PORTFOLIO
CARLOS AFÁN DE RIBERA GARCÍA-LIÑÁN
ARCHITECTURE
background
INDEXbackground carlos afán de ribera
PERSONAL DETAILSEDUCATIONWORK EXPERIENCELANGUAGESCOURSESCAD SKILLS
0
0
INDEXconnected houseproject idea. ii year
ocupation of residual spacemultifunctional place. iii year
50 dwellings in trianasocial housing. iv year
flat transformationhousing. hq architects punctual work
1
2
3
4
5 projectscarlos afán de ribera
AILSTION
WORK EXPERIENCELANGUAGESCOURSESCAD SKILLS
0
1
regional fire stationpublic building. final degree project
projects
1 CARLOS AFÁN DE RIBERAArchitecture student trained at the University of Seville with proven abilities for architectural and urban design, having a good command of some 2D and 3D CAD programs. Organized, hard worker and used to work under pressure. Great experience working in teams. Flexible and open to change, as well as always prepared to contribute with new ideas. Optimistic and highly motivated, always keen to face challenges in order to get better every day. To conclude, it is worth mentioning the capacity to adapt to new environments and to get on well with colleagues.
PERSONAL DETAILS
2
Nationality Spanish
Date of birth 05/03/1990
Address Madre de Dios, 6 - Ground Floor. 41004, Seville, Spain
Mobile +34 616055680
Email [email protected]
CU
RR
ICU
LU
M
EDUCATION
2008-current Architecture at Escuela Técnica Superior de Arquitectura de Sevilla. Seville, Spain.
2012-2013 PG (Politechnika Gdanska). Erasmus Program. Gansk, Poland.
1996-2008 Primary, Secondary and High School at Tabladilla School. Seville, Spain. Graduated with special distinction.
WORK EXPERIENCEMay 2014 Workshop ICO Foundation. “The Architect is Present”. Anna Heringer´s Team member.
September 2013-April 2014 Temprado 10 Arquitectos. Internship.
September 2012 Miguel Díaz Zulategui Arquitecto. Internship.
May 2014 Workshop “Cátedra Blanca”. Cruz y Ortiz Arquitectos
OS AFÁN DE RIBERA
VIT
AE
Architecture student trained at the University of Seville with proven abilities for architectural and urban design, having a good command of some 2D and 3D CAD programs. Organized, hard worker and used to work under pressure. Great experience working in teams. Flexible and open to change, as well as always prepared to contribute with new ideas. Optimistic and highly motivated, always keen to face challenges in order to get better every day. To conclude, it is worth mentioning the capacity to adapt to new environments and to get on well with colleagues.
AILS
3
onality Spanish
Date of birth 05/03/1990
Address Madre de Dios, 6 - Ground Floor. 41004, Seville, Spain
Mobile +34 616055680
Email [email protected]
current Architecture at Escuela Técnica Superior de Arquitectura de Sevilla. Seville, Spain.
2013 PG (Politechnika Gdanska). Erasmus Program. Gansk, Poland.
2008 Primary, Secondary and High School at Tabladilla School. Seville, Spain. Graduated with special distinction.
WORK EXPERIENCE Workshop ICO Foundation. “The Architect is Present”. Anna Heringer´s Team member.
April 2014 Temprado 10 Arquitectos. Internship.
Miguel Díaz Zulategui Arquitecto. Internship.
Workshop “Cátedra Blanca”. Cruz y Ortiz Arquitectos
LANGUAGESSpanish Native
English Fluent Level
Certificates: C1. Certificate of Advanced English (CAE). 2013.
B2. First Certificate of English (FCE). 2007.
French Basic Level
FURTHER EDUCATIONFebruary 2014 - June 2014 Practical English Course for Architects. FIDAS Foundation, Seville, Spain. (36 hours)
February 2014 - April 2014 Autodesk Revit Architecture. Renders Factory Academy, Seville, Spain. (44 hours)
February 2014 - March 2014 Graphic Design with Adobe Photoshop, Illustrator and Indesign. (50 hours)
Centro de Formación Permanente. University of Seville, Spain.
February 2014 - March 2014 Structures calculation with CYPECAD. Renders Factory Academy, Seville, Spain.
(70 hours)
September 2013 El emprendimiento: la asignatura pendiente. (20 hours)
UNIA (Univesidad Internacional de Andalucía), Seville, Spain.
August 2013 Strategic Management. King´s College of London. United Kingdom. (150 hours)
August 2013 The Entrepreneur: Skills and Smart Thinking.
King´s College of London. United Kingdom. (150 hours)
February 2012 - April 2012 3D Studio Max and V-RAY. (50 hours)
CAD SKILLSAutocad Advanced Level
Adobe Photoshop Upper Intermediate Level
Cypecad Upper Intermediate Level
Abode Illustrator Intermediate Level
Adobe Indesign Intermediate Level
Revit Architecture Intermediate Level
3D Sudio Max Intermediate Level
Sketchup Intermediate Level
3
Adobe Indesign Intermediate Level
Revit Architecture Intermediate Level
3D Sudio Max Intermediate Level
up Intermediate Level
CONNECTED HOUSE4
The project consisted in building a model to
insert it within a exterior wall. The model
would make up a house for two people.
light
c bb
aa1
2
3
10 5m
Adobe Indesign Intermediate Level
Revit Architecture Intermediate Level
3D Sudio Max Intermediate Level
up Intermediate Level
NECTED HOUSE 5
The project consisted in building a model to
insert it within a exterior wall. The model
would make up a house for two people.
light
c b
aa1
2
3
MOCKUP + PHOTOSHOPThe way of solving this piece of wall was starting from a solid cube, as it was the real wall, and then extracting the mass
shaping the different spaces. There was a conection among all the rooms which at the same time were at different
heights. Depending on its functions, these rooms were differently illuminated.
10 5m
5 6
The program was solved around the living room, which was completely open to the public space. The services, compound
of kitchen, distribution gallery and toilet, form an L embracing the living room. To conclude, the bedroom was hidden over
the entrance, and was required to climb a stair to access to it.
MOCKUP + PHOTOSHOP
7
The program was solved around the living room, which was completely open to the public space. The services, compound
of kitchen, distribution gallery and toilet, form an L embracing the living room. To conclude, the bedroom was hidden over
the entrance, and was required to climb a stair to access to it.
MassChillida
Extract
a
b
c
1
23
MOCKUP + PHOTOSHOP
10 5m
OCCUPYING RESIDUAL SPACE 8
PPPPPPPPPPPPlllllllllllaaaaaaaaaaannnnnnnnnnn111111111111111111111000000000000000000000000 555555555555555555555555555mmmmmmmmmmmmmmmmmmmmmmm
ING RESIDUAL SPACE 9
The site is an unoccupied plot
placed in one of the corners
of the historical Alameda
Square in the city of Seville.
The purpose was to merge
the plot with the square,
involving the neighbors and
the casual visitors in the
project.
It could be used as a meeting
point, as a resting place or
just to walk through. Also it
could host street´s spectacle.
The project is complemented
with a scaffolding system to
build a viewpoint, where you
can enjoy the place in a
different way.
SKETCHUP + PHOTOSHOP
PPP aaaannn11111000 5555mm 1111100000 55555mmmmmSSSSSeeeeeccccctttttiiiiiooooonnnnn
9 10SKETCHUP + PHOTOSHOP
11SKETCHUP + PHOTOSHOP
11 12
Wrinkle
13
Temporal
Public
Adaptability
50 DWELLINGS IN TRIANA 14
SSSSSittttteeeee PPPPPlllllaaaaannnnn100000 55555m
Modules
0
50 DWELLINGS IN TRIANA 15
The plot is located in the historical distric of Triana, in Seville. The idea
was to occupy the empty place sewing the adjacent buildings following
an orthogonal pattern.
Using the “Unité d´habitation” of Le Corbusier as main reference, there
is a repetition of modules fullfiling the plot.
3D STUDIO MAX + PHOTOSHOP
it 1 m
Modules
Section A20 10 m
444444444444000000000000 22222222220000000000
222222222222222222222222222nnnnnnnnnnnnnnnnnnnnnnnnddddddddddd FFFFFFFFllllllllllloooooooooooooooooooooooorrrrrrrrrrr
a
15 163D STUDIO MAX + PHOTOSHOP
Sew
20 10 m
44444444440000000000 222222222220000000000
Social
The modules are repeated horizontally placing them next to each other.
They are placed in a way that terraces at different height appear, crea-
ting an interesting game of volumes.
The purpose was to create something like a village, where common
spaces has special importance, and relationship is search.
Vertically, a block is created piling modules. The access to the dwellings
are located every two storeys.
Section B 3333333333333333333333333rrrrrrrrrrrrrrrrrrrrrrrrrrdddddddddddd FFFFFFFFFllllllllllooooooooooooooooooooorrrrrrrrrr
a
bbbbbbbbbbbbbbbbbbbbbbbb
173D STUDIO MAX + PHOTOSHOP
Sew
20 10 m
440 220
Social
The modules are repeated horizontally placing them next to each other.
They are placed in a way that terraces at different height appear, crea-
ting an interesting game of volumes.
The purpose was to create something like a village, where common
al importance, and relationship is search.
Vertically, a block is created piling modules. The access to the dwellings
are located every two storeys.
Section B 3333rrrrrr F oorr
a
bbbbbbbbbbbb
17 18
00
1
2
module A1
00
1
module A2
The main module, repeated horizontally, could be single or double as
we can see in the images. Entrance was at the same level, creating a
terrace when the superior model was missing. The distribution of the
dwelling is an adaptation of the dwelling in the “Unité d´habitation”,
being simple and very modular and following “Le modulor” of Le
Corbusier rules.
19
00
1
2
module A1
0
00
0
1
2
00
1
module B2
module B1
module C
module A2
The main module, repeated horizontally, could be single or double as
we can see in the images. Entrance was at the same level, creating a
race when the superior model was missing. The distribution of the
dwelling is an adaptation of the dwelling in the “Unité d´habitation”,
ng simple and very modular and following “Le modulor” of Le
Corbusier rules.
There is a second type of modules, widther, whose function is to
occupy the excess of area not filled by the module A horizontally.
The third type of module was repeated vertically. The double-duplex
share a terrace in one of the storeys trying to promote the relationship
among the people who live there.
REGIONAL FIRE STATION20
00000000 5555555555555555555555550000000m SSSSSSSSSSSSSSSSSSSSSSSSSSiiiiiiiiiiittttttttttttttttteeeeeeeeeeeee PPPPPPPPPPPlllllllllllllaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnn
IONAL FIRE STATION 21MOCKUP + REVIT + PHOTOSHOP
55555
The project is located in Ecija,
one of the most important towns
of Seville. To be more accurate,
it is placed within a residential
area, but next to the main
leisure center in the neigbour-
hood.
Apart from that, since its impor-
tant position in the district in
terms of green areas, one of the
main intentions of the project is
to conect visually the private
and public gardens.
Besides, the objective was to
create an institutional building
for the people from Ecija. Thats
the reason of trying to reveal this
solid appearance. Also the only
use of ceramic materials except
in special details that we use
white concrete.
SSSSSSSSSiiiitt PPPllllaaaan
21MOCKUP + REVIT + PHOTOSHOP
22
2222222220 111100000mmmmm FFFFFFFFFFFFFFiiiiiiiirrrrrrrrrrrrrrsssssssssssssssssstttttttttttttttttttttttttttttttttt FFFFFFFFFFFFFFFFFFFFFFFFFFlllllllllllllllllllllllooooooooooooooooooooooooooooooooooooooooooooooooooooooorrrrrrrrrrrrrrrrrrrrrrrrrr PPPPPPPPPPPPPPPPPPPPPPPPPPPPllllllllllllllllllllllllllllllaaaaaaaaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnnnnnnnnnnnnnnnnnnnnn
The design is focused in solving
the schizophrenia that the
firefighter has to deal with. Their
tension andnerve go at their
best every mission.
So its shape, structure, interior
division and program is based
on the aim of dividing work
from relax. So there is some-
thing like an axis which separate
one from another.
0
aaa
MOCKUP + REVIT + PHOTOSHOP23
2220 111000mmmm FFFFiirrrrrrrrssssstttt Flllloooooo Pllaaaann
The design is focused in solving
the schizophrenia that the
firefighter has to deal with. Their
sion andnerve go at their
y mission.
So its shape, structure, interior
division and program is based
on the aim of dividing work
from relax. So there is some-
thing like an axis which separate
one from another.
0 10m Section ASection A
aaaa
23 24
The structure is dividen into two parts. The The
garage, with long spans, solved with steel gara
and the rest of the building solved with and
concrete.conc
Structure I: concrete
Structure II: Steel
25
The structure is dividen into two parts. The The
ith long spans, solved with steel gara
and the rest of the building solved with and
concrete.conc
rete
S II Steel
FLAT TRANSFORMATION 26
Final Plan10 5m
The project consisted in
transformating a flat, that
was being used as a clinic,
into a dwelling. The main
purpose was to reduce
cost, so there were many
limitations in terms of
defi
becau
keepi
possible.
Plan0 5m
New walls
FLAT TRANSFORMATION 273D STUDIO MAX + VRAY + PHOTOSHOP
Final Plan10 5m
The project consisted in
transformating a flat, that
was being used as a clinic,
into a dwelling. The main
purpose was to reduce
cost, so there were many
limitations in terms of
defining the spaces
because of the aim of
keeping as many walls as
possible.
My role in the project was to help in
the arrangement of the apartment,
defining the final plan, and to
develop a 3D model in order to
show the result.
Plan0 5m
walls