arman ALI Saudi Aramco (Satorp) Approved Email Id: [email protected] Cell No : +966 55 6633274 POST APPLIED FOR QA/QC INSPECTOR (electrical) BRIEF SUMMARY A versatile, analytical and result oriented Quality Control / Construction & Maintenance professional with over 16 years experience with well established companies in the Middle East and Pakistan. Currently Electrical QC Inspector with DRAKE&SCULL K.S.A. involved in operation and data canter Project AL RAJHI BANK RIYADH. Possesses a thorough knowledge of safety and quality standards followed in the oil and gas industry, refineries and petrochemical plants. Skilled at reading of PID's, engineering drawings, wiring and block drawings, loop drawings and. Well known about International standards (NEC, NEMA, API, IEC, ANSI, and IEEE). Well known about Saudi Aramco and International Standards. Strong expertise in reviewing and enforcing quality control procedures (QCP), inspection and test plans (ITP) to ensure compliance to the required standards. In depth hands on experience in pre-commissioning activities, Calibration of relayand electrical testing for LV/MV/HT circuit and switch gear and functional test etc. Proven leadership skills in multi cultural environments, adapts easily to changed situations / environments and consistently seeks to upgrade skills and keep pace with changing technology. PROFESSIONAL EXPERIENCE (DRAKE & SCULL KSA.) ODC PROJECT BANK AL RAJHI RIYADH CONSULTANT# ARCADIS. Client Designation Period Project BANK AL RAJHIRIYADH QA/QC Inspector (Electrical)cum MEP 13 Sep 2014 to Till TIER # 4 DATA CENTER & OPREACTION BUILDING Responsibilities: Monitoring & Inspection of the construction activities and material approvals and inspection of the subcontractor. Monitoring & Inspection with subcontractor QC inspector and Megger testing of LV cables, Inspection of Cable Termination torque test. LV &MV motors inspection and testing. Resume of Arman Ali

Transcript of ar qc pk

Page 1: ar qc pk

arman ALISaudi Aramco (Satorp) ApprovedEmail Id: [email protected] No : +966 55 6633274

POST APPLIED FOR QA/QC INSPECTOR (electrical)

BRIEF SUMMARY

A versatile, analytical and result oriented Quality Control / Construction & Maintenance professional with over 16 years experience with well established companies in the Middle East and Pakistan.

Currently Electrical QC Inspector with DRAKE&SCULL K.S.A. involved in operation and data canter Project AL RAJHI BANK RIYADH.

Possesses a thorough knowledge of safety and quality standards followed in the oil and gas industry, refineries and petrochemical plants.

Skilled at reading of PID's, engineering drawings, wiring and block drawings, loop drawings and. Well known about International standards (NEC, NEMA, API, IEC, ANSI, and IEEE). Well known about Saudi Aramco and International Standards. Strong expertise in reviewing and enforcing quality control procedures (QCP), inspection and test

plans (ITP) to ensure compliance to the required standards. In depth hands on experience in pre-commissioning activities, Calibration of relayand electrical

testing for LV/MV/HT circuit and switch gear and functional test etc. Proven leadership skills in multi cultural environments, adapts easily to changed situations /

environments and consistently seeks to upgrade skills and keep pace with changing technology.

PROFESSIONAL EXPERIENCE

(DRAKE & SCULL KSA.)ODC PROJECT BANK AL RAJHI RIYADH

CONSULTANT# ARCADIS. Client Designation Period Project BANK AL RAJHIRIYADH

QA/QC Inspector (Electrical)cum MEP

13 Sep 2014 to Till TIER # 4 DATA CENTER &OPREACTION BUILDING

Responsibilities: Monitoring & Inspection of the construction activities and material approvals and

inspection of the subcontractor. Monitoring & Inspection with subcontractor QC inspector and Megger testing of LV

cables, Inspection of Cable Termination torque test. LV &MV motors inspection and testing. Establish quality control standards and supervise their implementations. Inspect the material samples at site to incorporate with the commented approvals. Order, inspect, and verify quantity and quality of materials and supplies. Adhere to Quality Assurance and Quality Control policies and procedures. Liaise with project management teams to identify the motives for any given work request

to ensure the scope of work agreed suitable and completing task within the agreed timeframe.

For mechanical systems testing not only smoke for ducting, pressure test for water supply, firefighting, chilled pipes, drainage system gravity test, air balancing for supply air and pressure test for diesel tanks and welding works.

Resume of Arman Ali

Page 2: ar qc pk

Deference scenarios of UGWT, fuel tanks and pipe line works. Material Receiving, installation and Inspection of M.V Switch Gear, M.V Power

Transformer, Cable Bus, L.V Switch Gear, Motor Control Canter, Dry type Transformer, Panels and, Battery charger, etc.

Inspection of cables, cable tray, conduits, duct bank, and trenches. Grounding system Lighting system and receptacles Inspection and witnessed for testing of mv cables 6kv to 66kv insulation Continuity and

Hi-Pot Test Inspection and witnessed for Testing of current Transformer –IR, Continuity, and Ratio

test, etc. Inspection and witnessed for Testing of LV MV motors -Winding resistance, IR,

Polarization Index test Inspection and witnessed of all field LV, MV and control cables and cable gland marking

and identification.

(SAUDI BINLADIN GROUP)VISION ETIMAAD ENGINEERING.Bin ladin Group.

MAIN CONTACTOR DAR AL HANDASAH. Client Designation Period Project DAR AL HANDASAH

QA/QC Inspector (Electrical) 28 Nov 2013 to Aug 2014

Third Saudi Expansion of Holly HARAM MAKKAH

Prepare IR and participate site inspection with client. Inspection of Electrical and MEP materials, tools and equipments.Daily routine site

inspection of construction group for electrical and MEP works. Preparation of IR when work is ready for final inspection by client.

CARLO GAVAZZI ARABIA CO.LTD, Bonatti Group

MAIN CONTACTOR TECHNIP S.P.A.

Client Designation Period Project SATORP QA/QC Inspector (Electrical) June 2011 to Aug 2013 JERP - Package#5A

Responsibilities: Responsible for the implementation of Inspection and Test Plan, Quality Control

Procedures during execution of Electrical/ Instrumentation works on site. See to it that the works are done according to the Approved for Construction drawings

and specifications, Saudi Aramco or other contractual standards. Site coordination/monitoring of site personnel regarding construction work and Quality

Control Procedures. Prepare RFI and participate site inspection with client. Inspection of Electrical and Instrumentation materials, tools and equipments.Daily

routine site inspection of construction group for electrical and instrumentation works. Preparation of RFI when work is ready for final inspection by client. Monitoring of corrective action when there are non-conformities or Punch list. Inspection of incoming electrical and instrument materials and equipments. Preparation of Quality documents like erection checklist reports, Test reports, Pressure

Tests, 2-week Look Ahead program, As-built drawings, etc.

Resume of Arman Ali

Page 3: ar qc pk

Responsible for the all recommissioning activities from the vendor. Related electrical equipment like LV MV motors cables panels lighting system HVAC

system. Witness on vendor pre-commissioning/commissioning CT&VT ABB 13.5KV related all

test and Bus Bar AC high potential test.

FERTIL UAE. Ruwais Fertilizer Industries DESCON Engineering.UAE)

Client Designation Period ProjectFERTIL UAE Lead man (Electrical) Nov 2008 to Dec 2010 Urea

Debottlenecking Project

Responsibilities: Monitoring & Inspection of the construction activities of the subcontractor. Monitoring & Inspection with subcontractor QC inspector and Megger testing of LV

cables, Inspection of Cable Termination torque test. LV &MV motors inspection and testing and commissioning work. Main grounding work under ground and above ground.

Descon Engineering UAE & PAKISTAN & Etimaad Engineering. Pakistan

DETAIL#

Client Designation Period ProjectAUCH GAS FIELD (OGDC).PAKISTAN

Electrical tech

OCT2008 TONOV 2008

Shut Down,s & maintenance work in OIL & GAS PLANTS

Dubai Electrical and Water Authority.(DEWA).UAE

Electrical tech

NOV 2007 TO FEB 2008

Abu Dhabi Gas Liquefaction Company. (ADGAS).UAE

Electrical tech

Sep 2007 To Dec 2007

Pakistan petroleum Limited Rawalpindi.PAK

Electrical tech

July 2007 To Aug 2007

Fuji Fertilizer Bin Qasim Limited.(FFBL)KARACHIPAK

Electrical tech

March 2007 To May 2007

Abu Dhabi Polymer Limited (Borouge). UAE

Electrical tech

Nov 2006 To Feb 2007

Maple Leaf Cement Factory. Pakistan

Electrical tech

Aug 2006 To Nov 2006

Atomic Energy Chashma Nuclear Nuclear Power Plant.pak

Electrical tech

JULY 2008 To SEP 2008

M. Tech Pvt Ltd. Switch Gear Company . Paksitan

Company Designation Period Loction M.TECH PVT LTD. Electrical Tech Jan 2004 to Aug 2006 Lahore .pak

Resume of Arman Ali

Page 4: ar qc pk

I worked on different type of new industrial panels’ termination. Main control panels and change over panels, also work on air circuit breaker power factor improvement panels. Motor control circuit. DOL), Star Delta, Reverse Forward stator, Digital control variable speed driver (VFD, VSD) and DCS system, and PLC control panels. Following Installation work in field.

Dawood Hercules chemical ltd. DCS termination. Attock Oil Refinery limited. DCS system United Detirganted Unilever Pakistan. PLC, VSD,

Waves Cool Industries Pvt. Ltd . Pakistan

Company Designation Period LoctionWaves cool Industries

pvt.LtdElectrical tech Feb 2002 to Dec 2003 Lahore. pak

Handle to power and control circuit maintenance specially star delta, (DOL) direct on line stator, reverse forward, electronics (control card),Lath machine, generator AVR, power factor improvement circuit, injection moulding machine, telephones exchange.

PROFESSIONAL QUALIFICATION

1. Diploma of Associate Engineering (DAE) in Electrical Engineering from Govt Poly Technical Institute Jhelum, (1998-2001).

2. Secondary School Certificate (SSC) From Govt High School Ali Pur Chatha.3. AUTO CAD (2D/3D), DOS, Internet, Ms Word, Excel, Office, Power Point, including software and

hardware installation

TRAININGS ATTENDED

H2S & Breathing Apparatus Seminar (BOROUAGE)UAE Work at confined space training (ADGAS)DAS ISLAND UAE Work at height training (FERTIL) Incident and Injury Free (IIF) seminar (DEWA) Permit to work (PTW) course (SATORP) Log out Tag out (LO/TO)and testing works training (Technip) Safety induction and Behaviour-Based Safety (BBS)training (CGA)

PERSONAL INFORMATION

NAME : ARMAN ALI FATHER’S NAME : SIRAJ DIN DATE OF BIRTH : 1Oth OCT 1981 NATIONALITY : PAKISTAN LANGUAGES : ENGLISH, HINDI, URDU, ARABIC PASSPORT NO : GB-1795742

Resume of Arman Ali