Aquatic Alliance Brochure 2009

26
Making Dreams Reality

Transcript of Aquatic Alliance Brochure 2009

Page 1: Aquatic Alliance Brochure 2009

Making Dreams Reality

Aquatic Mechanical Consulting

Page 2: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Submittal of Qualifications

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 3: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Table of Contents

Firm History and Services 1

Featured Projects 2

Relevant Project Experience 3

Key Personnel Resumes 4

Don Carey, Principal - Aquatic Specialist

Melchor Berona, PE, LEED AP, Principal - Mechanical Engineer

Rey Delansig, PE - Mechanical Engineer and Project Manager

Tom Hammond, PE - Structural Engineer

Cody Butcher - Aquatic Specialist

Regulatory Agency Knowledge 5

Sustainable Design Practices

Added Value

Contact Information 6

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 4: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Firm History and ServicesBerona Carey Aquatic Alliance (BCAA) is a joint venture group specializing in aquatic, recreation and sports facility, consulting, planning, facility audits, energy audits and economic feasibility studies for counties, school districts, YMCA and athletic clubs, resorts and private developments. Our team has a specialized background to meet the needs of aquatic, recreation and sports facilities and programs conducive to mass participation. BCAA takes pride in its ability to provide a full-range of project services from feasibility studies, to engineering-only through the completion of construction. In addition to ensuring that our technical knowledge is up to date, we guarantee that our designs meet all current and applicable codes.

Services Provided Aquatic Leisure Parks Indoor Aquatic Centers Outdoor Aquatic Centers Wellness Centers Facility Audits Mechanical Engineering Feasibility Studies Energy Audits Cost Estimating Cost Control Grant Writing Code Review Construction Documents Electrical Engineering Structural Engineering Architectural Design Support Facility Programming

Architectural Design SupportBCAA works closely with architectural firms to provide engineering and specialized aquatic, fitness and recreational consulting services with experience at all levels of aquatic design. Our approach results in user oriented, operationally efficient, high-quality facilities with multiple programming capabilities and excellent cost recovery potential. Our experience in operations provides us with and ‘edge’ in design and development as well as our personal experience managing all types of facilities.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 5: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Mechanical EngineeringBCAA has extensive experience in the design of mechanical systems that are energy efficient, cost-effective and easy to maintain. We structure each system to the particular needs of the project. In addition to coordinating with architectural firms, BCAA offers mechanical systems designed for HVAC in all types of facilities including specialized systems for swimming pools that include filtration, chemical systems, pumps, piping, heating, facility plumbing and commissioning. BCAA has provided complete mechanical design for both new and upgraded facilities.

Feasibility StudiesBCAA provides feasibility studies that cover the full-range of services including: programming, economic, operation and technical. We assist our clients with programming and attendance figures derived from the dailey program schedule, tailored to each facility. Client needs, alternative funding, revenue and expenses, potential facility design options and estimate construction cost are also addressed, providing a basis for informed decision making. BCAA is often engaged to conduct feasibility studies for clients. Since these engagements occur throughout the United States, we take special care to research state and local codes, environmental implication and other considerations and address the specific technical requirements.

Facility ProgrammingManagements, maintenance and operations programming are essential elements in cost recovery and facility quality. We work side-by-side with the management and staff in opening a new or recently renovated facility. We facilitate review and evaluations and reorganization processes.

Work ExperienceBCAA has provided consulting services for more than 300 aquatic and recreational projects. Don Carey has hand on experience in management, operation and design of aquatic and recreation facilities. Melchor Berona works with clients to provide them with detailed information on their facilities’ mechanical and control systems, including life expectancy, energy efficiency and maintenance issues.

Construction ManagementBCAA has provided construction management services for many aquatic and recreation facilities. We work closely with the architects, owners and contractors throughout the entire project in order to assure a well-built and functional facility. We realize that the life span of the facility is important to everyone and we closely monitor every step of construction.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 6: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Featured ProjectsKamiak High School, Mukilteo, WashingtonDon Carey served as Design Consultant for the architect on this new 125-foot by 45 foot swimming pool with movable bulkhead. The pool was part of a 40 million-dollar new high school project. The pool has overflow deck level gutters for a wave free pool. Faciltiy also has a diving tank and electronic timing system. The mechanical room has a high-end rate sand filter and ozone system.

Sun River Resort Swimming Pool, Sun River, OregonThe renovation of this thirty-year old outdoor pool included raising the bottom of the pool to increase use by expanding space for water games and family activities.

6,000 Sq. Ft. swimming pool Kiddy play pool Shallow water for family activities Water mushroom and spray toys Non-corrosive high rate sand filters Locker rooms Ozone system 50 Ft. water slide Kiddy slide Water basketball and volleyball

Yakima Parks and Recreation, Franklin, WashingtonWork Included:

Re-surfacing of pools Raising the bottom of pools Installed new gutters Resurfaced pool decks Renovated locker rooms

Added Amenities: Created kiddy pool Installed spray toys Installed 100+ foot slide Water toys Water basketball

Renovated the Mechanical Systems: New high rate sand filters New chemical systems

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 7: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Moon Valley, Phoenix, ArizonaAquatic, sports, fitness, and golfing center with 36 hole course included the following features:

140 Ft. pool with moveable bulkhead Zero-depth kiddy pool with water spray

toys 1 and 3 meter diving boards Electronic timing system Hot tub, sauna and steam room Racquetball courts /regulation gymnasium Fitness center Ozone and high rate sand filters Concessions: indoor and outdoor Pro-shop

Wild Waves Water Park, Federal Way, WashingtonDeveloped the construction documents for the waterslide at Enchanted Village for the children’s play area and supervised construction. The mechanical and structural documents for Wild Waves first park which included the wave pool, deep water pool, waterslides, and spas. Additionally we developed the construction documents for phase II of the water park including additional water slides, kiddy pool with water toys, water slide, surf hill and also provided construction supervision. Phase III we developed the plans for the bumper boat pool and supervised the construction; developed a new plan to upgrade the chemical system for all pools.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 8: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Relevant Project Experience

New and Renovated Indoor Aquatic, Recreational and Sports Facilities

City of Wainwright Wainwright, AK Fircrest School Seattle, WACity of Baker City Baker City City of Rupert Rupert, WACity of Ontario Ontario, OR City of Fife Fife, WACity of Evanston Evanston, WY City of Woodburn Woodburn, ORCity of Craig Craig, AK Haines School District Haines, AKStevenson School District Stevenson, WA Northern Arizona University Flagstaff, AZKent School District Kent, WA Lake Washington School District Kirkland, WA Mukilteo School District Edmonds, WA North Thurston School District Lacey, WACollege of Idaho Caldwell, ID Chehalem Park & Recreation District Newberg, OR Puyallup School District Puyallup, WA Puyallup Indian Nation Puyallup, WACentral Community College Seattle, WA Parkrose School District Portland,OR Douglas County Park & Recreation East Wenatchee, WA Inn at Semi-Ah-Moo Blaine, WAMarriott Residence Hotel Seattle, WA Marriott Resort Hotel Sea Tac, WARiggins Hot Springs Riggins, ID Black Mountain Ranch Deming, WANew Life Fitness Center Lynnwood, WA West Seattle Athletic Club Seattle, WAWoodinville Athletic Club Woodinville, WA Monroe Fitness Center Monroe, WAPanorama City Senior Estates Lacey, WA Olympus Spa Club for Women Lynnwood, WAAnchorage Swim & Tennis Club Anchorage, AK Tacoma YMCA Tacoma, WAOlympia YMCA Olympia, WA Santa Ana YMCA Santa Ana, CAEastside YMCA Bellevue, WA SW Tacoma Community Center Tacoma, WAJuanita Racquet Club Kirkland, WA Ashland YMCA Ashland, OREverett YMCA Everett, WA All Star Fitness Club Seattle, WAOregon Athletic Club Portland, OR Eastman-Rush Foundation Carnation, WABoise YMCA Boise, ID Gateway Athletic Club Seattle, WALittle Creek Casino and Hotel Shelton, WA Menominee Casino Resort Green Bay, WIUniversity of Idaho Moscow, ID Sumner School District Sumner, WASeattle University Seattle, WA Seattle Pacific University Seattle, WAWest Seattle YMCA Seattle, WA Highline Club Burien, WAThe Spokane Club Spokane, WA Bellevue Athletic Club Bellevue, WAPro Club Redmond, WA Providence Point Issaquah, Menominee Casino Resort Kaneas, WI Edmonton Mall Edmonton, ABCity of Crescent City Crescent City, CA Nez Perce Casino Resort Lewiston, IDCity of Seattle, Evens Pool Seattle, WA Coeur D’Alene Casino Resort Coeur D’Alene, IDNSR Project Seattle, WA Lincoln Center Towers Pool Bellevue, WA

New Indoor Aquatic, Recreational and Sports Facilities (European Projects)

Urach Resort West Germany Ohain Center BelgiumRotterdam Aquatic/Sports Center Rotterdam Holland Leedam Aquatic Center Leedam, HollandNunspeet Aquatic Center Nunspeet, Holland Winschoten Aquatic Center Winschoten, Holland

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 9: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance New and Renovated Outdoor Aquatic, Recreation and Sports Facilities

City of Connell Connell, WA City of Goldendale Goldendale, WA City of Moxee Moxee, WA City of Yakima Yakima, WACity of Everett Everett, WA City of Selah Selah, WACity of Othello Othello, WA City of Renton Renton, WACity of Clarkston Clarkston, WA City of Douglas Douglas, AZCity of Lewiston Lewiston, ID Condon School District Condon, ORNaches Park & Recreation District Naches, WA Hermiston School District Hermiston, ORButterfield Resort & Water Park Temecula, Ca Enchanted Village Federal Way, WA Wild Waves Federal Way, WA City of Rupert Rupert, IDBirch Bay Water Park Birch Bay, WA Soledad Canyon Resort Acton, CAThe Breakers Tucson, AZ Harbor Point Birch Bay, WAArizona State Univesity Tempe, AZ Klahaya Swim Club Edmonds, WAIssaquah Highlands Resort Issaquah, WA Triangle Swim Club Bellevue, WASamena Club Bellevue, WA Aqua Club Seattle, WAHilltop Community Association Bellevue, WA Eugene Tennis Club Eugene, ORCamp Arnold Eatonville, WA U.S. Navy San Diego, CAU.S. Navy Oak Harbor, WA Arbor Heights Swim Club Seattle, WACity of Prosser Prosser, WA Lake Conner Park Lake Stevens, WA

Energy Audits, Facility Audits, Feasibility Studies, Community Surveys, Marketing Plans, Grant Applications and Funding Alternatives

City of Seattle Seattle, WA City of Bremerton Bremerton, WACity of Tukwila Tukwila, WA City of Valdez Valdez, AKCity of Petersburg Petersburg, AK City of Shoreline Shoreline, WACity of Grandview Grandview, WA City of Newberg Newberg, ORCity of Tualatin Tualatin, OR City of Salem, Salem, ORCity of Spokane Spokane, WA Bremerton Housing Authority Bremerton, WACity of Yakima Yakima, WA City of Portland Portland, ORCity of Raymond Raymond, WA City of Quincy Quincy, WACity of Ephrata Ephrata, WA City of Othello Othello, WACity of Anchorage Anchorage, AK City of Douglas Douglas, AZCity of Billings Billings, MT City of Moses Lake Moses Lake, WACity of Woodburn Woodburn, OR City of Orofino Orofino, IDCity of Lewiston Lewiston, ID City of Selah Selah, WACity of Zillah Zillah, WA City of Clarkston Clarkston, WACity of Hoquiam Hoquiam, WA Douglas County East Wenatchee, State of Idaho Boise, ID Clark County Las Vegas, NVCity of Lakeview Lakeview, OR City of Kettle Falls Kettle Falls, WACity of Moxee Moxee, WA Eastman-Rush Memorial Foundation Carnation, WANorthwest Aquatic Foundation Federal Way, WA City of Crescent City Crescent City, CACity of Bellevue Bellevue, WA City of Grangeville Grangeville, IDCity of Astoria Astoria, OR City of Silverton Silverton, ORCity of Hamilton Hamilton, MT City of Helena Helena, MTCity of Belgrade Belgrade, MT City of Grandview Grandview, WACity of Kendrick Kendrick, ID City of Rupert Rupert, IDSeattle Pacific University Seattle, WA Central Washington University Ellensberg, WASeattle University Seattle, WA University of Washington Seattle, WACollege of Idaho Caldwell, ID University of Alaska Anchorage, AKHaines School District Haines, AK Hermiston School District Hermiston, ORFerndale School District Ferndale, WA North Bend School District North Bend, ORMonroe Park & Recreation District Monroe, WA Sunset Park & Recreation District Seaside, ORPrescott Park & Recreation District Prescott, WA Oaksdale Park & Recreation District Oaksdale, WANorthwest Park & Recreation District Blaine, WA Quilliyute Parks & Recreation District Forks, WAVictoria Park & Recreation District Victoria, B.C. Selah Recreation Service Area Selah, WAK & J Park & Recreation District Lewiston, ID St. Helens Park & Recreation District St. Helens, ORRavalli Park & Recreation District Corvallis, MT George Fox University Newberg, ORLewis & Clark State College Lewiston, ID Walla Walla College Walla Walla, WAInn at Semi-Ah-Moo Resort Blaine, WA Grays Harbor Resort Aberdeen, WAMarriott Resident Hotel Seattle, WA Marriott Resort Hotel Sea Tac, WASand Pointe Resort Sand Pointe, ID Riggins Hot Springs Resort Riggins, IDSmugglers Notch Resort Cambridge, VT Moon Valley Country Club Phoenix, AZSea Pointe Village Resort Wildwood, NJ Sutherlin Knoll Golf & Recreation Southerlin, OR

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 10: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance Flying M Guest Ranch Yamhill, OR The Breakers Water Park Tucson, AZBlack Mountain Guest Ranch Deming, WA St. Martin Hotel and Spa Resort Stevenson, WAGateway Athletic Club Seattle, WA Bellevue Athletic Club Bellevue, WAThe Spokane Club Spokane, WA Oregon Athletic Club Portland, ORSamena Club Bellevue, WA Aqua Club Kenmore, WACoastal Fitness Center Florence, OR Del Norte County Fair Crescent City, CASun River Home Owner's Association Sun River, OR Hec Edmundson Pavilon Seattle, WA

Don Carey, Aquatics Specialist

Don Carey is a recognized expert in aquatic and recreation, resorts, sports and fitness facilities. He provides consultation services for design, design support, mechanical and chemical systems, construction management, master plans, feasibility studies, comprehensive plans, financial planning, grant writing community surveys, project coordination, facility programming, and staff training. Don has been involved with public and private administration, environmental management, facility design support, facility programming and staff training for more than 40 years. Don was previously the director for one of the nation’s largest aquatic agencies, including county indoor and outdoor pools and swimming beaches throughout the Puget Sound, Washington region.

As an adjunct professor at four different universities, he has lectured on facility design, management, funding, budget and motivation. Having coached national swimming champions, he is the author of four books on aquatic recreation and numerous articles in professional trade journals.

EducationGeorge Fox University, Undergraduate and Graduate workSanta Ana College, Certified Pool Operator

Instructor and LecturerUniversity of Wisconsin, George Fox University, Central Washington University, Seattle Pacific University, Seattle University, Aquatic Management School, CPO Instructor, Guest Lecturer at 48 Different Conferences.

Summary of Design Experience

• City of Woodburn, WA, New Indoor Aquatic Center – Project Manager• Riggins Hot Springs Resort, Riggings, ID, Spa and Pools – Project Manager• Central Klickitat County Park & Recreation District Swimming Pool Renovation, Goldendale, WA –

Aquatic Design Consultant• Panorama City, Lacey, WA, New Indoor Aquatic Center – Aquatic Project Manager • City of Craig, AK, New Indoor Aquatic/Recreation Complex – Project Manager• City of Selah, WA, Renovation Outdoor Pool – Project Manager• City of Rupert Fundraising and Swimming Pool Renovation, Rupert, ID – Project Manager• Kamiak High School, Mukilteo, WA, New Aquatic Center – Aquatic Design Consultant• Parkrose High School, OR, New Indoor Aquatic Center – Aquatic Design Consultant• Moon Valley Country Club, Phoenix, AZ, Outdoor Aquatic & Sports Center – Project Manager• Wild Wave Water Park, Federal Way, WA – Project Manager• Northern Arizona University, Indoor Aquatic Center – Aquatic Design Consultant

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 11: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance • City of Fife, WA, New Indoor Aquatic Center – Aquatic Design Consultant• YMCA/Baker City, OR, New Indoor Aquatic Complex – Aquatic Design Consultant• Hermiston School District, OR, New Indoor/Outdoor Aquatic Center – Project Manager• Providence Point, Issaquah, WA, Renovation Indoor Pool – Project Manager• Sunriver Resort, Bend, OR, Renovation Outdoor Pools – Project Manager• Haines School District, AK, New Indoor Aquatic Facility – Project Manager

Melchor E. Berona, PE, LEEDAP – Principal, Lead Mechanical Engineer

Melchor has over 29 years of mechanical engineering and design experience. His design emphasis is on heat recovery, steam heating, energy conservation systems and hydronic cooling and heating for both renovation and new construction projects. His designs include state-of-the-art temperature and environmental controls for fully computerized building automation systems. He has particular expertise in HVAC systems upgrades in older buildings, mechanical systems troubleshooting, building surveys, evaluations and retro-commissioning.

EducationB.S.M.E., University of Washington, 1979

Professional Memberships and RegistrationsAmerican Society of Heating, Refrigeration, and Air Conditioning (ASHRAE), Architectural for Health Panel (AHP), Building Commissioning Assoc. (BCA) and North Seattle Community College HVAC-Technical Advisory Committee, LEED Certified. Registered in; Washington, Alaska, California, Idaho, Oregon, Nevada, Wisconsin, Hawaii, Arizona, Mississippi and Virgin Islands.

Summary of Design ExperienceNez Perce Tribe Casino, Lewiston, ID. Principal-In-Charge (P.I.C.) and mechanical engineer for the mechanical engineering services for the new 185,000 square foot casino facility, which includes gaming, kitchen, dining, lobby, administration, maintenance, meeting room, swimming pool, spa and support areas. The building also includes a 2-story hotel, 85 guest rooms and 4 suites.

Coeur D'Alene Tribal Casino, Coeur D'Alene, ID. Mechanical Engineer for the 90,000 square foot addition/renovation to the existing 55,000 square foot facility, including gaming area, bingo hall, multi-purpose assembly room, swimming pool and spa areas, kitchen/dining area and slot machine area. Our design included new HVAC, plumbing, fire sprinkler and DDC controls.

Green Lake Community Center/Evans Pool Improvements, Seattle, WA. Melchor was the Mechanical Engineer responsible for the design upgrades including swimming pool ventilation and heat recovery improvements.

Menominee Casino Resort, Keshena, WI. Mechanical Engineer for the new addition/renovation to the existing facility, including new gaming area, bingo hall, multi-purpose conference rooms, provided the design for the HVAC, filtration, chemical and circulation systems for the swimming pool, spa and water features, kitchen/dining area, and slot machine area. Our design included new HVAC, plumbing, fire sprinkler and DDC controls for the new additions and the new hotel rooms.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 12: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance Hec-Edmundson Pavilion Study and Renovation. Project Mechanical Engineer for systems survey and report evaluating existing conditions for a future upgrade. Provided complete mechanical engineering design services for full renovation of the facility. The building was fully gutted and new heating, ventilation, air distribution, plumbing and air conditioning was designed.

Fort Warden State Park – Dining Facility. The new facility consisted of four large meeting rooms, lobby entrance, cafe and full size kitchen along with administrative offices. The HVAC systems included a four pipe hydronic chilled water and boiler systems. The systems are DDC controlled. The facility included eight central air handlers, one make-up air unit, five exhaust fans, boiler system and air-cooled chiller along with circulation pumps. We provided the test plan and performed all the systems functional performance tests and all systems check-out. All work and records were consolidated into one packaged for submittal.

King County Airport Terminal. The project consisted of a major retrofit of the historical facility. The second floor was renovated for the airport administration offices; the first floor housed the US Customs, Immigration and USDA offices, holding/interview rooms and inspection areas. The North portion reused two main multi-zoned air conditioners. The areas they served were fully renovated with new systems and DDC controls. The south portion was provided a new single packaged multi-zoned air conditioner. The areas served by the new AC unit were fully renovated with new systems and DDC controls. We provided a test plan, pre-functional and functional performance testing.

Rey Delansig, PE, Senior Mechanical Engineer/Project Manager

Rey is proficient in HVAC and plumbing design systems for commercial and institutional establishments. Typical duties include load calculation, system layout, equipment sizing and selection, specification preparation, project coordination with other disciplines including clients, project jurisdiction officials and equipment vendors. His design emphasis is on heat recovery, steam heating, and energy conservation systems, hydronic cooling, plumbing/piping and heating for both renovation and new construction projects. Rey also provides senior level project construction inspection and support to ensure that projects are constructed in accordance with the design documents.

EducationB.S.M.E., Manila, Philippines

Professional MembershipsAssociation of Filipino-American Engineers of Washington (AFEW): Current PresidentRegistered in Washington State

Summary of Design ExperienceMenominee Casino Resort, Keshena, WI. Mechanical Engineer for the new addition/renovation to the existing facility, including new gaming area, bingo hall, multi-purpose conference rooms, provided the design for the HVAC, filtration, chemical and circulation systems for the swimming pool, spa and water features, kitchen/dining area, and slot machine area. Our design included new HVAC, plumbing, fire sprinkler and DDC controls for the new additions and the new hotel rooms.

Camp Kalsman, Arlington, WA. Provided mechanical and plumbing design for a multi-building educational camp for youths. The buildings included faculty housing, staff housing, dormitory cabins, dining/kitchen, pool and administration located within a 300 acre property. Mechanical Engineer.

Heritage Hills Homeowners Association. Provided mechanical engineering to renovate the swimming pool and wading pool, including new piping main drains, filtration, and chemical and heating systems. Mechanical Engineer.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 13: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance Lake Connor Park, Lake Stevens, WA. Mechanical design for the new outdoor swimming pool piping, filtration, chemical and heating systems. Renovation of the existing bathhouse including the plumbing and ventilation systems. Mechanical Engineer.

Triangle Club, Bellevue, WA. Provided mechanical and plumbing design for new athletic club. Scope of work included ventilation & heating design for two story building including men and women’s locker/toilet room and pool. Mechanical Engineer.

Klahaya Swim and Tennis Club, Edmonds, WA. Provided mechanical and plumbing design for new athletic club. Scope of work included ventilation & heating design for locker rooms, lobby area, new family changing area main and wading pool. Mechanical Engineer.

NSR Project, Seattle, WA. Mechanical engineering services for the indoor/outdoor pool, spa and water features. Project included the HVAC system, filtration, pool heating and chemical systems. Mechanical Engineer.

Lincoln Center Towers, Bellevue, WA. Provided engineering services for the HVAC and plumbing systems for the indoor swimming pool. Mechanical Engineer.

Matsui Residence Pool, Redmond, WA. Provided mechanical and plumbing design for new residential pool, and landscape water features. Mechanical Engineer.

St. Joseph Hospital Peace Health S. Campus, Bellingham, WA. HVAC addition to St. Joseph Hospital South Campus in Bellingham. Preparation of construction documents for mechanical permit and construction, which included drawings, load calculations for equipment sizing, preparing of the NREC forms and specifications placed on the drawings. Mechanical Engineer.

140th Ave. NE Apartment Complex, Woodinville, WA. Mechanical design for plumbing and ventilation for multiple buildings within a 485-unit apartment complex with a parking garage below. This project also included a tenant clubhouse with a kitchen and bathrooms. Mechanical Engineer.

Redmond Ridge Retail, Redmond, WA. Mechanical Design for permit set on shell/core and basic T.I. layout for a 7,500 square foot retail space. Service included load calculations for equipment sizing, preparing of the mechanical NREC forms and review of contractor submittals. Mechanical Engineer.

Hyatt Hotel, Seattle, WA. Mechanical Design for permit set on new indoor pool. Fee included load calculations for equipment sizing, preparing of the mechanical NREC forms and review of contractor submittals. Mechanical Engineer.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 14: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Thomas Hammond, PE, Structural Engineer

Mr. Hammond directs structural designs and investigations for private and public clients. He has developed special expertise in designing marine related structures, and also has design experience with cold region engineering due to involvement with numerous projects in Alaska. Mr. Hammond has special expertise and interest in historic renovation, and has been the structural engineering member of the Seattle Landmarks Preservation Board for the last six years.

EducationB.S.C.E., University of Washington, 1958Civil Engineering, Post Graduate Study in Hydraulics StructuresUniversity of Washington, 1960, 1968

Professional Memberships and RegistrationsProfessional Structural EngineerRegistered in; Washington, Alaska, Arizona, Hawaii, Missouri, Nevada, New Mexico, Oregon, and Utah.

Summary of Design ExperienceLittle Creek Hotel & Resort indoor Pool, Spa, Shelton, WACity of Rupert, Rupert, ID - Indoor aquatic recreation CenterMenominee Casino & Resort - Indoor leisure pool, spa, sauna and water fallsPanorama City Retirement Center, Lacey, WA - New indoor aquatic and fitness centerProvidence Point Indoor Swimming Pool Renovation, Issaquah, WAClub Continental Outdoor Pool, Seattle, WAJuanita Racquetball Club and Indoor Pool, Kirkland, WAMill Creek Swimming Indoor Pool, Mill Creek, WAAnchorage Tennis Club and Indoor Pool, Anchorage, AK

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 15: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance Camp Arnold, Eatonville, WA - Renovated existing outdoor swimming pool, new 1000 sq. ft. play pool with water toys, and 60 ft. water slide. City of Craig Swimming Pool, Craig, AK - 25 yd indoor pool, play pool with water toys, spa, sauna and weight room and 55 ft. waterslide Sunset Empire Park & Recreation District, Seaside, OR - renovation of the existing indoor pool, new indoor 55 ft. waterslide, spa and warm water therapy poolParkrose School District High School Indoor competition pool, Portland, ORAthletic Club of Bend, Bend, OR - 8 lane 25 meter pool and zero depth play pool with water toys, and family spaSellwood Outdoor Swimming Pool, Portland, OR - renovated existing pool by adding water toys and water slideMoon Valley Country Club, Phoenix, AZ - 50 Meter Outdoor Pool with bulkhead, zero entry play pool with water toys, diving tank with 3 and 1 meter diving boards, indoor spa, sauna, gymnasium, racquetball courts, 10 outdoor tennis courts, and indoor and outdoor concession areas Gateway Athletic Club, Seattle, WA - new indoor pool and spaSun River Resort, Sun River, OR - Renovation of two outdoor swimming pools, water toys and 55 ft. waterslide City of Connell Outdoor Swimming Pool, Connell, WA - L shape pool, zero depth play pool/water toys/50 ft. slideCity of Raymond, Raymond, WA - Renovation of the existing swimming pool and bathhouse, new play pool with water toys and 50 ft. water slideAll Star Fitness Club, Seattle, WA - indoor pool, and spaWoodinville Athletic Club, Woodinville, WA - indoor pool, spa, kiddy pool, steam room and saunaKlahaya Swim & Tennis Club, Edmonds, WA - Renovation of existing outdoor pool, wading pool and bathhouse.

Cody Butcher, CPRP

Cody Butcher has been involved in aquatic and recreation for more than 10 years, specializing in management and maintenance for leisure parks, including budgeting, staff training and operations. Mr. Butcher is presently the aquatic director for the Great Wolf Lodge in Grand Mound, WA. His responsibilities include the management and operations of the only large indoor water park in the Pacific Northwest. The facility has a wave pool, water slides, play pools, restaurants, and a hotel.

EducationBA, Leisure Services, Minor Business Management, Metropolitan State College of Denver, CO

Professional MembershipsCertified Parks and Recreation ProfessionalCertified Pool Operator and Aquatic Facilities OperatorNational Parks and Recreation AssociationWashington Recreation and Parks AssociationNational Playground Safety InspectorEllis & Associates International Lifeguard Training Program InstructorAmerican Red Cross Certification

Representative ServicesDirector of Parks & Recreation for the City of Prosser, WAConsultant, Highland Ranch Community Association, Highlands Ranch, Co indoor/outdoor leisure facility.Consultant, Water World, Federal Heights, CO, 65 acre Water Park.

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 16: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 17: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Regulatory Agency Knowledge

Berona Engineers has performed numerous projects within local cities as both lead consultant and subconsultant where we have successfully worked with regulatory agencies to secure permits. Historically, over 65% of our work experience has been with public agencies involving administrative review and permitting processes.

Sustainable Design Practices

BCAA has three LEED Certified Professionals on-staff available to work with clients to create sustainable and cost effective buildings. BCAA is familiar with many sustainable design guidelines and programs and have experience with LEED. We understand that sustainable design requires cost effective, high performance systems tuned to work in harmony with the entire building and balancing occupant comfort with the natural environment.

Added Value

Extensive pool experience

Full-service aquatic services

Familiar with public agencies in Washington Oregon, California, Arizona, Idaho, Wyoming, Montana

and Alaska.

Energy conservation analysis

MBE Certified firm

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178

Page 18: Aquatic Alliance Brochure 2009

Berona Carey Aquatic Alliance

Contact Information

Aquatic/Recreation Office: Consulting Services

Structural Engineering Services

Address: 2302 R Street S.E., #58

Auburn, WA 98002

Phone: (425) 894-1826

Fax: (206) 575-2178

Email: [email protected]

Main Office: Mechanical Engineering Services

Address: 4630 200th Street SW, Suite C

Lynnwood, WA 98036

Phone: (425) 744-6033

Fax: (425) 744-6322

Email: [email protected]

Berona Carey Aquatic Alliance 2302 R Street S.E., #58 Auburn, WA 98002 p (425) 894-1826 f (206) 575-2178