AREVA UHP Cavitation Peening Update Lisa Hawkins Business Development Manager Component Repair & Replacement

Transcript of AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique...

Page 1: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

AREVA UHP Cavitation Peening Update

Lisa Hawkins

Business Development Manager Component Repair & Replacement

Page 2: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Overview AREVA Peening Technology & Industry Update

Page 3: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

What is Ultra High Pressure (UHP) Cavitation Peening?

Ultra High Velocity Jet Creates pressure below that of vapor pressure in water

Cavitation Vapor bubbles form in water

Shock Waves Occur from bubble collapse at surface generating high pressures on the material

Compressive Stresses In the surface layer of material results

Video Cavitation peening is a well understood, proven process A Page 3 > Lynchburg Visit - October 13, 2016

AREVA

Page 4: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 4 > Lynchburg Visit – October 13, 2016

Unique Technologies

UHP Cavitation peening (Patented)

Hyperbaric testing

Controlled depth abrasive jet milling

High speed ceramic machining

Selective coating removal

Precision 5-axis machining

Downhole energy tooling

Nuclear cleaning & decommissioning tooling

Customers

Page 5: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 5

UHP Cavitation Peening Surface Finish

'

Non-peened Peened with Leak Indications No Leak Indications

Cavitation peened surfaces are not adverse to NDE

> Lynchburg Visit - October 13, 2016

A AREVA

Page 6: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 6 > Lynchburg Visit – October 13, 2016

Why AREVA Selected UHP Cavitation Peening

Compressive stress depths meet or exceed MRP requirements

No abrupt edge between peened and unpeened regions

Very tolerant to surface conditions and geometries

Very robust process with a large saturation zone

Does not require complicated tooling

No FME concerns

Safe for both personnel and component when operated within

the controlled boundaries

AREVA scored UHP Cavitation Peening as the

best mitigation process

Page 7: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

AREVA RV Head Peening Technology Update

Page 8: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 8 > Lynchburg Visit – October 13, 2016

AREVA’s 1st RVH Peening Implementation Completed Successfully

Completed within a sub 30 day outage

window

Safety, HU, dose & PCE goals were all met

Headstand modifications were

implemented

seamlessly and did not affect critical path

With NRC approval, peening will provide

for inspection relief that will reduce

operating costs and dose

Cavitation Peening is a PROVEN Technology that

will Maintain Your Asset for the Life of Your Plant

Page 9: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

RV Head Peening All OD Surfaces

...,. Alloy 600 (nozzle): .xxx" + depth of compressive stress

+ Depth of compression eliminates flaw detection gap

...,. Alloy 82/182 (j-groove weld): .xxx" + depth of compressive stress

...,. Most adaptable process to the j-groove I nozzle geometry

AREVA's UHP Peening eliminates flaw detection gap and Depth of compressive stress exceeds MRP requirement of 0.40" A

Page 9 > Lynchburg Visit - October 13, 2016 AREVA

Page 10: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

RV Head Peening Open Penetration IDs

...,. Nozzles without thermal sleeves (such as thermocouples, spare nozzles)

...,. > .xxx" depth of compressive stress

...,. Seal around open penetration and flood up

Depth of compressive stress exceeds MRP requirement of .010" A Page 10 > Lynchburg Visit - October 13, 2016

AREVA

Page 11: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

RV Head Peening ID Annulus with Thermal Sleeves

...,. Greater than .xxx" (.xx mm) depth of compression on all PWSCC susceptible CROM ID surfaces

...,. Exceeds the MRP requirement of .01 O"

...,. The only vendor that can peen the annulus without removing or modifying the thermal sleeves

AREVA's Cavitation Peening is the solution for ID surface mitigation A Page 11 > Lynchburg Visit - October 13, 2016

AREVA

Page 12: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

UHP Cavitation Peening Qualification

...,. The peening process effectiveness was demonstrated on full scale representative mockups at the nominal, max and min ranges of essential variables used for site implementation

+ Full scale nozzle mockups include material and geometry constraints

...,. X-ray diffraction was used to determine the residual stress on peened full scale representative mockups

+ Confirm the desired peening coverage and depth of compression has been achieved

...,. A qualification report is provided to the utility that documents how all requirement are met

+ Topical Report I Relief Request I ASME Code

Essential variable range for qualification mockups and site implementation are the same A

Page 12 > Lynchburg Visit - October 13, 2016 AREVA

Page 13: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Process Control and Verification

...,. Essential variables are controlled/monitored to ensure acceptable results are achieved

...,. The tooling control system records the value of each essential variable

+ The electronic data will be reviewed/verified post-process

...,. The operator has a real-time display of all essential variables

...,. If an essential variable gets outside of the qualified limits the operator is immediately alerted

In - process verification I post - process verification

Page 13 > Lynchburg Visit - October 13, 2016 AREVA

Page 14: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

RV Primary Nozzle Cavitation Peening

Page 15: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 15 > Lynchburg Visit – October 13, 2016

Primary Nozzle Mitigation UHP Cavitation Peening

Self-propelled tool to minimize time required to

move between nozzles

Page 16: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 16 > Lynchburg Visit – October 13, 2016

Primary Nozzle Mitigation UHP Cavitation Peening

Low dose, remote delivery -

alleviates polar crane use

Page 17: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Primary Nozzle Mitigation UHP Cavitation Peening

Typical Primary Nozzle UHP Cavitation Peening Schedule

Rx Vessel Turnover to AREVA x days

Typical 3-Loop On Component Cavitation Peening x days of RCS Primary Nozzles

Demob Equipment x day

Typical Primary Nozzle UHP Cavitation Peening Dose

Dose estimate is approximately x REM

Significant dose reduction compared to other mitigation techniques

Page 17 > Lynchburg Visit - October 13, 2016

Peening can prevent I PWSCC, reduce risk of

flaw propogation, provide inspection

relief, and transition your plant to a 10-year

I inspection cycle - all with a proven process

A AREVA

Page 18: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

p.18

Primary Nozzle Mitigation Repair Contingency

Repair contingency for shallow flaws

AREVA Proprietary – Second License Renewal Delegation – October 13, 2016

Page 19: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

BMN Cavitation Peening

Page 20: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Equipment Development OD & ID Surface Tooling

Qualified state-of-the-art tooling ready to deploy

AREVA Proprietary - Second License Renewal Delegation - October 13, 2016 p.20

A AREVA

Page 21: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 21 > Lynchburg Visit – October 13, 2016

Typical BMN Cavitation Peening Schedule

BMN tooling and process – Qualified

Synergies with AREVA ISI inspections

Typical 3 Loop BMN peening implementation schedule:

Includes peening of ID & OD, all 50 nozzles x days on component

Depth of ID compressive stress .xxx”

Greater than .xxx” depth of OD nozzle compressive stress

exceeds .040” MRP min

Page 22: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Regulatory Compliance

Page 23: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 23 > Lynchburg Visit – October 13, 2016

Regulatory Compliance

NRC SE fully supports inspection relief for RV Head and

Primary Nozzles as defined in MRP-335R3

Safety Evaluation for MRP-335R3 has been released

Extend your RV Head inspection interval to 10 years

Extend your RV Primary Nozzle Inspection cycles to 10 years

Code Cases N-770-4 and N-729-5 are approved by ASME to

provide inspection relief for RV Head and RV Primary Nozzles

No Code Case for BMN peening

The NRC is not imposing any additional BMN inspection

requirements

Current requirement: bare metal visual examination every other refuel

outage

Page 24: AREVA UHP Cavitation Peening Update · Page 4 > Lynchburg Visit – October 13, 2016 Unique Technologies UHP Cavitation peening (Patented) Hyperbaric testing Controlled depth abrasive

Page 24 > Lynchburg Visit – October 13, 2016

Why Peen RV Heads, Primary BMN Nozzles

Mitigation prevents PWSCC initiation

Mitigation provides asset life extension through elimination of

the degradation process

Cost of cavitation peening is less than the cost of emergent

repairs

Eliminates potential for repair and outage contingency cost

AREVA exceeds the compressive stress requirements per

MRP

Mitigate now or repair/replace later