ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR BOARD ROADS AND INFRASTRUCTURE SERVICES 12 TH SEPTEMBER 2019 MARINE ASSET MANAGEMENT PLAN – UPDATE 1.0 EXECUTIVE SUMMARY 1.1 This report provides Members with an update on ongoing schemes currently being addressed within the Council’s Marine Asset Management Plan. 1.2 Council officers meet regularly with representatives from Transport Scotland, Calmac and CMal to discuss future plans for the Council’s marine assets; the most strategic of these meetings being the Argyll Ferries Infrastructure Group (AFIG). 1.3 Main priorities agreed with Transport Scotland, CMAL and Calmac remain as follows:- Iona and Fionnphort – Provision of breakwater and overnight berth respectively. Mull / Craignure Pier – Upgrade infrastructure. 1.4 This report provides an update on the following schemes:- Craignure Pier Helensburgh Pier Rothesay Pontoons Rothesay Harbour Fionnphort and Iona Oban North Pier Dunoon Breakwater Link-spans - general Campbeltown Harbour 1.5 Members are asked to:- a) note this report and, in particular, the progress achieved to date on those schemes highlighted within this report and b) to approve the revised version of the 10 year asset management plan in the appendix to this report.

Transcript of ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and...

Page 1: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

ARGYLL AND BUTE COUNCIL

ARGYLL AND BUTE HARBOUR BOARD

ROADS AND INFRASTRUCTURE SERVICES

12TH SEPTEMBER 2019

MARINE ASSET MANAGEMENT PLAN – UPDATE 1.0 EXECUTIVE SUMMARY

1.1 This report provides Members with an update on ongoing schemes

currently being addressed within the Council’s Marine Asset Management Plan.

1.2 Council officers meet regularly with representatives from Transport Scotland, Calmac and CMal to discuss future plans for the Council’s marine assets; the most strategic of these meetings being the Argyll Ferries Infrastructure Group (AFIG).

1.3 Main priorities agreed with Transport Scotland, CMAL and Calmac remain as follows:-

• Iona and Fionnphort – Provision of breakwater and overnight berth respectively.

• Mull / Craignure Pier – Upgrade infrastructure. 1.4 This report provides an update on the following schemes:-

• Craignure Pier • Helensburgh Pier • Rothesay Pontoons • Rothesay Harbour • Fionnphort and Iona • Oban North Pier • Dunoon Breakwater • Link-spans - general • Campbeltown Harbour

1.5 Members are asked to:-

a) note this report and, in particular, the progress achieved to date on those schemes highlighted within this report and b) to approve the revised version of the 10 year asset management plan in the appendix to this report.

Page 2: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

ARGYLL AND BUTE COUNCIL

ARGYLL AND BUTE HARBOUR BOARD

DEVELOPMENT AND INFRASTRUCTURE SERVICES

12TH SEPTEMBER 2019

MARINE ASSET MANAGEMENT PLAN – UPDATE 2.0 INTRODUCTION 2.1 This report provides Members with an update on ongoing major,

and/or noteworthy, schemes currently being addressed within the Council’s Marine Asset Management Plan.

3.0 RECOMMENDATIONS

3.1 Members are asked to:- a) note this report and, in particular, the progress achieved to date on those schemes highlighted within this report and, b) approve the revised version of the 10 year asset management plan in the appendix to this report – Revision E.

4.0 BACKGROUND

4.0 A report was presented to the Harbour Board in January 2018 which provided details of major schemes being programmed within the Marine Asset Management Plan at that time; this report provides Members with a further update. In order to fund the various works identified in the Asset Management Plan in future years, it will be necessary to review fees and charges on an annual basis to ensure necessary funding is available for identified works.

4.1 As Members are aware, Council officers meet regularly with

representatives from Transport Scotland, Calmac and CMAL to discuss future plans for the Council’s marine assets; priorities are set by the Council on the basis of these discussions.

4.2 Main priorities agreed with Transport Scotland, CMAL and

Calmac remain as follows:-

• Iona and Fionnphort – Provision of breakwater and overnight berth respectively.

• Mull / Craignure Pier – Upgrade infrastructure.

4.3 This report provides Members with an update on a range of schemes.

Page 3: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

5.0 DETAIL - The Asset Management Plan:-

5.1 The Asset Management Plan lists the likely work to be carried

out over the next 10 years across the entire marine infrastructure; it also provides indicative budgets – see Appendix A. Currently the overall costs for planned works is in excess of £90 million – this includes an estimated figure for potential works at Craignure Pier on Mull. Further detail is provided below for some of the more major, or noteworthy, schemes. Capital works programmed for this financial year total £4.627 million. A number of schemes have been added to the plan as a result of information received from last year’s principal surveys; these latest schemes include remedial works at Craighouse on Jura and the South Pier on Gigha where concrete works are required; in addition, cathodic protection will be installed at Port Askaig, Carradale and West Loch near Tarbert to protect sheet piles. To ensure this year’s capital budget is not over-spent, the next phase of the works at Rothesay – grouting – will be phased to adjust overall capital spend.

5.2 Craignure Pier:-

Since the last meeting of the Harbour Board, the STAG report has now been completed. The report considers a number of costed options for replacement of the pier and for the interim phase until replacement – Costs are attached in Appendix B of this report. A separate report will be presented to the September 2019 Harbour Board. A Craignure Port User group has been established and Terms of Reference agreed. These meetings to be chaired by an elected Member of the Council.

5.3 Helensburgh Pier:-

5.3.1 With the assistance of the Helensburgh Seafront Development Project (HSDP), liaison continues with Waverley Excursions to consider wether it is possible to identify affordable options to allow berthing of the Waverley at the pier. Options which have been given some consideration are as follows:-

• Major repairs to the timber pier to reinstate all

damaged sections - essentially, all damaged timbers would be replaced on a like-for-like basis, including timbers in the fire-damaged area. Costs for this option are likely to be in the region of £850K.

• Construct new berthing structure (monolithic piles with fendering system) adjacent to the pier and connected by an access gangway - this option would allow the Waverley to berth. Costs are likely to be in the region of £580K for this option.

• Dredging - a further option would involve berthing the

Waverley to the west side of the pier and dredging a new channel to accommodate the approach to the pier; this option would involve less work on the pier itself. A cost estimate for related works is currently

Page 4: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

being produced – however, latest indications are that initial capital dredging costs could be significant and this option would require regular expenditure of the Piers and Harbours revenue budget to ensure that channel depths were maintained.

5.3.2 Members should be aware that funding for any of the

options has not, as yet, been identified and that no income is generated at this pier.

5.3.3 In the meantime, in the interests of public safety, £85,000

of ‘town-centre’ funding has been allocated to make the pier safer for pedestrian use – particularly given that the pier is, for the time-being, not functioning as a vessel berthing facility. Design work will be carried out in-house with a view to issuing a tender for appropriate works later this year.

5.4 Rothesay Pontoons:-

5.4.1 £150,000 of town-centre funding has been allocated for replacement of pontoons at Rothesay Harbour. A plan of the pontoons is provided in Appendix C. The existing pontoons are anchored in place with concrete blocks and chains. Circular piles can be used to anchor pontoons in place, however, this is a more costly option than using anchor blocks and chains; it does, however, have the benefit of providing a more stable platform and this is likely to be more attractive to cruise ship groups. An exercise will be carried out to ascertain the likely increase in income, versus the additional cost of piling. If sufficient additional income can be generated it may be possible to fund prudential borrowing that could supplement the town centre funding. .

5.4.2 Dependent upon the design solution, Design Services will

produce tender documentation for a design / build contract with a view to having the contract in place before the end of this financial year. However, for the ‘piled option’, ground investigation works may be required – at the time of writing this report, a review of record drawings/reports was being carried out. A project programme will be produced for all phases of this project, however, it should be noted that the application for marine licences and procurement / organisation of ground investigation works will ensure that any construction programme will be significantly constrained given the limited time available prior to contract award. Contract award must be made before the end of March 2020 to comply with the Town Centre Fund conditions.

5.5 Rothesay Harbour –

Work on the wave screen is nearing completion, with works due to be complete by mid-August this year. The wave screen is considered to be the first phase in the overall work required to address continuing settlement at Rothesay Pier. Following completion of installation of the wave screen, which will reduce the risk of further settlement, further works will be required in

Page 5: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

order to stabilise the infill material within the masonry pier; grouting work will be carried out in the forthcoming financial year. In addition to civil engineering works, a contract will be issued shortly for removal and refurbishment of all sixteen cylinders in the passenger access gangway (PAG) at Rothesay; works will be carried out overnight and, as such, no disruption to sailings is anticipated. Photographs of the wave screen and PAG are provided in Appendix D in this report.

5.6 Fionnphort / Iona Ferry Slips –

5.6.1 Byrne Looby’s feasibility report has now been issued at draft stage. This detailed report considers a number of options for the overnight berth at Fionnphort and breakwater on Iona. The layout for the preferred options is provided in Appendix E to this report.

5.6.2 The original estimate for the works, based on a report

produced by the consultant Arch Henderson in 2015, varied from circa £4 million to £31 million for both schemes - £4 million being taken as the original overall scheme estimate. Following the development of the latest favoured schemes by Byrne Looby, the updated estimates for preferred schemes at Iona and Fionnphort are £10 million and £8.3 million respectively i.e. £18.3 million in total. The berthing structure at Fionnphort and breakwater at Iona now differ significantly from that originally anticipated, with scheme types developed from information gathered through consultation with the local community and from the recently completed wave-modelling studies.

5.6.3 Dependent upon the next stages – sedimentation

modelling and final scheme design – it is anticipated that work may commence on site at Fionnphort as early as 2020 – see attached programme in Appendix E. A brief for the sedimentation study is currently out to tender. Given the increase in estimated cost for this scheme, an Outline Business Case will be produce for Member approval prior to moving to full design stage.

5.7 Oban North Pier –

Grouting work to stabilise ground at the North Pier is now complete.

5.8 Dunoon Breakwater –

A contract to address settling rock armour at Dunoon breakwater was awarded to the Contractor L.M. Keating on 23 August 2019 – value £812K. The contractor’s programme is awaited. A photograph of the rock armour and Dunoon breakwater is attached in Appendix F. Transport Scotland have agreed to host an officer working group to consider port side infrastructure for the Gourock to Dunoon

Page 6: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

service. Updates on the work of this group will be brought to the Harbour Board.

5.9 Link-Spans –

A tender was issued in mid-2018 to seek the services of a Mechanical Engineer with specialist link-span experience. A specialist engineer, seconded from the consultant ‘Royal Haskoning’, has been working directly for Marine Services since the beginning of this calendar year. A complete review has been carried out on all Council link-spans – at Dunoon, Rothesay, Campbeltown, Port Askaig and Craignure – this has taken the form of on-site inspections, reviews of maintenance records – both specialist and on-site maintenance – along with a complete review of extant link-span maintenance contracts. Recommendations were made to extend one of two existing contracts for a finite period with a view to re-tendering link-span maintenance in the near future. Following initial surveys and recommendations, RL Engineering, our current maintenance contractor, has completed their ‘first-round’ of servicing on all link-spans since the contract extension was signed. The opportunity was taken to replace all hydraulic hoses at all 5 link-spans during RL’s recent servicing work. Craignure link-span will require replacement of some major parts and work is ongoing to prepare for refurbishment work later this year – see photos in Appendix G. Close liaison will take place with Calmac and, of course, the local community before works are carried out. Once planned works are completed at Craignure, a tender will be issued for maintenance of link-spans – the tender document is currently at draft stage.

In addition to the above, a consultancy brief to carry out structural checks on all link-spans, was recently issued for tender purposes. Tender returns are awaited.

5.10 Campbeltown Harbour –

Sheet piling works / cathodic protection. A contract to address corrosion of sheet piling at Campbeltown Old Quay walls (C, D, E and F) has been won by the contractor ‘Lochshell Engineering’. Works are due to start this week, with an on-site survey by the contractor, followed by off-site fabrication. See Appendix H for location photograph.

6.0 CONCLUSION

6.1 This report provides Members with an update on a number of

marine-related projects which are all at various phases – from early feasibility stage to on-site construction stage.

7.0 IMPLICATIONS 7.1 Policy None directly arising from this report. 7.2 Financial Proposed additional increase in fees and

charges will ensure that future income is sufficient to maintain and develop the

Page 7: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

Council’s marine assets this financial year. Further fee increases will be required to fund prudential borrowing in future years.

7.3 Legal Considered to be none directly arising from

this report. 7.4 HR None 7.5 Equalities None 7.6 Risk Completed works will reduce requirement to

repair and maintain existing infrastructure. 7.7 Customer Services Overall improvement in travel experience and

quality of journeys.

Appendix A - 10 year Asset Management Plan Appendix B - Craignure – Estimated Costs Appendix C - Rothesay Pontoons - layout Appendix D - Rothesay Wavescreen - photos Appendix E - Fionnphort & Iona – layout plans, estimated costs, programme Appendix F - Dunoon Rock-armour - photo Appendix G - Craignure link-span - photos Appendix H - Campbeltown – Sheet piling - photos Executive Director with responsibility for Roads and Infrastructure: Pippa Milne Head of Roads & Infrastructure Services: Jim Smith Policy Lead: Councillor Roddy McCuish 2 September 2019 For further information contact: Stewart Clark, Marine Operations Manager Tel: 01546 604893

Page 8: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

APPENDIX A

ASSET MANAGEMENT PLAN

Page 9: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

10 YEAR - ASSET MANAGEMENT PLAN Revision E

£4,627,000 £12,075,000£4,627,000 £12,075,000 £14,200,000 £5,450,000 £22,000,000 £21,150,000 £6,550,000 £2,450,000 £950,000 £1,800,000 £91,252,000

£500,000 £500,000

£20,000 £20,000

£550,000

£550,000

£50,000 £50,000

£260,000 £250,000 £500,000 £3,560,000£50,000 £2,500,000

£80,000 £400,000 £480,000

£180,000 £730,000

£50,000 £500,000

£200,000 £50,000 £300,000 £560,000

£10,000

£50,000 £300,000 £750,000 £750,000 £20,000,000 £20,000,000 £41,900,000

£50,000

£80,000 £75,000 £1,200,000 £1,355,000

£75,000 £1,200,000 £1,275,000

£100,000 £250,000 £350,000

£880,000 £50,000 £100,000 £1,000,000 £2,030,000

£50,000 £200,000 £250,000

£30,000 £150,000 £150,000 £330,000

£220,000 £8,000,000 £500,000 £8,720,000

£250,000 £50,000 £2,950,000£150,000 £1,000,000 £1,500,000

£200,000 £20,000 £450,000

£30,000 £200,000

£10,200,000

£200,000 £1,000,000 £9,000,000

£20,000 £370,000

£100,000 £250,000

£50,000 £25,000 £500,000 £575,000

£190,000£190,000

£150,000 £150,000

£800,000 £800,000

£540,000 £100,000 £300,000 £5,250,000 £800,000 £6,990,000

£50,000 £3,170,000

£600,000£500,000 £2,000,000£20,000

£50,000 £150,000 £2,000,000£800,000 £1,000,000

£30,000 £250,000 £280,000

£30,000 £250,000 £380,000£100,000

£87,000£87,000

£91,252,000

Miscelleaneous

Structure

LocationNameNo

TotalCapital

36

35 Port Askaig Pier

37

40 Tayinloan Ferry Slip Kintyre (West Coast)

41 Tighnabruaich Pier Kyles of Bute

38 Rothesay Harbour Bute

42 West Loch Tarbert Kintyre (North)

4

7

3

Kintyre (South)

Kintyre (South)

Mull (South West)

Islay

Bunessan

Campbeltown Old Quay

Campbeltown New Quay

6

5

Craignure Pier

(2027/28

1

LismoreAchnacroish Ferry Slip2

Upper Loch Fyne St. Catherine's Slip39

(2024/25)

CollArinagour Old Pier

Jura (East Coast)Craighouse Pier

Mull (East End)

Bruichladdich Pier

Carradale Harbour Kintyre (East Coast)

10

9

8

12

11 Crinan Ferry Slip

(2028/29

Year 7 Year 10Year 8

(2023/24)

Year 9

(2025/26)

LismoreAchnacroish Pier

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

(2019/20) (2020/21) (2021/22) (2022/23) (2026/27

Crinan Harbour Quay Crinan

Crinan

14

13

22

21

20

19

18

Dunoon

Dunoon

Dunoon Pier

Dunoon Harbour Jetty

17

16

15 Dalintober Jetty Campbeltown

Seil

Luing

Cuan Ferry Slip

Cuan Ferry Slip

EasdaleEasdale Pier

DunoonDunoon Breakwater

Fionnphort Ferry Slip

Feolin Ferry Slip

Ellenabeich Pier

Easdale Low Water Landing

Mull (South West)

Jura (Sound of Islay)

Seil

Easdale

23

Helensburgh

Gigha

Gigha

Helensburgh Pier

Gigha South Pier

Gigha Ferry Slip

26

25

24

28

27

32

31

30

Mainland Sound of Jura

Iona

Keills

Iona Ferry Slip

29

Port Beag Slip

Lagg

Kilcreggan

Islay (Loch Indaal)

Oban

Islay

Port Charlotte

Kilcreggan Pier

33

34 Port Appin

Oban

Oban

Lismore (North)

Jura (Sound of Jura)

Port Appin

Oban Times Slip

Oban North Pier

Lismore Point

Page 10: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

APPENDIX B

CRAIGNURE - OPTION COSTS

Page 11: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

Interim Option Capital Cost Capital Cost +44% OB

Interim Option 1: Reference Case £1.6 million £2.3 million

Interim Option 2: Pier Extension £12.3 million £17.7 million

Interim Option 3: South Berth Improvements £3.2 million £4.6 million

Long-Term Option Capital Cost Capital Cost +44% OB

Option 1A: Finger Pier on footprint of existing £44.5 million £64.1 million

Option 1B: Finger pier in close proximity to existing £45.5 million £65.5 million

Option 2A: Finger Pier within Craignure Bay to South of Existing £46.2 million £66.5 million

Option 2B: Nested Berths within Craignure Bay to South of Existing £51.2 million £73.7 million

Option 3A: Finger Pier within Craignure Bay to North of Existing £44.1 million £63.5 million

Option 3B: Nested Berths within Craignure Bay to North of Existing £43.7 million £62.9 million

Page 12: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

12

APPENDIX C

ROTHESAY PONTOONS - LAYOUT

Page 13: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

13

Page 14: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

14

APPENDIX D

ROTHESAY WAVESCREEN & PASSENGER ACCESS GANGWAY

PHOTOS

Page 15: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

15

Rothesay Pier – New Wavescreen

Page 16: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

16

Rothesay Pier – Passenger Access Gangway

Page 17: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

17

APPENDIX E

FIONNPHORT / IONA SKETCH PLANS & PROGRAMME

ESTIMATED COSTS

Page 18: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

18

Iona Breakwater

Page 19: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

19

Fionnphort – Overnight Berth and Breakwater

Page 20: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

20

Page 21: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

21

APPENDIX F

DUNOON BREAKWATER ROCK ARMOUR – PHOTO

Page 22: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

22

Dunoon Breakwater – Rock Armour

Page 23: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

23

APPENDIX G

CRAIGNURE LINKSPAN & SPARE CYLINDER PHOTOS

Page 24: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

24

Craignure Link-span

Spare cylinder under test

Page 25: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

25

APPENDIX H

CAMPBELTOWN SHEET PILING WORKS – PHOTOS

Page 26: ARGYLL AND BUTE COUNCIL ARGYLL AND BUTE HARBOUR … · Rothesay, Campbeltown, Port Askaig and Craignure this has – taken the form of onsite inspections, reviews of maintenance -

26

Campbeltown Old Quay – Walls C, D, E and F.