![Page 1: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/1.jpg)
ArrowheadWestonTransmission Line
Project
Dave Van HouseMinnesota Power
![Page 2: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/2.jpg)
Description & Overview
220 mile 345,000 volt electric transmission line
Approved by the Minnesota and Wisconsin regulators in 2001
Construction Began in Minnesota February 2004
Construction to Begin in Wisconsin Fall 2004
Construction scheduled to be completed in 2008
![Page 3: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/3.jpg)
Why was it proposed?
Reliability!!
Improves Regional System Security
Provides Maintenance & Operational Flexibility
Allows Customers Greater Access to Generation Sources
![Page 4: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/4.jpg)
1
0
100
200
300
400
500
600
700
1
Intertie Capacity vs Energy Usage by State
Per
Un
it I
nte
rtie
Cap
acit
y (k
VA
/GW
h)
Wisconsin Minnesota Iowa Illinois Nebraska S. Dakota N. Dakota
RankLast
![Page 5: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/5.jpg)
![Page 6: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/6.jpg)
www.powerupwisconsin.com
Minnesota
Minnesota’s electric network is tied to neighboring states.
If Wisconsin has a problem, Minnesota has a problem.
Minnesota Power customers have been knocked off line by electric system disturbances related to the weak Minnesota-Wisconsin connection.
![Page 7: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/7.jpg)
Recent Regional Problems
June 11, 1997
June 25, 1998
June 10, 1999
![Page 8: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/8.jpg)
![Page 9: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/9.jpg)
![Page 10: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/10.jpg)
IMPACT OF June 25, 1998 DISTURBANCE
IN MAPP■ 60+ TRANSMISSION LINES TRIPPED■ 4,000+ MW OF GENERATION LOST■ More Than 39,000+ CUSTOMERS
AFFECTED
IN NW ONTARIO■ BLACK OUT TO 113,000 CUSTOMERS■ 650 MW OF LOAD LOST ■ 270 MW OF Generation Lost
![Page 11: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/11.jpg)
![Page 12: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/12.jpg)
![Page 13: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/13.jpg)
Wisconsin Actions
1997 events raise concerns about electric supply reliability in Wisconsin
Wisconsin utilities and regulators form Wisconsin Reliability Assessment Organization (WRAO)
WRAO forms engineering group to study alternatives - WIRES group
![Page 14: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/14.jpg)
![Page 15: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/15.jpg)
PERFORMANCE EVALUATION
DETAILED POWER FLOWS SIMULATION
GENERATOR RESPONSE
DYNAMIC STABILITY
VOLTAGE STABILITY
IMPACT ON MAPP
CONSTRUCTION COSTS
LOSS EVALUATION
![Page 16: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/16.jpg)
Power Flow Analysis
Reactive Voltage Support Requirements
Steady State Maximum Transfer capability
Sensitivity to Modeling Assumptions
Transmission System Loss Analysis
![Page 17: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/17.jpg)
Generator Response
Mechanical Stress on Weston Generator Shaft
■ Large Phase Angle Across MAPP MAIN Interface
■ Eau Claire Arpin Line Switching
■ Instanteous change in Power output
![Page 18: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/18.jpg)
Dynamic Stability
Ability of Systems Generators to remain synchronized and recover from Major System Disturbance
MAPP WUMS Disturbances Loss of New Facilities Impact on Existing Limiting Conditions Dynamic Reactive Support Requirements
![Page 19: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/19.jpg)
Voltage Stability
Ability of the System to Maintain Adequate Voltage Following a Disturbance
Without Adequate Voltage Support System can Experience■ Increased Current Demand (P = VI)■ Slowly Declining Voltage■ Loss of Voltage Sensitive Loads■ Voltage Collapse
![Page 20: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/20.jpg)
Engineering to Support Permitting
Calculation of;■ AUDIBLE NOISE■ ELECTRIC FIELD■ MAGNETIC FIELD
Analysis of Potential Farm Impacts■ Stray Voltage■ Earth Currents
![Page 21: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/21.jpg)
Magnetic Field Electric Field Spark Discharge
Multiple Routes Multiple Structures Multiple Circuits Multiple Flows Future Years
EMF Issues
![Page 22: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/22.jpg)
Transmission Line Noise
Due to Corona Discharge■ Electric Field at surface of the conductor
exceeds the breakdown strength of air■ Generates light, audible noise radio noise
and energy losses
Mitigation■ Increase Conductor Surface area
• Larger Conductors• Multiple conductors
![Page 23: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/23.jpg)
Substation Noise Monitoring
Long Term
Short Term
ExistingEquipment
Impact ofAdditions
![Page 24: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/24.jpg)
Arrowhead Substation Noise
![Page 25: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/25.jpg)
Other Engineering Issues
Differential GPS Interference (Precision Farming)
Electric & Magnetic Field
■ Impacts on Pacemakers and implantable Defibulators
■ Impacts on Railroad, Pipeline and AM Radio Transmitter sites
![Page 26: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/26.jpg)
![Page 27: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/27.jpg)
Opposition to the project:
Save Our Unique Lands Citizens Utility Board Wisconsin Environmental Decade North American Water Office Hillside Dairy World Organization of Landowner
Freedom
![Page 28: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/28.jpg)
![Page 29: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/29.jpg)
![Page 30: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/30.jpg)
Common Utility Corridor
![Page 31: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/31.jpg)
Visual Impact Of Crossing
![Page 32: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/32.jpg)
Existing 161 kV H-Frame
![Page 33: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/33.jpg)
954 ACSR 2-ConductorBundle with Shield Wire
![Page 34: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/34.jpg)
Single 3M Composite Conductor
![Page 35: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/35.jpg)
Post Permit Studies
Equipment Specification
Construction Support Analysis
Operating studies
![Page 36: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/36.jpg)
Equipment Specifications Transient studies
■ Breaker Switching Duties• Shunt Reactor• Shunt Capacitor• 345 & 230 kV line breakers
■ Capacitor Bank Switching Issues• Voltage Magnification
■ Insulation Coordination• Surge Arrester rating & placement• Equipment BIL requirements• Line Insulation
![Page 37: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/37.jpg)
![Page 38: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/38.jpg)
Construction Impact Studies
Constructability■ Line outage concerns■ Maintenance issues■ Ownership Issues
Increased Cost Landowner Opposition
![Page 39: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/39.jpg)
Operating Studies
Determination of Operating Limits■ Reactive Support Requirements
• Shunt Capacitor location optimization■ Line Loadability Issues
• System Intact and Post Contingency■ Phase Shifter Requirements
• Line load sharing optimization• Post Contingency requirements
■ New Flow-Gate Limits• System Intact and Post Contingency
![Page 40: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/40.jpg)
Summary
Operating experience has shown there is a significant risk to electrical reliability in the upper Midwest and Wisconsin
Engineering study commissioned through Assembly Act 204
WRAO recommendation Arrowhead Weston 345 kV Line
![Page 41: Arrowhead Weston Transmission Line Project Dave Van House Minnesota Power.](https://reader035.fdocuments.us/reader035/viewer/2022070411/56649cee5503460f949bc71c/html5/thumbnails/41.jpg)
Summary
The Arrowhead-Weston Project will substantially alleviate the reliability problems being experienced due to the weak electrical tie between the upper Midwest and Wisconsin.
It will also provide import capability for Wisconsin to meet its emergency power supply requirements.