Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive...
Transcript of Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive...
![Page 1: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/1.jpg)
1 June 2018
Army National Guard
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
Activities at
Camp Grayling, Michigan
5 June 2018
![Page 2: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/2.jpg)
2 June 2018
Who Is Involved?
• Michigan Army National Guard (MIARNG) • ARNG – Installation and Environment Division (IED), Cleanup & Restoration
Branch• US Army Corps of Engineers • Michigan Department of Environmental Quality (MDEQ), Remediation &
Redevelopment Division• AECOM Technical Services, Inc. (Germantown, MD)
• Restoration Advisory Board: Formal public avenue for input into CERCLA process
![Page 3: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/3.jpg)
3 June 2018
ARNG Preliminary Assessment (PA)/ Site Inspection (SI) Overview
Work Phases
CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act
*Preliminary Assessment
*Site Inspection
Remedial Investigation
Feasibility Study
Proposed Plan
Decision Document
Remedial Design
Remedial Action
CERCLA Process*Current stage of activity
Notes: • An interim removal action can be conducted or a No Further Action
determination can be made at any phase• Restoration Advisory Board is typically solicited at RI/FS phase
![Page 4: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/4.jpg)
4 June 2018
Grayling Army Air Field (GAAF)PA Findings
• Reviewed available data and conducted a 3-day site visit February 27-March 1, 2018
• Interviewed current and former Camp Grayling personnel– Environmental staff– Former firefighting personnel– Grayling City Fire Department Chief– Michigan Department of Natural Resources personnel
• Completed visual inspections at Areas of Interest and documented with photographs
• Areas of Interest -“Fire Training Areas” and “Non-Fire Training Areas”
• Final Preliminary Assessment Report becomes part of the Administrative Record that will be available to the public
![Page 5: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/5.jpg)
5 June 2018
Overall GAAF PA Findings &
Areas of Interest (AOI)
Bivouac Area
Northwestern end of Runway 14/32
Building 1194 Ramp
Building 1160
Taxiway D
Southeastern end of Runway 14/32
Between Former MATES and Runway 14/32
Former MATES Location
Camp Grayling Fire Department
Notes: Aqueous Film Forming Foam (AFFF) was used extensively by the military to train for and fight aircraft fires.
![Page 6: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/6.jpg)
6 June 2018
SI Objectives (Sampling)
• Primary Objectives– Confirm the presence/ absence of a release at each potential AOI– Gather data to better understand groundwater flow direction(s)
• Additional Objectives– Presence has been confirmed at the GAAF boundary – Sampling of drinking water is on-going through MDEQ– Check for alternate contamination sources--none known at GAAF
![Page 7: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/7.jpg)
7 June 2018
GAAF Conceptual Site Model
Comparison of AOIs to MDEQ Perfluorooctanesulfonic Acid
(PFOS) and Perfluorooctanoic Acid (PFOA) Heat Map
Source (Heat Map): MIDEQ Tracking Report- Grayling area 05-24-2018 (ppt)
![Page 8: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/8.jpg)
8 June 2018
CERCLA Timeline & Next Steps
CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act
*Preliminary Assessment
*Site Inspection
Remedial Investigation
Feasibility Study
Proposed Plan
Decision Document
Remedial Design
Remedial Action
July 2018: Final Report
Winter 2018: SI Kickoff
Remedial Investigation-Begins Oct 2018• Sampling to achieve a three dimensional
picture of releases• Solicit for Restoration Advisory Board• Risk Assessment
![Page 9: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/9.jpg)
9 June 2018
Contacts
• LTC Adel Johnson– Email: [email protected]– Phone: (703) 601-6818
• Bonnie Packer– Email: [email protected]– Phone: (703) 607-7977
![Page 10: Army National Guard Comprehensive Environmental Response ...€¦ · CERCLA - Comprehensive Environmental Response, Compensation, and Liability Act *Preliminary Assessment *Site Inspection.](https://reader033.fdocuments.us/reader033/viewer/2022050400/5f7dd67240a72f0166134a80/html5/thumbnails/10.jpg)
10 June 2018
QUESTIONS?