Area Measurements from Site Plans and Introduction to
WinSLAMM Analyses
Robert PittDept. of Civil and Environmental Engineering
University of AlabamaTuscaloosa, AL 35487
![Page 2: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/2.jpg)
![Page 3: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/3.jpg)
Little Shades Creek Subwatersheds
Area (acres) 1 2 3 4 All others
Total
Single family
339 448 676 401 1747 3611
Town homes
0 20 8 0 94 122
Multi-family 0 47 13 0 27 87
School/
church
0 0 38 13 58 109
Commercial 8 8 17 7 42 82
All other 70 153 199 164 621 1207
Total 417 676 951 585 2589 5218
![Page 4: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/4.jpg)
![Page 5: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/5.jpg)
![Page 6: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/6.jpg)
![Page 7: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/7.jpg)
![Page 8: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/8.jpg)
![Page 9: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/9.jpg)
![Page 10: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/10.jpg)
Characteristics of Land Development in Rocky Ridge Low density
Medium density pre 1960
High density
Strip commercial
Office parks
Directly connected imperviousness
6.11 8.98 15 90.6 60.19
Impervious areas draining to pervious areas
4.7 6.2 9 0 1.14
Pervious Areas 89.19 84.82 76 9.4 38.67
Total 100 100 100 100 100
![Page 11: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/11.jpg)
![Page 12: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/12.jpg)
![Page 13: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/13.jpg)
![Page 14: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/14.jpg)
![Page 15: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/15.jpg)
![Page 16: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/16.jpg)
![Page 17: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/17.jpg)
![Page 18: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/18.jpg)
![Page 19: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/19.jpg)
![Page 20: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/20.jpg)
![Page 21: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/21.jpg)
![Page 22: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/22.jpg)
![Page 23: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/23.jpg)
![Page 24: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/24.jpg)
![Page 25: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/25.jpg)
![Page 26: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/26.jpg)
![Page 27: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/27.jpg)
![Page 28: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/28.jpg)
![Page 29: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/29.jpg)
![Page 30: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/30.jpg)
![Page 31: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/31.jpg)
![Page 32: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/32.jpg)
Summary of Measured Areas
• Totally connected impervious areas: 25.9 acres– parking 15.3 acres– roofs (flat) 8.2 acres– streets (1.2 curb-miles and 33 ft wide) 2.4 acres
• Landscaped/open space 15.4 acres
• Total Area 41.3 acres
![Page 33: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/33.jpg)
Stormwater Controls• Biofiltration areas
– 52 units of 40 ft by 8 ft– Surface area: 320 ft2
– Bottom area: 300 ft2
– Depth: 1 ft – Vertical stand pipe: 0.5 ft. dia. 0.75 ft high– Broad-crested weir overflow: 8 ft long, 0.25 ft wide
and 0.9 ft high– Amended soil: sandy loam
![Page 34: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/34.jpg)
Stormwater Controls (cont.)
• Wet detention pond– Surface area at pond surface:
• 3% of 25.9 paved acres = 0.78 acres• 0.5% of 15.4 unpaved acres = 0.077 acres• Total area: 0.95 acres
– Pond areas different depth:• 0 ft 0 acres 4 ft 0.95 acres• 1 ft 0.1 acres 5 ft 1.15 acres• 2 ft 0.3 acres 6 ft 1.25 acres• 3 ft 0.5 acres 7 ft 1.31 acres
![Page 35: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/35.jpg)
![Page 36: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/36.jpg)
![Page 37: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/37.jpg)
![Page 38: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/38.jpg)
![Page 39: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/39.jpg)
![Page 40: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/40.jpg)
![Page 41: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/41.jpg)
![Page 42: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/42.jpg)
![Page 43: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/43.jpg)
![Page 44: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/44.jpg)
![Page 45: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/45.jpg)
![Page 46: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/46.jpg)
![Page 47: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/47.jpg)
![Page 48: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/48.jpg)
![Page 49: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/49.jpg)
Runoff Volume ChangesBase conditions
With biofiltration
With pond With biofilt. and pond
Runoff volume (106 ft3/yr)
2.85 1.67 2.85 1.67
Average Rv 0.59 0.35 0.59 0.35
Average CN 98 96 98 96
% reduction in volume
n/a 41% 0% 41%
![Page 50: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/50.jpg)
Particulate Solids ChangesBase conditions
With biofiltration
With pond With biofilt. and pond
Particulate solids (lbs/yr)
30,250 27,650 3,660 3,320
Part. size controlled (flw-wgt meters)
n/a n/a 3.2 3.7
% reduc. in discharges
n/a 9% 88% 89%
![Page 51: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/51.jpg)
Residential Area Source AreasArea (acres) Large
lotsSmall lots
Total area
Roofs 0.39 0.52 0.91
Driveways 0.15 0.12 0.27
Sidewalks 0.06 0.04 0.10
Landscaped areas
1.61 1.07 2.68
Subtotals 2.21 1.75 3.96
Streets 0.57
Undeveloped area
1.07
Total area: 5.60 acres
![Page 52: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/52.jpg)
![Page 53: Area Measurements from Site Plans and Introduction to WinSLAMM Analyses Robert Pitt Dept. of Civil and Environmental Engineering University of Alabama.](https://reader036.fdocuments.us/reader036/viewer/2022062720/56649efc5503460f94c0f086/html5/thumbnails/53.jpg)
Example Area Calculations for Workshop Problem
Roofs Concrete around buildings
Street areas (widths)
Sidewalks Parking islands
Large landscaped areas
Parking
0.49 (35)
0.3 (20)
0.29 (40)
3.57 acres
2.88 acres
1.08 acres
0.07 acres 1.03 acres
3.98 acres 8.07 acres
17.3% 13.9% 5.2% 0.3% 5.0% 19.3% 39.0%