Arlington Effective Educator Development System. Philosophy Statement The new evaluation system...

34
Arlington Effective Educator Development System

Transcript of Arlington Effective Educator Development System. Philosophy Statement The new evaluation system...

Page 1: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Arlington Effective Educator Development System

Page 2: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Philosophy Statement• The new evaluation system should be centered on Educators and

Evaluators learning together, and building relationships for the long run – collaboration, not confrontation.

• Evaluations should be evidence-based.• Documentation of feedback on a topic/issue should be noted before

Educators can be faulted for failure to improve.• Overall goal is to ensure that all Educators receive the supervision

and support they need to develop as thoughtful, reflective, and effective Educators.

Page 3: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Timeline for All Plans: Goal Development

• May 15 – District Goals set• June 15 – School Goals set• Sept. 15 - Superintendent or designee meets with Evaluators

and Educators to explain the evaluation process• Sept. 24 – Early Release Day: one hour Baseline Edge training;

one hour time for data analysis and goal drafting• October 1 – Evaluator meets with 1st Year Educators to assist

in self-assessment and goal setting process; all Educators submit draft goals

Page 4: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Educator Plan Development

• October 1 – Evaluator meets with first year Educators• October 15 – Evaluator meets with all other Educators in

teams or individually to establish Educator Plans• November 1 – Evaluator approves all Educator Plans

Page 5: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Observation NotesDefinitions• Unannounced Observation: An Evaluator is in your classroom

and is taking notes during a visit that lasts a minimum of 10 minutes.

• Observation During a Meeting: An Evaluator attends a parent/IEP/TAT/CLT/Dept./Grade level meeting AND indicates that they are there as an observer at the beginning of the meeting. The Evaluator will refrain from participating in the meeting in order to take notes and be an objective observer.

• Announced Observation: One full period/class with pre and post conversations.

• Conversation and written feedback within 5 days of observation (unless extraordinary circumstances)

Page 6: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Observation Notes Continued• No video/audio taping or photos taken without the explicit

agreement of the Educator (written consent form)• Educators may submit any of the above at any time for their

own evidence/artifacts• Observation deadline dates: indicate time by which BOTH the

observation AND the follow-up conversation and written feedback should occur

• At times an Evaluator may be accompanied by another administrator. In this case, the second administrator’s primary purpose will be to observe the Evaluator’s practice, not the Educator under observation.

• Educator Responses: Educator can always submit a response to the observation report.

Page 7: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Feedback Conversations• Within 5 days of the observation, the Evaluator sends the

Educator written initial feedback• Within 5 days of the observation, the Educator signs up for a

post-observation conversation• Evaluators will maintain a Google calendar for this purpose• Google calendars shall contain a sufficient number of slots

before, during, and after school for the purpose of post-observation follow-ups

• Recommended time for follow-up conversations is 15 – 20 minutes, though these sessions can be extended

Page 8: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Written Feedback• Educators can wait to receive the draft written feedback from

the Evaluator before they meet with the Evaluator• Educators can choose to schedule the post-observation

conversation before they receive the draft written feedback in order to expedite the process, if they choose to do this

Page 9: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

2 Year Self-Directed Growth Plan

For Educators with Professional Teacher Status whose overall rating is Proficient or Exemplary:Each Year:• 4 unannounced observations total• Nov. 15 - 1st observation• One per month in January, March and April• May 15 - Evaluator completes Evaluation Report• Formative Evaluation Meeting at the end of Year 1• June 1 if moving to Directed Growth Plan• June 10 if moving to 2 Year Self-Directed Growth Plan

• Summative Evaluation Meeting at the end of Year 2• June 1 if moving to Directed Growth Plan• June 10 if moving to another 2 Year Self-Directed Growth Plan

Page 10: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

One Year Self-Directed Growth

For Educators with Professional Teacher Status whose overall rating is Proficient or Exemplary in 2013-2014 only

• 4 unannounced observations total• Nov. 15 - 1st observation• One per month in January, March and April• Feb. 7 – Evaluator completes Formative Assessment Report• Formative Assessment Meeting by February 28• May 15 - Evaluator completes Summative Evaluation Report• Summative Evaluation Meeting• June 1 if moving to Directed Growth Plan• June 10 if moving to 2 Year Self-Directed Growth Plan

Page 11: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Developing Educator PlanFor Educators in their first three years of teaching in Arlington, and Educators teaching under a different license (first year only):• 6 Observations total• Oct. 15 - 1st Unannounced observation• Nov. 15 - One announced full period/lesson observation• Remaining 4 unannounced observations in December,

January, March and April• Written notice to teacher at Formative Assessment meeting if

Evaluator thinks teacher performance indicates possible non-renewal (just a heads up, this does not constitute a non-renewal letter – for non-PTS teachers only)

• Formative Assessment – February 28• Summative Evaluation – June 10

Page 12: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Directed Growth PlanFor Educators with PTS whose overall rating is Needs Improvement (same as Developing Educator Plan)• 6 Observations total • Oct. 15 - 1st Unannounced observation• Nov. 15 - One announced full period/lesson observation• Remaining 4 unannounced observations one per month in

December, January, March and April• Formative Assessment by February 28• Summative Evaluation by May 15• At the end of the Directed Growth Plan, the Evaluator will rate the

Educator as either Proficient (Educator moves to a 2 Year Self-Directed Growth Plan) or Unsatisfactory (Educator moves to an Improvement Plan)

Page 13: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Directed Growth Plan• The Directed Growth Plan will contain the requirement that a

written plan be developed that will include the specific indicators in need of improvement, the provision of specific assistance to the Educator, and an articulation of the expectations of the Educator.

• Educators will be encouraged to request that the Association participate in the development of this plan. (AEA Notification)

Page 14: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Improvement Plan *None in 2013-2014 – must go through Directed Growth Plan first

For Educators with PTS whose overall rating is Unsatisfactory:• 1 unannounced observation in September• 2 unannounced observations in October and November, one in

December• 2 unannounced observations per month for the duration of the

plan• 1 announced full period/lesson observation must be completed

by the Formative Assessment conversation• Minimum timeframe for first Improvement Plan will be from the

beginning of the school year to December vacation, maximum timeframe will be one year

• A Successive Improvement Plan will have a 30 day minimum timeframe and a maximum one year timeframe

(i.e. Improvement Plan – Directed Growth Plan – Improvement Plan)

Page 15: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Improvement Plan• The Improvement Plan will contain the requirement that a

written plan be developed that will include the specific indicators in need of improvement, the provision of specific assistance to the Educator, and an articulation of the expectations of the Educator.

• Educators will be encouraged to request that the Association participate in the development of this plan. (AEA Notification)

• At the end of the Improvement Plan:1. Improvement leads to Self-Directed Growth Plan2. Substantial progress leads to Directed Growth Plan3. Unsatisfactory performance leads to dismissal

Page 16: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Formative Assessment February!• Dedicated January Meeting Time to collect evidence• Jan. 21: Educator submits evidence on Standards I and II and

goals – up to 3 pieces of evidence for each area by end of year• Feb. 7: Evaluator will complete mid-cycle Formative Assessment

Reports for Educators on one year plans.• Feb. 28: Evaluator holds Formative Assessment Conversation.

Page 17: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Timeframe for Summative Evaluations• Dedicated April Meeting Time to collect evidence• April 30: Educator submits additional evidence on Standards I

and II and goals - up to 3 pieces of evidence in each area total• May 15: Evaluator completes Summative Evaluation Report and

sends to Educator (Formative Evaluation for 2 Year Plans)• June 1: Evaluator meets with Educators whose overall ratings

are Needs Improvement or Unsatisfactory• June 10: Evaluator meets with all Educators whose ratings are

Proficient or Exemplary• June 15: Educator signs Summative Evaluation Report and adds

response, if any, within 5 school days of receipt• End of Year: All Directed Growth and Improvement Plans are

written and signed

Page 18: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Timelines (Appendix B)

Page 19: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Evaluation Year at a Glance September

Self-AssessmentData AnalysisGoal Setting1st Unannounced Obsvn. - Impvt. Plan

OctoberEducator Plans1st Unannounced Observation for Non-PTS , Directed Growth

NovemberAnnounced Observation for Non-PTS & Directed Growth1st Unan. for Self-Directed Growth Plan

December2nd Unan. Observation for Non-PTS, Directed Growth

JanuaryContinue with unannounced observations for all Plans; Educators submit evidence

FebruaryFormative Assessment Reports and Conversations

MarchContinue with unannounced observations for all Plans

AprilContinue with unannounced observations for all Plans; Educators submit evidence

MayFormative (Year 1 of 2 Year Self-Directed Growth Plan) andSummative Evaluation Reports CompletedBegin meetingsDistrict Goals

JuneSummative and Formative Conversations; Write any Directed Growth or Improvement Plans by end of yearSchool Goals

Other things to factor into an Evaluator and Educator’s Work Load and Calendar: Report CardsEnd of Term/Grades

MCASClass ListsCourse SelectionPTO/School CouncilStudent/Parent IssuesLife….

Page 20: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Career AdvancementA) In order to attain Professional Teacher Status, the Educator

should achieve ratings of proficient or exemplary on each Performance Standard and Overall

B) In order to qualify to apply for a teacher leader position, the Educator must have had a Summative Evaluation performance rating of proficient or exemplary for at least the previous two years

Page 21: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Postpone to the Future• Rating Impact on Student Learning Growth (DDM)• Using student feedback in Educator evaluation• Using staff feedback in Educator Evaluation of Administrators

Waiting for “direction and guidance” from DESE – then we will bargain with respect to these issues. (June 30, 2013)

Page 22: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Transition from Existing System• Balance Evaluator Workloads:• Goal is 50% of Educators will be on 1 year and 50% on 2

year plan for each Evaluator1. All Non-PTS will be on 1 year plan2. All “Pilot” teachers will be on 2 year plan3. Remaining PTS teachers will be chosen at random to enter a

1 or 2 year plan with a desired result of 50/50. Both the Association and the Administration will be represented during the selection process on Monday, June 10 at 3:00.

Page 23: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Plan of Assistance• Under current system, a teacher may be placed on a Plan of

Assistance at any point in the evaluation cycle after the Evaluator makes the determination that the teacher is not meeting the Principles of Effective Teaching.

• Under the new evaluation system, a Plan of Assistance will be called a Directed Growth Plan.

• The standard for placing an Educator on a Directed Growth plan in 2013-2014 will be a minimum of one year of documentation of evaluation, supervision and support, including feedback with specific areas of deficiency that were not subsequently rectified.

• No mid year plan changes.

Page 24: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Serious Disagreements• Should there be a serious disagreement between the Educator

and the Evaluator regarding an overall summative performance rating of needs improvement or unsatisfactory:• Educator can request a meeting with Evaluator’s supervisor• AEA member may also attend the meeting

Page 25: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Grievance Procedure• Violations of this article are subject to the grievance and

arbitration procedure. • The parties recognize that the time-lines and dates associated

with the newly negotiated Evaluation System are untested.• For 2013-2014 school year, missed timelines alone of less than

ten school days shall not be the subject of a grievance alleging a violation of the new Evaluation System.

Page 26: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Evaluator TrainingSuperintendent shall ensure that Evaluators have training in the following areas:• Supervision and evaluation, including the regulations and the

standards and indicators of effective teaching practice• All the information as included in the six training modules as

specified by the DESE (11 hours minimum)• Specific training around discourse necessary to support a

coaching model of evaluation.• Formal documentation of the professional development in thisarea will be placed on file.

Page 27: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Joint Labor-Management Team

• The parties agree to establish a joint labor-management team, which shall review the evaluation process and procedures annually through the first three years of implementation and recommend adjustments to the parties.

Page 28: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Miscellaneous• No Educator will move from a Self-Directed Growth Plan to an

Improvement Plan without first participating in a Directed Growth Plan.

• Any Educator moving to a Directed Growth Plan or Improvement Plan will have that plan in place by the end of the school year preceding the plan implementation.

• AEA and APS will collaborate on a template for Directed Growth and Improvement Plans.

• Exemplary off the table informally for 2013-2014• Use DESE rubrics for 2013-2014

Page 29: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Evaluation Charts (Appendix A)

Page 30: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Forms in Baseline Edge

1. Goals and Educator Plan2. Observation Form3. Formative Assessment4. Formative Evaluation5. Summative Evaluation

*Optional Paper Self-AssessmentForm to support goal development

Page 31: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Evidence Collection

Options• “Portfolio” in Baseline Edge• Attachments to forms in Baseline Edge• Paper/Binder

Number• 3 best pieces for Standards I and II• 3 best pieces per goal (2 goals)• No more than 12 total

Page 32: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

More on Baseline Edge

Q. Who can see your Baseline Edge evaluations?A. Your Primary and Contributing Evaluator, Building Principal, Laura Chesson (supervises Department Heads), Kathy Bodie

Note: Paper copies of Formative and Summative Evaluations as well as any Directed Growth and/or Improvement Plans will be kept in your personnel folder.

Evaluation Support Team: There will be designated teachers at each building to help with the mechanics and technical aspects of the new Evaluation System (stipend position)

Page 33: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.

Baseline Edge Training• Voluntary trainings will be held this summer – dates TBD• September 24th early release day – 1 hour Baseline Edge

training

Page 34: Arlington Effective Educator Development System. Philosophy Statement The new evaluation system should be centered on Educators and Evaluators learning.