Transcript of ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME)...

Page 1: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

ARC Communication Board

Page 2: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Team MembersCortney Ross (ME) – Project ManagerKirk Marquard (ME)Achilles Tziazas (CE)Amy Koster (ID)Rachel Lepkowski (ID)

Elizabeth DeBartolo (ME) – Project GuideDaniel Phillips (EE) – Project GuideStan Rickel (ID) – Project Consultant

Page 3: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Team Organizational Chart

Page 4: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Project OverviewOur customer, Donna, is a

mentally handicapped young adult who is in a motorized wheelchair. She has speech disabilities so she needs a special way to communicate with people who don’t know her well. She currently uses a book full of pictures that she and the staff that helps her is familiar with. Last year, a SD project designed a touch screen audio device to help her communicate with new people.

Page 5: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Customer Needs1.Safety

1.Customer Safetya.No Interference With Wheelchair Controlsb.Easily Be Able To Get Out of Way of Customer

i.Low Obstruction of Visionc.Custom Enclosure

2.Product Safetya.Fixed to Wheelchairb.Adequate Product Sizec.Adequate Product Weightd.Durable and Robuste.Weather Resistant

i.User Friendlya.Graphical User Interfaceb.Picture Basedc.Flow of Components on Wheelchair (Overall System)d.Customer Requests

•Female Voice Output•Colorful and Girly Case

1.Convenience1.Battery

i.Easily Chargedii.Able To Plug In and Rechargeiii.Long Battery Life

a.System Must Be Fastb.Customer

•Left Hand Design•Antiglare Screen

1.Volume Adjustment for Staff2.Upgradable By Staff

Page 6: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Current Design: “Big Pink Box”

Page 7: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Embedded ComputerComputer of choice: EBC-7040• Reasons:

• Cheap ($370)• Small size• Robust construction (absorbs vibrations, cushioned

design, fanless operation)• ARM9 class processor (high performance & “ultra-

low” power consumption)• Ready “out of the box”• Can come with both Windows CE or Debian Linux• Supports up to 1280x1024 resolution• Integrated Audio• Only weights 0.4kg• USB port for LCD Touch Screen

Page 8: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Issues:Slow response time from Embedian.com

affects buying all other components (Taiwan)Embedian mentioned in their most recent e-

mail that their Windows CE is “not mature yet”

There is still the option for Linux for this box though

Time is running out!Backup plan: ARK-1370 by Advantech

Embedded Computer

Page 9: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

LCD Touch ScreenLCD chosen: Caltron 12.1 inch Open Frame LCD (FBT-

12120)Reasons:

Choice of USB or Serial (chosen USB Plug & Play)Specs allow for 85% humidityThin design (only 1.45 inches thin)Option of Resistive vs Acoustic Wave (chosen Resistive

because of the ease of operation and it is also cheaper)Satisfies desired resolution of 800x600Weight is O.K. : 1.4kg = 3.3lbPrice is around $600 before their educational discountHas drivers for Windows CE and for “popular Linux

distributions”

Page 10: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Issues:Caltron is out of these LCDsNew shipment coming in approximately 10

days without counting any other delays like issues at the customs More delays

If we have to go back to using Linux, the drivers do not specify which Linux distributions are supported

Backup Plan: Use the LCD that is in the “big pink box”

LCD Touch Screen

Page 11: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

BatteryPower Requirements

Using: h = 16 hoursEBC-7040: Needs a 12V, 32,000 mAh batteryLCD Touch Screen: Needs a 12V, 46,720 mAh

batteryA 12V battery should provide the necessary currents.

Issues:Should I add 32,000+46,720 to come up with the

desired mAh?Not an electrical engineer Need more help with

electrical engineering aspects of the project (already visited Dr. Slack)

Page 12: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Operating SystemReasons:

Easier for the current developer to code using Visual Studio Using previous knowledge

.NET is very popular and easy to programData from companies that develop embedded

systems benefit Windows CE Need less developers per project Less “time-to-market” for Windows CE (number of

months from design to first shipment)Issues:

Issues with Embedian’s Windows CE

Page 13: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Cable connectorCurrent decisions:

Looked into using a parallel cable to carry: Audio (sound) Video Power USB

to the front panelResults:

The only way to find out if it works is to actually implement this ASAP even without having the components (Dr. Slack’s suggestion)

Might face issues if a parallel cable is used, due to the reason that video is a high speed signal (Dr. Slack & Dr. Reddy)

It can be done but the only way to find out is to try it out

Page 14: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Pictures Under Donna’s Chair

Page 15: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Pictures Under Donna’s Chair

Page 16: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Pictures Under Donna’s Chair

Page 17: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Final Arm Design Assembled View

Page 18: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Final Arm Design Exploded View

Page 19: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Final Arm Design Attached To Sample Wheelchair

Page 20: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Purchasable Arm Hardware Daessy Lockable Frame Clamp LRFA+RTHTM+O3L Lockable Rear Folding Adapter with Tube Mount & Offset Link

(requires lock) Fits 7/8” Tube Angle Positioning with Locking Adjustments Quick Release for Complete Removal of Arm. Price : $340.00 (In process of designing a similar component to

make from scratch – save money)

http://www.daessy.com/dms/dpm9/indexpm.html

Page 21: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Purchasable Arm Hardware McMaster Incremental Angle Hinge P/N 1258A22 2040 in-lbs Max Torque Price: $112.00 (Could be made from

stock save money)

Page 22: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Purchasable Arm Hardware Ball Base Tube Mount U-Bolt Clamp to

7/8” Diameter Tubing Easychair: RM-02c Price : $20.00

Socket Arm Used for Ball bases Easychair : RM-06 Price : $30.00

Ball Base Flat Mount Uses #8 and #10 Screws for mounting

Easychair: RM-02 Price: $20.00

All Used for LCD/Laptop Mounting

http://easychairworkstation.com/products.htm

Page 23: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Standard Arm Push Strength

Max Push Force Male Of 5th Percentile MIL-STD-14720

52 lbs MAX

http://books.google.com/books?id=QZc2QRI0wnQC&pg=PA610&lpg=PA610&dq=how+much+force+can+a+human+exert&source=web&ots=zw5mm3ASMl&sig=pQFkyIdI056QthbEUKoYYF_rLnY#PPA612,M1

Page 24: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Hand Calculations See JPG Images See Excel Spreadsheet

Page 25: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Computerized Stress Analysis Using COSMOS Express to verify Hand Stress Calculations

Page 26: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Stress Comparison To Strait Bar

Page 27: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Hand Sketched Case Designs

Page 28: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Hand Sketched Case Designs

Page 29: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Hand Sketched Case Designs

Page 30: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

SolidWorks Case and GUI Design

Page 31: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Shock MountingWhat needs to be shock mounted?

Computer to wheel chairBatteries to wheel chairPOSSIBLY LCD touch screen to casing

Already be accounted for in arm design

Page 32: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Shock Mounting

Page 33: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

ThermoformingCJK is aware of our project and is willing to

work with us to make a successful casehttp://www.youtube.com/watch?v=WL-h0HAc

dFADemonstration at Miller Plastics in PA

Awaiting response on what type of plastics that can be thermoformedLooking into polycarbonate, delrin and UHMW

polyethyleneNeed to finalize CAD design to send over to

them

Page 34: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Our BIGGEST Concern: OUR WEBSITE IS GONE!!!

Page 35: ARC Communication Board. Team Members Cortney Ross (ME) – Project Manager Kirk Marquard (ME) Achilles Tziazas (CE) Amy Koster (ID) Rachel Lepkowski (ID)

Questions.. Comments.. Concerns???