ARCH 330 Fall 2008 Third Set
description
Transcript of ARCH 330 Fall 2008 Third Set
ARCH 330ARCH 330Fall 2008Fall 2008Third SetThird Set
Rough CarpentryRough Carpentry
Wall, Floor & Roof Wall, Floor & Roof SystemsSystems
Rough C
arp
entr
y
wall
fram
ing
Header
Cripple
Trimmer
Studs
Rough Sill
(Usually ¼” per side)
Rough Opening
Rough C
arp
entr
y
wall
fram
ing
- job
site
photo
Rough C
arp
entr
y
wall
fram
ing
Engineered Floor Joist (TJI)
King StudTrimmer Stud
Glulam Header
Floor Joist (TJI) Blocking
Rough C
arp
entr
y
head
er
fram
ing
- jobsi
te p
hoto
Trimmer Stud
Stud (typical)
Cripple
Header
Wall Sheathing
Engineered Roof Joist
Roof Sheathing
Hold Down Strap @ Shear Wall
Roof Truss
Roof Sheathing
Double Top Plate Stud
Cripple
Trimmer Stud
Sky
Roof Truss
Stud (typical)
Double Top Plate
Blocking Stud @ Perpendicular Wall
TemporaryBracing
Roof Truss
Stud (typical)
Trimmer Stud
Double Top Plate
Cripple
Rough C
arp
entr
y
wall
fram
ing
- b
ays
& g
ab
le
en
ds
Rough C
arp
entr
y
corn
er
bra
cing
Rough C
arp
entr
y
wall
sheath
ing
Rough C
arp
entr
y
roof
fram
ing
- s
tick