Arquitectura Final Huber
-
Upload
julio-oblitas -
Category
Documents
-
view
233 -
download
0
description
Transcript of Arquitectura Final Huber
![Page 1: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/1.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM
05.05.0205.04.05.07
0606.0106.0206.07
07.0007.01
0808.01.08.02NE08.12
0909.01.09.03.09.05.09.06
10.10.0110.04
12.0012.0112.01.0412.01.05NE
12.0212.02.0412.02.0712.02.14
13.13.01.0013.0713.02
![Page 2: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/2.jpg)
13.0413.05
1414.01
1515.0115.0215.03
16.0116.01.09
![Page 3: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/3.jpg)
HOJA DE METRADOS - ARQUITECTURA
DESCRIPCCIÓN
MUROS Y TABIQUES DE ALBAÑILERIAMURO DE SOGA CON LADRILLO KING KONG TIPO IV 09X13X24cmMURO DE BLOQUE HUECO DE CONCRETO E=20CM, MEZCLA 1:5TABIQUE CON SISTEMA DRYWALL
REVOQUES Y ENLUCIDOSTARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5TARRAJEO DE MUERO INTERIOR Y EXTERIOR, E=1.5CM, C:A=1:5VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS
CIELOS RASOSCIELO RASO CON MEZCLA CEMENTO ARENA 1:5,E=10CM
PISO Y PAVIMENTOS PISO DE PORCELANATO 60x60 CM ANTIDESLIZANTE COLOR GRISPISO DE PORCELANATO 30X30 CM ANTIDESLIZANTE COLOR GRISPISO MACHIMBRADO DE MADERA ESTORAQUE 1" X 4"CONTRAPISO
ZOCALOS Y CONTRAZOCALOSZOCALO DE BALDOSA CERAMICO 30X30 cmZOCALO DE MADERA RODON 3/4" h VARIABLECONTRAZOCALO DE PORCELANATO COLOR GRIS, H=15 cmCONTRAZOCALO DE MADERA, H=10cm
COBERTURASTEJA PLANA DE CONCRETO 20X40 CM COLOR LADRILLOCOBERTURA C/ PANEL METALICO GALVANIZADO Y ZINCADO ,TIPO ACANALADO
CARPINTERIA DE MADERA Y METÁLICACARPINTERIA DE MADERAPERGOLAS DE MADERAESTRUCTURA DE MADERA , SOL Y SOMBRA PUERTA TABLERO AGLOMERADO MELAMINICO
CARPINTERIA METALICA Y HERRERIAPUERTA DE HOJA METALICA CONTRAPLACADAMAMPARA DE ALUMINIO SEGÚN DISEÑO P/VIDRIO TEMPLADO ESPESOR 6MM, IC. SUMIN E INST. PASAMANOS DE FºGº DE 2 ", CON ANCLAJE CADA METRO
CERRAJERIABISAGRA ALUM. DE 4" X 4" PESADA EN PUERTABISAGRA ALUM. DE 2 1/2" X 2 1/2" PESADA EN PUERTACERRADURA DE MANNIJA TIPO PALANCA
![Page 4: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/4.jpg)
CERROJO "SAPITO" PARA PUERTAS EN CUBICULOS DE SS.HHTIRADOR DE BRONCE PARA PUERTAS
VIDRIOS, CRISTALES Y SIMILARESVIDRIO TEMPLADO E=6MM, INC. INSTALACIÓN
PINTURAPINTURA LATEX 02 MANOS EN CIELO RASO Y VIGAS INT/EXTPINTURA LATEX 02 MANOS EN MUROS Y COLUMNASPINTURA BARNIZ EN CARPINTERIA DE MADERA
VARIOSPIZARRA ACRILICO
![Page 5: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/5.jpg)
HOJA DE METRADOS - ARQUITECTURA
TOTAL UND.
141.23 m2412.67 m2315.84 m2
4.31 m2553.89 m2178.96 m
121.75 m2
212.65 m277.62 m2419.9 m2
710.17 m2
75.83 m218.42 m2
41.3 m29.17 m2
547.94 m2207.39 m2
m232.52 m236.63 m2
6.32 m2
m238.12 m210.03 m2
17.3 ml
76 und10 und19 und
HUBER:No existe piso estoraque pero existe la partida de piso siahuanuco
![Page 6: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/6.jpg)
8 und14 und
59.08 m2
121.75 m2 732.85 m2
75.46 m2
2.00 und
![Page 7: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/7.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM
05.05.02
![Page 8: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/8.jpg)
05.04.
![Page 9: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/9.jpg)
![Page 10: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/10.jpg)
![Page 11: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/11.jpg)
05.07
![Page 12: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/12.jpg)
![Page 13: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/13.jpg)
![Page 14: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/14.jpg)
HOJA DE METRADOS - ARQUITECTURA
DESCRIPCCIÓN
MUROS Y TABIQUES DE ALBAÑILERIAMURO DE SOGA CON LADRILLO KING KONG TIPO IV 09X13X24cm
Eje AH, entre ejes A1 y A2
Eje AI, entre ejes A1 y A3
Eje A2, entre AH y AI
Eje AH y eje AI, entre A4 y A5
Botadero
Botadero
Eje AH, entre A4 y A5
Eje AI, entre A4 y A6
Eje A3, entre AH y AI
Eje AH, entre A2 y A3
Eje AI, entre A2 y A3
Eje AH, entre A1 y A2
Eje AI, entre A1 y A2
Eje A2, entre AH y AI
![Page 15: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/15.jpg)
MURO DE BLOQUE HUECO DE CONCRETO E=20CM, MEZCLA 1:5
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 1
Eje AA - AB
Eje AB - AC
Eje AB - AC
Eje AB - AC
Eje AC - AD
Eje AD - AE
Eje AE - AF
Eje AH - AI
Eje AI - AJ
Elevación frontal, Segundo nivel (Plano AAB-300) - elevación 1
Eje AA - AB
Eje AB - AC
Eje AC - AD
Eje AD - AE
Eje AE - AF
Eje AG - AH
![Page 16: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/16.jpg)
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 4
Eje A1 - A2
Eje A2 - A3
Eje A3 - A4
Eje A4 - A5
Eje B1 - B2
Elevación frontal, Segunda nivel (Plano AAB-300) - elevación 4
Eje A1 - A2
Eje A2 - A3
Eje A3 - A4
Eje A4 - A5
Elevación frontal (Plano AAB-300)
Elevación 3 - primer nivel
Elevación 3 - segundo nivel
![Page 17: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/17.jpg)
Elevación frontal (Plano AAB-300) - Primer nivel - Elevación 2
Eje A5 - Esquina AJ a puerta
Eje A5 - Puerta a esquina AI
Eje A5 - Encima de la puerta
Eje A5 entre AI - AH
Eje A5 entre BA - AE
Eje A5 entre AA - BA
Eje A5, Entrada a SUM - Laterales de puerta
Eje A5, Entrada a LOBBY - Laterales de puerta hasta
Eje B7 entre BB - BC
Eje B7 Entre BC - BD
Eje BB - BD entre B6 - B7
Eje BB - BD entre B5 - B6
Eje BD - entre B4 - B5
Eje BB - ente B4 - B5
Eje B3 - entre BB - mampara
Eje B4 - entre BB - mampara
Eje BA - entre B1 - B2
![Page 18: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/18.jpg)
TABIQUE CON SISTEMA DRYWALL
Eje A1, entre AA y AB
Eje A1, entre AC y AF
Eje AF, entre A1 y A3
Eje AF, entre A3 y A5
Eje A5, entre AA y AE
Eje AA, entre A1 y A5
![Page 19: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/19.jpg)
![Page 20: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/20.jpg)
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5
MURO DE BLOQUE HUECO DE CONCRETO E=20 CM. MEZCLA 1:5
![Page 21: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/21.jpg)
ACERO DE REFUERZO HORIZONTAL ENTRE MUROS: fy=4,200 kg/cm2
![Page 22: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/22.jpg)
HOJA DE METRADOS - ARQUITECTURA
N° DE VECESDIMENSIONES
PARCIAL TOTALLARGO ANCHO ALTO
141.23141.23
1.00 1.00 3.30 3.50 11.551.00 1.00 3.00 3.50 10.501.00 1.00 2.50 3.50 8.751.00 2.00 2.55 3.50 17.851.00 2.00 2.05 3.50 14.351.00 1.00 0.45 3.50 1.581.00 1.00 3.00 3.50 10.501.00 1.00 2.75 3.50 9.631.00 1.00 3.40 3.50 11.901.00 1.00 1.90 3.50 6.651.00 1.00 2.05 3.50 7.171.00 1.00 3.30 3.50 11.551.00 1.00 3.00 3.50 10.501.00 1.00 2.50 3.50 8.75
N° DE ELEMENTOS
![Page 23: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/23.jpg)
412.67
84.651.00 1.00 3.00 3.50 10.501.00 1.00 0.65 2.50 1.631.00 1.00 0.70 2.50 1.751.00 1.00 3.40 1.00 3.401.00 1.00 3.15 3.50 11.031.00 1.00 3.15 3.50 11.031.00 1.00 3.10 3.50 10.851.00 1.00 3.15 3.50 11.031.00 1.00 6.70 3.50 23.45
18.351.00 1.00 3.00 1.00 3.001.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 2.75 1.00 2.75
![Page 24: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/24.jpg)
60.201.00 1.00 3.00 3.50 10.501.00 1.00 3.15 3.50 11.031.00 1.00 3.15 3.50 11.031.00 1.00 3.00 3.50 10.501.00 1.00 4.90 3.50 17.15
14.761.00 1.00 3.00 1.20 3.601.00 1.00 3.15 1.20 3.781.00 1.00 3.15 1.20 3.781.00 1.00 3.00 1.20 3.60
39.451.00 2.00 2.30 2.35 10.811.00 2.00 1.70 2.35 7.991.00 1.00 2.20 3.50 7.701.00 2.00 1.85 3.50 12.95
14.40
![Page 25: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/25.jpg)
1.00 4.00 3.00 1.20 14.40
180.861.00 1.00 4.30 3.50 15.051.00 1.00 0.30 3.50 1.051.00 1.00 2.20 0.30 0.661.00 1.00 3.15 2.35 7.401.00 3.00 3.15 3.50 33.081.00 1.00 3.00 3.50 10.501.00 1.00 1.30 3.50 4.551.00 1.00 1.00 2.10 2.101.00 1.00 3.35 3.50 11.731.00 1.00 3.30 3.50 11.551.00 2.00 3.00 2.10 12.601.00 4.00 0.70 2.10 5.881.00 1.00 2.70 3.50 9.451.00 1.00 0.90 2.10 1.891.00 1.00 5.25 3.50 18.381.00 1.00 5.00 3.50 17.501.00 1.00 5.00 3.50 17.50
![Page 26: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/26.jpg)
315.841.00 1.00 3.50 5.60 19.601.00 1.00 12.00 5.60 67.201.00 1.00 5.15 5.60 28.841.00 1.00 5.50 5.60 30.801.00 1.00 15.50 5.60 86.801.00 1.00 14.75 5.60 82.60
Plano de planta, donde se proyecta la elevación 2.
Elevación 2
![Page 27: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/27.jpg)
![Page 28: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/28.jpg)
![Page 29: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/29.jpg)
![Page 30: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/30.jpg)
HOJA DE METRADOS - ARQUITECTURA
UND.
m2
![Page 31: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/31.jpg)
m2
![Page 32: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/32.jpg)
![Page 33: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/33.jpg)
![Page 34: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/34.jpg)
m2
Plano de planta, donde se proyecta la elevación 2.
Elevación 2
![Page 35: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/35.jpg)
![Page 36: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/36.jpg)
![Page 37: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/37.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM
0606.01
![Page 38: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/38.jpg)
06.02
![Page 39: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/39.jpg)
![Page 40: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/40.jpg)
![Page 41: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/41.jpg)
![Page 42: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/42.jpg)
06.07
![Page 43: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/43.jpg)
![Page 44: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/44.jpg)
HOJA DE METRADOS - ARQUITECTURA
DESCRIPCCIÓN
REVOQUES Y ENLUCIDOSTARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
SS.HH MUJERES - LONGITUD TOTAL
Eje A4, entre AH y AI
Eje AI, entre A4 y A5
Eje A5, entre AH y AI
Eje AH, entre A5 y A4
SS.HH VARONES - LONGITUD TOTAL
Eje A3, entre AH y AI
Eje AI, entre A3 y A4
Eje A4, entre AH y AI
Eje AH, entre A3 y A4
SS.HH ACCESIBLE
Eje A2, entre AH y AI
Eje AI, entre A2 y A3
Eje A3, entre AH y AI
Eje AH, entre A2 y A3
![Page 45: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/45.jpg)
TARRAJEO DE MUERO INTERIOR Y EXTERIOR, E=1.5CM, C:A=1:5
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 1
Eje AA - AB
Eje AB - AC
Eje AB - AC
Eje AB - AC
Eje AC - AD
Eje AD - AE
Eje AE - AF
Eje AH - AI
Eje AI - AJ
Elevación frontal, Segundo nivel (Plano AAB-300) - elevación 1
Eje AA - AB
Eje AB - AC
Eje AC - AD
Eje AD - AE
Eje AE - AF
Eje AG - AH
![Page 46: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/46.jpg)
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 4
Eje A1 - A2
Eje A2 - A3
Eje A3 - A4
Eje A4 - A5
Eje B1 - B2
Elevación frontal, Segunda nivel (Plano AAB-300) - elevación 4
Eje A1 - A2
Eje A2 - A3
Eje A3 - A4
Eje A4 - A5
Elevación frontal (Plano AAB-300)
Elevación 3 - primer nivel
![Page 47: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/47.jpg)
Elevación 3 - segundo nivel
Elevación frontal (Plano AAB-300) - Primer nivel - Elevación 2
Eje A5 - Esquina AJ a puerta
Eje A5 - Puerta a esquina AI
Eje A5 - Encima de la puerta
Eje A5 entre AI - AH
Eje A5 entre BA - AE
Eje A5 entre AA - BA
Eje A5, Entrada a SUM - Laterales de puerta
Eje A5, Entrada a LOBBY - Laterales de puerta hasta
Eje B7 entre BB - BC
Eje B7 Entre BC - BD
Eje BB - BD entre B6 - B7
Eje BB - BD entre B5 - B6
Eje BD - entre B4 - B5
Eje BB - ente B4 - B5
Eje B3 - entre BB - mampara
Eje B4 - entre BB - mampara
Eje BA - entre B1 - B2
![Page 48: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/48.jpg)
Eje AH, entre ejes A1 y A2
Eje AI, entre ejes A1 y A3
Eje A2, entre AH y AI
Eje AH y eje AI, entre A4 y A5
Botadero
Botadero
Eje AH, entre A4 y A5
Eje AI, entre A4 y A6
Eje A3, entre AH y AI
![Page 49: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/49.jpg)
Eje AH, entre A2 y A3
Eje AI, entre A2 y A3
Eje AH, entre A1 y A2
Eje AI, entre A1 y A2
Eje A2, entre AH y AI
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS
DERRAME EN MAMPARAS
Pabellón A - Mampara 3
Pabellón A - Mampara 3
Pabellón B - Mampara 4
Pabellón B - Mampara 4
Pabellón B - Mampara 5
Pabellón B - Mampara 5
Pabellón B - Mampara 6
Pabellón B - Mampara 6
DERRAME EN PUERTAS
Pabellón A - Puerta 2
Pabellón A - Puerta 2
Pabellón A - Puerta 3
Pabellón A - Puerta 3
Pabellón A - Puerta 12
Pabellón A - Puerta 12
Pabellón A - Puerta 14
Pabellón A - Puerta 14
Pabellón A - Puerta 15
Pabellón A - Puerta 15
Pabellón A - Puerta 16
Pabellón A - Puerta 16
Pabellón B - Puerta 3
Pabellón B - Puerta 3
DERRAME DE VENTANAS
Pabellón A - ventana 39
Pabellón A - ventana 39
Pabellón A - ventana 40
Pabellón A - ventana 40
DERRAME MD
Pabellón A - MD28
Pabellón A - MD28
Pabellón A - MD29
Pabellón A - MD29
![Page 50: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/50.jpg)
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5
MURO DE BLOQUE HUECO DE CONCRETO E=20 CM. MEZCLA 1:5
ACERO DE REFUERZO HORIZONTAL ENTRE MUROS: fy=4,200 kg/cm2
![Page 51: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/51.jpg)
HOJA DE METRADOS - ARQUITECTURA
N° DE VECESDIMENSIONES
PARCIAL TOTALLARGO ANCHO ALTO
4.31
17.141.00 1.00 2.05 2.10 4.311.00 1.00 3.15 2.10 6.621.00 1.00 2.05 2.10 4.311.00 1.00 2.55 0.75 1.91
19.991.00 1.00 3.40 2.10 7.141.00 1.00 2.75 2.10 5.781.00 1.00 2.30 2.10 4.831.00 1.00 3.00 0.75 2.25
21.211.00 1.00 2.75 2.10 5.781.00 1.00 2.05 2.10 4.311.00 1.00 3.40 2.10 7.141.00 1.00 1.90 2.10 3.99
N° DE ELEMENTOS
![Page 52: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/52.jpg)
553.89
84.651.00 1.00 3.00 3.50 10.501.00 1.00 0.65 2.50 1.631.00 1.00 0.70 2.50 1.751.00 1.00 3.40 1.00 3.401.00 1.00 3.15 3.50 11.031.00 1.00 3.15 3.50 11.031.00 1.00 3.10 3.50 10.851.00 1.00 3.15 3.50 11.031.00 1.00 6.70 3.50 23.45
18.351.00 1.00 3.00 1.00 3.001.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 3.15 1.00 3.151.00 1.00 2.75 1.00 2.75
![Page 53: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/53.jpg)
60.201.00 1.00 3.00 3.50 10.501.00 1.00 3.15 3.50 11.031.00 1.00 3.15 3.50 11.031.00 1.00 3.00 3.50 10.501.00 1.00 4.90 3.50 17.15
14.761.00 1.00 3.00 1.20 3.601.00 1.00 3.15 1.20 3.781.00 1.00 3.15 1.20 3.781.00 1.00 3.00 1.20 3.60
39.451.00 2.00 2.30 2.35 10.811.00 2.00 1.70 2.35 7.991.00 1.00 2.20 3.50 7.70
![Page 54: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/54.jpg)
1.00 2.00 1.85 3.50 12.95
14.401.00 4.00 3.00 1.20 14.40
180.861.00 1.00 4.30 3.50 15.051.00 1.00 0.30 3.50 1.051.00 1.00 2.20 0.30 0.661.00 1.00 3.15 2.35 7.401.00 3.00 3.15 3.50 33.081.00 1.00 3.00 3.50 10.501.00 1.00 1.30 3.50 4.551.00 1.00 1.00 2.10 2.101.00 1.00 3.35 3.50 11.731.00 1.00 3.30 3.50 11.551.00 2.00 3.00 2.10 12.601.00 4.00 0.70 2.10 5.881.00 1.00 2.70 3.50 9.451.00 1.00 0.90 2.10 1.891.00 1.00 5.25 3.50 18.381.00 1.00 5.00 3.50 17.501.00 1.00 5.00 3.50 17.50
![Page 55: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/55.jpg)
141.231.00 1.00 3.30 3.50 11.551.00 1.00 3.00 3.50 10.501.00 1.00 2.50 3.50 8.751.00 2.00 2.55 3.50 17.851.00 2.00 2.05 3.50 14.351.00 1.00 0.45 3.50 1.581.00 1.00 3.00 3.50 10.501.00 1.00 2.75 3.50 9.631.00 1.00 3.40 3.50 11.90
Plano de planta, donde se proyecta la elevación 2.
Elevación 2
![Page 56: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/56.jpg)
1.00 1.00 1.90 3.50 6.651.00 1.00 2.05 3.50 7.171.00 1.00 3.30 3.50 11.551.00 1.00 3.00 3.50 10.501.00 1.00 2.50 3.50 8.75
178.96
61.261.00 2.00 1.80 3.602.00 2.00 3.05 12.201.00 2.00 3.15 6.302.00 2.00 3.05 12.201.00 2.00 2.98 5.952.00 2.00 3.05 12.201.00 1.00 2.71 2.712.00 1.00 3.05 6.10
93.851.00 4.00 1.10 4.402.00 4.00 2.20 17.601.00 1.00 0.75 0.752.00 1.00 2.10 4.201.00 5.00 0.75 3.752.00 5.00 1.80 18.001.00 1.00 2.20 2.202.00 1.00 2.10 4.201.00 3.00 1.80 5.402.00 3.00 2.10 12.601.00 2.00 1.80 3.602.00 2.00 3.05 12.201.00 1.00 0.75 0.752.00 1.00 2.10 4.20
9.051.00 2.00 1.00 2.002.00 2.00 0.55 2.201.00 1.00 3.15 3.152.00 1.00 0.85 1.70
14.801.00 2.00 2.30 4.602.00 2.00 0.85 3.401.00 2.00 1.70 3.402.00 2.00 0.85 3.40
![Page 57: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/57.jpg)
![Page 58: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/58.jpg)
HOJA DE METRADOS - ARQUITECTURA
UND.
m2
![Page 59: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/59.jpg)
m2
![Page 60: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/60.jpg)
![Page 61: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/61.jpg)
![Page 62: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/62.jpg)
Plano de planta, donde se proyecta la elevación 2.
Elevación 2
![Page 63: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/63.jpg)
m
![Page 64: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/64.jpg)
![Page 65: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/65.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM
07.0007.01
![Page 66: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/66.jpg)
HOJA DE METRADOS - ARQUITECTURA
DESCRIPCCIÓN
CIELOS RASOSCIELO RASO CON MEZCLA CEMENTO ARENA 1:5,E=10CM
PABELLON B
DEPOSITO
![Page 67: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/67.jpg)
![Page 68: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/68.jpg)
HOJA DE METRADOS - ARQUITECTURA
N° DE VECESDIMENSIONES
PARCIAL TOTALLARGO ANCHO ALTO
121.75
AREA CAD AREA CAD AREA CAD AREA CAD AREA CAD 90.28
AREA CAD AREA CAD AREA CAD AREA CAD AREA CAD 31.47
N° DE ELEMENTOS
![Page 69: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/69.jpg)
HOJA DE METRADOS - ARQUITECTURA
UND.
m2
![Page 70: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/70.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
08 PISO Y PAVIMENTOS
08.01. PISO DE PORCELANATO 60x60 CM ANTIDESLIZANTE COLOR GRIS
PABELLON B AREA CAD AREA CAD
N° DE ELEMENTOS
![Page 71: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/71.jpg)
TERRAZA AREA CAD AREA CAD
LOBBY AREA CAD AREA CAD
![Page 72: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/72.jpg)
LOBBY ENTRE SS.HH ACCESIBLE Y DEPOSITO AREA CAD AREA CAD
![Page 73: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/73.jpg)
LOBBY ENTRE SS.HH HOMBRES Y SS.HH MUJERES AREA CAD AREA CAD
08.02 PISO DE PORCELANATO 30X30 CM ANTIDESLIZANTE COLOR GRIS
DEPOSITO AREA CAD AREA CAD
![Page 74: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/74.jpg)
SS.HH MUJERES AREA CAD AREA CAD
![Page 75: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/75.jpg)
SS.HH HOMBRES AREA CAD AREA CAD
SS.HH ACCESIBLE AREA CAD AREA CAD
![Page 76: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/76.jpg)
DEPOSITO AREA CAD AREA CAD
![Page 77: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/77.jpg)
BOTADERO AREA CAD AREA CAD
![Page 78: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/78.jpg)
NE PISO MACHIMBRADO DE MADERA ESTORAQUE 1" X 4"
SUM AREA CAD AREA CAD
AULA DE MUSICA AREA CAD AREA CAD
![Page 79: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/79.jpg)
08.12 CONTRAPISO
PABELLON B AREA CAD AREA CAD
![Page 80: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/80.jpg)
TERRAZA AREA CAD AREA CAD
![Page 81: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/81.jpg)
LOBBY AREA CAD AREA CAD
LOBBY ENTRE SS.HH ACCESIBLE Y DEPOSITO AREA CAD AREA CAD
![Page 82: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/82.jpg)
LOBBY ENTRE SS.HH HOMBRES Y SS.HH MUJERES AREA CAD AREA CAD
![Page 83: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/83.jpg)
DEPOSITO AREA CAD AREA CAD
SS.HH MUJERES AREA CAD AREA CAD
![Page 84: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/84.jpg)
SS.HH HOMBRES AREA CAD AREA CAD
![Page 85: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/85.jpg)
SS.HH ACCESIBLE AREA CAD AREA CAD
DEPOSITO AREA CAD AREA CAD
![Page 86: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/86.jpg)
BOTADERO AREA CAD AREA CAD
![Page 87: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/87.jpg)
SUM AREA CAD AREA CAD
![Page 88: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/88.jpg)
AULA DE MUSICA AREA CAD AREA CAD
![Page 89: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/89.jpg)
MURO DE BLOQUE HUECO DE CONCRETO E=15 CM. MEZCLA 1:5
MURO DE BLOQUE HUECO DE CONCRETO E=20 CM. MEZCLA 1:5
![Page 90: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/90.jpg)
ACERO DE REFUERZO HORIZONTAL ENTRE MUROS: fy=4,200 kg/cm2
![Page 91: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/91.jpg)
HOJA DE METRADOS - ARQUITECTURADIMENSIONES
PARCIAL TOTAL UND.LARGO ANCHO ALTO
212.65 m2
AREA CAD AREA CAD AREA CAD 90.28
![Page 92: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/92.jpg)
AREA CAD AREA CAD AREA CAD 57.84
AREA CAD AREA CAD AREA CAD 54.57
![Page 93: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/93.jpg)
AREA CAD AREA CAD AREA CAD 7.62
![Page 94: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/94.jpg)
AREA CAD AREA CAD AREA CAD 2.34
77.62 m2
AREA CAD AREA CAD AREA CAD 31.47
![Page 95: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/95.jpg)
AREA CAD AREA CAD AREA CAD 11.31
![Page 96: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/96.jpg)
AREA CAD AREA CAD AREA CAD 12.30
AREA CAD AREA CAD AREA CAD 6.90
![Page 97: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/97.jpg)
AREA CAD AREA CAD AREA CAD 13.96
![Page 98: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/98.jpg)
AREA CAD AREA CAD AREA CAD 1.68
![Page 99: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/99.jpg)
419.90 m2
AREA CAD AREA CAD AREA CAD 303.40
AREA CAD AREA CAD AREA CAD 116.50
![Page 100: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/100.jpg)
710.17 m2
AREA CAD AREA CAD AREA CAD 90.28
![Page 101: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/101.jpg)
AREA CAD AREA CAD AREA CAD 57.84
![Page 102: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/102.jpg)
AREA CAD AREA CAD AREA CAD 54.57
AREA CAD AREA CAD AREA CAD 7.62
![Page 103: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/103.jpg)
AREA CAD AREA CAD AREA CAD 2.34
![Page 104: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/104.jpg)
AREA CAD AREA CAD AREA CAD 31.47
AREA CAD AREA CAD AREA CAD 11.31
![Page 105: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/105.jpg)
AREA CAD AREA CAD AREA CAD 12.30
![Page 106: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/106.jpg)
AREA CAD AREA CAD AREA CAD 6.90
AREA CAD AREA CAD AREA CAD 13.96
![Page 107: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/107.jpg)
AREA CAD AREA CAD AREA CAD 1.68
![Page 108: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/108.jpg)
AREA CAD AREA CAD AREA CAD 303.40
![Page 109: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/109.jpg)
AREA CAD AREA CAD AREA CAD 116.50
![Page 110: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/110.jpg)
![Page 111: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/111.jpg)
![Page 112: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/112.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN
09 ZOCALOS Y CONTRAZOCALOS
09.01. ZOCALO DE BALDOSA CERAMICO 30X30 cm
SS-HH ACCESIBLE1.001.001.00
N° DE ELEMENTOS
![Page 113: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/113.jpg)
SS-HH VARONES1.001.001.001.001.001.00
![Page 114: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/114.jpg)
SS-HH MUJERES1.001.001.001.001.001.00
BOTADERO1.001.001.00
![Page 115: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/115.jpg)
1.00
09.03. ZOCALO DE MADERA RODON 3/4" h VARIABLE
AJ ENTRE A1-A2 1.00
![Page 116: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/116.jpg)
AJ ENTRE A2-A3 1.00
AJ ENTRE A3-A4 1.00
![Page 117: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/117.jpg)
AJ ENTRE A4-A51.00
![Page 118: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/118.jpg)
AI ENTRE A1-A21.00
AI ENTRE A2-A31.00
![Page 119: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/119.jpg)
AI ENTRE A3-A41.001.00
![Page 120: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/120.jpg)
AI ENTRE A4-A51.00
A1 ENTRE AI -AJ 1.00
![Page 121: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/121.jpg)
A5 ENTRE AI -AJ 1.001.00
09.05. CONTRAZOCALO DE PORCELANATO COLOR GRIS, H=15 cm
EJE AA ENTRE INICIO -A1 1.00
![Page 122: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/122.jpg)
EJE AA ENTRE A1-A5 1.00
EJE AA ENTRE B1-B7 1.00
![Page 123: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/123.jpg)
EJE A1 ENTRE AA-AD 1.00
EJE A1 ENTRE AD-AH 1.00
![Page 124: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/124.jpg)
EJE A1 ENTRE AH-AI 1.00
EJE A5 ENTRE AA-AF 1.001.00
![Page 125: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/125.jpg)
EJE A5 ENTRE AF-AI 1.001.00
EJE A5 ENTRE AI-AJ1.00
EJE AJ ENTRE INICIO -A11.00
![Page 126: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/126.jpg)
EJE AJ ENTRE A1-A3EJE AJ ENTRE A3-A4 1EJE AJ ENTRE A4-A5 1
1
EJE B1 ENTRE BA-BD 1
![Page 127: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/127.jpg)
EJE BD ENTRE B1-B2 1
EJE BD ENTRE B2-B6 11
![Page 128: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/128.jpg)
EJE BD ENTRE B6-B7 1
EJE B7 ENTRE BB-BD 1
![Page 129: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/129.jpg)
EJE B7 ENTRE BA-BB 1
DEPOSITO 1111111
![Page 130: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/130.jpg)
TERRAZA 11111111
![Page 131: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/131.jpg)
AULAS ARTES 1111111
![Page 132: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/132.jpg)
LOBBY 111111111111111
09.06 CONTRAZOCALO DE MADERA, H=10cm
SLUM 1EJE AF ENTRE A1-A5 1
![Page 133: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/133.jpg)
EJE A5 ENTRE AA-AF 111
![Page 134: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/134.jpg)
EJE AA ENTRE A1-A5 1
EJE A1 ENTRE AA-AF 111
![Page 135: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/135.jpg)
![Page 136: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/136.jpg)
HOJA DE METRADOS - ARQUITECTURA
N° DE VECESDIMENSIONES
PARCIAL TOTAL UND.LARGO ANCHO ALTO
75.83 m2
1.00 2.74 2.11 5.782.00 1.78 2.11 7.511.00 3.81 2.11 8.04
![Page 137: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/137.jpg)
1.00 3.88 2.11 8.191.00 0.68 2.11 1.431.00 2.07 2.11 4.371.00 3.20 2.11 6.751.00 3.20 0.75 2.402.00 0.10 1.25 0.25
![Page 138: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/138.jpg)
1.00 3.88 2.11 8.191.00 3.00 2.11 6.331.00 3.00 0.75 2.251.00 0.10 1.25 0.131.00 2.07 2.11 4.371.00 0.68 2.11 1.43
1.00 1.20 2.11 2.531.00 1.86 2.11 3.921.00 1.86 0.75 1.40
![Page 139: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/139.jpg)
1.00 0.45 1.25 0.56
18.42 m2
1.00 0.65 0.60 0.39
![Page 140: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/140.jpg)
1.00 0.90 0.60 0.54
1.00 0.85 0.60 0.51
![Page 141: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/141.jpg)
1.00 0.70 0.60 0.42
![Page 142: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/142.jpg)
1.00 3.85 0.60 2.31
1.00 4.00 0.60 2.40
![Page 143: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/143.jpg)
1.00 2.50 0.60 1.501.00 0.40 0.60 0.24
![Page 144: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/144.jpg)
1.00 3.75 0.60 2.25
1.00 7.65 0.60 4.59
![Page 145: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/145.jpg)
1.00 0.80 0.60 0.481.00 4.65 0.60 2.79
41.30 m2
1.00 0.65 0.15 0.10
![Page 146: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/146.jpg)
1.00 16.00 0.15 2.40
1.00 17.25 0.15 2.59
![Page 147: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/147.jpg)
2.00 5.10 0.15 1.53
1.00 12.00 0.15 1.80
![Page 148: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/148.jpg)
1.00 12.00 0.15 1.80
1.00 17.10 0.15 2.571.00 0.95 0.15 0.14
![Page 149: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/149.jpg)
1.00 17.10 0.15 2.571.00 0.95 0.15 0.14
1.00 4.90 0.15 0.74
1.00 0.65 0.15 0.10
![Page 150: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/150.jpg)
1 6.5 0.15 0.981 2.9 0.15 0.441 4.45 0.15 0.67
1 7.7 0.15 1.16
![Page 151: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/151.jpg)
1 1.8 0.15 0.27
1 4.85 0.15 0.731 1.15 0.15 0.17
![Page 152: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/152.jpg)
1 4 0.15 0.60
1 10.6 0.15 1.59
![Page 153: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/153.jpg)
1 6.75 0.15 1.01
1 5.6 0.15 0.841 7.2 0.15 1.081 1.4 0.15 0.211 5.75 0.15 0.861 0.3 0.15 0.051 0.3 0.15 0.051 0.35 0.15 0.05
![Page 154: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/154.jpg)
1 6.45 0.15 0.971 10.7 0.15 1.601 0.6 0.15 0.091 0.45 0.15 0.071 1.5 0.15 0.221 1.55 0.15 0.231 4.9 0.15 0.741 2.2 0.15 0.33
![Page 155: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/155.jpg)
1 5.55 0.15 0.831 1.2 0.15 0.181 1.55 0.15 0.231 4.85 0.15 0.731 7.65 0.15 1.151 4.85 0.15 0.731 4.55 0.15 0.68
![Page 156: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/156.jpg)
2 0.3 0.15 0.091 3.1 0.15 0.461 0.85 0.15 0.131 0.45 0.15 0.071 0.85 0.15 0.131 5.45 0.15 0.821 2.75 0.15 0.411 0.45 0.15 0.071 0.35 0.15 0.051 4 0.15 0.601 3.85 0.15 0.582 0.3 0.15 0.091 5.5 0.15 0.831 0.85 0.15 0.131 5.8 0.15 0.87
9.17 m2
1 5.15 0.15 0.7731 5.5 0.15 0.825
![Page 157: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/157.jpg)
1 16.45 0.15 2.46751 0.95 0.15 0.14251 0.35 0.15 0.0525
![Page 158: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/158.jpg)
1 14.7 0.15 2.205
1 4.45 0.15 0.66751 12.85 0.15 1.92752 0.35 0.15 0.105
![Page 159: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/159.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM ITEM DESCRIPCCIÓN N° DE VECES
10 10. COBERTURAS
09.01. 10.01 TEJA PLANA DE CONCRETO 20X40 CM COLOR LADRILLO
ENTRE A1-A5 y AA-AF 1.00 1.001.00 1.00
EJE A1-A5 , AG-AH 1.00 1.00
N° DE ELEMENTOS
![Page 160: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/160.jpg)
EJE A1-A5 , AH-AI 1.00 1.001.00 1.00
![Page 161: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/161.jpg)
EJE A1-A5 , AI-AJ 1.00 1.00
DEPOSITO 1.00 1.00
![Page 162: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/162.jpg)
TERRAZA 1.00 1.00
![Page 163: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/163.jpg)
AULA DE ARTES 1.00 1.00
10.04 COBERTURA C/ PANEL METALICO GALVANIZADO Y ZINCADO ,TIPO ACANALADO
EJE AH-AI Y A2-A4 1 1
![Page 164: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/164.jpg)
EJE AA-AF Y A1-A5 1.00 1.00
1.00 1.00
1.00 1.00
![Page 165: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/165.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
547.94 m2
3.75 15.50 58.133.75 15.50 58.13
3.85 15.95 61.41
![Page 166: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/166.jpg)
4.05 5.90 23.904.05 5.95 24.10
![Page 167: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/167.jpg)
7.90 15.95 126.01
37.53 37.53
![Page 168: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/168.jpg)
61.98 61.98
![Page 169: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/169.jpg)
96.78 96.78
207.39 m2
4.635 4.28 19.8378
![Page 170: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/170.jpg)
3.85 15.5 59.6754.25 15.5 65.875
4 15.5 62
![Page 171: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/171.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
12.00 CARPINTERIA DE MADERA Y METÁLICA
12.01 CARPINTERIA DE MADERA
12.01.04 PERGOLAS DE MADERA
VIGA 3" X 6" MADERA TORNILLO 1 241 11 11 11 11 11 11 11 11 11 11 11 11 11 51 11 11 11
N° DE ELEMENTOS
![Page 172: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/172.jpg)
12.01.05 ESTRUCTURA DE MADERA , SOL Y SOMBRA
MADERA TORNILLO 1.5"X3" 1.00 120.001.00 1.001.00 48.001.00 1.00
![Page 173: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/173.jpg)
1.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 28.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 13.001.00 1.001.00 1.001.00 1.001.00 1.00
![Page 174: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/174.jpg)
1.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.00
NE PUERTA TABLERO AGLOMERADO MELAMINICO
SS-HH MUJERES
P-12 1 3
HUBER:no existe item
![Page 175: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/175.jpg)
SS-HH VARONES
P-12 1.00 2
12.02 CARPINTERIA METALICA Y HERRERIA
12.02.04 PUERTA DE HOJA METALICA CONTRAPLACADASUM
![Page 176: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/176.jpg)
P-15 1.00 3.00
P-16 1.00 2.00
![Page 177: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/177.jpg)
BOTADEROP-3 1.00 1.00
P-2 1.00 4.00
![Page 178: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/178.jpg)
P-4 1.00 2.00
![Page 179: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/179.jpg)
P-14 1.00 1.00
![Page 180: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/180.jpg)
12.02.07 MAMPARA DE ALUMINIO SEGÚN DISEÑO P/VIDRIO TEMPLADO ESPESOR 6MM, IC. SUMIN E INST.
MAMPARA 3 2.00 4.002.00 4.002.00 4.002.00 4.00
![Page 181: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/181.jpg)
MAMPARA 5 2.00 8.002.00 8.002.00 8.002.00 8.002.00 2.002.00 2.00
MAMPARA 4 2.00 8.002.00 2.002.00 4.002.00 4.002.00 2.002.00 2.00
![Page 182: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/182.jpg)
MAMPARA 6 1.00 4.001.00 4.001.00 2.001.00 2.001.00 1.001.00 1.00
![Page 183: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/183.jpg)
12.02.14 PASAMANOS DE FºGº DE 2 ", CON ANCLAJE CADA METRO
1.00 3.001.00 4.001.00 4.00
![Page 184: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/184.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
m2
32.52 m2
0.15 3.70 13.320.15 6.30 0.950.15 5.82 0.870.15 4.65 0.700.15 3.70 0.560.15 1.92 0.290.15 3.27 0.490.15 4.03 0.600.15 5.59 0.840.15 4.36 0.650.15 2.25 0.340.15 2.51 0.380.15 1.08 0.160.15 4.97 0.750.15 6.20 4.650.15 4.18 0.630.15 1.68 0.250.15 3.70 6.10
![Page 185: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/185.jpg)
36.63 m2
0.04 4.30 20.640.04 3.70 0.150.04 3.30 6.340.04 3.14 0.13
![Page 186: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/186.jpg)
0.04 2.95 0.120.04 2.90 0.120.04 2.76 0.110.04 2.57 0.100.04 2.37 0.090.04 2.18 0.090.04 2.02 0.080.04 1.83 0.070.04 1.63 0.070.04 3.80 4.260.04 3.65 0.150.04 3.46 0.140.04 3.27 0.130.04 3.07 0.120.04 2.88 0.120.04 2.69 0.110.04 2.14 0.090.04 1.94 0.080.04 1.75 0.070.04 1.56 0.060.04 1.37 0.050.04 1.18 0.050.04 0.99 0.040.04 0.79 0.030.04 0.60 0.020.04 0.41 0.020.04 0.22 0.010.04 3.00 1.560.04 2.72 0.110.04 2.53 0.100.04 2.34 0.090.04 2.14 0.09
![Page 187: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/187.jpg)
0.04 1.95 0.080.04 1.76 0.070.04 1.57 0.060.04 1.38 0.060.04 1.19 0.050.04 0.99 0.040.04 0.80 0.030.04 0.61 0.020.04 0.42 0.020.04 0.23 0.010.04 2.32 0.090.04 2.13 0.090.04 1.94 0.080.04 1.74 0.070.04 1.55 0.060.04 1.36 0.050.04 1.17 0.050.04 0.98 0.040.04 0.79 0.030.04 0.59 0.020.04 0.40 0.020.04 0.21 0.01
6.32 m2
0.75 1.5 3.375
![Page 188: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/188.jpg)
0.7 2.1 2.94
m2
38.12 m2
![Page 189: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/189.jpg)
1.80 2.10 11.34
1.80 2.10 7.56
![Page 190: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/190.jpg)
0.75 2.10 1.575
1.10 2.10 9.24
![Page 191: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/191.jpg)
0.90 2.10 3.78
![Page 192: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/192.jpg)
2.20 2.10 4.62
![Page 193: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/193.jpg)
10.03 m2
0.05 1.90 0.760.05 0.45 0.180.05 0.90 0.360.05 0.45 0.18
![Page 194: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/194.jpg)
0.05 0.85 0.680.05 1.95 1.560.05 0.60 0.480.05 0.80 0.640.10 0.85 0.340.10 1.95 0.78
0.05 0.60 0.480.05 1.80 0.360.05 1.95 0.780.05 0.85 0.340.10 0.85 0.340.10 1.95 0.78
![Page 195: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/195.jpg)
0.05 0.85 0.170.05 0.80 0.160.05 1.95 0.200.05 1.80 0.180.10 0.85 0.090.10 1.95 0.20
![Page 196: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/196.jpg)
17.30 ml
2.70 8.101.90 7.600.40 1.60
![Page 197: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/197.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
13. CERRAJERIA
13.01.00 BISAGRA ALUM. DE 4" X 4" PESADA EN PUERTA
SUMP-15 3 8
N° DE ELEMENTOS
![Page 198: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/198.jpg)
P-16 2 8
BOTADEROP-3 1 4
![Page 199: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/199.jpg)
P-2 4 4
![Page 200: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/200.jpg)
P-4 2 4
![Page 201: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/201.jpg)
P-14
1 8
![Page 202: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/202.jpg)
13.07 BISAGRA ALUM. DE 2 1/2" X 2 1/2" PESADA EN PUERTA
SS-HH MUJERES 3 2P-12
SS-HH VARONES 2 2P-12
![Page 203: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/203.jpg)
13.02 CERRADURA DE MANNIJA TIPO PALANCA
SUMP-15 3
![Page 204: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/204.jpg)
P-16 2
BOTADEROP-3 1
![Page 205: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/205.jpg)
P-2 4
![Page 206: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/206.jpg)
P-4 2
![Page 207: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/207.jpg)
P-14 1
13.04 CERROJO "SAPITO" PARA PUERTAS EN CUBICULOS DE SS.HH
SS-HH MUJERESP-12 3 2
![Page 208: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/208.jpg)
SS-HH VARONESP-12 2 1
13.05 TIRADOR DE BRONCE PARA PUERTAS
![Page 209: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/209.jpg)
MAMPARA 3 2 2
MAMPARA 5
2 2
![Page 210: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/210.jpg)
2 2MAMPARA 4
![Page 211: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/211.jpg)
1 2MAMPARA 6
![Page 212: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/212.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
76.00 und
24
![Page 213: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/213.jpg)
16
4
![Page 214: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/214.jpg)
16
![Page 215: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/215.jpg)
8
![Page 216: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/216.jpg)
8
![Page 217: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/217.jpg)
10.00 und
6
4
![Page 218: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/218.jpg)
19.00 und
2 6
![Page 219: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/219.jpg)
2 4
1 1
![Page 220: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/220.jpg)
1 4
![Page 221: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/221.jpg)
1 2
![Page 222: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/222.jpg)
2 2
8.00 und
6
![Page 223: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/223.jpg)
2
14.00 und
![Page 224: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/224.jpg)
4
4
![Page 225: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/225.jpg)
4
![Page 226: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/226.jpg)
2
![Page 227: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/227.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
14 VIDRIOS, CRISTALES Y SIMILARES
14.01 VIDRIO TEMPLADO E=6MM, INC. INSTALACIÓN
1.00 3.00
MAMPARA 3
2.00 2.00
N° DE ELEMENTOS
![Page 228: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/228.jpg)
2.00 1.002.00 2.002.00 2.00
MAMPARA 5
2.00 2.002.00 2.002.00 2.002.00 2.00
![Page 229: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/229.jpg)
MAMPARA 4
2.00 2.002.00 2.002.00 1.002.00 2.00
MAMPARA 6
![Page 230: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/230.jpg)
1.00 1.001.00 1.001.00 1.001.00 2.00
![Page 231: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/231.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
59.08 m2
1.74 0.89 4.65
0.45 0.90 1.62
![Page 232: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/232.jpg)
1.85 0.90 3.330.45 1.90 3.420.90 1.90 6.84
0.60 0.85 2.040.80 0.85 2.720.60 1.95 4.680.80 1.95 6.24
![Page 233: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/233.jpg)
0.60 0.85 2.040.60 1.95 4.681.80 0.85 3.060.90 1.85 6.66
![Page 234: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/234.jpg)
0.80 0.85 0.681.80 0.85 1.530.80 1.95 1.560.90 1.85 3.33
![Page 235: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/235.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
15 PINTURA
15.01 PINTURA LATEX 02 MANOS EN CIELO RASO Y VIGAS INT/EXT
PABELLON B AREA CAD AREA CAD
N° DE ELEMENTOS
![Page 236: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/236.jpg)
DEPOSITO AREA CAD AREA CAD
15.02 PINTURA LATEX 02 MANOS EN MUROS Y COLUMNAS
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 1
Eje AA - AB 1.00 1.00Eje AB - AC 1.00 1.00Eje AB - AC 1.00 1.00Eje AB - AC 1.00 1.00Eje AC - AD 1.00 1.00Eje AD - AE 1.00 1.00
![Page 237: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/237.jpg)
Eje AE - AF 1.00 1.00Eje AH - AI 1.00 1.00Eje AI - AJ 1.00 1.00
Elevación frontal, Segundo nivel (Plano AAB-300) - elevación 1
Eje AA - AB 1.00 1.00Eje AB - AC 1.00 1.00Eje AC - AD 1.00 1.00Eje AD - AE 1.00 1.00Eje AE - AF 1.00 1.00Eje AG - AH 1.00 1.00
![Page 238: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/238.jpg)
Elevación frontal, Primer nivel (Plano AAB-300) - elevación 4
Eje A1 - A2 1.00 1.00Eje A2 - A3 1.00 1.00Eje A3 - A4 1.00 1.00Eje A4 - A5 1.00 1.00Eje B1 - B2 1.00 1.00
Elevación frontal, Segunda nivel (Plano AAB-300) - elevación 4
Eje A1 - A2 1.00 1.00Eje A2 - A3 1.00 1.00Eje A3 - A4 1.00 1.00Eje A4 - A5 1.00 1.00
![Page 239: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/239.jpg)
Elevación frontal (Plano AAB-300)
Elevación 3 - primer nivel 1.00 2.001.00 2.001.00 1.001.00 2.00
Elevación 3 - segundo nivel
1.00 4.00
![Page 240: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/240.jpg)
Elevación frontal (Plano AAB-300) - Primer nivel - Elevación 2
Eje A5 - Esquina AJ a puerta 1.00 1.00Eje A5 - Puerta a esquina AI 1.00 1.00Eje A5 - Encima de la puerta 1.00 1.00Eje A5 entre AI - AH 1.00 1.00Eje A5 entre BA - AE 1.00 3.00Eje A5 entre AA - BA 1.00 1.00Eje A5, Entrada a SUM - Laterales de puerta 1.00 1.00Eje A5, Entrada a LOBBY - Laterales de puerta hasta 1.00 1.00Eje B7 entre BB - BC 1.00 1.00Eje B7 Entre BC - BD 1.00 1.00Eje BB - BD entre B6 - B7 1.00 2.00Eje BB - BD entre B5 - B6 1.00 4.00Eje BD - entre B4 - B5 1.00 1.00Eje BB - ente B4 - B5 1.00 1.00Eje B3 - entre BB - mampara 1.00 1.00Eje B4 - entre BB - mampara 1.00 1.00Eje BA - entre B1 - B2 1.00 1.00
![Page 241: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/241.jpg)
![Page 242: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/242.jpg)
Eje AH, entre ejes A1 y A2 1.00 1.00Eje AI, entre ejes A1 y A3 1.00 1.00Eje A2, entre AH y AI 1.00 1.00Eje AH y eje AI, entre A4 y A5 1.00 2.00Botadero 1.00 2.00Botadero 1.00 1.00Eje AH, entre A4 y A5 1.00 1.00Eje AI, entre A4 y A6 1.00 1.00Eje A3, entre AH y AI 1.00 1.00Eje AH, entre A2 y A3 1.00 1.00Eje AI, entre A2 y A3 1.00 1.00Eje AH, entre A1 y A2 1.00 1.00Eje AI, entre A1 y A2 1.00 1.00Eje A2, entre AH y AI 1.00 1.00
DERRAME EN MAMPARAS
Pabellón A - Mampara 3 1.00 2.00Pabellón A - Mampara 3 2.00 2.00Pabellón B - Mampara 4 1.00 2.00Pabellón B - Mampara 4 2.00 2.00Pabellón B - Mampara 5 1.00 2.00Pabellón B - Mampara 5 2.00 2.00Pabellón B - Mampara 6 1.00 1.00Pabellón B - Mampara 6 2.00 1.00
![Page 243: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/243.jpg)
DERRAME EN PUERTAS
Pabellón A - Puerta 2 1.00 4.00Pabellón A - Puerta 2 2.00 4.00Pabellón A - Puerta 3 1.00 1.00Pabellón A - Puerta 3 2.00 1.00Pabellón A - Puerta 12 1.00 5.00Pabellón A - Puerta 12 2.00 5.00Pabellón A - Puerta 14 1.00 1.00Pabellón A - Puerta 14 2.00 1.00Pabellón A - Puerta 15 1.00 3.00Pabellón A - Puerta 15 2.00 3.00Pabellón A - Puerta 16 1.00 2.00Pabellón A - Puerta 16 2.00 2.00Pabellón B - Puerta 3 1.00 1.00Pabellón B - Puerta 3 2.00 1.00
DERRAME DE VENTANAS
Pabellón A - ventana 39 1.00 2.00Pabellón A - ventana 39 2.00 2.00Pabellón A - ventana 40 1.00 1.00Pabellón A - ventana 40 2.00 1.00
DERRAME MD
Pabellón A - MD28 1.00 2.00Pabellón A - MD28 2.00 2.00Pabellón A - MD29 1.00 2.00Pabellón A - MD29 2.00 2.00
15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA
![Page 244: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/244.jpg)
VIGA 3" X 6" MADERA TORNILLO 1 241 11 11 11 11 11 11 11 11 11 11 11 11 11 51 11 11 11
![Page 245: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/245.jpg)
MADERA TORNILLO 1.5"X3" 1.00 120.001.00 1.001.00 48.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 28.001.00 1.001.00 1.001.00 1.00
![Page 246: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/246.jpg)
1.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 13.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.00
![Page 247: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/247.jpg)
1.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.001.00 1.00
SS-HH MUJERES
P-12 1 3
SS-HH VARONES
P-12 1.00 2
![Page 248: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/248.jpg)
![Page 249: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/249.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
121.75 m2
AREA CAD AREA CAD AREA CAD 90.28
![Page 250: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/250.jpg)
AREA CAD AREA CAD AREA CAD 31.47
732.85 m2
84.653.00 3.50 10.500.65 2.50 1.630.70 2.50 1.753.40 1.00 3.403.15 3.50 11.033.15 3.50 11.03
![Page 251: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/251.jpg)
3.10 3.50 10.853.15 3.50 11.036.70 3.50 23.45
18.353.00 1.00 3.003.15 1.00 3.153.15 1.00 3.153.15 1.00 3.153.15 1.00 3.152.75 1.00 2.75
![Page 252: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/252.jpg)
60.203.00 3.50 10.503.15 3.50 11.033.15 3.50 11.033.00 3.50 10.504.90 3.50 17.15
14.763.00 1.20 3.603.15 1.20 3.783.15 1.20 3.783.00 1.20 3.60
![Page 253: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/253.jpg)
39.452.30 2.35 10.811.70 2.35 7.992.20 3.50 7.701.85 3.50 12.95
14.403.00 1.20 14.40
![Page 254: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/254.jpg)
180.864.30 3.50 15.050.30 3.50 1.052.20 0.30 0.663.15 2.35 7.403.15 3.50 33.083.00 3.50 10.501.30 3.50 4.551.00 2.10 2.103.35 3.50 11.733.30 3.50 11.553.00 2.10 12.600.70 2.10 5.882.70 3.50 9.450.90 2.10 1.895.25 3.50 18.385.00 3.50 17.505.00 3.50 17.50
![Page 255: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/255.jpg)
Plano de planta, donde se proyecta la elevación 2.
Elevación 2
![Page 256: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/256.jpg)
141.233.30 3.50 11.553.00 3.50 10.502.50 3.50 8.752.55 3.50 17.852.05 3.50 14.350.45 3.50 1.583.00 3.50 10.502.75 3.50 9.633.40 3.50 11.901.90 3.50 6.652.05 3.50 7.173.30 3.50 11.553.00 3.50 10.502.50 3.50 8.75
61.261.80 3.603.05 12.203.15 6.303.05 12.202.98 5.953.05 12.202.71 2.713.05 6.10
![Page 257: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/257.jpg)
93.851.10 4.402.20 17.600.75 0.752.10 4.200.75 3.751.80 18.002.20 2.202.10 4.201.80 5.402.10 12.601.80 3.603.05 12.200.75 0.752.10 4.20
9.051.00 2.000.55 2.203.15 3.150.85 1.70
14.802.30 4.600.85 3.401.70 3.400.85 3.40
75.46 m2
![Page 258: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/258.jpg)
0.15 3.70 13.320.15 6.30 0.950.15 5.82 0.870.15 4.65 0.700.15 3.70 0.560.15 1.92 0.290.15 3.27 0.490.15 4.03 0.600.15 5.59 0.840.15 4.36 0.650.15 2.25 0.340.15 2.51 0.380.15 1.08 0.160.15 4.97 0.750.15 6.20 4.650.15 4.18 0.630.15 1.68 0.250.15 3.70 6.10
![Page 259: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/259.jpg)
0.04 4.30 20.640.04 3.70 0.150.04 3.30 6.340.04 3.14 0.130.04 2.95 0.120.04 2.90 0.120.04 2.76 0.110.04 2.57 0.100.04 2.37 0.090.04 2.18 0.090.04 2.02 0.080.04 1.83 0.070.04 1.63 0.070.04 3.80 4.260.04 3.65 0.150.04 3.46 0.140.04 3.27 0.13
![Page 260: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/260.jpg)
0.04 3.07 0.120.04 2.88 0.120.04 2.69 0.110.04 2.14 0.090.04 1.94 0.080.04 1.75 0.070.04 1.56 0.060.04 1.37 0.050.04 1.18 0.050.04 0.99 0.040.04 0.79 0.030.04 0.60 0.020.04 0.41 0.020.04 0.22 0.010.04 3.00 1.560.04 2.72 0.110.04 2.53 0.100.04 2.34 0.090.04 2.14 0.090.04 1.95 0.080.04 1.76 0.070.04 1.57 0.060.04 1.38 0.060.04 1.19 0.050.04 0.99 0.040.04 0.80 0.030.04 0.61 0.020.04 0.42 0.020.04 0.23 0.010.04 2.32 0.090.04 2.13 0.090.04 1.94 0.08
![Page 261: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/261.jpg)
0.04 1.74 0.070.04 1.55 0.060.04 1.36 0.050.04 1.17 0.050.04 0.98 0.040.04 0.79 0.030.04 0.59 0.020.04 0.40 0.020.04 0.21 0.01
0.75 1.5 3.375
0.7 2.1 2.94
![Page 262: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/262.jpg)
HOJA DE METRADOS - ARQUITECTURA
ITEM DESCRIPCCIÓN N° DE VECES
16.01 VARIOS
16.01.09 PIZARRA ACRILICO 2.00 1.00
N° DE ELEMENTOS
![Page 263: Arquitectura Final Huber](https://reader037.fdocuments.us/reader037/viewer/2022103007/5695d1481a28ab9b0295e206/html5/thumbnails/263.jpg)
HOJA DE METRADOS - ARQUITECTURA
DIMENSIONESPARCIAL TOTAL UND.
LARGO ANCHO ALTO
2.00 und