
Max. operating voltage 25 kV AC
Contact wires 1 contact wire
SML 60 kN
Working load Max. 25 kN
21.07.2016 Company presentation Arthur Flury AG 31
21.07.2016
• This equipment avoids any arc creation
at passing locomotives even in power
consuming condition.
Type ASNS25
25 kV AC Automatic switched phase break
• As safety equipment at sites where different
phase of electric OHL have to be connected.
Company presentation Arthur Flury AG 32
21.07.2016
Lightning protection outside
Earthing
Overvoltage protection
Equipotential rail
Earthing and lightning protection
Company presentation Arthur Flury AG 33
21.07.2016
RED CAD Flury
CAD-Lightning protection
planning with RED CAD Flury
Company presentation Arthur Flury AG 34
21.07.2016
Universal clamp
Derivation clamp
for conductorConnection set Quadro
conductor clip
Conductor holder for
interlocking tiles
Ridge conductor
holder
Gutter folding
border clip
Snow guard
terminal
Lightning protection material
Company presentation Arthur Flury AG 35
21.07.2016
Earthing and
Foundation earthing components
Cross connector Parallel clamp Wedge connector Connection set with
round crossing clamp
Cross and parallel
connector
Earth wire
connectorEarthing strip
climp
Equipotential
box
Company presentation Arthur Flury AG 36
21.07.2016
Overvoltage protectionOvervoltage protection
DS 250 VG combined-
Type 1/2/3Overvoltage protection
DS 40 - Type 2
Overvoltage protection
DS 240 – Type 3
Adaptor PBCH-HF /
CS 1 – Type 3
Coarse and middle protection
DS 60 VGPV - Type 1 + 2
Telephone applications MJ 8
2 RN – Type 3
RF Search
Protection
Company presentation Arthur Flury AG 37
Power distribution technology
21.07.2016
Electrical connection
Company presentation Arthur Flury AG 38
Connection material /
Cutting and Compression tools
21.07.2016
Cone connector Branch joint bronze Crimping sleeveMechanical connector
Company presentation Arthur Flury AG 39
21.07.2016
Security technology
Earthing and short
circuiting devices
Company presentation Arthur Flury AG 40
Philosophy Arthur Flury AG «ALL IN HOUSE»
Cu
sto
me
r e
xp
ecta
tio
ns
Corporate management
Strategic management
Cu
sto
me
r sa
tisfa
ction
Internal support processes
Sales
Production
Purchasing
Tool manufacture
Construction
Development
Quality management
21.07.2016 Company presentation Arthur Flury AG 41
Setting objectives and planning
Evalu
atio
n
Cu
sto
me
r exp
ecta
tion
s
Cu
sto
me
r sa
tisfa
ctio
nContinual improvement of the management system
Management process
Process model for ISO 9001
C
U
S
T
O
M
E
R
C
U
S
T
O
M
E
R
Monitoring
Product realization
Production
process
Procurement
process
Development
process
Marketing and
distribution
process
Management of resources
Imple
menta
tio
n
Quality management
21.07.2016
Constant inspections, measurements and analyses in all areas provide data for steady
improvements to meet requirements of our customers optimally.
Document and data monitoring (incl. Change processes)
Quality certification monitoring
Labeling and traceability of products
Variance monitoring (defects)
Testing instruments
monitoring
Statistical methods
Internal audits
Company presentation Arthur Flury AG 42
21.07.2016
Efficient use of row-material and ressources
Prevention of unnecessary noise, odour and electro-smog
No discharge of sewage in waters
Prevention of emissions in the air
Prevention of contamination of ground
Ecological handling of waste
Ongoing implementation of improvementsfollowing the norm ISO 14000
Ecology
We care about ecology.
Ecology aspects are analysed and improved every year by our quality supervisor
according the following points:
Company presentation Arthur Flury AG 43
• Innovative new development
• Product adjustment on individual
customer request
• Steady improvements
• Own test facility
• Own high voltage- and
high current laboratory
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 44
21.07.2016
• Monitoring • Training • Support
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 45
• Construction
• Change management
• Project documentation
• Engineering
• Tool development
• Tool construction
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 46
• Production of new tools and
mounting devices
• Safeguarding of tool maintenance
• Prototype construction
• Testing constructions
• Apprenticeship as polytechnician
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 47
Purchasing
• Securing and efficient warehousing of the goods to be procured
• Periodical audits and benchmarks guarantee the compliance
of the philosophy of the company
• Clever pooling of qualified, proved and ISO certified suppliers
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 48
21.07.2016
• Presses from 25 up to 300 tonnes
• Efficient follow-on cutting tools
• Modern follow-on composite tools
• Computer controlled runner manufacture
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 49
• CNC universal lathe
• Robot technology
• Assembly
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 50
• Isolator tensile testing machine
• High bay storage facility
• Modern assembly of section
insulators and phase breaks
• Custom length droppers from
precalculation
• Testing and final assembly of all
products in house
• Labelling of
relevant
components
for tracking
21.07.2016
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 51
21.07.2016
• Consulting • Support • Partnership
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 52
21.07.2016
• Seminars • Training • Courses
Development EngineeringTool
manufacturePurchasing Production Sales
Company presentation Arthur Flury AG 53
«ALL IN HOUSE»
Innovation by steady further development
Flexibilty for custom specific solutions
Continuous high product quality through
optimized manufacturing process
State of the art production methods
to guarantee sustainable products
Our lengthy experience, our modern production techniques and our contemporary quality
management system combine to ensure high quality products from Arthur Flury.
21.07.2016 Company presentation Arthur Flury AG 54