Architecture Portfolio

57
DANIEL CHANG ARCHITECTURE PORTFOLIO SYRACUSE UNIVERSITY

description

Design work done in Syracuse University

Transcript of Architecture Portfolio

  • DANIEL CHANG

    ARCHITECTURE PORTFOLIOSYRACUSE UNIVERSITY

  • CONTENTS

  • South Campus Dormitorycomprehensive design studio

    Florence Science Centerbridging the connection

    Hudson Yards Hotelsconnecting the high line to the 7 train

    Advanced Building Systemssherman fairchild center

    PHOTOGRAPHY | ILLUSTRATION

  • South Campus DormitorySyracuse, New York | Design collaboration with J. Suarez

    The project called for a newly designed dormitory for the south campus of Syracuse University. The initial design concept was generated from a malleable parti model. The concept was to have a ground floor of public program understood as one band with the dormitory above as a separate band. The public program consisted of a cafeteria, lounge, gymnasium, theater and study. The crossing of the two bands offers zones of outdoor/indoor conditions for communal gathering spaces.

    comprehensive design studio

  • process

    SITE

    The design concept began with the idea of a circulation alley-way that ran through public zones of program. It evolved into an idea of distinct programmatic bands, one for public program at the ground floor and one of dormitory rooms above that overlap and intersect one another, creating interstitial spaces dedicated to gathering.

  • 16

    UP

  • 16

    UP

  • 43

    1

    2

    3

    3

    3

    9

    UP

  • 3

  • 0 - 0

    roof floor

    ground floor

    + 15 - 3

    + 12 - 0

    dormitory 1st floor+ 28 - 0

    + 25 - 1

    dormitory 2nd floor+ 38 - 8

    + 36 - 4

    dormitory 3rd floor+ 49 - 5

    + 47 - 0

    dormitory 4th floor+ 60 - 0

    + 57 - 9

    roof+ 71 - 7

    + 68 - 5

    4 - 6 15 - 5 7 - 11 15 - 5 29 - 3 19 - 0

    12-0

    3

    -9

    9-1

    02

    -9

    8-4

    2

    -3

    8-4

    2

    -3

    8-4

    2

    -3

    8-4

    3

    -2

    15-9

    32168 64

    45-6

    cross section aascale 1/8

  • 0 - 0

    roof floor

    ground floor

    + 15 - 3

    + 12 - 0

    dormitory 1st floor+ 28 - 0

    + 25 - 1

    dormitory 2nd floor+ 38 - 8

    + 36 - 4

    dormitory 3rd floor+ 49 - 5

    + 47 - 0

    dormitory 4th floor+ 60 - 0

    + 57 - 9

    roof+ 71 - 7

    + 68 - 5

    4 - 6 15 - 5 7 - 11 15 - 5 29 - 3 19 - 0

    12-0

    3

    -9

    9-1

    02

    -9

    8-4

    2

    -3

    8-4

    2

    -3

    8-4

    2

    -3

    8-4

    3

    -2

    15-9

    32168 64

    45-6

    cross section aascale 1/8

  • 230.9477

    0 - 0ground floor

    basement-9 - 2

    9-2

    12

    -0

    3-9

    9

    -10

    10-7

    13

    -9

    45-6

    15

    -9

    10-7

    10

    -7

  • 230.9477

    0 - 0ground floor

    basement-9 - 2

    9-2

    12

    -0

    3-9

    9

    -10

    10-7

    13

    -9

    45-6

    15

    -9

    10-7

    10

    -7

  • cap flashing

    base flashing3 concrete parapet

    4 cast in place concrete roof slab

    wear course

    thermal insulation

    drainage layerroofing membrane

    vapor retarder

    grill

    2 wide hot water pipehydronic under floor radiator

    aluminum claddingattachment clip

    shim

    exterior plywood sheathinginsulation

    interior sheathing wallinterior finishing

    1 7/8 bolt connection

    embedded metal stud

    double glaze insulating glass windowmetal window frame

    steel channel1 7/8 bolt connection

    structural mullion

    4 cast in place floor slab10 concrete beam

    rebar

    floor finishing

    6 secondary concrete beam

    sound and thermal insulation

    double 5/8 gypsum boardingmetal suspenders

    return vent

    exhaust fanexterior operable vent

    aluminum cladding

    RHS aluminum framingoperable aluminum louver

    metal window framedouble glaze sliding windows

    insulationinterior finishing

    HRV supply vent

    metal stud wall w/ insulationindoor aluminum cladding

    plaster

  • The project called for a new science museum situated at the exit of the Uffizi Gallery and next to Palazzo Vecchio. The brief stated that the generator of the project was to be an architectural translation of a scientific instrument at the Galileo Museum.

    The Nobilis double Sparking Magnet is a device that creates and stores energy through the gyration of a central core conducting piece that creates and breaks a circuit connection with the two magnets. By translating this instrument into the site, the science center acts as a circuit connection between the Uffizi and Palazzo Vecchio. Through the implementation of a surface that can be digital, manipulative, interactive and informative with a circulation sequence that mimics the idea of an oscillating core, the center can become a flexible mode of display, a malleable environment that constantly engages the user and stimulates all modes of thought.

    Florence is often understood as a museum city, where preservation of the historic city fabric is of upmost importance. The idea of the science center was to preserve the existing language and order of the city while modernizing the interior through the use of technology, where display becomes an informative spectacle.

    Nobilis Double Sparking Magnet

    Florence Science CenterFlorence, Italybridging the connection

  • analysisRepresentation of the instrument transcribed into a sequence between the two structures. This sequence gave rise to a circulatory pattern that attempts to bridge these two structures in an oscillating fashion.

  • process

  • Second Floor Plan

    Ground Floor Plan

  • Third Floor Plan

    Fourth Floor Plan

  • HUDSON YARDS HOTELSNew York City | Design collaboration with Z. Goldstein and S. Reynoldsconnecting the High Line to the 7 train

    7

    The proposed 7 train extension and phase three of the High Line intersect at Hudson Yards, creating an opportunity to connect these two infrastructures. The challenge of the project is understood sectionally, where the subway stop and highline are separated by more than 100 in height.

    Within Hudson Yards are the Javits Center, New York Citys convention center designed by I.M. Pei and the newly proposed Hudson Yards Development consisting primarily of large residential apartments. These elements, along with the High Line and 7 station offer multiple facets of design with regards to user groups and program.

    The designed intervention was of five hotels ranging from one star to five star, connected by a common sky lobby with commercial program below. In order to mask the depth of descent from the high line to the 7 subway platform, trees were inserted throughout the path within the plazas as well as in the stairs themselves, creating a green trail among the typical concrete city surroundings.

  • FLUSHING MAIN STREET 34TH AND 11TH AVENUE

    7 14 bus linesLIRR train

    automobileACE subway

    Penn station

    ferry

    population 28% use population 22% use

    FlushingMain Street

    13

    74 street

    14

    1 2

    7

    Grand Central Station 42nd St

    Times Square 42nd St

    Hudson Yards 34th and 11th

    flushing station - ranked 12 - 57,753 weekday users

    flushing population - 200,000

    57,753 / 200,000 = 28.8% of residents use flushing station 7

    projected Hudson Yards population - 315,000 (workers incl.)

    (315,000 * 22%) + (26,550 - (15,000 / 2) * 32%) = 75,396 WD users32%265502905736041

    WEEKDAY

    SATURDAY

    SUNDAY

    7

    ranked 7half are hotel users accounted in original population

    83% workers

    12% residents5% hotel

    =

    PM Peak Hour Manhattan Analysis

    Significant PM Peak Hour Congestion

    77 ... development inhabitants potential

    NEW YORK CITY GROWTH FORMULA

    7 + development inhabitants potential

    significanttransportation

    development inhabitants potentialM

    BAR

    VIEWING SPECTACLE

    FOOD STALLSFARMERS MARKET

    OUTDOOR SPORTING

    TEMPORARY GALLERIESMEDIA GARDEN

    BIKE RENTAL

    HUDSON YARDS

    HIGHLINE

    HU

    DSO

    N R

    IVER

    PAR

    K

    7

    JAVITS

    THEATRE

    COFFEE

    GROCERY

    DAY CARE

    GYM

    LUNCH SEATING

    AQUARIUM

    hotel guestage.55

    hours on site.10m t w t f s su

    priorities. convention centersite seeing

    buisness personage.36

    hours on site.8m t w t f s su

    priorities. social scenelunch

    efficiency consolidation

    touristage.30

    hours on site.5m t w t f s su

    priorities. convention centersite seeing

    family residenceage.40,8,10

    hours on site.16m t w t f s su

    priorities. efficiency consolidationsocial scene

    family entertainment

    studentage.20

    hours on site.3m t w t f s su

    priorities. media entertainmentsports

    employeeage.26

    hours on site.8m t w t f s su

    priorities. media entertainmentsports

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    SUMMER

    WEEKDAY

    WEEK END

    AMPM

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    M T W Th F S Su M T W Th F S Su

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    WINTER

    WEEKDAY

    WEEK END

    AMPM

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    HUDSON YARDS HIGHLINEH

    UD

    SON

    RIV

    ER P

    ARK

    7

    JAVITS

    M T W Th F S Su

    SUBWAY LANDMARKS

    7

    program/user analysisDesign concepts began through studying user groups within the area and coming from the High Line and 7 train. Multiple programmatic concepts and arrangements were considered with regards to these users and their flow.

  • gym

    grocery

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    bowlingalley

    bar

    stage

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7food

    shops

    viewingstalls

    bar

    media

    streetmarket

    library

    coee

    mediagallery

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7food

    gallery

    performance

    gymoutdoorcourts

    bar

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    theater

    outdoorseating

    display

    food

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    library

    seatingspectacle

    driving range

    tavern

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    playgroundbilliards

    pub

    pavillion

    bike rental

    pool

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    shueboard

    dancing

    ballroom

    internationalfood

    studiosrollerrink

    OTB

    javits

    highline

    hudson yards

    park

    javits

    highline

    hudson yards

    7

    park

    7

    club

    live stage

    miniputt

    pizza

    courts

  • SITE

    ?

    HIGH FLOORS CAN SEE WATERFLOORS ROTATED TOWARD WATER

    SEMI-HIGH FLOORS CAN SEE JAVITS ROOFFLOORS ROTATED TOWARD JAVITS ROOF

    LOWER FLOORS CAN SEE PARK ARMATUREFLOORS ROTATED ON AXIS WITH PARK AMATURE

    PURCHASE ADJACENT FAR

    early schematic designSite is in-between the Javits Center and the Hudson Yards Development where phase three of the High Line will terminate. Early schemes looked into primarily athletic programs, pedestrian circulation patterns and the experience of arriving at the structure via subway.

  • three hotel schemeThe design begins to go away from a singular structure towards a multiple structure approach that is integrated with the sequence of transitioning from the High Line towards the 7 subway station in a green pathway.

  • HIGHLINE

    7 Hudson Yards34 Street StationSubway

    five hotel schemeThis final scheme transitioned from three hotels to five hotels while maintaining the idea of the sky lobby and the green descent. The hotels range from 5 star to 1 star, where the height of each hotel is representative of the demand in New York City. Window sizes dictate the star level of the hotel.

    HOTEL

    RETAIL

    LOBBY + SHARED AMENITIES

    DEM

    AND

  • HIGHLINE

    7 Hudson Yards34 Street StationSubway

  • 7 Hudson Yards34 Street StationSubway

  • 7 Hudson Yards34 Street StationSubway

  • Advanced Building Systemssherman fairchild center

  • PHOTOGRAPHY | ILLUSTRATION

  • KO B E B R YA N T24 l o s a n g e l e s l a ke r s

    B E N WA L L A C E3 d e t ro i t p i s t o n sA N D R E I K I R I L E N KO47 u t a h j a z z

    PA U L P I E R C E34 b o s t o n c e l t i c s

    TRUE FALSE

    C H R I S A N D E R S O N11 d e nve r n u g g e t s

    L E B R O N J A M E S6 m i a m i h e a t